CN217601235U - Highway bridge construction hanging flower basket - Google Patents

Highway bridge construction hanging flower basket Download PDF

Info

Publication number
CN217601235U
CN217601235U CN202221750240.XU CN202221750240U CN217601235U CN 217601235 U CN217601235 U CN 217601235U CN 202221750240 U CN202221750240 U CN 202221750240U CN 217601235 U CN217601235 U CN 217601235U
Authority
CN
China
Prior art keywords
additional
guardrail
foundation
plate
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221750240.XU
Other languages
Chinese (zh)
Inventor
张雁平
樊明彦
崔长宇
陆圣豪
霍永生
唐超良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Traffic Engineering Consulting Supervision Co ltd
Original Assignee
Ningbo Traffic Engineering Consulting Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Traffic Engineering Consulting Supervision Co ltd filed Critical Ningbo Traffic Engineering Consulting Supervision Co ltd
Priority to CN202221750240.XU priority Critical patent/CN217601235U/en
Application granted granted Critical
Publication of CN217601235U publication Critical patent/CN217601235U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a highway bridge construction hanging basket, which relates to the technical field of highway bridge construction equipment and comprises symmetrically arranged foundation baskets and additional baskets for connecting the foundation baskets on two sides, wherein each foundation basket comprises a foundation support plate for people to stand and foundation guardrails symmetrically arranged on two sides of the foundation support plate, and each additional basket comprises an additional support plate for people to stand and additional guardrails symmetrically arranged on two sides of the additional support plate; inserting plates are symmetrically arranged on one side, close to the foundation basket, of the additional supporting plate, inserting grooves for inserting and limiting the inserting plates are formed in the foundation supporting plate, and the additional supporting plate and the foundation supporting plate are fixed through bolts; and a fixing device is arranged between the foundation guardrail and the additional guardrail to connect the foundation guardrail with the additional guardrail. The additional baskets with different sizes are additionally arranged and replaced on the foundation basket, so that the hanging basket can be constructed on the bridge with the size corresponding to the additional baskets in an auxiliary manner, and the utilization rate of the hanging basket for highway bridge construction is improved.

Description

Highway bridge construction hanging flower basket
Technical Field
The application relates to the technical field of highway bridge construction equipment, in particular to a highway bridge construction hanging basket.
Background
The highway bridge construction refers to the construction and maintenance of a bridge according to a design method. In the process of highway bridge construction, a bridge bottom and a bridge wall are usually required to be constructed, the bridge bottom and the bridge wall are usually far away from the ground, and workers are required to be close to the bridge bottom and the bridge wall by means of a highway bridge construction special hanging basket to assist the workers in completing construction of a highway bridge.
In the related art, the existing highway bridge construction hanging basket is generally integrally arranged, a bottom plate, a foundation guard rail and a foundation support frame of the highway bridge construction hanging basket are connected in a welding mode through a channel, a steel wire rope is arranged on the foundation support frame in a penetrating mode, and a lifting device is used for connecting the steel wire rope to complete lifting of the highway bridge construction hanging basket.
With respect to the related art in the above, the inventors consider that: for highway bridges of different sizes, highway bridge construction hanging baskets with the lengths corresponding to the lengths need to be used for auxiliary construction, and the highway bridge construction hanging baskets are integrally arranged, so that one highway bridge construction hanging basket can only be used for construction of highway bridges of one size, the utilization rate of the highway bridge construction hanging baskets is low, and an improved space is provided.
SUMMERY OF THE UTILITY MODEL
The application provides a public road bridge roof beam construction hanging flower basket, through install the dress basket of changing unidimensional additional on basic basket, make the hanging flower basket can assist the construction on the bridge of the size that corresponds with it to improve the utilization ratio of public road bridge roof beam construction hanging flower basket.
The application provides a public road bridge roof beam construction hanging flower basket adopts following technical scheme:
a highway bridge construction hanging basket comprises symmetrically arranged foundation baskets and additional baskets used for connecting the foundation baskets on two sides, wherein each foundation basket comprises a foundation support plate for people to stand and foundation guardrails arranged on the foundation support plate;
inserting plates are symmetrically arranged on one side, close to the foundation basket, of the additional supporting plate, inserting grooves for the inserting plates to be placed in and limited are formed in the foundation supporting plate, and the additional supporting plate and the foundation supporting plate are fixed through bolts;
and a fixing device is arranged between the foundation guardrail and the additional guardrail to connect the foundation guardrail with the additional guardrail.
By adopting the technical scheme, the additional baskets with different sizes are installed or replaced among the foundation baskets, so that the hanging basket can be used on the highway bridge with the size corresponding to the hanging basket, and the utilization rate of the hanging basket for highway bridge construction is improved. The inserting plate is inserted into the inserting groove, so that the additional basket and the basic basket are connected in advance. Wear to establish through the bolt and install basket and basic basket screw-thread fit additional, improve the stability of being connected between additional basket and the basic basket.
Optionally, a limiting block is integrally arranged on one side, close to the additionally-installed supporting plate, of the base supporting plate, a limiting groove for the limiting block to be placed into is formed in the additionally-installed supporting plate, and the limiting block is used for limiting the inserting plate and the base supporting plate along the length direction perpendicular to the inserting plate.
Through adopting above-mentioned technical scheme, through putting into the slot with the inserted block, make the stopper get into the spacing inslot to make stopper along the spacing foundation support board of perpendicular to picture peg length direction and picture peg, thereby spacing foundation support board with install the backup pad additional, improve foundation support board and install the stability of being connected between the backup pad additional.
Optionally, a first attracting magnet is arranged on one side, close to the additional mounting support plate, of the limiting block, the first attracting magnet is used for attracting the basic support plate and the additional mounting support plate, and a first groove for mounting the first attracting magnet is formed in the limiting block.
Through adopting above-mentioned technical scheme, through setting up first actuation magnet, make first actuation magnet actuation foundation support board with install the backup pad additional, improve foundation support board and install the stability of being connected between the backup pad additional. The first attraction magnet is arranged in the first groove, so that the installation position of the first attraction magnet is fixed, and the stability of connection between the first attraction magnet and the limiting block is improved.
Optionally, the position of contradicting first actuation magnet on installing the backup pad additional is provided with second actuation magnet, second actuation magnet is used for the first actuation magnet of actuation, install the second recess that offers the installation of second actuation magnet in the backup pad additional.
By adopting the technical scheme, the second attracting magnet is attracted with the first attracting magnet through the arrangement of the second attracting magnet, so that the stability of connection between the foundation support plate and the additionally-installed support plate is improved. The second attracting magnet is installed in the second groove, so that the installation position of the second attracting magnet is fixed, and the stability of connection between the second attracting magnet and the additionally installed supporting plate is improved.
Optionally, install the integrative pothook that is provided with in one side that is close to basic guardrail on the guardrail additional, set up the groove of letting off that supplies the pothook to get into on the basic guardrail, it runs through basic guardrail along the length direction of perpendicular to pothook to let off the groove, set up on the basic guardrail and supply the pothook to insert and fixed joint groove along the direction of putting into of picture peg, it communicates with each other with the joint groove to let off the groove.
Through adopting above-mentioned technical scheme, move back and let the groove through making the pothook get into to insert and the joint in the joint inslot along the length direction of pothook, make to install the guardrail additional and be connected with basic guardrail, improve the stability of being connected between installing guardrail additional and the basic guardrail, thereby improve basic basket and install the stability of being connected between the basket additional.
Optionally, fixing device includes the mount, rotates post and rotor plate, the mount sets up on installing guardrail and basis guardrail additional with fixed basis guardrail and install the guardrail additional, set up on the mount and rotate the rotation hole that the post rotates to be connected with rotating, the mount is worn to establish by the rotation post, it is fixed with installing guardrail and basis guardrail additional with rotor plate threaded connection to rotate the post.
Through adopting above-mentioned technical scheme, through setting up the mount, make the mount along the spacing fixed basis guardrail of perpendicular to horizontal direction with install the guardrail additional, improve the stability of being connected between basis guardrail and the installation guardrail additional. Wear to establish through rotating the post and rotate the hole and with rotor plate threaded connection, make the mount be difficult for coming off from basic guardrail and install the guardrail additional, improve basic guardrail and install the stability of being connected between the guardrail additional.
Optionally, fixing device still includes the fixed plate, fixed plate an organic whole sets up the one side that is close to installing guardrail and basic guardrail additional on the mount, the fixed plate inserts and moves back and lets the groove along moving back spacing pothook of length direction and the basic guardrail in groove, the rotation hole runs through the fixed plate along the length direction of fixed plate.
Through adopting above-mentioned technical scheme, insert through the fixed plate and move back and let the groove, with the pothook along moving back the length direction who lets the groove spacing on basic guardrail in, improve the stability of being connected between pothook and the basic guardrail, and then improve and install the stability of being connected between guardrail and the basic guardrail additional.
Optionally, the fixing device further includes a baffle plate disposed between the fixing plate and the rotating plate, and a through hole for the rotating column to penetrate and fix is formed in the baffle plate.
Through adopting above-mentioned technical scheme, through with the baffle mounting on the mount, make the baffle with the mount spacing and be fixed in install guardrail and basic guardrail additional on, improve the mount and install the stability of being connected between the guardrail additional, improve the stability of being connected between mount and the basic guardrail, and then improve and install the stability of being connected between guardrail and the basic guardrail additional.
Optionally, inserting columns for limiting the baffle are symmetrically arranged on one side, close to the fixing frame, of the baffle, and column grooves for inserting and fixing the inserting columns are formed in the fixing frame.
Through adopting above-mentioned technical scheme, insert the post through will inserting the post and insert the post inslot, make the baffle be connected with the mount, wear to establish the baffle and with rotor plate screw-thread fit when rotating the post, make the baffle be difficult for taking place skew, improve the stability of being connected between baffle and the mount, and then improve and install the stability of being connected between guardrail and the basic guardrail additional.
Optionally, one side of the rotating plate close to the baffle is integrally provided with a protrusion for limiting the rotating plate, and the baffle is provided with a clamping hole for clamping the protrusion.
Through adopting above-mentioned technical scheme, downthehole through going into the joint with protruding joint, make the rotor plate spacing on the baffle, improve the stability of being connected between rotor plate and the baffle to improve the stability of being connected between baffle and the mount.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by installing or replacing additional baskets with different sizes between the foundation baskets, the hanging basket can be constructed on the highway bridge with the sizes corresponding to the hanging baskets, so that the utilization rate of the hanging basket is improved;
2. the insertion block is inserted into the insertion slot, the base support plate is pre-connected with the additional support plate, the base support plate and the additional support plate are mutually limited along the length horizontal direction perpendicular to the insertion plate by arranging the limiting block, and finally the additional support plate is in threaded fit with the base support plate by penetrating through the bolt, so that the connection stability between the base support plate and the additional support plate is improved;
3. through inserting the pothook joint inslot, the messenger installs guardrail and basic guardrail in advance additional, through setting up the mount, makes the mount install guardrail and basic guardrail additional along the perpendicular to install the length direction of guardrail additional spacing and fixed, improves the stability of being connected between guardrail and the basic guardrail additional.
Drawings
Fig. 1 is an overall schematic view of a public road bridge roof beam construction hanging basket in the embodiment of the application.
Fig. 2 is an explosion diagram of a foundation support plate, a foundation guardrail, an additional support plate and an additional guardrail in the embodiment of the application.
Fig. 3 is an explosion diagram of a foundation support plate, a foundation guardrail, an additional support plate and an additional guardrail in the embodiment of the application.
Fig. 4 is an exploded view illustrating the fixing frame, the rotating column, the baffle plate and the rotating plate in the embodiment of the present application.
Fig. 5 is an exploded view of the fixing frame, the rotating column, the baffle plate and the rotating plate in the embodiment of the present application.
Description of reference numerals: 1. a foundation basket; 2. a foundation support plate; 3. a base guardrail; 4. perforating; 5. adding a basket; 6. additionally installing a supporting plate; 7. installing a guardrail additionally; 8. inserting plates; 9. a slot; 10. a fixing device; 11. a limiting block; 12. a limiting groove; 13. a first attracting magnet; 14. a first groove; 15. a second attracting magnet; 16. a second groove; 17. a hook; 18. a receding groove; 19. a clamping groove; 20. a fixed mount; 21. a fixing plate; 22. a baffle plate; 23. inserting a column; 24. a column groove; 25. rotating the column; 26. rotating the hole; 27. a protrusion; 28. a clamping hole; 29. and rotating the plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
Referring to fig. 1, the embodiment of the application discloses a public road bridge roof beam construction hanging flower basket, including basic basket 1 and additional installation basket 5. The foundation basket 1 is symmetrically provided with two, and the additional basket 5 is arranged between the two foundation baskets 1. The foundation basket 1 comprises a foundation support plate 2 and a foundation fence 3 connected by welding.
Install basket 5 including installing backup pad 6 with install guardrail 7 additional through welded connection additional. The foundation basket 1 is connected with the additional basket 5 through clamping and is fixed through bolts. By installing the additional baskets 5 with different sizes between the foundation baskets 1, the hanging baskets can be applied to the highway bridge with the corresponding size, thereby improving the utilization rate of the hanging baskets.
Referring to fig. 2 and 3, an inserting plate 8 is integrally arranged on the additional supporting plate 6, and the inserting plate 8 is positioned on one side, close to the base supporting plate 2, of the additional supporting plate 6. The base support plate 2 is provided with a slot 9, and the slot 9 is positioned at the position where the base support plate 2 is abutted to the inserting plate 8. The slot 9 is used for inserting the inserting plate 8 to connect the base supporting plate 2 and the additional supporting plate 6.
Referring to fig. 2 and 3, a limiting block 11 is integrally arranged on the base support plate 2, and the limiting block 11 is located on one side, close to the additional installation support plate 6, of the base support plate 2. Install the backup pad 6 additional and seted up spacing groove 12, spacing groove 12 is located installs backup pad 6 additional and is close to one side of foundation support plate 2, and spacing groove 12 is located picture peg 8 and installs between the backup pad 6 additional. The limiting groove 12 is used for placing the limiting block 11 to limit the inserting plate 8 in the slot 9 along the length direction perpendicular to the inserting plate 8.
Referring to fig. 2 and 3, a first attracting magnet 13 is mounted on the limiting block 11, and the first attracting magnet 13 is located on one side of the limiting block 11 close to the additional mounting support plate 6. The first attraction magnet 13 is used for attracting the additional mounting support plate 6 and the base support plate 2, so that the connection between the additional mounting support plate 6 and the base support plate 2 is more stable. The limiting block 11 is provided with a first groove 14 for mounting the first absorption magnet 13. In order to improve the stability of the connection between the first absorption magnet 13 and the first groove 14, an epoxy glue may be applied in the first groove 14 to improve the stability of the connection between the first absorption magnet 13 and the first groove 14.
Referring to fig. 2 and 3, the additional supporting plate 6 is provided with a second attracting magnet 15, and the second attracting magnet 15 is located at a position where the additional supporting plate 6 abuts against the first attracting magnet 13. The polarity of the second attracting magnet 15 is opposite to the polarity of the first attracting magnet 13. The connection between the base support plate 2 and the additional support plate 6 is more stable through the attraction between the second attraction magnet 15 and the first attraction magnet 13. The additional supporting plate 6 is provided with a second groove 16 for installing the second attracting magnet 15. In order to improve the stability of the connection between the second attracting magnet 15 and the second groove 16, epoxy glue may be applied in the second groove 16 to improve the stability of the connection between the second attracting magnet 15 and the second groove 16.
Referring to fig. 2 and 3, the additional guardrail 7 is integrally provided with hooks 17, and the hooks 17 are symmetrically arranged on one side of the additional guardrail 7 close to the base guardrail 3. The basic guardrail 3 is provided with a receding groove 18, the receding groove 18 is positioned on one side of the basic guardrail 3 close to the additionally-installed guardrail 7, and the receding groove 18 penetrates through the basic guardrail 3 along the length direction perpendicular to the clamping hook 17. The basic guardrail 3 is provided with a clamping groove 19, and the clamping groove 19 is communicated with the receding groove 18. When the hook 17 enters the receding groove 18, the height of the inserting plate 8 is larger than that of the limiting block 11. When the hook 17 is inserted into the clip groove 19, the plug board 8 can be placed into the slot 9.
Referring to fig. 2 and 4, a fixing device 10 for connecting the base guardrail 3 and the additional guardrail 7 is installed between the base guardrail 3 and the additional guardrail 7. The fixing device 10 includes a fixing frame 20, a fixing plate 21, a rotating post 25, a blocking plate 22, and a rotating plate 29. The mount 20 sets up on installing guardrail 7 and basic guardrail 3 additional, and mount 20 is used for the reinforcement to install guardrail 7 and basic guardrail 3 additional being connected. The fixing plate 21 is integrally arranged on the fixing frame 20, and the fixing plate 21 is positioned on one side of the fixing frame 20 close to the additional guardrail 7 and the basic guardrail 3. Through inserting fixed plate 21 and moving back and let in the groove 18, make pothook 17 along the length direction of pothook 17 spacing in joint inslot 19 to make mount 20 spacing and be fixed in install guardrail 7 and basic guardrail 3 additional on, and then strengthen installing guardrail 7 and being connected of basic guardrail 3 additional.
Referring to fig. 4 and 5, the baffle 22 is disposed on the fixing frame 20, and the baffle 22 is located on a side of the fixing frame 20 away from the fixing plate 21. The baffle plate 22 is used for limiting the fixing frame 20 on the additional guardrail 7 and the basic guardrail 3. The baffle 22 is integrally provided with inserting columns 23, the inserting columns 23 are symmetrically arranged, and the inserting columns 23 are positioned on one side, close to the fixed frame 20, of the baffle 22. The fixing frame 20 is provided with a column slot 24 for inserting the inserting column 23, and the column slot 24 is positioned on one side of the fixing frame 20 close to the baffle 22.
Referring to fig. 4 and 5, the rotating column 25 is disposed on the fixing frame 20. The fixing plate 21 is formed with a rotation hole 26, and the rotation hole 26 penetrates the fixing plate 21 along a length direction of the rotation hole 26. The baffle plate 22 is provided with a through hole 4, and the through hole 4 penetrates through the baffle plate 22 along the length direction of the rotating column 25. The rotary column 25 is respectively connected with the rotary hole 26 and the through hole 4 in a rotating mode, so that the baffle plate 22 is limited on the fixing frame 20 by the rotary column 25, the fixing frame 20 is fixed on the additionally-installed guardrail 7 and the foundation guardrail 3, and the connection between the additionally-installed guardrail 7 and the foundation guardrail 3 is reinforced.
Referring to fig. 4 and 5, the rotating column 25 is in threaded connection with a rotating plate 29, the rotating plate 29 is integrally provided with protrusions 27, the protrusions 27 are symmetrically arranged, and the protrusions 27 are positioned on one side of the rotating plate 29 close to the baffle 22. The baffle 22 is provided with a clamping hole 28, and the clamping hole 28 is positioned on one side of the baffle 22 close to the rotating column 25. Through making protruding 27 joint income joint hole 28 in to rotatory rotation post 25 to with rotor plate 29 spacing on baffle 22, make rotation post 25 and baffle 22 be connected more stably.
The installation process of the highway bridge construction hanging basket in the embodiment of the application is as follows:
1. the clamping hook 17 is inserted into the receding groove 18, so that the height of the plug board 8 is higher than that of the limiting block 11, when the clamping hook 17 is inserted into the clamping groove 19 along the direction that the plug board 8 is placed into the slot 9, the plug board 8 can be placed into the slot 9, and the additional supporting board 6 is connected with the basic supporting board 2 in advance. Wear to establish simultaneously through the bolt and install backup pad 6 and 2 screw-thread fit of foundation support board additional to consolidate foundation support board 2 and install being connected between the backup pad 6 additional.
2. When the inserting plate 8 is inserted into the inserting groove 9, the limiting block 11 enters the limiting groove 12, so that the inserting plate 8 is limited in the inserting groove 9 along the length direction perpendicular to the inserting plate 8, and the connection between the base supporting plate 2 and the additionally-installed supporting plate 6 is more stable. When the limiting block 11 enters the limiting groove 12, the first attracting magnet 13 and the second attracting magnet 15 are mutually abutted and mutually attracted, and the connection between the foundation support plate 2 and the additionally installed support plate 6 is reinforced again.
3. When the hook 17 is inserted into the clamping groove 19. The fixing plate 21 is inserted into the receding groove 18, and the hook 17 is limited in the clamping groove 19 along the length direction of the hook 17, so that the fixing frame 20 is fixed on the additional installation guardrail 7 and the basic guardrail 3, and the additional installation guardrail 7 and the basic guardrail 3 are connected and reinforced. The inserting column 23 is inserted into the column groove 24, so that the baffle plate 22 is connected with the fixed frame 20, and the baffle plate 22 limits the fixed frame 20 on the additional guardrail 7 and the basic guardrail 3. The rotating plate 29 is limited on the baffle 22 by the bulge 27 clamped into the clamping hole 28. The rotating hole 26 and the through hole 4 are formed through the rotating column 25 and are in threaded fit with the rotating plate 29, so that the rotating plate 29 is limited and fixed on the baffle 22.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a public road bridge roof beam construction hanging flower basket which characterized in that: the device comprises symmetrically arranged foundation baskets (1) and additional baskets (5) used for connecting the foundation baskets (1) at two sides, wherein the foundation baskets (1) comprise foundation support plates (2) for people to stand and foundation guardrails (3) arranged on the foundation support plates (2), and the additional baskets (5) comprise additional support plates (6) for people to stand and additional guardrails (7) symmetrically arranged at two sides of the additional support plates (6);
inserting plates (8) are symmetrically arranged on one side, close to the base basket (1), of the additional supporting plate (6), inserting slots (9) for the inserting plates (8) to be placed in and limited are formed in the base supporting plate (2), and the additional supporting plate (6) and the base supporting plate (2) are fixed through bolts;
and a fixing device (10) is arranged between the foundation guardrail (3) and the additional guardrail (7) to connect the foundation guardrail (3) and the additional guardrail (7).
2. The public road bridge roof beam construction hanging basket of claim 1, characterized in that: the utility model discloses a spacing picture peg, including base support plate (2), be close to one side an organic whole that installs backup pad (6) additional on base support plate (2) and be provided with stopper (11), install spacing groove (12) that supply stopper (11) to put into additional on backup pad (6), stopper (11) are used for spacing picture peg (8) and base support plate (2) along the length direction of perpendicular to picture peg (8).
3. A road bridge construction gondola according to claim 2, characterized in that: one side, close to the additionally-installed supporting plate (6), of the limiting block (11) is provided with a first attraction magnet (13), the first attraction magnet (13) is used for attracting the basic supporting plate (2) and the additionally-installed supporting plate (6), and a first groove (14) for installing the first attraction magnet (13) is formed in the limiting block (11).
4. A road bridge construction gondola according to claim 3, characterized in that: the position of contradicting first actuation magnet (13) on installing backup pad (6) additional is provided with second actuation magnet (15), second actuation magnet (15) are used for actuation first actuation magnet (13), offer second recess (16) that supply second actuation magnet (15) to install on installing backup pad (6) additional.
5. The public road bridge roof beam construction hanging basket of claim 1, characterized in that: install guardrail (7) additional and go up one side an organic whole that is close to basic guardrail (3) and be provided with pothook (17), set up the groove of giving way (18) that give way that supplies pothook (17) to get into on basic guardrail (3), the length direction who gives way groove (18) along perpendicular to pothook (17) runs through basic guardrail (3), offer on basic guardrail (3) and supply pothook (17) to insert and fixed joint groove (19) along the direction of putting into of picture peg (8), it communicates mutually with joint groove (19) to give way groove (18).
6. A road and bridge construction gondola as claimed in claim 5, characterized in that: fixing device (10) include mount (20), rotate post (25) and rotor plate (29), mount (20) set up in install guardrail (7) additional and basic guardrail (3) go up with fixed basic guardrail (3) and install guardrail (7) additional, offer on mount (20) and rotate post (25) rotation hole (26) of being connected, rotate post (25) and wear to establish mount (20), it is fixed in order to install guardrail (7) additional and basic guardrail (3) to rotate post (25) and rotor plate (29) threaded connection.
7. A road and bridge construction gondola as claimed in claim 6, characterized in that: fixing device (10) still include fixed plate (21), fixed plate (21) an organic whole sets up and is close to the one side of installing guardrail (7) additional and basic guardrail (3) on mount (20), fixed plate (21) insert and move back and let groove (18) along the spacing pothook of length direction (17) and basic guardrail (3) of groove (18) of moving back, rotate hole (26) and run through fixed plate (21) along the length direction of fixed plate (21).
8. A road and bridge construction gondola as claimed in claim 7, characterized in that: the fixing device (10) further comprises a baffle plate (22) arranged between the fixing plate (21) and the rotating plate (29), and a through hole (4) for the rotating column (25) to penetrate through and fix is formed in the baffle plate (22).
9. A road bridge construction gondola according to claim 8, characterized in that: one side of the baffle (22) close to the fixing frame (20) is symmetrically provided with inserting columns (23) used for limiting the baffle (22), and the fixing frame (20) is provided with column grooves (24) for inserting and fixing the inserting columns (23).
10. A road bridge roof beam construction basket according to claim 8, characterized in that: one side of the rotating plate (29) close to the baffle (22) is integrally provided with a protrusion (27) used for limiting the rotating plate (29), and the baffle (22) is provided with a clamping hole (28) for clamping the protrusion (27).
CN202221750240.XU 2022-07-08 2022-07-08 Highway bridge construction hanging flower basket Active CN217601235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221750240.XU CN217601235U (en) 2022-07-08 2022-07-08 Highway bridge construction hanging flower basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221750240.XU CN217601235U (en) 2022-07-08 2022-07-08 Highway bridge construction hanging flower basket

Publications (1)

Publication Number Publication Date
CN217601235U true CN217601235U (en) 2022-10-18

Family

ID=83592020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221750240.XU Active CN217601235U (en) 2022-07-08 2022-07-08 Highway bridge construction hanging flower basket

Country Status (1)

Country Link
CN (1) CN217601235U (en)

Similar Documents

Publication Publication Date Title
CN217601235U (en) Highway bridge construction hanging flower basket
CN111794589A (en) Safety protection bearing structure that town road bed was used
CN217203640U (en) Road and bridge construction attachment strap structure
CN214005530U (en) Highway guardrail convenient to change
CN214117013U (en) Building structure design wall column base connection structure
CN211714780U (en) Foundation pit support structure
CN210067011U (en) Assembled building convenient to installation
CN204112248U (en) A kind of mounting seat support of sound barrier
CN218027375U (en) Weather-resistant steel isolation fence for road
CN218061759U (en) Beautify cover convenient to installation
CN216130130U (en) Deep foundation pit protection device for building construction
CN216142532U (en) Electric power engineering is with protection rail
CN217949066U (en) Environment-friendly combined supporting structure of deep foundation pit
CN220644313U (en) Open-pit mine slope toe support
CN217629416U (en) Bridge railing convenient to equipment
CN214996651U (en) Diagonal bracing guardrail
CN216043087U (en) Fender is enclosed in town road construction
CN214879786U (en) Tower crane with assembled tower crane foundation
CN219864463U (en) Foundation pit limb protection device
CN110539099A (en) adjustable jig frame for positioning precast beam guardrail reinforcing steel bars and construction method thereof
CN219691234U (en) Building foundation pit protection device
CN212104107U (en) Foundation pit supporting structure convenient to dismouting
CN213509962U (en) Building construction basis deep basal pit protective structure
CN217760396U (en) Building engineering warning fence
CN214783259U (en) Anti-throwing net structure for steel guardrail of highway bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant