CN217631220U - Construction frame reinforcing apparatus - Google Patents

Construction frame reinforcing apparatus Download PDF

Info

Publication number
CN217631220U
CN217631220U CN202221754000.7U CN202221754000U CN217631220U CN 217631220 U CN217631220 U CN 217631220U CN 202221754000 U CN202221754000 U CN 202221754000U CN 217631220 U CN217631220 U CN 217631220U
Authority
CN
China
Prior art keywords
hoop
centre gripping
staple bolt
gripping subassembly
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221754000.7U
Other languages
Chinese (zh)
Inventor
方鹏
彭俊凤
管清晨
师飞
宋凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xinyijia Decoration Technology Co ltd
Original Assignee
Shandong Xinyijia Decoration Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xinyijia Decoration Technology Co ltd filed Critical Shandong Xinyijia Decoration Technology Co ltd
Priority to CN202221754000.7U priority Critical patent/CN217631220U/en
Application granted granted Critical
Publication of CN217631220U publication Critical patent/CN217631220U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a construction frame reinforcing apparatus, including first staple bolt and second staple bolt, first staple bolt comprises first hoop and second hoop, and the second staple bolt comprises third hoop and fourth hoop, the right-hand member of first hoop is provided with first centre gripping subassembly, and the left end of second hoop is provided with second centre gripping subassembly, and first centre gripping subassembly includes first snap ring and first clamp, and second centre gripping subassembly includes second snap ring and second clamp. This construction scaffold reinforcing apparatus utilizes first staple bolt to fix on the montant surface, is utilizing first centre gripping subassembly to centre gripping the right side horizontal pole afterwards, and the horizontal pole centre gripping of left side is with second centre gripping subassembly, because first staple bolt, first centre gripping subassembly and second centre gripping subassembly formula as an organic whole to can assemble montant, left side horizontal pole and right side horizontal pole on the device, strengthen stability, avoided first staple bolt, first centre gripping subassembly and second centre gripping subassembly at the gliding problem in steel pipe surface.

Description

Construction frame reinforcing apparatus
Technical Field
The utility model relates to a scaffold consolidates technical field, specifically is a construction scaffold reinforcing apparatus.
Background
The existing construction frame is assembled into a whole by a plurality of independent hoops, but when the independent hoops are connected unstably, the hoops are easy to slide on the surface of a steel pipe, so that potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction frame reinforcing apparatus to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a construction scaffold reinforcing apparatus, includes first staple bolt and second staple bolt, and first staple bolt comprises first hoop and second hoop, and the second staple bolt comprises third hoop and fourth hoop, the right-hand member of first hoop is provided with first centre gripping subassembly, and the left end of second hoop is provided with second centre gripping subassembly, and first centre gripping subassembly includes first snap ring and first clamp, and second centre gripping subassembly includes second snap ring and second clamp, is connected through supporting component between first staple bolt and the second staple bolt.
Preferably, the left end of the first clamping ring is fixedly connected with the right end of the first hoop.
Preferably, the right end of the second clamping ring is fixedly connected with the left end of the second hoop.
Preferably, the supporting component comprises a threaded cylinder, the inner wall of the threaded cylinder is in threaded connection with a threaded rod, and the lower end of the threaded cylinder and the upper end of the threaded rod are both rotatably connected with an opening frame.
Preferably, mounting holes are formed in the surfaces of the opening frame, the second hoop, the second clamping ring and the second clamping ring.
Preferably, the right end of the first hoop is fixedly connected with a reinforcing rib, and the other end of the reinforcing rib is fixedly connected with the lower end of the first clamping ring.
Advantageous effects
The utility model provides a construction frame reinforcing apparatus possesses following beneficial effect:
1. this construction scaffold reinforcing apparatus utilizes first staple bolt to fix on the montant surface, is utilizing first centre gripping subassembly to centre gripping the right side horizontal pole after that, and the left side horizontal pole centre gripping is with the second centre gripping subassembly, because first staple bolt, first centre gripping subassembly and second centre gripping subassembly formula as an organic whole to can assemble montant, left side horizontal pole and right side horizontal pole on the device, strengthened stability, avoided first staple bolt, first centre gripping subassembly and second centre gripping subassembly at the gliding problem in steel pipe surface.
2. This construction scaffold reinforcing apparatus fixes the second staple bolt on left side top horizontal pole, utilizes outside bolt to pass the mounting hole, can fix two opening frames respectively on the surface of second staple bolt and second centre gripping subassembly to usable supporting component supports left side horizontal pole and left side top horizontal pole, forms the down tube, further improvement the stability of scaffold.
Drawings
FIG. 1 is a schematic front view of the present invention;
fig. 2 is a schematic view of a three-dimensional structure of the first hoop of the present invention;
fig. 3 is the schematic view of the structure of the threaded cylinder of the present invention.
In the figure: 1 first clamp, 2 second clamp, 3 third clamp, 4 fourth clamp, 5 first clamps, 6 first clamps, 7 second clamps, 8 second clamps, 9 threaded rods, 10 opening frames, 11 strengthening ribs, 12 mounting holes, 13 montants, 14 right side horizontal poles, 15 left side horizontal poles, 16 left side top horizontal poles, 17 threaded cylinders.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a construction scaffold reinforcing apparatus, includes first staple bolt and second staple bolt, first staple bolt is by first armful hoop 1 and second armful hoop 2 constitute, it is as an organic whole to assemble first armful hoop 1 and second armful hoop 2 to usable first armful hoop 1 and second armful hoop 2 are with montant 13 centre gripping, the second staple bolt comprises third armful hoop 3 and fourth armful hoop 4, assemble third armful hoop 3 and fourth armful hoop 4 as an organic whole after, can make the second staple bolt fix the surface at left side top horizontal pole 16.
The right-hand member of first armful hoop 1 is provided with first centre gripping subassembly, the left end of second armful hoop 2 is provided with second centre gripping subassembly, first centre gripping subassembly includes first snap ring 5 and first clamp 6, the left end of first snap ring 5 and the right-hand member fixed connection of first armful hoop 1, put right side horizontal pole 14 in first snap ring 5, it is as an organic whole to utilize outside bolt to assemble first clamp 6 and first snap ring 5, thereby can be with the 14 centre grippings of right side horizontal pole, the right-hand member fixedly connected with strengthening rib 11 of first armful hoop 1, the other end of strengthening rib 11 and the lower extreme fixed connection of first snap ring 5, strengthening rib 11 can strengthen the intensity of first snap ring 5.
The second centre gripping subassembly includes second snap ring 7 and second clamp 8, the right-hand member of second snap ring 7 and the left end fixed connection of second clamp ring 2, with second snap ring 7 and second clamp 8 assembly back as an organic whole, can with left side horizontal pole 15 centre gripping between second snap ring 7 and second clamp 8, because first staple bolt, first centre gripping subassembly and second centre gripping subassembly formula as an organic whole, thereby can be with montant 13, left side horizontal pole 15 and right side horizontal pole 14 assembly on the device, and then strengthened montant 13, the stability of left side horizontal pole 15 and right side horizontal pole 14, first staple bolt has been avoided, first centre gripping subassembly and second centre gripping subassembly are at the gliding problem in steel pipe surface.
Be connected through supporting component between first staple bolt and the second staple bolt, supporting component includes a screw thread section of thick bamboo 17, and the inner wall threaded connection of a screw thread section of thick bamboo 17 has threaded rod 9, rotates the length of 9 adjustable threaded rods 9 of threaded rod, and the lower extreme of a screw thread section of thick bamboo 17 all rotates with the upper end of threaded rod 9 and is connected with opening frame 10, and mounting hole 12 has all been seted up on the surface of opening frame 10, second staple bolt, second snap ring 7 and second clamp 8.
Utilize outside bolt to pass mounting hole 12, can fix two opening frames 10 respectively on the surface of second staple bolt and second centre gripping subassembly to usable supporting component supports left side horizontal pole 15 and left side top horizontal pole 16, forms the down tube, further improvement the stability of scaffold.
The working principle is as follows: when the building scaffold reinforcing device is used, firstly, the vertical rod 13 is clamped by the first hoop clamping ring 1 and the second hoop clamping ring 2, the third hoop clamping ring 3 and the fourth hoop clamping ring 4 are assembled into a whole, the second hoop is fixed on the surface of the left upper cross rod 16, the first clamp 6 and the first clamp ring 5 are assembled into a whole, so that the right cross rod 14 can be clamped, then, the second clamp ring 7 and the second clamp ring 8 are assembled into a whole, the left cross rod 15 can be clamped between the second clamp ring 7 and the second clamp 8, as the first hoop, the first clamping component and the second clamping component are integrated, the vertical rod 13, the left cross rod 15 and the right cross rod 14 can be assembled on the device, the stability of the vertical rod 13, the left cross rod 15 and the right cross rod 14 is enhanced, an external bolt penetrates through the mounting hole 12, the two open frames 10 can be respectively fixed on the surfaces of the second hoop and the second clamping component, so that the left cross rod 15 and the left upper cross rod 16 can be supported by the supporting component, an inclined rod is further formed, and the stability of the scaffold is further improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction frame reinforcing apparatus, includes first staple bolt and second staple bolt, its characterized in that: first staple bolt is by first hoop (1) and second hoop (2) constitution, and the second staple bolt comprises third hoop (3) and fourth hoop (4), the right-hand member of first hoop (1) is provided with first centre gripping subassembly, and the left end of second hoop (2) is provided with second centre gripping subassembly, and first centre gripping subassembly includes first snap ring (5) and first clamp (6), and second centre gripping subassembly includes second snap ring (7) and second clamp (8), is connected through supporting component between first staple bolt and the second staple bolt.
2. A construction frame reinforcement as claimed in claim 1, wherein: the left end of the first clamping ring (5) is fixedly connected with the right end of the first hoop ring (1).
3. A construction frame reinforcing apparatus as claimed in claim 1, wherein: the right end of the second clamping ring (7) is fixedly connected with the left end of the second hoop (2).
4. A construction frame reinforcing apparatus as claimed in claim 1, wherein: the supporting component comprises a threaded cylinder (17), the inner wall of the threaded cylinder (17) is connected with a threaded rod (9) in a threaded mode, and the lower end of the threaded cylinder (17) and the upper end of the threaded rod (9) are connected with an opening frame (10) in a rotating mode.
5. A construction frame reinforcing apparatus as claimed in claim 4, wherein: mounting holes (12) are formed in the surfaces of the opening frame (10), the second hoop, the second clamping ring (7) and the second hoop (8).
6. A construction frame reinforcement as claimed in claim 1, wherein: the right-hand member fixedly connected with strengthening rib (11) of first clamp ring (1), the other end and the lower extreme fixed connection of first snap ring (5) of strengthening rib (11).
CN202221754000.7U 2022-07-07 2022-07-07 Construction frame reinforcing apparatus Expired - Fee Related CN217631220U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221754000.7U CN217631220U (en) 2022-07-07 2022-07-07 Construction frame reinforcing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221754000.7U CN217631220U (en) 2022-07-07 2022-07-07 Construction frame reinforcing apparatus

Publications (1)

Publication Number Publication Date
CN217631220U true CN217631220U (en) 2022-10-21

Family

ID=83632780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221754000.7U Expired - Fee Related CN217631220U (en) 2022-07-07 2022-07-07 Construction frame reinforcing apparatus

Country Status (1)

Country Link
CN (1) CN217631220U (en)

Similar Documents

Publication Publication Date Title
CN217631220U (en) Construction frame reinforcing apparatus
CN204662966U (en) One is waftd window formwork support structure
CN210216706U (en) Combined building supporting steel structure
CN212406037U (en) Assembly type building external hanging rack
CN217782488U (en) Supporting and connecting device for curtain wall installation
CN212224879U (en) Assembled plastics rail
CN215253443U (en) Steel construction architectural design trunk form pillar structure
CN206888490U (en) A kind of construction scaffold
CN216076614U (en) Protective railing
CN213418077U (en) Steel structure beam column connecting piece
CN213597474U (en) Scaffold connecting piece for building
CN210827849U (en) A assembled building frame for in construction
CN212176102U (en) Additional strengthening for steel construction
CN210219540U (en) Anti-wind-load stable landscape lamp mounting structure
CN215291063U (en) Stably-installed wooden stair post
CN218148880U (en) Steel structure anti-seismic frame structure
CN213476658U (en) Basket bracket structure is hung to bridge
CN214942204U (en) Telescopic heightening device for attached lifting scaffold
CN217208829U (en) Fixing support for line tower through-vision bench instrument
CN213445883U (en) Assembled building hoisting accessory
CN211057783U (en) Building concrete pipe pile
CN218406130U (en) Novel glass breast board
CN218149685U (en) Green energy-conserving construction frame reinforcing apparatus of using
CN212802051U (en) A antidetonation beam column structure for building
CN219219754U (en) Construction carrying frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221021