CN217583469U - Pipeline installation device - Google Patents

Pipeline installation device Download PDF

Info

Publication number
CN217583469U
CN217583469U CN202221145743.4U CN202221145743U CN217583469U CN 217583469 U CN217583469 U CN 217583469U CN 202221145743 U CN202221145743 U CN 202221145743U CN 217583469 U CN217583469 U CN 217583469U
Authority
CN
China
Prior art keywords
fixed
buried
pipeline
embedded
embedded pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221145743.4U
Other languages
Chinese (zh)
Inventor
陈起军
齐浒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Construction Engineering Group Co ltd
Original Assignee
Hefei Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Construction Engineering Group Co ltd filed Critical Hefei Construction Engineering Group Co ltd
Priority to CN202221145743.4U priority Critical patent/CN217583469U/en
Application granted granted Critical
Publication of CN217583469U publication Critical patent/CN217583469U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline installation device relates to the construction field, and it is fixed with the fixed ear that the symmetry set up including pre-buried in the pre-buried portion at building position in the pre-buried portion, fixed ear is the arc, and has on the fixed ear and be used for supplying the fixed orifices of iron nail, the vertical jib of pre-buried portion fixedly connected with, the fixed cover of lower extreme fixedly connected with of jib, the lower extreme of fixed cover is fixed with and is used for carrying out the pipeline mounting fixed to the water and electricity pipeline. When the whole device is used, the construction is simple and convenient, and the drilling at the top of a floor can be avoided. Secondly when pre-buried, can be through artifical reasonable adjustment pre-buried position, and then avoid destroying the secretly buried pipeline, also avoided the expense that the later stage was repaired and is produced, reduce dust and noise pollution simultaneously, healthy environmental protection. Finally, whole device possesses multiple fixed effect after fixed, and is fixed firm, is difficult to become flexible, excellent in use effect.

Description

Pipeline installation device
Technical Field
The utility model relates to a construction field especially relates to a pipeline installation device.
Background
Traditional water and electricity pipeline jib mounting means at first will play line, location jib mounted position at floor top, then handheld drilling tool drills, passes through expansion bolts with the jib at last and fixes on the structural slab, and the construction process is comparatively complicated, and has more hidden danger: (1) the working face is located the floor top, has the take a theatrical performance, needs the operation of building a platform, and bullet line and drilling all are inconvenient for the operation, and have certain potential safety hazard. (2) The positions of pipelines and steel bars in the structure are not clear, the pipelines can be damaged by drilling, the repairing cost is high, or the drilling positions are overlapped with the steel bars, the drilling depth is not enough for installing expansion bolts, and the expansion bolts need to be shifted for re-drilling, so that unnecessary damage is caused. (3) The drilling is operated from bottom to top, has certain requirements on the physical quality of workers, is accompanied by dust and noise during construction, is harmful to the human body and can cause environmental pollution. To this end, a pipeline installation device is required.
SUMMERY OF THE UTILITY MODEL
Objects of the invention
In view of this, the present invention provides a pipeline installation device to solve the technical problem in the background art.
(II) technical scheme
In order to achieve the technical purpose, the utility model provides a pipeline installation device:
it is fixed with the fixed ear that the symmetry set up including pre-buried in the pre-buried portion at building position in the pre-buried portion, fixed ear is the arc, and has on the fixed ear and be used for supplying the fixed orifices of iron nail, the vertical jib of pre-buried portion fixedly connected with, the fixed cover of lower extreme fixedly connected with of jib, the lower extreme of fixed cover is fixed with and is used for carrying out the pipeline mounting fixed to the water and electricity pipeline.
Preferably, the embedded part is including being columniform first pre-buried pipe, and the upper end of first pre-buried pipe is fixed with first pre-buried piece, and the diameter of first pre-buried piece is greater than the external diameter of first pre-buried pipe, the lower extreme of first pre-buried pipe with fixed ear is fixed.
Preferably, the upper end of the hanger bar is fixed to the inside of the hanger bar by gluing.
Preferably, pre-buried portion is including being the pre-buried pipe of columniform inboard threaded second, and the upper end of the pre-buried pipe of second is fixed with the pre-buried piece of second, the pre-buried pipe of second the lower extreme with it is fixed to fix the ear, the upper end an organic whole of jib is provided with fixed quarter butt, and the upper end an organic whole of fixed quarter butt is provided with the threaded connection pole of threaded connection in the pre-buried pipe of second, be provided with the locating part on the pre-buried pipe of second.
Preferably, the locating part includes the screw thread quarter butt with the pre-buried tub of lower extreme threaded connection of second, and the end fixing of screw thread quarter butt has the fixture block of joint between fixed quarter butt and jib, the other end of screw thread quarter butt is fixed with the knob.
Preferably, the inner side of the lower end of the second pre-buried pipe is provided with a shadow hiding groove for hiding the fixture block, and the fixture block is positioned on one side of the fixed short rod.
Preferably, the lower end of the second pre-buried pipe is provided with a threaded hole matched with the threaded short rod in size, and the threaded short rod is in threaded connection with the threaded hole.
According to the technical scheme, the method has the following beneficial effects:
whole device when using, can follow the construction at floor top and carry out pre-buried, not only the construction is simple, convenient, and can avoid the later stage to drill at the floor top. Secondly when pre-buried, can be through artifical reasonable adjustment pre-buried position, and then avoid destroying the secretly buried pipeline, also avoided the expense that the later stage was repaired and is produced, reduce dust and noise pollution simultaneously, healthy environmental protection. Finally, whole device possesses multiple fixed effect after fixed, and is fixed firm, is difficult to become flexible, excellent in use effect. The whole device has simple structure and low manufacturing cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a pipeline installation device according to a first embodiment of the present invention.
Fig. 2 is an enlarged schematic view of a structure in fig. 1.
Fig. 3 is a schematic view of a fixing lug of a pipeline installation device according to a first embodiment of the present invention.
Fig. 4 is a schematic structural diagram of a pipeline installation device according to a second embodiment of the present invention.
Fig. 5 is an enlarged schematic view of the structure at B in fig. 4.
Description of the drawings: the device comprises a pre-buried part 1, a first pre-buried pipe 11, a first pre-buried piece 12, a second pre-buried piece 13, a second pre-buried pipe 14, a threaded short rod 15, a knob 16, a fixture block 17, a shadow hiding groove 18, a fixed short rod 19, a threaded connecting rod 20, a suspender 2, a fixed sleeve 3, a pipeline fixed part 4, a water and electricity pipeline 5, a fixed lug 6 and an iron nail 7.
Detailed Description
The following description is merely exemplary in nature and is not intended to limit the present disclosure, application, or uses. It should be understood that throughout the drawings, identical or similar reference numerals indicate identical or similar parts and features. The drawings are only schematic representations of the concepts and principles of the embodiments of the disclosure, and do not necessarily show specific dimensions or proportions of the various embodiments of the disclosure. Certain features that are part of a particular figure may be exaggerated in order to illustrate relevant details or structures of embodiments of the present disclosure.
Example one
Referring to fig. 1-3, a pipeline installation device, including pre-buried portion 1 in the building position of pre-buried portion, be fixed with the fixed ear 6 that the symmetry set up on pre-buried portion 1, fixed ear 6 is the arc, and has the fixed orifices that is used for supplying iron nail 7 to fix on fixed ear 6, 1 fixedly connected with vertical jib 2 of pre-buried portion, the fixed cover 3 of lower extreme fixedly connected with of jib 2, the lower extreme of fixed cover 3 is fixed with and is used for carrying out the pipeline mounting 4 fixed to water and electricity pipeline 5. Specifically, the pipeline fixing member 4 may be preferably an existing pipeline clamp or an annular suspension ring, the pipeline fixing member 4 is integrally provided with the fixing sleeve 3, and the fixing sleeve 3 is integrally provided with the lower end of the suspension rod 2.
The embedded part 1 comprises a first cylindrical embedded pipe 11, a first embedded piece 12 is fixed at the upper end of the first embedded pipe 11, the diameter of the first embedded piece 12 is larger than the outer diameter of the first embedded pipe 11, and the lower end of the first embedded pipe 11 is fixed with the fixing lug 6. The upper end of the suspension lever 2 is fixed to the inside of the suspension lever 2 by glue.
The utility model discloses when using, with first pre-buried pipe 11, first pre-buried piece 12 and fixed ear 6 are whole pre-buried to the building position that corresponds, for example the floor top, it is pre-buried simple, need not carry out artifical drilling construction to the building position in the later stage like the tradition, not only construction convenience, it is dustproof simultaneously, utilize iron nail 7 to fix ear 6 at the building position that corresponds, afterwards, fix in first pre-buried pipe 11 with the upper end of jib 2 through glue again, finally, can accomplish the installation to water and electricity pipeline 5 in being fixed in pipeline mounting 4 with water and electricity pipeline 5.
Example two
Referring to fig. 4 to 5, a pipeline installation apparatus is different from the first embodiment in that an embedded portion 1 includes a cylindrical second embedded pipe 14 with threads on an inner side, a second embedded piece 13 is fixed to an upper end of the second embedded pipe 14, a lower end of the second embedded pipe 14 is fixed to a fixing lug 6, a fixing short rod 19 is integrally arranged at an upper end of a suspension rod 2, a threaded connection rod 20 in threaded connection with the second embedded pipe 14 is integrally arranged at an upper end of the fixing short rod 19, and a limiting member is arranged on the second embedded pipe 14. Specifically, the suspension rod 2, the fixed short rod 19 and the threaded connecting rod 20 are integrally provided.
It should be noted that the limiting member includes a threaded short rod 15 in threaded connection with the lower end of the second embedded pipe 14, a fixture block 17 clamped between the fixed short rod 19 and the suspension rod 2 is fixed at the end of the threaded short rod 15, and a knob 16 is fixed at the other end of the threaded short rod 15.
In addition, the inner side of the lower end of the second pre-buried pipe 14 is provided with a shadow hiding groove 18 for hiding the fixture block 17, and the fixture block 17 is positioned at one side of the fixing short rod 19. The lower extreme of second pre-buried pipe 14 is provided with the screw hole with screw stub 15 size adaptation, and screw stub 15 threaded connection is in the screw hole. Specifically, the knob 16 is circular, the latch 17 is cylindrical, and the size of the latch 17 is smaller than that of the shadow hiding groove 18.
The utility model discloses when using, with the pre-buried piece 13 of second, the pre-buried pipe of second 14 and fixed ear 6 are all pre-buried to the building position that corresponds, for example the floor top, after pre-buried targets in place, manpower rotating knob 16 rotates screw stub 15 earlier and makes fixture block 17 be located shadow and hide groove 18, later again with the pre-buried piece 13 of second, fixed stub 19 and 2 screw in pre-buried pipes of jib 2 screw in second 14, make fixture block 17 block carry out dual fixed to jib 2 between threaded connection pole 20 and jib 2 at rotating knob 16 at last, so, can be so that fixed more firm not hard up.
When the whole device is used, the construction is simple and convenient, and the drilling at the top of a floor can be avoided. Secondly when pre-buried, can be through artifical reasonable adjustment pre-buried position, and then avoid destroying the secretly buried pipeline, also avoided the expense that the later stage was repaired and is produced, reduce dust and noise pollution simultaneously, healthy environmental protection. Finally, whole device possesses multiple fixed effect after fixed, and is fixed firm, is difficult to not hard up, excellent in use effect. The whole device has simple structure and low manufacturing cost.
Exemplary embodiments of the proposed solution of the present disclosure have been described in detail above with reference to preferred embodiments, however, it will be understood by those skilled in the art that many variations and modifications may be made to the specific embodiments described above, and that many combinations of the various technical features and structures presented in the present disclosure may be made without departing from the concept of the present disclosure, without departing from the scope of the present disclosure, which is defined by the appended claims.

Claims (7)

1. The utility model provides a pipeline installation device, its characterized in that, including pre-buried in pre-buried portion (1) at building position, be fixed with fixed ear (6) that the symmetry set up on pre-buried portion (1), fixed ear (6) are the arc, and have on fixed ear (6) and be used for supplying fixed orifices of iron nail (7), pre-buried portion (1) vertical jib (2) of fixedly connected with, the fixed cover (3) of lower extreme fixedly connected with of jib (2), the lower extreme of fixed cover (3) is fixed with and is used for carrying out pipeline mounting (4) fixed to water and electricity pipeline (5).
2. The pipeline installation device according to claim 1, wherein the embedded part (1) comprises a first cylindrical embedded pipe (11), a first embedded piece (12) is fixed at the upper end of the first embedded pipe (11), the diameter of the first embedded piece (12) is larger than the outer diameter of the first embedded pipe (11), and the lower end of the first embedded pipe (11) is fixed with the fixing lug (6).
3. A pipeline installation device according to claim 2, wherein the upper end of the boom (2) is fixed to the inside of the boom (2) by gluing.
4. The pipeline installation device according to claim 1, wherein the embedded part (1) comprises a cylindrical second embedded pipe (14) with threads on the inner side, a second embedded piece (13) is fixed at the upper end of the second embedded pipe (14), the lower end of the second embedded pipe (14) is fixed with the fixing lug (6), a fixing short rod (19) is integrally arranged at the upper end of the suspender (2), a threaded connecting rod (20) which is in threaded connection with the second embedded pipe (14) is integrally arranged at the upper end of the fixing short rod (19), and a limiting part is arranged on the second embedded pipe (14).
5. The pipeline installation device according to claim 4, wherein the limiting member comprises a threaded short rod (15) in threaded connection with the lower end of the second embedded pipe (14), a clamping block (17) clamped between the fixed short rod (19) and the suspension rod (2) is fixed at the end of the threaded short rod (15), and a knob (16) is fixed at the other end of the threaded short rod (15).
6. The pipeline installation device according to claim 5, wherein the inside of the lower end of the second embedded pipe (14) is provided with a shadow groove (18) for hiding the fixture block (17), and the fixture block (17) is positioned at one side of the fixing short rod (19).
7. A pipeline installation device according to claim 5 or 6, wherein the lower end of the second embedded pipe (14) is provided with a threaded hole matched with the size of the threaded short rod (15), and the threaded short rod (15) is in threaded connection with the threaded hole.
CN202221145743.4U 2022-05-13 2022-05-13 Pipeline installation device Active CN217583469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221145743.4U CN217583469U (en) 2022-05-13 2022-05-13 Pipeline installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221145743.4U CN217583469U (en) 2022-05-13 2022-05-13 Pipeline installation device

Publications (1)

Publication Number Publication Date
CN217583469U true CN217583469U (en) 2022-10-14

Family

ID=83551577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221145743.4U Active CN217583469U (en) 2022-05-13 2022-05-13 Pipeline installation device

Country Status (1)

Country Link
CN (1) CN217583469U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024082574A1 (en) * 2022-10-19 2024-04-25 中建科工集团有限公司 Pre-embed device for electromechanical pipeline support hanger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024082574A1 (en) * 2022-10-19 2024-04-25 中建科工集团有限公司 Pre-embed device for electromechanical pipeline support hanger

Similar Documents

Publication Publication Date Title
CN217583469U (en) Pipeline installation device
CN105058283B (en) Clamp tool for installing bell-spigot type nodular cast iron pipe
CN204304330U (en) With the threading apparatus target seeker of resiliency supported pin
CN209748157U (en) Pipeline for subregion type municipal administration cable
CN210151883U (en) Inner lining repairing mechanism for rain sewage pipeline
CN204913698U (en) A fixture attachment for installing socket joint formula nodular cast -iron pipe
CN215488182U (en) Water supply and drainage pipeline connecting structure for real estate building
CN215166319U (en) Sewage pipe section installation auxiliary device
CN207547194U (en) Inside concrete mortar mediation structure of building steel pipe
CN202247967U (en) Spiral connection embedded pipe
CN202275965U (en) Fast connection device of grounded round steels
CN210119581U (en) Detachable pipeline surveys clamp
CN213585027U (en) A take over 90 degrees elbows for wearing cable
CN219571053U (en) Adjustable positioning device for laying buried multi-pipeline side by side
CN219413773U (en) Pipeline bracket
CN216666672U (en) Municipal works auxiliary device
CN211740882U (en) Pressure test auxiliary tool for socket-and-spigot joint nodular cast iron pipe
CN215721471U (en) City planning municipal drainage pipe
CN218440973U (en) Structure is laid fast to pipeline
CN217759523U (en) Fastening device for ceiling suspender
CN212105878U (en) Municipal construction is with non-excavation pipe laying rig of being convenient for change drill bit
CN208442749U (en) A kind of energy-saving lighting lamp
CN211680140U (en) Hole drilling machine
CN212860521U (en) Rubber ring mounting device
CN212684341U (en) Automatic control additive pipeline design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant