CN218148385U - Precast concrete foundation ditch bank protection - Google Patents

Precast concrete foundation ditch bank protection Download PDF

Info

Publication number
CN218148385U
CN218148385U CN202222186722.3U CN202222186722U CN218148385U CN 218148385 U CN218148385 U CN 218148385U CN 202222186722 U CN202222186722 U CN 202222186722U CN 218148385 U CN218148385 U CN 218148385U
Authority
CN
China
Prior art keywords
prefabricated
slope
drain pipe
anchor rod
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222186722.3U
Other languages
Chinese (zh)
Inventor
陈雁云
郭宝圣
沈伟
冉垂正
曾宇廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202222186722.3U priority Critical patent/CN218148385U/en
Application granted granted Critical
Publication of CN218148385U publication Critical patent/CN218148385U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a precast concrete foundation pit slope protection, which comprises a plurality of rectangular precast concrete plates, wherein a steel bar net is arranged in each precast concrete plate, the top surface of each precast concrete plate is provided with 4 lifting rings, the lower ends of the lifting rings are pre-embedded in concrete and welded with the steel bar net, and each precast concrete plate is provided with a plurality of preformed holes; a plurality of prefabricated plates are fully paved on the side slope of the foundation pit, and waterproof rubber strips are embedded in gaps between adjacent prefabricated plates; an anchor rod is arranged in each preformed hole, the anchor rod is inserted into slope rock soil at an angle vertical to the slope surface, and cement mortar is filled in a gap between the anchor rod and the preformed hole. The utility model discloses construction bank protection is fast, the recoverable used repeatedly of prefabricated plate.

Description

Precast concrete foundation ditch bank protection
Technical Field
The utility model belongs to the technical field of the civil engineering construction, a protection construction of foundation ditch side slope is related to, concretely relates to precast concrete foundation pit bank protection.
Background
When the underground infrastructure is built, a deeper foundation pit is usually required to be excavated, and the construction period is longer. Because undisturbed soil is disturbed when the foundation pit is excavated, slope protection is required to be carried out in order to avoid collapse of the foundation pit slope. The conventional method is to lay a reinforcing mesh on the side slope and then spray a layer of concrete to form the slope protection, so that the field construction amount is large, the process is complex, the side slope protection is not timely due to slow construction progress, and required consumables cannot be recycled, so that great waste is caused.
Disclosure of Invention
The utility model aims at the above-mentioned problem, a precast concrete foundation ditch bank protection is provided for bank protection construction progress to it is extravagant to reduce the material, reduces construction cost.
The technical scheme of the utility model as follows:
the utility model provides a precast concrete foundation pit bank protection which characterized in that: the concrete prefabricated slab comprises a plurality of rectangular concrete prefabricated slabs, wherein a steel bar net is arranged in each prefabricated slab, 4 hanging rings are arranged on the top surface of each prefabricated slab corresponding to 4 corners, the lower ends of the hanging rings are embedded in concrete and welded with the steel bar net, a plurality of anchor rod through holes are formed in each prefabricated slab, and the anchor rod through holes are perpendicular to the slab surface of the prefabricated slab; a plurality of prefabricated plates are fully paved on a foundation pit slope, waterproof rubber strips are embedded in gaps between adjacent prefabricated plates, an anchor rod is arranged in each anchor rod through hole on each prefabricated plate, the anchor rod is inserted into slope rock soil at an angle vertical to the slope surface, and cement mortar is filled in gaps between the anchor rods and the anchor rod through holes.
Furthermore, according to the precast concrete foundation pit revetment, each precast slab is provided with at least one drain pipe preformed hole, a drain pipe penetrates through each drain pipe preformed hole, the drain pipe is made of a PVC pipe, the pipe wall of the drain pipe is provided with a plurality of water seepage holes, coarse sand is filled in the drain pipe, the rear end of the drain pipe is inserted into the rock soil of the side slope to a certain depth, and the front end of the drain pipe protrudes out of the precast slab and inclines towards the lower side of the side slope.
The utility model discloses the prefabricated plate that adopts can be processed at the back, and fortune is on the side slope to on-the-spot direct mount, and the bank protection construction speed is fast, can dismantle used repeatedly with the prefabricated plate after underground works accomplishes moreover, and it is extravagant to reduce the material.
Drawings
Fig. 1 is a schematic view of a local plane structure of a revetment according to the present invention;
FIG. 2 is a schematic view of a partial cross-sectional structure of the prefabricated panels;
fig. 3 is the utility model discloses a local facade structure schematic diagram of bank protection.
Detailed Description
As shown in fig. 1, 2 and 3, the utility model comprises a plurality of rectangular concrete precast slabs 1, a steel bar net 11 is arranged in each precast slab, 4 rings 12 are arranged on the top surface of each precast slab corresponding to 4 corners, the lower ends of the rings are pre-embedded in the concrete and welded with the steel bar net, a plurality of anchor rod through holes 13 are arranged on each precast slab, and the anchor rod through holes are vertical to the slab surface of the precast slab; a plurality of precast slabs are fully paved on a foundation pit slope, waterproof rubber strips 2 are embedded in gaps between adjacent precast slabs, an anchor rod 3 is arranged in each anchor rod through hole on each precast slab, the anchor rod is inserted into slope rock soil at an angle vertical to the slope surface, and cement mortar is filled in gaps between the anchor rods and the anchor rod through holes.
The utility model discloses during the concrete implementation, still can still be equipped with at least one outlet pipe preformed hole 14 on every prefabricated plate, when the prefabricated plate was laid on the side slope, wear to establish a outlet pipe 4 in every outlet pipe preformed hole, the outlet pipe adopts the PVC pipe, opens a plurality of infiltration holes on the pipe wall, coarse sand in the filling in the outlet pipe, certain degree of depth in the outlet pipe rear end inserted the side slope ground, the outlet pipe front end is outstanding outside the prefabricated plate and to the slope below slope.
When the precast slab of the utility model is poured, the anchor rod through hole and the drain pipe preformed hole on the precast slab are formed by adopting a PVC pipe, a certain inclination angle is preset between the drain pipe preformed hole and the precast slab surface, and the inclination angle is smaller than the slope angle of the side slope to be constructed, so that when the drain pipe is inserted into the preformed hole, the drain pipe can incline towards the lower part of the side slope; the lifting ring is U-shaped by bending the plain steel bars, two ends of the lifting ring are welded with the steel bar net before concrete pouring, the top of the lifting ring is higher than the top surface of the prefabricated plate by a certain height, and the prefabricated plate can be lifted by a crane through the lifting ring.
During construction, the prefabricated plates are paved from the bottom of the foundation pit slope to the top row by row; when the precast slabs are provided with the preformed holes of the water drain pipes, when each precast slab is laid, the water drain pipes are firstly embedded into the side slope soil body according to the positions of the holes of the water drain pipes, and then the front ends of the water drain pipes penetrate out of the precast slabs; and after each row of prefabricated plates are laid, laying a waterproof rubber strip at the top of one row, then laying the next row upwards, and ensuring that the bottom edges of the upper row of prefabricated plates compress the rubber sealing strips at the top edges of the lower row of prefabricated plates. After the prefabricated slabs are completely laid, anchor rods are arranged in the through holes of the anchor rods, mortar is poured into the through holes of the anchor rods, and waterproof rubber strips are embedded into vertical seams of the left prefabricated slabs and the right prefabricated slabs which are adjacent to each other, so that foundation pit slope protection construction is completed. And after the underground engineering construction is finished, the prefabricated slab is dismantled and recycled for reuse.

Claims (2)

1. The utility model provides a precast concrete foundation pit bank protection which characterized in that: the concrete prefabricated slab comprises a plurality of rectangular concrete prefabricated slabs, wherein a steel bar net is arranged in each prefabricated slab, 4 hanging rings are arranged on the top surface of each prefabricated slab corresponding to 4 corners, the lower ends of the hanging rings are embedded in concrete and welded with the steel bar net, a plurality of anchor rod through holes are formed in each prefabricated slab, and the anchor rod through holes are perpendicular to the slab surface of the prefabricated slab; a plurality of prefabricated plates are fully paved on a foundation pit side slope, waterproof rubber strips are embedded in gaps between every two adjacent prefabricated plates, an anchor rod is arranged in each anchor rod through hole in each prefabricated plate, the anchor rods are inserted into side slope rock soil at an angle perpendicular to the slope surface, and cement mortar is filled in gaps between the anchor rods and the anchor rod through holes.
2. The precast concrete foundation pit protection slope according to claim 1, characterized in that: each prefabricated plate is also provided with at least one drain pipe preformed hole, a drain pipe penetrates through each drain pipe preformed hole, the drain pipe is made of a PVC pipe, the pipe wall of the drain pipe is provided with a plurality of water seepage holes, coarse sand is filled in the drain pipe, the rear end of the drain pipe is inserted into slope rock soil to a certain depth, and the front end of the drain pipe protrudes out of the prefabricated plate and inclines towards the lower side of the slope.
CN202222186722.3U 2022-08-19 2022-08-19 Precast concrete foundation ditch bank protection Active CN218148385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222186722.3U CN218148385U (en) 2022-08-19 2022-08-19 Precast concrete foundation ditch bank protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222186722.3U CN218148385U (en) 2022-08-19 2022-08-19 Precast concrete foundation ditch bank protection

Publications (1)

Publication Number Publication Date
CN218148385U true CN218148385U (en) 2022-12-27

Family

ID=84552486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222186722.3U Active CN218148385U (en) 2022-08-19 2022-08-19 Precast concrete foundation ditch bank protection

Country Status (1)

Country Link
CN (1) CN218148385U (en)

Similar Documents

Publication Publication Date Title
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN104727302B (en) Board wall cast-in-place construction technique between a kind of friction pile stake
CN110159294B (en) Construction method for lengthening open cut tunnel at tunnel junction section of high and steep terrain bridge
CN104452829A (en) Piled raft foundation anti-floating structure and construction method
CN214993554U (en) Hydraulic engineering's side slope reinforced structure
CN107386317A (en) Foam concrete lightweight barricade and construction method are excavated after a kind of first precompressed of deep ultra-soft soil
WO2023213117A1 (en) Widening structure and construction method for existing subgrade embankment wall section near river
CN107090837A (en) Pit-in-pit reinforced concrete retaining wall composite supporting structure and construction method thereof
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN203160254U (en) Pit support structure
CN212272234U (en) High-strength combined template for open groove section of large-section inclined shaft
CN217760383U (en) Enclosure structure arranged on slope support
CN218148385U (en) Precast concrete foundation ditch bank protection
CN114164726B (en) Local deep excavation backfill structural roadbed and rapid construction method
CN207331699U (en) Pit-in-pit reinforced concrete retaining wall composite supporting structure
CN114922195A (en) Construction method of soft soil deep and large foundation pit adjacent to protected object
CN114657851A (en) Roadbed disposal method for river pond area crossing
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN204551521U (en) The cast-in-place construction structure of board wall between a kind of antislide pile stake
CN211421139U (en) Shield constructs well crown beam bearing structure
CN110863496B (en) Method for replacing, supporting, excavating and constructing arch center foundation by concrete supporting in stone-filled island building area
CN112813996A (en) Construction method of deepwater cast-in-place concrete cofferdam
CN111577330A (en) Construction method for open channel section of large-section inclined shaft and high-strength combined template thereof
CN115305921A (en) Construction method for precast concrete foundation pit slope protection
CN206916773U (en) Foam concrete lightweight barricade is excavated after the first precompressed of deep ultra-soft soil