CN217581170U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN217581170U
CN217581170U CN202221233796.1U CN202221233796U CN217581170U CN 217581170 U CN217581170 U CN 217581170U CN 202221233796 U CN202221233796 U CN 202221233796U CN 217581170 U CN217581170 U CN 217581170U
Authority
CN
China
Prior art keywords
fixed
ring
spring
periphery
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221233796.1U
Other languages
Chinese (zh)
Inventor
韩存梅
韩玉平
韩玉春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xicha Construction Engineering Co ltd
Original Assignee
Jiangsu Xicha Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xicha Construction Engineering Co ltd filed Critical Jiangsu Xicha Construction Engineering Co ltd
Priority to CN202221233796.1U priority Critical patent/CN217581170U/en
Application granted granted Critical
Publication of CN217581170U publication Critical patent/CN217581170U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a scaffold for building construction, which relates to the technical field of building construction and comprises a supporting tube and a clamping component; supporting a tube: the circumferential surface is provided with clamping holes which are uniformly distributed; clamping the assembly: contain go-between, solid fixed ring, first spring and card post, the go-between has been cup jointed on the periphery of stay tube, two corresponding slide openings have been seted up to the periphery of go-between, the inside sliding connection of slide opening has the card post, and two card equal joints of post are in the inside in the card hole rather than corresponding, be fixed with first spring on the terminal surface of card post, the one end that card post was kept away from to first spring is fixed with solid fixed ring, gu fixed ring fixes the inside at the slide opening, install on the periphery of go-between and pull the subassembly, install coupling assembling on the lower terminal surface of go-between, fix the collar through setting up the joint subassembly, it contains swivel and stay cord to pull the subassembly, can install fast and dismantle.

Description

Scaffold for building construction
Technical Field
The utility model relates to a construction technical field specifically is a scaffold frame for construction.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is carried out smoothly, is mainly used for constructors to move up and down and stack materials or is used as an operating platform, and at present, the scaffold used in building construction is mainly built by steel pipes, fasteners and other parts through the combination of vertical pipes and transverse pipes according to construction requirements. The existing scaffold is complex in structure and high in required parts and component quantity, so that the efficiency of the installation and disassembly process is low, and therefore the scaffold for building construction is provided.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide a scaffold frame for construction, can install fast and dismantle, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: a scaffold for building construction comprises a supporting tube and a clamping assembly;
supporting a tube: the circumferential surface is provided with clamping holes which are uniformly distributed;
clamping the assembly: contain go-between, solid fixed ring, first spring and card post, the go-between has been cup jointed on the periphery of stay tube, two corresponding slide openings have been seted up to the periphery of go-between, the inside sliding connection of slide opening has the card post, and two card equal joints of post are in the inside in the card hole rather than corresponding, be fixed with first spring on the terminal surface of card post, the one end that card post was kept away from to first spring is fixed with solid fixed ring, gu fixed ring fixes the inside at the slide opening, install on the periphery of go-between and drag the subassembly, install coupling assembling on the lower terminal surface of go-between, fix the collar through setting up the joint subassembly.
Furthermore, the pulling assembly comprises a rotating ring and pull ropes, the rotating ring is rotatably connected to the circumferential surface of the connecting ring, two corresponding pull ropes are fixed inside the rotating ring, one end, far away from the rotating ring, of each pull rope penetrates through the fixing ring and is fixed on the end face of the clamping column, and the clamping column is pulled to move through the pulling assembly.
Furthermore, coupling assembling contains collar, fixed plate and steel pipe, be fixed with the collar on the lower terminal surface of go-between, be fixed with two corresponding fixed plates on the periphery of collar, the connecting hole has been seted up at the middle part of fixed plate, the inside sliding connection of connecting hole has the steel pipe.
Further, still include spacing subassembly, spacing subassembly contains mount, slide bar, spacing ring, second spring and pull ring, be fixed with the mount on the downside of fixed plate, the groove is led to in having seted up the slip on the downside of mount, the inside sliding connection who leads to the groove slides has the slide bar, spacing logical groove has been seted up to the lower extreme of steel pipe periphery, the upper end joint of slide bar is in the inside of spacing logical groove, be fixed with the spacing ring on the periphery of slide bar, the second spring has been cup jointed on the periphery of slide bar, the upper end of second spring is fixed on the lower terminal surface of spacing ring, the inside at the mount is fixed to the lower extreme of second spring, be fixed with the pull ring on the lower terminal surface of slide bar, inject the position of steel pipe through setting up spacing subassembly.
Furthermore, a handle is fixed on the circumferential surface of the rotating ring, a rubber sleeve is fixed on the circumferential surface of the handle, and a user can pull the rotating ring to rotate through the handle.
Furthermore, a base is fixed on the lower end face of the supporting tube, connecting holes which are uniformly distributed are formed in the upper end face of the base, and the supporting tube is fixed by arranging the base and the connecting holes.
Compared with the prior art, the beneficial effects of the utility model are that: this scaffold frame for construction has following benefit:
the steel pipe can be inserted into the fixing plate through the connecting hole formed in the middle of the fixing plate in the using process, the sliding rod moves upwards under the action of the second spring after the steel pipe is inserted into the limiting through groove formed in the circumferential surface of the steel pipe, the steel pipe can be fixed after the steel pipe is inserted into the fixing plate, the sliding rod and the limiting through groove are pulled downwards to be separated through the pull ring when the steel pipe is required to be detached, the steel pipe can be detached after the separation, and the steel pipe is convenient to use.
Drawings
FIG. 1 is a schematic view of the front side structure of the present invention;
fig. 2 is the schematic diagram of the connecting assembly structure of the present invention.
In the figure: the device comprises a support pipe 1, a clamping hole 2, a clamping component 3, a connecting ring 31, a fixing ring 32, a first spring 33, a clamping column 34, a pulling component 4, a rotating ring 41, a pulling rope 42, a connecting component 5, a mounting ring 51, a fixing plate 52, a steel pipe 53, a limiting component 6, a fixing frame 61, a sliding rod 62, a limiting ring 63, a second spring 64, a pulling ring 65, a handle 7, a rubber sleeve 8, a base 9 and a connecting hole 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present embodiment provides a technical solution: a scaffold for building construction comprises a supporting tube 1 and a clamping component 3;
supporting a tube 1: the circumferential surface is provided with clamping holes 2 which are uniformly distributed;
the clamping assembly 3: the device comprises a connecting ring 31, a fixed ring 32, a first spring 33 and clamping columns 34, wherein the connecting ring 31 is sleeved on the circumferential surface of a supporting tube 1, two corresponding sliding holes are formed in the circumferential surface of the connecting ring 31, the clamping columns 34 are connected inside the sliding holes in a sliding manner, the two clamping columns 34 are clamped inside corresponding clamping holes 2, the first spring 33 is fixed on the end surface of each clamping column 34, one end, far away from the clamping columns 34, of the first spring 33 is fixed with the fixed ring 32, the fixed ring 32 is fixed inside the sliding holes, a pulling assembly 4 is installed on the circumferential surface of the connecting ring 31, a connecting assembly 5 is installed on the lower end surface of the connecting ring 31, the pulling assembly 4 comprises a rotating ring 41 and a pulling rope 42, the rotating ring 41 is rotatably connected on the circumferential surface of the connecting ring 31, two corresponding pulling ropes 42 are fixed inside the rotating ring 41, one end, far away from the rotating ring 41, of the pulling rope 42 passes through the fixed ring 32 and is fixed on the end surface of the clamping columns 34, the connecting assembly 5 comprises a mounting ring 51, a fixing plate 52 and a limiting ring 62, the lower end surface of the connecting plate 62 is connected on the connecting groove 64, and a limiting ring 62, a limiting ring 62 is connected on the lower end of the connecting groove 64, a limiting ring 62, the lower end of the second spring 64 is fixed in the fixing frame 61, the pull ring 65 is fixed on the lower end face of the slide rod 62, the position of the steel pipe 53 is limited by arranging the limiting assembly 6, the pull assembly 4 pulls the clamping column 34 to move, and the mounting ring 51 is fixed by arranging the clamping assembly 3.
Wherein: the handle 7 is fixed on the circumferential surface of the rotating ring 41, the rubber sleeve 8 is fixed on the circumferential surface of the handle 7, and a user can pull the rotating ring 41 to rotate through the handle 7.
Wherein: a base 9 is fixed on the lower end face of the supporting tube 1, connecting holes 10 which are uniformly distributed are formed in the upper end face of the base 9, and the supporting tube 1 is fixed by arranging the base 9 and the connecting holes 10.
The utility model provides a pair of scaffold for construction's theory of operation as follows: firstly, the rotating ring 41 is rotated to enable the two pull ropes 42 to move, the two pull ropes 42 move to pull the two clamping columns 34 to move into the two sliding holes formed in the circumferential surface of the connecting ring 31, then the connecting ring 31 is pulled to move downwards, the mounting ring 51 is driven to move downwards in the moving process of the connecting ring 31, the mounting ring 51 moves downwards to drive the fixing plate 52 to move downwards, after the fixing plate 52 moves downwards to a proper position, the steel pipe is inserted into the inside of the fixing plate, after the insertion, the sliding rod 62 moves upwards under the action of the second spring 64 to enter the limiting through groove formed in the circumferential surface of the steel pipe 53, after the insertion, the steel pipe 53 can be fixed, when the steel pipe needs to be detached, the sliding rod 62 is pulled downwards through the pull ring 65 to be separated from the limiting through groove, the steel pipe 53 can be detached after the separation, and great convenience is achieved.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a scaffold frame for construction which characterized in that: comprises a supporting tube (1) and a clamping component (3);
support tube (1): the circumferential surface is provided with clamping holes (2) which are uniformly distributed;
clamping assembly (3): contain go-between (31), solid fixed ring (32), first spring (33) and card post (34), go-between (31) have been cup jointed on the periphery of stay tube (1), two corresponding slide openings have been seted up to the periphery of go-between (31), the inside sliding connection of slide opening has card post (34), and two equal joints of card post (34) are in the inside rather than the card hole (2) that corresponds, be fixed with first spring (33) on the terminal surface of card post (34), the one end that card post (34) were kept away from in first spring (33) is fixed with solid fixed ring (32), gu fixed ring (32) are fixed in the inside of slide opening, install on the periphery of go-between (31) and pull subassembly (4), install coupling assembling (5) on the lower terminal surface of go-between (31).
2. A scaffold for construction according to claim 1, wherein: the pulling assembly (4) comprises a rotating ring (41) and pull ropes (42), the rotating ring (41) is connected to the circumferential surface of the connecting ring (31) in a rotating mode, two corresponding pull ropes (42) are fixed inside the rotating ring (41), and one end, far away from the rotating ring (41), of each pull rope (42) penetrates through the fixing ring (32) and is fixed to the end face of the clamping column (34).
3. A scaffold for construction according to claim 1, wherein: coupling assembling (5) contain collar (51), fixed plate (52) and steel pipe (53), be fixed with collar (51) on the lower terminal surface of connecting ring (31), be fixed with two corresponding fixed plates (52) on the periphery of collar (51), the connecting hole has been seted up at the middle part of fixed plate (52), the inside sliding connection of connecting hole has steel pipe (53).
4. A scaffold for construction according to claim 3, wherein: still include spacing subassembly (6), spacing subassembly (6) contain mount (61), slide bar (62), spacing ring (63), second spring (64) and pull ring (65), be fixed with mount (61) on the downside of fixed plate (52), the logical groove of slip has been seted up on the downside of mount (61), the inside sliding connection who slides the logical groove has slide bar (62), spacing logical groove has been seted up to the lower extreme of steel pipe (53) periphery, the upper end joint of slide bar (62) is in the inside of spacing logical groove, be fixed with spacing ring (63) on the periphery of slide bar (62), second spring (64) have been cup jointed on the periphery of slide bar (62), the upper end of second spring (64) is fixed on the lower terminal surface of spacing ring (63), the inside at mount (61) is fixed to the lower extreme of second spring (64), be fixed with pull ring (65) on the lower terminal surface of slide bar (62).
5. A scaffold for construction according to claim 2, wherein: a handle (7) is fixed on the circumferential surface of the rotating ring (41), and a rubber sleeve (8) is fixed on the circumferential surface of the handle (7).
6. A scaffold for construction according to claim 1, wherein: the support tube is characterized in that a base (9) is fixed on the lower end face of the support tube (1), and connecting holes (10) which are uniformly distributed are formed in the upper end face of the base (9).
CN202221233796.1U 2022-05-23 2022-05-23 Scaffold for building construction Active CN217581170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221233796.1U CN217581170U (en) 2022-05-23 2022-05-23 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221233796.1U CN217581170U (en) 2022-05-23 2022-05-23 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN217581170U true CN217581170U (en) 2022-10-14

Family

ID=83552032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221233796.1U Active CN217581170U (en) 2022-05-23 2022-05-23 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN217581170U (en)

Similar Documents

Publication Publication Date Title
CN214531117U (en) Assembled steel construction house module connection structure
CN217581170U (en) Scaffold for building construction
CN211572472U (en) Scaffold for building construction
CN218060762U (en) Assembled steel construction building turning beam column connecting piece
CN215185659U (en) High-strength light energy-saving bridge convenient to assemble and disassemble
CN215759644U (en) Connecting assembly for mounting of constructional engineering
CN211473618U (en) Tent support of convenient equipment
CN213297056U (en) Scaffold for mounting wall plates
CN220596768U (en) Detachable large pipe fitting lug
CN219508824U (en) Assembled major structure
CN216616981U (en) Make things convenient for adjustable formwork mounting structure of dismouting
CN217450718U (en) Combined fountain equipment
CN219260743U (en) Bridge template convenient to dismantle
CN215055953U (en) Tent is buckled and is had its tent
CN217812704U (en) Connecting assembly for tent installation and adjustment
CN215055071U (en) Upper and lower separating mechanism for scaffold
CN214093739U (en) Air intelligent TSP comprehensive sampler
CN220539229U (en) House building template installation fixed knot constructs
CN216235902U (en) Support attaches wall device convenient to installation is dismantled
CN215679863U (en) Warning sign of portable dismouting
CN213234190U (en) Construction is with convenient scaffold frame
CN215631449U (en) A high strength construction support for civil engineering building uses
CN219569527U (en) Outer frame for glass curtain wall construction
CN215759329U (en) Water pipe assembly of water supply tank for building construction
CN215803166U (en) A wooden template for civil engineering construction easy to assemble and disassemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant