CN217601361U - Hydraulic engineering gate is installation device for headstock gear - Google Patents

Hydraulic engineering gate is installation device for headstock gear Download PDF

Info

Publication number
CN217601361U
CN217601361U CN202221540072.1U CN202221540072U CN217601361U CN 217601361 U CN217601361 U CN 217601361U CN 202221540072 U CN202221540072 U CN 202221540072U CN 217601361 U CN217601361 U CN 217601361U
Authority
CN
China
Prior art keywords
fixing
bolt
headstock gear
groups
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221540072.1U
Other languages
Chinese (zh)
Inventor
何传凤
姚尚文
刘伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Haixing Ecological Technology Co ltd
Original Assignee
Anhui Haixing Ecological Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Haixing Ecological Technology Co ltd filed Critical Anhui Haixing Ecological Technology Co ltd
Priority to CN202221540072.1U priority Critical patent/CN217601361U/en
Application granted granted Critical
Publication of CN217601361U publication Critical patent/CN217601361U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of the headstock gear erection equipment, appear mismatching when being used for solving and reserving the bolt and being connected with the headstock gear, lead to later stage workman can only readjust the position of reserving the bolt, increase the problem of the time cost of installing the headstock gear, specifically a hydraulic engineering is installation device for the headstock gear, including the bearing wall, the fixed four group reservation bolts that are provided with in inside of bearing wall, the top that the bolt was reserved to four group is provided with the fixed plate, and the top of fixed plate is connected with the headstock gear body through the base, is provided with adjustment mechanism between fixed plate and the bearing wall, the utility model discloses a through four group's bracing pieces draw close each other in adjustment mechanism and let the height of fixed plate and the highly uniform who reserves the bolt, the installation to the headstock gear body is accomplished through fixing bolt again with the alignment of second fixed slot above the base in the fixed plate, has solved the problem of reserving the bolt and the inconvenient installation of headstock gear body size mismatching.

Description

Hydraulic engineering gate is installation device for headstock gear
Technical Field
The utility model relates to a headstock gear erection equipment technical field specifically is a hydraulic engineering gate is installation device for headstock gear.
Background
The gate hoist is a large-scale hydraulic machinery product, the gate hoist is related to the normal operation of a hydraulic structure, and the gate hoist has special significance for safe and reliable operation, flexible and convenient operation except meeting the design requirements of general hoisting machinery;
the gate hoist is generally fixed by being connected with bolts embedded in a bearing wall, and the positions of reserved bolts cannot be accurately controlled when the bolts are reserved in the existing construction site, so that the reserved bolts are not matched with the hoist when connected, workers can only readjust the positions of the reserved bolts in the later period, and the time cost for installing the hoist is increased;
in view of the above technical drawbacks, a solution is proposed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hydraulic engineering is installation device for gate hoist, it draws close each other through four group's bracing pieces in the adjustment mechanism and lets the height of fixed plate and the highly uniform of reserving the bolt, the mounting hole above the base aligns with the second fixed slot in the fixed plate and accomplishes the installation to the headstock gear body through fixing bolt again, the problem of the inconvenient installation of reserving bolt and headstock gear body size mismatching has been solved, mismatch appears when having solved and reserving the bolt and being connected with the headstock gear, lead to later stage workman can only readjust the position of reserving the bolt, increase the time cost's of installation headstock gear problem.
In order to achieve the above object, the utility model provides a following technical scheme:
a mounting device for a gate hoist of hydraulic engineering comprises a bearing wall, wherein four groups of reserved bolts are fixedly arranged inside the bearing wall, a fixing plate is arranged at the tops of the four groups of reserved bolts, the top of the fixing plate is connected with a hoist body through a base, and an adjusting mechanism is arranged between the fixing plate and the bearing wall;
adjustment mechanism includes first notch, bracing piece, two-way screw lead screw, connecting rod, connecting block and control panel, first notch is provided with four groups, the inside of first notch is provided with the bracing piece, the bottom of bracing piece contacts with the outer wall of bearing wall, is located equal fixedly connected with connecting rod between the bracing piece of homonymy, and is two sets of one side that the connecting rod is relative is connected with the connecting block through the bearing rotation, and is two sets of threaded connection has two-way screw lead screw between the connecting block.
Furthermore, one end fixedly connected with control panel of two-way screw lead screw, the bracing piece passes through the bolt and is connected with the inside rotation of first notch.
Further, the fixed plate includes fixed plate body, first fixed slot, second fixed slot and fixing bolt, first fixed slot has all been seted up to four corners on the fixed plate body top lateral wall, and the cross section of first fixed slot is narrow down for wide, is located two sets of homonymy a plurality of groups of second fixed slots have been seted up between the first fixed slot, and the second fixed slot sets up perpendicularly in first fixed slot.
Further, the inner wall threaded connection of second fixed slot has fixing bolt, and fixing bolt's top and base threaded connection, reserve bolt and first fixed slot threaded connection, and threaded connection has fixation nut on the outer wall of reserving the bolt, and fixation nut's diameter is greater than the diameter of first fixed slot bottom.
Furthermore, the four groups of first notches are formed in the bottom side wall of the fixing plate body, and the base is fixedly connected with the bottom end of the hoist body.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the utility model, two groups of connecting blocks are mutually drawn to drive four groups of supporting rods to mutually draw together through rotating the bidirectional threaded screw rod in the adjusting mechanism, and the four groups of supporting rods are mutually drawn together until the height of the fixed plate is consistent with the height of the reserved bolt, thereby facilitating the installation of the hoist body;
2. in the utility model, the installation of the fixed plate body is completed by connecting the first fixed groove in the fixed plate with the reserved bolt and matching with the adjusting mechanism, the installation hole on the base is aligned with the second fixed groove, and then the installation of the hoist body is completed by the fixed bolt, thus solving the problem that the reserved bolt is not matched with the hoist body in size and is inconvenient to install;
3. the utility model discloses in, draw close each other through four group's bracing pieces among the adjustment mechanism and let the height of fixed plate and the highly uniform of reserving the bolt, the mounting hole above the base aligns with the second fixed slot in the fixed plate and accomplishes the installation to the headstock gear body through fixing bolt again, has solved the problem of reserving the bolt and unmatched inconvenient installation of headstock gear body size.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings;
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view of the structure of the area A in FIG. 1;
FIG. 3 is an enlarged view of the structure of the region B in FIG. 1;
fig. 4 is a perspective view of the adjusting mechanism of the present invention;
fig. 5 is a perspective view of the middle fixing plate of the present invention.
Reference numerals: 1. a load-bearing wall; 2. a hoist body; 3. a base; 4. reserving a bolt; 5. an adjustment mechanism; 6. a fixing plate; 51. a first notch; 52. a support bar; 53. a bidirectional threaded lead screw; 54. a connecting rod; 55. connecting blocks; 56. a control panel; 61. a fixing plate body; 62. a first fixing groove; 63. a second fixing groove; 64. and (5) fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
when the headstock gear is installed, the unmatched phenomenon of mounting hole and reserved bolt 4 above the headstock gear base 3 appears, leads to the headstock gear still need readjust the position of reserved bolt 4 at the in-process of installation, has increased the time cost of installation headstock gear, now proposes a solution:
as shown in fig. 1-5, the mounting device for the gate hoist of the hydraulic engineering provided by the utility model comprises a bearing wall 1, four groups of reserved bolts 4 are fixedly arranged inside the bearing wall 1, the top parts of the four groups of reserved bolts 4 are provided with a fixing plate 6, the top part of the fixing plate 6 is connected with a hoist body 2 through a base 3, and an adjusting mechanism 5 is arranged between the fixing plate 6 and the bearing wall 1;
adjustment mechanism 5 includes first notch 51, bracing piece 52, two-way screw lead screw 53, connecting rod 54, connecting block 55 and control panel 56, first notch 51 is provided with four groups, the inside of first notch 51 is provided with bracing piece 52, the bottom of bracing piece 52 contacts with the outer wall of bearing wall 1, equal fixedly connected with connecting rod 54 between the bracing piece 52 that is located the homonymy, one side that two sets of connecting rods 54 are relative is connected with connecting block 55 through the bearing rotation, threaded connection has two-way screw lead screw 53 between two sets of connecting block 55. Specifically, firstly, according to the size adjustment fixed plate 6 of headstock gear body 2 to the height between the bearing wall 1, keep fixed plate 6 and reserve bolt 4 highly uniform, at first rotate control panel 56, control panel 56 rotates and lets two-way screw lead screw 53 rotate, two-way screw lead screw 53 rotates and drives two sets of connecting blocks 55 and draw close each other, the in-process connecting rod 54 that draws close each other at two sets of connecting blocks 55 drives four groups of bracing pieces 52 and draws close each other until the height of fixed plate 6 and the highly uniform who reserves bolt 4.
One end fixedly connected with control panel 56 of two-way screw lead screw 53, control panel 56 rotates and drives two-way screw lead screw 53 to rotate, and two-way screw lead screw 53 rotates and drives connecting block 55 and draw close each other, and bracing piece 52 passes through the inside rotation of bolt and first notch 51 and is connected.
In this embodiment, the two-way threaded screw 53 is rotated in the adjusting mechanism 5, so that the two connecting blocks 55 are mutually closed to drive the four groups of supporting rods 52 to mutually close, and the four groups of supporting rods 52 are mutually closed to reach the height of the fixing plate 6 consistent with the height of the reserved bolt 4, thereby facilitating the installation of the hoist body 2.
The second embodiment:
present building site is when reserving bolt 4, and the position of reserving bolt 4 can not accurate control for unmatched phenomenon appears when reserving bolt 4 and headstock gear and being connected, leads to later stage workman can only readjust the position of reserving bolt 4, increases the time cost of installation headstock gear, now proposes a solution:
fixed plate 6 includes fixed plate body 61, first fixed slot 62, second fixed slot 63 and fixing bolt 64, first fixed slot 62 has all been seted up to four corners on the fixed plate body 61 top lateral wall, first fixed slot 62 is longer, it is great in the space of first fixed slot 62 the inside activity to reserve bolt 4, and the cross section of first fixed slot 62 is narrow down for last wide, be located and seted up a plurality of groups second fixed slot 63 between two sets of first fixed slots 62 of homonymy, and second fixed slot 63 sets up perpendicularly in first fixed slot 62. Specifically, the connection between the reserved bolt 4 and the fixed plate 6 is completed, the reserved bolt and the fixed plate are fastened through the fixing nut, the connecting hole in the bottom end of the hoist body 2, above the base 3, is aligned with the second fixing groove 63, the base 3 is connected with the fixed plate 6 through the fixing bolt 64, and the installation of the hoist body 2 is completed.
The inner wall threaded connection of second fixed slot 63 has fixing bolt 64, and fixing bolt 64's top and base 3 threaded connection reserve bolt 4 and first fixed slot 62 threaded connection, and threaded connection has fixation nut on the outer wall of reserving bolt 4, and fixation nut's diameter is greater than the diameter of first fixed slot 62 bottom.
The four groups of first notches 51 are all arranged on the bottom side wall of the fixed plate body 61, and the base 3 is fixedly connected with the bottom end of the hoist body 2.
In this embodiment, be connected and cooperate adjustment mechanism 5 to accomplish the installation to fixed plate body 61 through first fixed slot 62 in the fixed plate 6 with reserving bolt 4, the mounting hole above the base 3 aligns with second fixed slot 63 and accomplishes the installation to headstock gear body 2 through fixing bolt 64 again, has solved and has reserved bolt 4 and the inconvenient problem of installing of headstock gear body 2 size mismatching.
The utility model discloses a working process and principle as follows:
firstly, adjusting the height between a fixing plate 6 and a bearing wall 1 according to the size of a hoist body 2, keeping the height between the fixing plate 6 and a reserved bolt 4 consistent, firstly, rotating a control disc 56, rotating the control disc 56 to enable a two-way threaded screw rod 53 to rotate, rotating the two-way threaded screw rod 53 to drive two groups of connecting blocks 55 to mutually approach, and driving four groups of supporting rods 52 to mutually approach by connecting rods 54 in the process that the two groups of connecting blocks 55 mutually approach until the height of the fixing plate 6 is consistent with the height of the reserved bolt 4;
be connected and cooperate adjustment mechanism 5 to accomplish the installation to fixed plate body 61 through first fixed slot 62 in the fixed plate 6 with reserve bolt 4, the mounting hole above the base 3 aligns with second fixed slot 63 and accomplishes the installation to headstock gear body 2 through fixing bolt 64 again, has solved and has reserved bolt 4 and headstock gear body 2 size and mismatch the inconvenient problem of installation.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not exhaustive and do not limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, thereby enabling others skilled in the art to best understand the invention and its practical application. The present invention is limited only by the claims and their full scope and equivalents.

Claims (5)

1. The mounting device for the gate hoist of the hydraulic engineering comprises a bearing wall (1), wherein four groups of reserved bolts (4) are fixedly arranged inside the bearing wall (1), and is characterized in that the tops of the four groups of reserved bolts (4) are provided with fixing plates (6), the tops of the fixing plates (6) are connected with a hoist body (2) through bases (3), and an adjusting mechanism (5) is arranged between the fixing plates (6) and the bearing wall (1);
adjustment mechanism (5) are including first notch (51), bracing piece (52), two-way screw lead screw (53), connecting rod (54), connecting block (55) and control panel (56), first notch (51) are provided with four groups, the inside of first notch (51) is provided with bracing piece (52), the bottom of bracing piece (52) contacts with the outer wall of bearing wall (1), is located equal fixedly connected with connecting rod (54) between bracing piece (52) of homonymy, and is two sets of one side that connecting rod (54) is relative is rotated through the bearing and is connected with connecting block (55), and is two sets of threaded connection has two-way screw lead screw (53) between connecting block (55).
2. The mounting device for the gate hoist of the water conservancy project according to claim 1, wherein a control panel (56) is fixedly connected to one end of the bidirectional threaded screw rod (53), and the support rod (52) is rotatably connected with the inside of the first notch (51) through a bolt.
3. The mounting device for the gate hoist of the water conservancy project according to claim 1, wherein the fixing plate (6) comprises a fixing plate body (61), a first fixing groove (62), a second fixing groove (63) and a fixing bolt (64), the first fixing groove (62) is formed in each of four corners of the top wall of the fixing plate body (61), the cross section of the first fixing groove (62) is wide at the top and narrow at the bottom, a plurality of groups of second fixing grooves (63) are formed between two groups of first fixing grooves (62) on the same side, and the second fixing grooves (63) are vertically arranged on the first fixing grooves (62).
4. The mounting device for the gate hoist of the water conservancy project according to claim 3, wherein a fixing bolt (64) is connected to the inner wall of the second fixing groove (63) in a threaded manner, the top of the fixing bolt (64) is connected to the base (3) in a threaded manner, the reserved bolt (4) is connected to the first fixing groove (62) in a threaded manner, a fixing nut is connected to the outer wall of the reserved bolt (4) in a threaded manner, and the diameter of the fixing nut is larger than that of the bottom of the first fixing groove (62).
5. The mounting device for the gate hoist of the water conservancy project according to claim 1, wherein the four groups of first notches (51) are formed in the bottom side wall of the fixing plate body (61), and the base (3) is fixedly connected with the bottom end of the hoist body (2).
CN202221540072.1U 2022-06-20 2022-06-20 Hydraulic engineering gate is installation device for headstock gear Active CN217601361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221540072.1U CN217601361U (en) 2022-06-20 2022-06-20 Hydraulic engineering gate is installation device for headstock gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221540072.1U CN217601361U (en) 2022-06-20 2022-06-20 Hydraulic engineering gate is installation device for headstock gear

Publications (1)

Publication Number Publication Date
CN217601361U true CN217601361U (en) 2022-10-18

Family

ID=83589340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221540072.1U Active CN217601361U (en) 2022-06-20 2022-06-20 Hydraulic engineering gate is installation device for headstock gear

Country Status (1)

Country Link
CN (1) CN217601361U (en)

Similar Documents

Publication Publication Date Title
CN210421629U (en) A steel-pipe column for assembly type structure
CN215166650U (en) Plugging structure for reserved hole component of building design floor slab
CN217601361U (en) Hydraulic engineering gate is installation device for headstock gear
CN219732331U (en) Steel beam connecting device for assembled building
CN116122304A (en) Deep foundation pit support changing device with adjustable supporting force
CN207063572U (en) Punch formwork reinforcement component support meanss after a kind of wall of High-building
CN215803206U (en) Framework column formwork structure
CN215564489U (en) Building templates demolishs device
CN215519422U (en) Steel bar truss building carrier plate bearing structure
CN212127270U (en) Rapid construction structure for hoisting steel frame column beam simultaneously in coordination of multiple machines
CN215368689U (en) Building construction template mounting structure
CN111677335A (en) Basement building construction is with preventing support arrangement that collapses
CN220184644U (en) Building templates button structure
CN218958450U (en) Vertical bridge fixing device
CN213402293U (en) Pipeline fixing device on civil and industrial building scaffold
CN218283812U (en) Drilling equipment for construction based on computer software
CN211997681U (en) Handling device for intelligent building manufacturing
CN214696440U (en) Steel frame crossbeam for steel structure factory building
CN212105134U (en) Building construction template mounting structure
CN213572988U (en) Expansion joint template for building construction
CN220790665U (en) Auxiliary positioning device for installation of steel structure net rack
AU2021101944A4 (en) A supporting and connecting device for prefabricated wall panel of prefabricated structure
CN217680433U (en) Auxiliary assembly is used in scaffold frame installation of encorbelmenting of basket of flowers pull rod formula
CN212562498U (en) Special buckle connecting piece for building formwork support
CN219622357U (en) Pipe gallery jacking device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant