CN105058283B - Clamp tool for installing bell-spigot type nodular cast iron pipe - Google Patents
Clamp tool for installing bell-spigot type nodular cast iron pipe Download PDFInfo
- Publication number
- CN105058283B CN105058283B CN201510584611.XA CN201510584611A CN105058283B CN 105058283 B CN105058283 B CN 105058283B CN 201510584611 A CN201510584611 A CN 201510584611A CN 105058283 B CN105058283 B CN 105058283B
- Authority
- CN
- China
- Prior art keywords
- fixture
- arm
- clamp
- screw mandrel
- iron pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B11/00—Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
- B25B11/02—Assembly jigs
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Clamps And Clips (AREA)
Abstract
The invention discloses a clamp tool for installing a bell-spigot type nodular cast iron pipe. The clamp tool comprises a clamp A and a clamp B. The clamp A and the clamp B are each provided with a clamp arm used for clamping pipelines and an arc-shaped hoop arranged on the clamp arm and used for holding the pipelines, wherein the arc-shaped hoop is located on the side, facing the pipelines, of the clamp arm. Tensioning lead screws are arranged between the portions, located on the same side, of the clamp arm of the clamp A and the clamp arm of the clamp B, penetrate through the clamp arms, and are parallel to the ground. A thrust nut is arranged at each of the two ends of each tensioning lead screw, located at the outer side of the corresponding clamp arm and matched with the tensioning lead screw. The clamp arm of the clamp A and the clamp arm of the clamp B are clamped on the two sides of the two oppositely arranged pipelines, and the thrust nuts are rotated to move towards the middle, so that the clamp at one side of the thrust nuts is pushed to move along with the thrust nuts. The clamp tool has the advantages of being simple in structure, convenient to operate, capable of assembling two pipelines quickly, and low in installation cost.
Description
Technical field
The present invention relates to a kind of pipeline installation engineering field, particularly a kind of fixture work for installing spigot-and-socket ductile iron pipe
Dress.
Background technology
In China's construction project, the commonly used socket joint ductile iron pipe of current water supply and sewage work, when mounted, spheroidal graphite casting
Iron pipe is usually mounted to underground, and installation site is deeper, and pipe trench is also narrow, causes installation operation scope little, and Jing can only often be adopted
Coordinated with Miniature digging machine and installed.However, the labour cost of digging machine is higher, and device is cumbersome, fully relies on operator Jing
Test with feel to transfer ductile iron pipe, it is relatively time-consuming.
Except using above-mentioned digging machine mode come, in addition to installing, during actual installation, also Jing pulls calabash frequently with traditional
Reed, is lifted by chain block forms a team to be respectively fitted on two relative ductile iron pipes.Although which solves
Relatively costly problem, but the efficiency or relatively low, the high labor intensive of workman of its installation.
The content of the invention
The invention aims to solve low existing means lifting spheroidal graphite cast-iron tube efficiency, high labor intensive, into
This higher problem, and a kind of clamp fixture of the installation spigot-and-socket ductile iron pipe for providing.
To achieve these goals, the clamp fixture of a kind of installation spigot-and-socket ductile iron pipe designed by the present invention, it
Including fixture A and fixture B, the fixture A and fixture B includes being used in combination for clamping the jig arm of pipeline and being arranged in jig arm
In the arc anchor ear for holding pipeline tightly;The jig arm of the fixture A and fixture B is constituted by the support arm that two rotary types connect, described
Arc anchor ear is located at jig arm towards the side of pipeline;Be provided between fixture A and fixture B homonymy jig arm one through jig arm and with
The horizontal tension screw mandrel in ground;One is equipped with the outside of the two ends of tension screw mandrel, jig arm to be engaged with screw mandrel is tensed
Push nut, by the jig arm in fixture A and fixture B is clamped in two pipeline both sides being oppositely arranged respectively, and rotate
Nut is pushed, the rotated backward middle part movement of nut is pushed, so as to promote the fixture in its side to move.
Further, for the ease of adjusting the spacing in fixture A and fixture B between two support arms, adapt to the folder of different tube diameters
Hold, meanwhile, be easy to fixture A, fixture B with the installation and removal between cast-iron pipe, one is provided with for adjusting in two support arm upper ends
The clamp system of spacing between section support arm, the clamp system include the clamping silk on a turnable support arm installed therein
Bar, the screw mandrel being fixedly mounted on another support arm are placed block and are located at and clamp screw mandrel placement block both sides and be enclosed within clamping screw mandrel
Adjusting nut, during use, rotating adjusting nut, you can drive that the screw mandrel in its side places block and to place block with screw mandrel solid
The support arm displacement of fixed connection.
Further, screw mandrel place block upper end be provided with one for place clamping screw mandrel breach, the breach can be so as to
Depart from screw mandrel placement block in placing to clamp screw mandrel or screw mandrel will be clamped, change the adjusting nut being easily damaged.
Further, the support arm is by upper arm, underarm and is placed in linking arm between upper arm and underarm and oblique
Composition, the linking arm in two in fixture A and fixture B support arm are cross-shaped, are provided with a rotary shaft in linking arm intersection.
Arranged in turnable structure by the support arm by fixture A and fixture B, two support arms can be connected into an entirety, together
When, it is easy to two arm rooms to rotate, adjusts the spacing of two arm rooms.
Further, the clamp system is arranged between fixture A and the upper arm of fixture B each support arm, and the arc is embraced
Hoop is on the underarm of fixture A and fixture B each support arm, and the radian of arc anchor ear is outer with cast-iron pipe in each fixture
Wall radian is identical.
Compared with prior art, a kind of clamp fixture of installation spigot-and-socket ductile iron pipe that the present invention is obtained has as follows
Advantage:
1st, by being clamped on two pipelines to be installed respectively using two fixtures, and wear in the jig arm of two fixtures
A piece horizontal tension screw mandrel, by push nut of the rotary sleeve on screw mandrel and on the outside of jig arm, you can drive and the spiral shell
The adjacent fixture of parent phase and pipeline are mobile to centre together, so that two pipelines connect together.
2nd, it is fitted with for adjusting two clamp systems for intersecting spacing between support arms, the clamp system on each fixture
Corresponding spacing between two support arms can be adjusted according to the external diameter size of field pipes, so as to realize the purpose of clamping pipe.
3rd, the structure of fixture is relatively simple, easy for installation, only needs a people i.e. operable during installation, save it is artificial and into
This.Meanwhile, during operative, only need the spacing in installs fixture, alignment jig between support arm and rotation to push nut,
It is time saving and energy saving.
Description of the drawings
Fig. 1 is the structural representation of fixture A or fixture B in embodiment;
Fig. 2 is that fixture A and fixture B is separately mounted in corresponding pipeline and state during pipe laying is illustrated in embodiment
Figure;
Fig. 3 is arranged on pipeline, by the view after the completion of Pipe installing for fixture in embodiment.
In figure:Jig arm 1, support arm 11, upper arm 111, linking arm 112, underarm 113, arc anchor ear 2, tension screw mandrel 3, push
Nut 4, clamping screw mandrel 5, screw mandrel place block 6, breach 61, adjusting nut 7, rotary shaft 8.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Embodiment:
A kind of clamp fixture of installation spigot-and-socket ductile iron pipe that the present embodiment is provided, as shown in Figure 1 to Figure 3, it wraps
Fixture A and fixture B is included, the fixture A and fixture B includes being used in combination for clamping the jig arm 1 of pipeline and being arranged in jig arm 1
In the arc anchor ear 2 for holding pipeline tightly, the arc anchor ear 2 is located at jig arm 1 towards the side of pipeline;In fixture A and fixture B homonymies
One is provided between jig arm 1 runs through jig arm 1 and the tension screw mandrel 3 horizontal with ground;Tensing two ends, the jig arm 1 of screw mandrel 3
Outside be equipped with one with tense the push nut 4 that is engaged of screw mandrel 3, by the jig arm 1 in fixture A and fixture B is distinguished
It is clamped in two pipeline both sides being oppositely arranged, and rotates push nut 4, pushes the rotated backward middle part movement of nut 4, so as to
The fixture in its side is promoted to move.In above-mentioned fixture A and fixture B, jig arm 1 can be one in the specific implementation
Put the cramping body of U-shaped.
The jig arm 1 of above-mentioned fixture A and fixture B is constituted by two support arms 11, and being provided with one in two support arms, 11 upper end is used for
The clamp system of spacing between support arm 11 is adjusted, the clamp system is included on a turnable support arm 11 installed therein
Clamp screw mandrel 5, the screw mandrel being fixedly mounted on another support arm 11 to place block 6 and be located at screw mandrel placement 6 both sides of block and be enclosed within folder
Adjusting nut 7 on tight screw mandrel 5, during use, rotating adjusting nut 7, you can drive the screw mandrel in its side place block 6 and with
Screw mandrel places 11 displacement of support arm that block 6 is fixedly connected.
As shown in figure 3, screw mandrel place block 6 upper end be provided with one for place clamping screw mandrel 5 breach 61.Concrete real
Shi Shi, above-mentioned breach 61 can also be installing holes concentric with screw mandrel 5 is clamped.
Specifically, above-mentioned support arm 11 is by upper arm 111, underarm 113 and is placed between upper arm 111 and underarm 113 and in inclining
Ramp-like linking arm 112 is constituted, and the linking arm 112 in two in fixture A and fixture B support arm 11 is cross-shaped, in connection
112 intersection of arm is provided with a rotary shaft 8.
Above-mentioned clamp system is arranged between fixture A and the upper arm 111 of fixture B each support arm 11, and the arc anchor ear 2 is pacified
It is mounted on the underarm 113 of fixture A and fixture B each support arm 11, and the radian of arc anchor ear 2 and cast-iron pipe in each fixture
Outer wall radian is identical.
Finally it should be noted that above example is only to illustrate technical scheme rather than restriction technologies side
Case, although applicant has been described in detail to the present invention with reference to preferred embodiment, one of ordinary skill in the art should manage
Solution, those are modified to technical scheme or equivalent, without deviating from the objective and scope of the technical program,
All should cover in the middle of scope of the presently claimed invention.
Claims (4)
1. it is a kind of install spigot-and-socket ductile iron pipe clamp fixture, it is characterised in that it includes fixture A and fixture B, the folder
Tool A and fixture B includes the jig arm for clamping pipeline(1)And it is arranged on jig arm(1)Above and for holding the arc of pipeline tightly
Anchor ear(2);The jig arm of the fixture A and fixture B(1)By the support arm of two rotary type connections(11)Composition, the arc are embraced
Hoop(2)Positioned at jig arm(1)Towards the side of pipeline;In fixture A and fixture B homonymy jig arm(1)Between be provided with one through jig arm
(1)And the tension screw mandrel horizontal with ground(3);Tensing screw mandrel(3)Two ends, jig arm(1)Outside be equipped with one
With tension screw mandrel(3)The push nut being engaged(4), by by the jig arm in fixture A and fixture B(1)Two are clamped in respectively
The pipeline both sides being oppositely arranged, and rotate push nut(4), push nut(4)Rotated backward middle part movement, so as to promote
The fixture of its side is moved;
In two support arms(11)Upper end is provided with one for adjusting support arm(11)Between spacing clamp system, the clamp system bag
Include a turnable support arm installed therein(11)On clamping screw mandrel(5), be fixedly mounted on another support arm(11)On silk
Bar places block(6)And it is located at screw mandrel placement block(6)Both sides are simultaneously enclosed within clamping screw mandrel(5)On adjusting nut(7), during use,
Rotating adjusting nut(7), you can drive the screw mandrel in its side to place block(6)And block is placed with screw mandrel(6)It is fixedly connected
Support arm(11)Displacement.
2. it is according to claim 1 it is a kind of install spigot-and-socket ductile iron pipe clamp fixture, it is characterised in that in screw mandrel
Place block(6)Upper end be provided with one for place clamping screw mandrel(5)Breach(61).
3. it is according to claim 1 it is a kind of install spigot-and-socket ductile iron pipe clamp fixture, it is characterised in that described
Arm(11)By upper arm(111), underarm(113)And it is placed in upper arm(111)And underarm(113)Between and oblique linking arm
(112)Composition, two in fixture A and fixture B support arm(11)In linking arm(112)It is cross-shaped, in linking arm(112)
Intersection is provided with a rotary shaft(8).
4. it is according to claim 3 it is a kind of install spigot-and-socket ductile iron pipe clamp fixture, it is characterised in that the folder
Tight mechanism is arranged on fixture A and fixture B each support arm(11)Upper arm(111)Between, the arc anchor ear(2)Installed in fixture
A and fixture B each support arm(11)Underarm(113)On, and arc anchor ear in each fixture(2)Radian and cast-iron pipe it is outer
Wall radian is identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510584611.XA CN105058283B (en) | 2015-09-15 | 2015-09-15 | Clamp tool for installing bell-spigot type nodular cast iron pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510584611.XA CN105058283B (en) | 2015-09-15 | 2015-09-15 | Clamp tool for installing bell-spigot type nodular cast iron pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105058283A CN105058283A (en) | 2015-11-18 |
CN105058283B true CN105058283B (en) | 2017-03-22 |
Family
ID=54487907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510584611.XA Active CN105058283B (en) | 2015-09-15 | 2015-09-15 | Clamp tool for installing bell-spigot type nodular cast iron pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105058283B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107053102B (en) * | 2017-05-04 | 2023-10-20 | 徐州徐工基础工程机械有限公司 | Ground turning type position changing machine |
CN108488484B (en) * | 2018-02-28 | 2020-08-04 | 中冶南方城市建设工程技术有限公司 | Efficient socket joint pipeline interface installation device |
CN109000038A (en) * | 2018-10-17 | 2018-12-14 | 中铁建大桥工程局集团电气化工程有限公司 | A kind of subway tunnel ductile iron pipeline installation tensioning equipment |
CN109483432A (en) * | 2018-11-12 | 2019-03-19 | 徐州天泽乘龙机械制造有限公司 | A kind of gripping mechanism of spheroidal graphite pipe |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1082479A (en) * | 1996-09-06 | 1998-03-31 | Osaka Gas Co Ltd | Conduit handling device |
JP3697931B2 (en) * | 1999-04-06 | 2005-09-21 | Jfeスチール株式会社 | How to remove the insertion joint |
CN201007411Y (en) * | 2007-02-06 | 2008-01-16 | 毛瑜 | Piping spigot-and-socket connector |
CN104400737B (en) * | 2014-09-23 | 2017-01-11 | 上海白蝶管业科技股份有限公司 | Pipeline socket connection clamp |
CN104353954A (en) * | 2014-11-03 | 2015-02-18 | 上海深海宏添建材有限公司 | Manual flexible abutting joint device of PP mute tube |
CN204913698U (en) * | 2015-09-15 | 2015-12-30 | 中冶建工集团有限公司 | A fixture attachment for installing socket joint formula nodular cast -iron pipe |
-
2015
- 2015-09-15 CN CN201510584611.XA patent/CN105058283B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105058283A (en) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105058283B (en) | Clamp tool for installing bell-spigot type nodular cast iron pipe | |
CN106869183B (en) | A kind of construction method of underground pipe gallery waterstop | |
JP5794455B2 (en) | Steel pipe complex processing equipment | |
CN204913698U (en) | A fixture attachment for installing socket joint formula nodular cast -iron pipe | |
JP2015166648A (en) | U-shaped tube fixture for heat exchanging pile and heat exchanging pile mounting method | |
CN217583469U (en) | Pipeline installation device | |
CN106759523B (en) | A kind of installation auxiliary device of underground pipe gallery waterstop | |
CN204416673U (en) | Earth source heat pump grout lines carries pipe machine | |
CN205938193U (en) | Quick connecting device of fluid pipe | |
JP2022103207A (en) | Mounting method for flange reinforcement tool | |
CN201746836U (en) | Anchor device | |
CN207386251U (en) | A kind of stainless steel Bender by roasting | |
CN203557294U (en) | Pipe clamp | |
CN207547194U (en) | A kind of building steel tube inner concrete mortar dredging structure | |
CN209510392U (en) | A kind of external conduit device of shield tunnel | |
CN212898497U (en) | Shield constructs quick-witted stabilising arrangement | |
JP2012132239A (en) | Construction method for underground structure | |
CN113305516B (en) | Construction method applied to welding and punching of template | |
CN211220430U (en) | Natural gas pipeline mounting structure | |
CN216279731U (en) | Pipeline laying auxiliary device for municipal water supply and drainage | |
CN219571053U (en) | Adjustable positioning device for laying buried multi-pipeline side by side | |
CN218931555U (en) | Pipeline manhole installation fixing device | |
CN210927047U (en) | Lighting working well | |
CN114809237B (en) | Tight connecting piece and method for branch pipes of agricultural pollution project shaft | |
CN209767132U (en) | Pipe orifice sealing plug of MPP cable protection pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |