CN217627377U - Building construction safety elevating gear - Google Patents
Building construction safety elevating gear Download PDFInfo
- Publication number
- CN217627377U CN217627377U CN202221483890.2U CN202221483890U CN217627377U CN 217627377 U CN217627377 U CN 217627377U CN 202221483890 U CN202221483890 U CN 202221483890U CN 217627377 U CN217627377 U CN 217627377U
- Authority
- CN
- China
- Prior art keywords
- mounting panel
- baffle
- bottom plate
- loading board
- construction safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003028 elevating effect Effects 0.000 title claims abstract description 16
- 238000009435 building construction Methods 0.000 title claims description 15
- 238000007664 blowing Methods 0.000 claims abstract description 31
- 238000010276 construction Methods 0.000 claims abstract description 6
- RKTYLMNFRDHKIL-UHFFFAOYSA-N copper;5,10,15,20-tetraphenylporphyrin-22,24-diide Chemical group [Cu+2].C1=CC(C(=C2C=CC([N-]2)=C(C=2C=CC=CC=2)C=2C=CC(N=2)=C(C=2C=CC=CC=2)C2=CC=C3[N-]2)C=2C=CC=CC=2)=NC1=C3C1=CC=CC=C1 RKTYLMNFRDHKIL-UHFFFAOYSA-N 0.000 claims abstract description 3
- 238000009434 installation Methods 0.000 claims description 16
- 239000000463 material Substances 0.000 claims description 9
- 239000004566 building material Substances 0.000 abstract description 33
- 238000000034 method Methods 0.000 abstract description 9
- 230000006378 damage Effects 0.000 description 5
- 238000007599 discharging Methods 0.000 description 4
- 238000005192 partition Methods 0.000 description 4
- 239000011435 rock Substances 0.000 description 4
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 241000220317 Rosa Species 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The application discloses construction safety elevating gear, including the bottom plate that is the tetragonal structure, left mounting panel is installed to the left end on the bottom plate, right mounting panel is installed to the right-hand member on the bottom plate, left side mounting panel and right mounting panel respectively with bottom plate mutually perpendicular, be provided with elevation structure in left side mounting panel and the right mounting panel respectively, elevation structure includes motor, threaded rod and loading board. Through the setting of blowing case, put the building materials at the blowing incasement, the blowing case lateral wall blocks the building materials, prevent that the building materials from hindering the people at the in-process landing that goes up and down, and the work efficiency is improved, the safety risk has been reduced, through the gyro wheel, the spout, the setting of baffle and cardboard, gyro wheel and spout sliding connection, when the blowing case rises to the assigned position, the rotation baffle, make the baffle keep away from the spout position, pull out the blowing case through the push rod, can be with building materials moving as a whole, do not need the staff to remove the building materials, time saving and labor saving, and convenient use.
Description
Technical Field
The application relates to the technical field of building construction, in particular to a building construction safety lifting device.
Background
Mechanical equipment for assisting in carrying is often needed in the carrying process of building materials, whether the mechanical equipment is safe and reliable relates to life and property safety of a construction party, particularly, a lifting platform has to be used due to high labor intensity when the building materials are transported from a low position to a high position, and whether the lifting platform is reliable is particularly important. At this point, it is necessary to use a lifting device to meet the demand for transporting the building material.
But current elevating gear security is relatively poor, when the transportation building materials, its building materials drop from the eminence very easily, not only waste time, and there is very big potential safety hazard, easily cause the casualties, when building materials are transported to the assigned position, need the staff to take out the building materials, inconvenient whole the removing of building materials, elevating gear all utilizes the walking wheel to make it be convenient for remove, but also reduced elevating gear's stability simultaneously, the contact of walking wheel and ground leads to whole elevating gear easily to take place to rock, harm staff's safety. Therefore, a building construction safety lifting device is provided to solve the above problems.
Disclosure of Invention
The utility model provides a construction safety elevating gear is used for solving current elevating gear security relatively poor in this embodiment, when the transportation building materials, its building materials drop from the eminence very easily, not only the waste time, and there is very big potential safety hazard, easily cause the casualties, when building materials are transported to the assigned position, need the staff to take out the building materials, it is inconvenient to remove the building materials is whole, elevating gear all utilizes the walking wheel to make its be convenient for remove, but also reduced elevating gear's stability simultaneously, the contact of walking wheel and ground leads to whole elevating gear to take place easily and rock, harm staff's problem of safety.
According to an aspect of the application, a construction safety elevating gear is provided, including the bottom plate that is the tetragonal structure, left mounting panel is installed to the left end on the bottom plate, right mounting panel is installed to the right-hand member on the bottom plate, left side mounting panel and right mounting panel respectively with bottom plate mutually perpendicular, be provided with elevation structure in left side mounting panel and the right mounting panel respectively, elevation structure includes motor, threaded rod, loading board and blowing case.
Further, universal wheels are installed at four corners of the bottom plate respectively, screws are installed on the outer sides of the universal wheels respectively, the screws penetrate through the bottom plate respectively, and the screws are connected with the bottom plate in a threaded mode respectively.
Further, the roof is installed respectively at left side mounting panel and right mounting panel top, be provided with the installation cavity in left side mounting panel right side wall and the right mounting panel respectively, be provided with the opening on left side mounting panel right side wall and the right mounting panel left side wall respectively.
Further, the motors are installed on the front side and the rear side of the bottom in the installation cavity respectively, the partition plates are installed above the motors respectively, the front end and the rear end of each partition plate are fixed on the inner walls of the front side and the rear side of the installation cavity respectively, and the left end and the right end of each partition plate are in lap joint with the inner walls of the left side and the right side of the installation cavity respectively.
Further, the motor output end passes the baffle respectively and is connected with the threaded rod, the motor output end rotates with the baffle respectively and is connected, the top is installed respectively at the threaded rod upper end in the installation cavity, threaded rod upper end rotates with the installation cavity interior top respectively and is connected.
Further, be provided with the loading board in the middle of left side mounting panel and the right mounting panel, both ends are installed respectively on the threaded rod about the loading board, both ends about the loading board are passed respectively to the threaded rod, the threaded rod respectively with loading board threaded connection.
Further, install the blowing case on the loading board, the open setting in blowing roof portion, both sides are provided with the through-hole respectively around the side wall upper end of blowing case left and right sides, install the safety rope on the through-hole respectively, the safety rope upper end is fixed respectively in the roof bottom.
Further, the left side and the right side of the bottom of the material placing box are respectively provided with a roller, the rollers are respectively arranged in sliding grooves, the sliding grooves are respectively arranged on the bearing plate, and the rollers are respectively connected with the sliding grooves in a sliding manner.
Furthermore, the baffle is installed through the connecting rod respectively on the lateral wall before the spout is close to one side loading board of left mounting panel and right mounting panel respectively, the connecting rod passes the baffle respectively and to can be on the loading board, the baffle rotates with the connecting rod respectively to be connected, install the cardboard respectively on the lateral wall before the spout opposite side loading board that the baffle corresponds respectively.
Furthermore, fixed plates are respectively fixed to the left side and the right side of the upper end of the front side wall of the material discharging box, the fixed plates are respectively perpendicular to the front side wall of the material discharging box, a push rod is installed at the front end of each fixed plate, and the left end and the right end of each push rod are respectively fixed to the fixed plates.
Through the above-mentioned embodiment of this application, setting through the blowing case, put the building materials at the blowing incasement, the blowing case lateral wall blocks the building materials, prevent that the building materials from hindering the people at lift in-process landing, and the work efficiency is improved, the safety risk is reduced, through the gyro wheel, the spout, the setting of baffle and cardboard, gyro wheel and spout sliding connection, when the blowing case rises assigned position, rotating baffle, make the baffle keep away from the spout position, pull out the blowing case through the push rod, can be with building materials moving as a whole, do not need the staff to remove the building materials, time saving and labor saving, and convenient use.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic overall structure of an embodiment of the present application;
FIG. 2 is a schematic front view of an embodiment of the present application;
fig. 3 is an enlarged schematic structural diagram at a in fig. 2 according to an embodiment of the present application.
In the figure: 1. a base plate; 2. a left mounting plate; 3. a right mounting plate; 4. a universal wheel; 5. a screw; 6. a top plate; 7. an opening; 8. a mounting cavity; 9. a motor; 10. a partition plate; 11. a threaded rod; 12. a carrier plate; 13. a material placing box; 14. a through hole; 15. a safety cord; 16. a roller; 17. a chute; 18. a connecting rod; 19. a baffle plate; 20. clamping a plate; 21. a fixing plate; 22. a push rod.
Detailed Description
In order to make the technical solutions of the present application better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only some embodiments of the present application, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In the present application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate an orientation or positional relationship based on the orientation or positional relationship shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
Furthermore, the terms "mounted," "disposed," "provided," "connected," and "sleeved" are to be construed broadly. For example, it may be a fixed connection, a removable connection, or a unitary construction; can be a mechanical connection, or an electrical connection; may be directly connected, or indirectly connected through intervening media, or may be in internal communication between two devices, elements or components. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
Referring to fig. 1-3, a building construction safety lifting device comprises a bottom plate 1 in a square structure, wherein a left mounting plate 2 is mounted at the left end of the bottom plate 1, a right mounting plate 3 is mounted at the right end of the bottom plate 1, the left mounting plate 2 and the right mounting plate 3 are respectively perpendicular to the bottom plate 1, lifting structures are respectively arranged in the left mounting plate 2 and the right mounting plate 3, and each lifting structure comprises a motor 9, a threaded rod 11, a bearing plate 12 and a material placing box 13.
The bottom four corners of the bottom plate 1 are respectively provided with a universal wheel 4, the outer sides of the universal wheels 4 are respectively provided with a screw 5, the screws 5 respectively penetrate through the bottom plate 1, and the screws 5 are respectively in threaded connection with the bottom plate 1.
Be provided with loading board 12 in the middle of left side mounting panel 2 and the right mounting panel 3, both ends are installed respectively on threaded rod 11 about loading board 12, threaded rod 11 passes both ends about loading board 12 respectively, threaded rod 11 respectively with loading board 12 threaded connection.
Be provided with loading board 12 in the middle of left side mounting panel 2 and the right mounting panel 3, both ends are installed respectively on threaded rod 11 about loading board 12, both ends about loading board 12 are passed respectively to threaded rod 11, threaded rod 11 respectively with 12 threaded connection of loading board.
Install bin 13 on the loading board 12, bin 13 top is opened and is set up, both sides are provided with through-hole 14 respectively around bin 13 left and right sides wall upper end, install safety rope 15 on the through-hole 14 respectively, safety rope 15 upper end is fixed respectively in roof 6 bottom.
The front side walls of the bearing plates 12 on one sides, close to the left mounting plate 2 and the right mounting plate 3 respectively, of the sliding grooves 17 are respectively provided with a baffle plate 19 through a connecting rod 18, the connecting rods 18 respectively penetrate through the baffle plates 19 and can be arranged on the bearing plates 12, the baffle plates 19 are respectively rotatably connected with the connecting rods 18, and the front side walls of the bearing plates 12 on the other sides, corresponding to the baffle plates 19 respectively, of the sliding grooves 17 are respectively provided with clamping plates 20.
The left side and the right side of the upper end of the front side wall of the material discharging box 13 are respectively fixed with a fixing plate 21, the fixing plates 21 are respectively vertical to the front side wall of the material discharging box 13, the front end of each fixing plate 21 is provided with a push rod 22, and the left end and the right end of each push rod 22 are respectively fixed on the fixing plates 21.
This application is when using, at first, when moving the device to the assigned position, screw 5 rotates, make 5 lower extremes of screw insert in the ground, support the device, make the device remain stable, avoid the contact of universal wheel 4 and ground to lead to whole elevating gear easily to take place to rock, harm staff's safety, put the building materials in blowing case 13, blowing case 13 lateral wall blocks the building materials, prevent that the building materials from landing injury people in the lift process, work efficiency has been improved, the safety risk has been reduced, after placing, baffle 19 rotates, make baffle 19 and cardboard 20 mutual joint, starter motor 9, motor 9 drives threaded rod 11 and rotates, thereby drive loading board 12 and blowing case 13 and rise, when blowing case 13 rises to the assigned position, baffle 19 rotates, make baffle 19 keep away from spout 17 position, pull out blowing case 13 through push rod 22, can be with building materials moving as a whole, do not need the staff to remove the building materials, time saving and labor saving, and convenience is used, install safety rope 15 on blowing case 13, further guarantee the safe use of device.
The application has the advantages that:
1. through the setting of blowing case 13, put the building materials in blowing case 13, blowing case 13 lateral wall blocks the building materials, prevents that the building materials from injuring people at the landing of lift in-process, has improved work efficiency, has reduced the safety risk.
2. Through the setting of gyro wheel 16, spout 17, baffle 19 and cardboard 20, gyro wheel 16 and spout 17 sliding connection, when blowing case 13 rose the assigned position, rotating damper 19 made baffle 19 keep away from spout 17 position, pull out blowing case 13 through push rod 22, can be with building materials moving as a whole, do not need the staff to remove the building materials, labour saving and time saving facilitates the use.
3. Through the setting of screw 5, when removing the assigned position with the device, rotate screw 5, make 5 lower extremes of screw insert the ground in, support the device, make the device remain stable, avoid the contact of universal wheel 4 and ground to lead to whole elevating gear to take place easily and rock, harm staff's safety.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims (10)
1. The utility model provides a construction safety elevating gear which characterized in that: including bottom plate (1) that is the tetragonal structure, left mounting panel (2) are installed to the left end on bottom plate (1), right mounting panel (3) are installed to the right-hand member on bottom plate (1), left side mounting panel (2) and right mounting panel (3) respectively with bottom plate (1) mutually perpendicular, be provided with elevation structure in left side mounting panel (2) and right mounting panel (3) respectively, elevation structure includes motor (9), threaded rod (11), loading board (12) and blowing case (13).
2. A building construction safety lifting device according to claim 1, characterized in that: the bottom plate (1) bottom four corners department installs universal wheel (4) respectively, screw (5) are installed respectively in universal wheel (4) outside, bottom plate (1) is passed respectively in screw (5), screw (5) respectively with bottom plate (1) threaded connection.
3. A building construction safety lifting device according to claim 1, characterized in that: roof (6) are installed respectively at left side mounting panel (2) and right mounting panel (3) top, be provided with installation cavity (8) in left side mounting panel (2) right side wall and right mounting panel (3) respectively, be provided with opening (7) on left side mounting panel (2) right side wall and right mounting panel (3) left side wall respectively.
4. A building construction safety lifting device according to claim 3, characterized in that: motor (9) are installed respectively on both sides around the bottom in installation cavity (8), baffle (10) are installed respectively to motor (9) top, both ends are fixed respectively around baffle (10) on installation cavity (8) both sides inner wall, both ends overlap joint each other with installation cavity (8) left and right sides inner wall respectively about baffle (10).
5. A building construction safety lifting device according to claim 1, characterized in that: the motor (9) output passes baffle (10) respectively and is connected with threaded rod (11), motor (9) output rotates with baffle (10) respectively to be connected, install top in installation cavity (8) respectively on threaded rod (11), threaded rod (11) upper end rotates with top in installation cavity (8) respectively to be connected.
6. A building construction safety lifting device according to claim 1, characterized in that: be provided with loading board (12) in the middle of left side mounting panel (2) and right mounting panel (3), both ends are installed respectively on threaded rod (11) about loading board (12), both ends about loading board (12) are passed respectively in threaded rod (11), threaded rod (11) respectively with loading board (12) threaded connection.
7. A building construction safety lifting device according to claim 1, characterized in that: install blowing case (13) on loading board (12), blowing case (13) top is opened and is set up, both sides are provided with through-hole (14) respectively around blowing case (13) left and right sides wall upper end, install safety rope (15) on through-hole (14) respectively, safety rope (15) upper end is fixed respectively in roof (6) bottom.
8. A building construction safety lifting device according to claim 7, characterized in that: idler wheels (16) are respectively installed on the left side and the right side of the bottom of the material placing box (13), the idler wheels (16) are respectively installed in sliding grooves (17), the sliding grooves (17) are respectively formed in the bearing plate (12), and the idler wheels (16) are respectively connected with the sliding grooves (17) in a sliding mode.
9. A building construction safety lifting device according to claim 8, characterized in that: spout (17) are close to respectively and install baffle (19) through connecting rod (18) on one side loading board (12) preceding lateral wall of left side mounting panel (2) and right side mounting panel (3), connecting rod (18) pass baffle (19) respectively to can be on loading board (12), baffle (19) rotate with connecting rod (18) respectively and are connected, install cardboard (20) respectively before spout (17) opposite side loading board (12) that baffle (19) correspond respectively on the lateral wall.
10. A building construction safety lifting device according to claim 7, characterized in that: fixed plate (21) are fixed with respectively on both sides about blowing case (13) preceding lateral wall upper end, fixed plate (21) respectively with blowing case (13) preceding lateral wall mutually perpendicular, push rod (22) are installed to fixed plate (21) front end, both ends are fixed respectively on fixed plate (21) about push rod (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221483890.2U CN217627377U (en) | 2022-06-14 | 2022-06-14 | Building construction safety elevating gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221483890.2U CN217627377U (en) | 2022-06-14 | 2022-06-14 | Building construction safety elevating gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217627377U true CN217627377U (en) | 2022-10-21 |
Family
ID=83626224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221483890.2U Active CN217627377U (en) | 2022-06-14 | 2022-06-14 | Building construction safety elevating gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217627377U (en) |
-
2022
- 2022-06-14 CN CN202221483890.2U patent/CN217627377U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019015243A1 (en) | Shaft module splicing system and splicing method therefor | |
CN107814299B (en) | Rapid construction method of building construction unloading platform and rapid unloading lift car | |
CN217627377U (en) | Building construction safety elevating gear | |
CN210593527U (en) | Scrap steel recovery device | |
CN207296344U (en) | It is a kind of to carry the construction platform automatically moved with material delivery functions | |
CN111998182B (en) | Platform for environment management | |
CN105236055A (en) | Vertical box device of vertical trash compression transfer station | |
CN218344944U (en) | Mine hoisting equipment facilitating material entering and exiting | |
CN210659184U (en) | Lifting integrated scaffold for building construction | |
CN211035023U (en) | Building material lifting device | |
CN204992713U (en) | Answer boost charge shelter | |
KR200448244Y1 (en) | Safety Plate for Hoist Door | |
CN214996137U (en) | Construction is with platform of unloading | |
CN213512947U (en) | Solar monitoring all-in-one machine | |
KR20070122117A (en) | Glass stacking apparatus | |
CN113895880A (en) | Photovoltaic module transportation cable car and photovoltaic module transportation system | |
CN217627272U (en) | Building construction hoist device | |
CN113247838A (en) | Lift for high altitude building construction convenient to equipment | |
CN102015516B (en) | Article handling machine equipped with a tiltable electrical cabinet | |
CN210122466U (en) | Civil engineering is with construction elevating gear | |
CN214006443U (en) | Scaffold frame is used to fitment | |
CN214671368U (en) | Portable experimental box for electronic technology design | |
CN217100256U (en) | Multifunctional automatic electromechanical equipment carrying device | |
CN216889931U (en) | Liftable support for construction engineering construction | |
CN109018913A (en) | A kind of large size resin tile shipment conveying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240509 Address after: Room 1203, Building B, Phase I, Yigao Shanghai Street, Lanshan District, Linyi City, Shandong Province, 276000 Patentee after: Shandong Guanxing Construction Group Co.,Ltd. Country or region after: China Address before: 273300 No. 207, JUNHE Road, Pingyi County, Linyi City, Shandong Province Patentee before: Shandong Guanlu Real Estate Co.,Ltd. Country or region before: China |