CN217630132U - Water stop steel plate structure - Google Patents

Water stop steel plate structure Download PDF

Info

Publication number
CN217630132U
CN217630132U CN202221878001.2U CN202221878001U CN217630132U CN 217630132 U CN217630132 U CN 217630132U CN 202221878001 U CN202221878001 U CN 202221878001U CN 217630132 U CN217630132 U CN 217630132U
Authority
CN
China
Prior art keywords
steel plate
plate body
water stop
water
end part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221878001.2U
Other languages
Chinese (zh)
Inventor
王恒
章俊
林道树
庞沛港
王瑞靖
拿旦木江·库尔班江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN202221878001.2U priority Critical patent/CN217630132U/en
Application granted granted Critical
Publication of CN217630132U publication Critical patent/CN217630132U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a water stop steel plate structure, which comprises a water stop steel plate body and a water stop steel plate end part formed at one end of the water stop steel plate body, wherein the water stop steel plate end part is bent to form a connecting groove; the end part of the water stop steel plate structure can partially extend into a connecting groove at the end part of the water stop steel plate matched with the end part of the water stop steel plate; and the joint of the end parts of the adjacent water stop steel plates is filled with waterproof paint. The utility model discloses a stagnant water steel sheet structure becomes the spread groove through buckling the formation in stagnant water steel sheet tip position, and two spread grooves are partly embedding each other in order to form into lock joint structure to pack waterproof coating in the gap, improve the sealed effect of stagnant water steel sheet junction and the stability of connecting with this, compare the welding, do not have the phenomenon of warping, welding and wearing, also reduced the potential safety hazard.

Description

Water stop steel plate structure
Technical Field
The utility model relates to a post-cast strip construction joint construction technology technical field especially relates to a stagnant water steel sheet structure.
Background
The water stop steel plate is a structure for preventing deep water by carrying out technical treatment on construction joints of a box foundation or a basement post-cast strip. In the prior art, when lower layer concrete is poured, 300mm by 3m steel plates are embedded in advance, 10-15 cm of upper parts of the 300mm by 3m steel plates are exposed outside, and the 300mm by 3m steel plates are poured together when next concrete is poured again, so that the water-stop steel plates have the function of preventing outside pressure water from permeating. Therefore, the water stop steel plate has higher requirement on welding nodes, and leakage points can not appear to influence the waterproof performance.
In order to avoid the connection between the water-stopping steel plates from appearing in deep water in the prior art, the connection between the water-stopping steel plates and the water-stopping steel plates is generally welded. However, when welding operation is carried out, the welding penetration and deformation of the water stop steel plate are caused by uneven local heating, so that the construction difficulty is increased, and the hidden danger of engineering quality is easy to exist.
Therefore, in view of the above technical problems, there is a need for those skilled in the art to develop a water stop steel plate structure.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an adjacent stagnant water steel sheet connects with the mode of lock joint, and fills and handle the stagnant water steel sheet structure in order to improve water-proof effects through water proof coating in the junction.
In order to achieve the above object, the present invention provides the following technical solutions:
the utility model discloses a stagnant water steel sheet structure, this stagnant water steel sheet structure includes:
a water stop steel plate body; and
the end part of the water stopping steel plate is formed at one end of the water stopping steel plate body, and the end part of the water stopping steel plate is formed into a connecting groove in a bending mode;
the end part of the water stop steel plate structure can partially extend into a connecting groove at the end part of one water stop steel plate matched with the end part of the water stop steel plate;
and waterproof paint is filled at the joint of the end parts of the adjacent water stop steel plates.
Further, the stagnant water steel sheet tip includes:
the first plate body forms an angle of 150 degrees with the water stop steel plate body;
the second plate body is formed at one end, far away from the water stop steel plate body, of the first plate body and is perpendicular to the first plate body; and
the third plate body is formed at one end, far away from the first plate body, of the second plate body and is perpendicular to the second plate body;
the space among the first plate body, the second plate body and the third plate body is the connecting groove.
Furthermore, the first plate body at the end part of the water stop steel plate can extend into the connecting groove at the end part of the water stop steel plate matched with the first plate body;
and the space between the third plate body and the inner wall of the connecting groove matched with the third plate body is configured into a waterproof space, and the waterproof space is filled with the waterproof coating.
Further, the end parts of the water stop steel plates which are matched with each other are fixed through a fastening structure;
the fastening structure includes:
the fastening bolt penetrates through the end part of the water stop steel plate along the direction vertical to the first plate body;
the periphery of the fastening bolt is provided with a rubber sleeve.
In the technical scheme, the utility model provides a pair of stagnant water steel sheet structure has following beneficial effect:
the utility model discloses a stagnant water steel sheet structure forms the spread groove through buckling in stagnant water steel sheet tip position, and two spread grooves part each other imbeds in order forming to the lock joint structure to pack waterproof coating in the gap, with this improve the sealed effect of stagnant water steel sheet junction and the stability of connecting, compare the welding, do not have the phenomenon of deformation, welding and wearing, also reduced the potential safety hazard.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments described in the present invention, and other drawings can be obtained by those skilled in the art according to these drawings.
Fig. 1 is a schematic view of a connection structure of a water stop steel plate structure provided in an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a water stop steel plate structure provided by the embodiment of the utility model.
Description of reference numerals:
1. a water stop steel plate body; 2. stopping the end part of the steel plate; 3. waterproof paint;
201. a first plate body; 202. a second plate body; 203. a third plate body;
401. fastening a bolt; 402. a rubber sleeve; 403. and a nut.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the present invention will be further described in detail with reference to the accompanying drawings.
See fig. 1-2;
a stagnant water steel sheet structure of this embodiment, this stagnant water steel sheet structure includes:
a water stop steel plate body 1; and
the water stopping steel plate end part 2 is formed at one end of the water stopping steel plate body 1, and the water stopping steel plate end part 2 is formed into a connecting groove in a bending mode;
the end part 2 of the water stop steel plate structure can partially extend into a connecting groove of the end part 2 of the water stop steel plate matched with the end part 2;
and the joint of the end parts 2 of the adjacent water stop steel plates is filled with waterproof paint 3.
Specifically, this embodiment discloses a novel stagnant water steel sheet structure, and adjacent stagnant water steel sheet structural connection's structure, at first, the stagnant water steel sheet structure of this embodiment includes stagnant water steel sheet body 1, and be formed with stagnant water steel sheet tip 2 that connects one end each other in this stagnant water steel sheet body 1, and stagnant water steel sheet tip 2 of this embodiment is buckled and is formed into the structure of buckling, and be formed as the spread groove in the structure of buckling, two stagnant water steel sheet tip 2 all partly imbeds in the corresponding spread groove each other in order to form the lock joint and connect, and for further improving sealed effect, pack waterproof coating in the space of lock joint's position.
The waterproof coating 3 related to the embodiment is one or more of waterproof asphalt, AB glue, JL-6218 metal adhesive and silicone bonding glue, and any waterproof coating can be selected to be respectively coated on the corresponding surfaces according to the connection and waterproof requirements of the end parts 2 of the adjacent water stop steel plates.
Preferably, the water stop steel plate end portion 2 of the present embodiment includes:
a first plate body 201 which forms an angle of 150 degrees with the water stop steel plate body 1;
a second plate 202 formed at one end of the first plate 201 far from the water stop steel plate body 1 and perpendicular to the first plate 201; and
a third plate 203 formed at an end of the second plate 202 away from the first plate 201 and perpendicular to the second plate 202;
the space among the first board body 201, the second board body 202 and the third board body 203 is a connecting groove.
The first plate body 201 of the water-stopping steel plate end part 2 can extend into a connecting groove of the water-stopping steel plate end part 2 matched with the first plate body;
the space between the third plate 203 and the inner wall of the connecting groove that is mated with it is configured as a waterproof space, and the waterproof space is filled with waterproof paint 3.
The embodiment further defines the structural composition of the end part 2 of the water stop steel plate, which is integrally formed with the water stop steel plate body 1 and specifically comprises a first plate body 201, a second plate body 202 and a third plate body 203; wherein, form into 150 contained angles between first plate body 201 and the stagnant water steel sheet body 1, and the first plate body 201 of second plate body 202 perpendicular to, third plate body 203 perpendicular to second plate body 202 forms the spread groove structure that extends for stagnant water steel sheet body 1 slope through this first plate body 201, second plate body 202 and third plate body 203, and the first plate body 201 of stagnant water steel sheet tip 2 of mutually supporting can extend to in the corresponding spread groove in order to form the lock joint and connect. Meanwhile, since the size of the connecting groove is slightly larger than the thickness of the first plate body 201, a gap is reserved between the first plate body 201 and the inner wall of the corresponding connecting groove, and the gap is sealed by filling waterproof paint.
In order to keep the relative positions of the two water stop steel plates and improve the structural stability after installation, the end parts 2 of the water stop steel plates which are matched with each other are fixed through a fastening structure;
the fastening structure includes:
a fastening bolt 401 penetrating the end 2 of the water stop steel plate in a direction perpendicular to the first plate body 201;
the fastening bolt 401 has a rubber bushing 402 on the outer periphery.
First, the fastening bolt 401 penetrates the two water stop steel plate end portions 2, the rubber sleeve 402 is sleeved outside the fastening bolt 401, and the nut 403 is attached to one end of the fastening bolt 401 extending to the other side of the water stop steel plate end portion 2. When arranging, arrange two sets of fastening structure along the direction of height of stagnant water steel sheet usually, all install a set of fastening structure in stagnant water steel sheet upper portion and lower part promptly, can further improve both connection structure stability like this.
In the technical scheme, the utility model provides a pair of stagnant water steel sheet structure has following beneficial effect:
the utility model discloses a stagnant water steel sheet structure becomes the spread groove through buckling forming in 2 positions of stagnant water steel sheet tip, and two spread grooves part embedding each other are in order to form into lock joint structure to pack waterproof coating 3 in the gap, with this improve the sealed effect of stagnant water steel sheet junction and the stability of connecting, compare the welding, do not have the phenomenon of deformation, welding and wearing, also reduced the potential safety hazard.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive on the scope of the appended claims.

Claims (4)

1. The utility model provides a stagnant water steel sheet structure which characterized in that, this stagnant water steel sheet structure includes:
a water stop steel plate body (1); and
the water stopping steel plate end part (2) is formed at one end of the water stopping steel plate body (1), and the water stopping steel plate end part (2) is formed into a connecting groove in a bending mode;
the end part (2) of the water stop steel plate structure can partially extend into a connecting groove of the end part (2) of the water stop steel plate matched with the end part;
and waterproof paint (3) is filled at the joint of the adjacent water stop steel plate end parts (2).
2. A waterstop steel plate structure as claimed in claim 1, wherein the waterstop steel plate end portion (2) comprises:
a first plate body (201) which forms a 150-degree angle with the water stop steel plate body (1);
the second plate body (202) is formed at one end, far away from the water stop steel plate body (1), of the first plate body (201) and is perpendicular to the first plate body (201); and
a third plate body (203) which is formed at one end of the second plate body (202) far away from the first plate body (201) and is vertical to the second plate body (202);
the space among the first plate body (201), the second plate body (202) and the third plate body (203) is the connecting groove.
3. A waterstop steel plate structure according to claim 2, wherein the first plate body (201) of the waterstop steel plate end part (2) can extend into the connecting groove of the waterstop steel plate end part (2) matched with the first plate body;
and the space between the third plate body (203) and the inner wall of the connecting groove matched with the third plate body is configured into a waterproof space, and the waterproof space is filled with the waterproof coating (3).
4. A waterstop steel plate structure according to claim 2 or 3, wherein the ends (2) of the waterstop steel plate which are mutually matched are fixed through a fastening structure;
the fastening structure includes:
a fastening bolt (401) penetrating through the end part (2) of the water stop steel plate along the direction vertical to the first plate body (201);
the fastening bolt (401) has a rubber sleeve (402) on the outer periphery.
CN202221878001.2U 2022-07-19 2022-07-19 Water stop steel plate structure Active CN217630132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221878001.2U CN217630132U (en) 2022-07-19 2022-07-19 Water stop steel plate structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221878001.2U CN217630132U (en) 2022-07-19 2022-07-19 Water stop steel plate structure

Publications (1)

Publication Number Publication Date
CN217630132U true CN217630132U (en) 2022-10-21

Family

ID=83635488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221878001.2U Active CN217630132U (en) 2022-07-19 2022-07-19 Water stop steel plate structure

Country Status (1)

Country Link
CN (1) CN217630132U (en)

Similar Documents

Publication Publication Date Title
CN213572429U (en) Waterproof connection structure of prefabricated outer wall
CN211007181U (en) External enclosure weight reduction prefabricated wall connecting node
CN211422313U (en) Novel waterproof and heat-preservation energy-saving outer window
CN217630132U (en) Water stop steel plate structure
CN207484711U (en) A kind of antiseep construction of horizontal structure deformation joint
CN205677114U (en) Installation node for assembled inside casing light partition wall
CN205742504U (en) A kind of intensive construction joint of ultra-large type cistern
CN205637241U (en) Composite wall panel and mounting structure thereof
CN211200828U (en) Composite assembly formula wallboard and interior wall connection structure
CN215716373U (en) Glass curtain wall closing in
CN213268014U (en) Corrugated cover plate mounting structure for advanced construction of roof post-cast strip
CN209779949U (en) Prefabricated assembled profiled steel sheet concrete shear force wall
CN211395721U (en) Open caisson reserved hole plugging waterproof structure
CN209494067U (en) Steel structural plant roof deformation joint structure
CN216109151U (en) Outer wall post-cast strip pre-sealing wall body
CN208088664U (en) Assembly of integral shearing wall structure
CN215671276U (en) Building crack repair structure and building wallboard
CN218148467U (en) Cast-in-place concrete cut-off wall and pore-creating cut-off wall connection structure
CN205976012U (en) Waterproof board and use thereof
CN216766311U (en) Assembled concrete building post-cast strip stagnant water structure
CN215801819U (en) Basement post-cast strip waterproof construction
CN215562843U (en) Waterproof construction of energy-conserving stock head of low carbon construction
CN215857840U (en) Underground combined mechanism
CN215829929U (en) Waterproof node of shower room
CN217782410U (en) Outer window antiseep edge frame water stop structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant