CN211572472U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN211572472U
CN211572472U CN201921708575.3U CN201921708575U CN211572472U CN 211572472 U CN211572472 U CN 211572472U CN 201921708575 U CN201921708575 U CN 201921708575U CN 211572472 U CN211572472 U CN 211572472U
Authority
CN
China
Prior art keywords
fixedly connected
groove
clamping
inner cavity
clamping column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921708575.3U
Other languages
Chinese (zh)
Inventor
庞高磊
宋会敏
周蕾
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
Original Assignee
CCCC First Highway Engineering Co Ltd
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Third Engineering Co Ltd of Highway Engineering Bureau of CCCC filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201921708575.3U priority Critical patent/CN211572472U/en
Application granted granted Critical
Publication of CN211572472U publication Critical patent/CN211572472U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a scaffold frame for construction, including the stay tube, the inboard top of stay tube and the fixed pipe of the equal fixedly connected with in bottom, the front and the back of stay tube all are provided with the support alignment jig, and first draw-in groove has all been seted up to four ends of support alignment jig, the positive and the equal fixedly connected with limiting plate in four corners at the back of stay tube. The utility model discloses a set up first draw-in groove, the limiting plate, first card post, the pull ring, the stopper, first spring, the fixture block, the second draw-in groove, the box, prevent shaking the mechanism, the fly leaf, the pull rod, draw the piece, second spring and second card post mutually support, the advantage of conveniently assembling scaffold frame for construction has been reached, make the workman when installing scaffold frame for construction, can effectually shorten workman's installation time, labour saving and time saving when making the workman install, increase scaffold frame's stability simultaneously, the amount of labour of workman has been reduced, workman's work efficiency has been improved, make things convenient for the workman to use.

Description

Scaffold for building construction
Technical Field
The utility model relates to a construction technical field specifically is a scaffold frame for construction.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with them, wherein the building buildings refer to the engineering which has top covers, beams, columns, walls, foundations and can form internal spaces and meet the requirements of people for production, living, study and public activities.
At construction's in-process, need use scaffold frame for construction, present scaffold frame for construction has following shortcoming: the scaffold for the existing building construction is inconvenient to assemble, so that a large amount of time of workers needs to be wasted when the scaffold for the building construction is installed by the workers, the condition that the workers waste time and labor is caused, the labor amount of the workers is increased, the work efficiency of the workers is reduced, and the workers are inconvenient to use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a scaffold frame for construction possesses the advantage to scaffold frame for construction convenience equipment, has solved the inconvenient equipment of scaffold frame for construction now, leads to the workman when installing scaffold frame for construction, need extravagant workman a large amount of time, causes the workman problem that wastes time and energy to appear.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a scaffold for building construction comprises a supporting tube, wherein the top and the bottom of the inner side of the supporting tube are fixedly connected with a fixed tube, the front and the back of the supporting tube are respectively provided with a supporting adjusting frame, four ends of the supporting adjusting frame are respectively provided with a first clamping groove, four corners of the front and the back of the supporting tube are respectively fixedly connected with a limiting plate, an inner cavity of the limiting plate is provided with a first clamping column, one end of the first clamping column penetrates through the inner cavity of the first clamping groove, the other end of the first clamping column penetrates through the outer side of the limiting plate and is fixedly connected with a pull ring, the surface of the first clamping column is fixedly connected with a limiting block, the surface of the first clamping column is sleeved with a first spring, two ends of the first spring are respectively fixedly connected with the inner side of the limiting block and the outer side of the limiting plate, the top of the supporting tube is provided, the bottom of the clamping block penetrates through an inner cavity of the supporting tube, a second clamping groove is formed in the inner side of the clamping block, a box body is fixedly connected to the top of the inner side of the supporting tube, anti-shaking mechanisms are arranged at the top and the bottom of the inner cavity of the box body, a movable plate is fixedly connected to the inner side of each anti-shaking mechanism, a pull rod is fixedly connected to the center of the inner side of the movable plate, one end, away from the movable plate, of the pull rod penetrates through the outer side of the box body and is fixedly connected with a pulling block, a second spring is fixedly connected to the top and the bottom of the inner side of the movable plate, one end, away from the movable plate, of the second spring is fixedly connected with the inner wall of the box body, a second clamping column is fixedly connected.
Preferably, the inner side of the anti-shaking mechanism is provided with a first through groove, the diameter of the inner cavity of the first through groove is larger than that of the pull rod, the outer side of the anti-shaking mechanism is provided with a second through groove, and the diameter of the inner cavity of the second through groove is larger than that of the second clamping column.
Preferably, a third through groove is formed in the outer side of the limiting plate, the diameter of the inner cavity of the third through groove is larger than that of the first clamping column, and the diameter of the inner cavity of the first clamping groove is larger than that of the first clamping column.
Preferably, the anti-shaking mechanism comprises a sliding sleeve, the inner side of the sliding sleeve is fixedly connected with the outer side of the movable plate, a sliding rod is slidably connected with the inner cavity of the sliding sleeve, fixed blocks are fixedly connected to the two ends of the sliding rod, and the outer side of each fixed block is fixedly connected with the inner wall of the box body.
Preferably, the outer end of the second clamping column is provided with an inclination, and the diameter of the inner cavity of the second clamping groove is larger than that of the second clamping column.
(III) advantageous effects
Compared with the prior art, the utility model provides a scaffold frame for construction possesses following beneficial effect:
1. the utility model discloses a set up first draw-in groove, the limiting plate, first card post, the pull ring, the stopper, first spring, the fixture block, the second draw-in groove, the box, prevent shaking the mechanism, the fly leaf, the pull rod, draw the piece, second spring and second card post mutually support, the advantage of conveniently assembling scaffold frame for construction has been reached, make the workman when installing scaffold frame for construction, can effectually shorten workman's installation time, labour saving and time saving when making the workman install, increase scaffold frame's stability simultaneously, the amount of labour of workman has been reduced, workman's work efficiency has been improved, make things convenient for the workman to use.
2. The utility model discloses a set up first draw-in groove, the limiting plate, first card post, the pull ring, stopper and first spring, play the effect that the card is fixed to supporting the alignment jig, can effectually prevent to support the alignment jig and drop, increase the stability when supporting the alignment jig and using, through setting up the fixture block, second draw-in groove and second card post, play the fixed effect of chucking to the loading board, prevent that the loading board from dropping, stability when increasing the loading board and using, prevent shaking the mechanism through setting up, play the stable effect when removing to the fly leaf, the problem of rocking has been solved to the fly leaf when removing, stability when having increased the fly leaf and removing, through setting up the pull rod and drawing the piece, play the effect of conveniently stimulateeing the fly leaf, through setting up the second spring, play the effect that resets to fly leaf and second card post.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic front view of the present invention;
FIG. 3 is a left side view of the structure of the present invention;
fig. 4 is a partially enlarged view of a portion a of fig. 1 according to the present invention.
In the figure: 1. supporting a tube; 2. a fixed tube; 3. supporting the adjusting frame; 4. a first card slot; 5. a limiting plate; 6. a first clamp post; 7. a pull ring; 8. a limiting block; 9. a first spring; 10. a carrier plate; 11. a clamping block; 12. a second card slot; 13. a box body; 14. an anti-shaking mechanism; 141. a sliding sleeve; 142. a slide bar; 143. a fixed block; 15. a movable plate; 16. a pull rod; 17. pulling the block; 18. a second spring; 19. and a second clamping column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a scaffold for building construction comprises a supporting tube 1, a fixed tube 2 is fixedly connected to the top and the bottom of the inner side of the supporting tube 1, supporting adjusting frames 3 are respectively arranged on the front and the back of the supporting tube 1, first clamping grooves 4 are respectively arranged on four ends of the supporting adjusting frames 3, limiting plates 5 are respectively fixedly connected to four corners of the front and the back of the supporting tube 1, a first clamping column 6 is arranged in an inner cavity of the limiting plate 5, one end of the first clamping column 6 penetrates through the inner cavity of the first clamping groove 4, the other end of the first clamping column 6 penetrates through the outer side of the limiting plate 5 and is fixedly connected with a pull ring 7, a limiting block 8 is fixedly connected to the surface of the first clamping column 6, a first spring 9 is sleeved on the surface of the first clamping column 6, two ends of the first spring 9 are respectively fixedly connected to the inner side of the limiting block 8 and the, four corners of the bottom of the bearing plate 10 are fixedly connected with clamping blocks 11, the bottom of the clamping block 11 penetrates through an inner cavity of the support tube 1, a second clamping groove 12 is formed in the inner side of the clamping block 11, a box body 13 is fixedly connected to the top of the inner side of the support tube 1, anti-shaking mechanisms 14 are arranged at the top and the bottom of the inner cavity of the box body 13, a movable plate 15 is fixedly connected to the inner side of the anti-shaking mechanisms 14, a pull rod 16 is fixedly connected to the center of the inner side of the movable plate 15, one end, away from the movable plate 15, of the pull rod 16 penetrates through the outer side of the box body 13 and is fixedly connected with a pull block 17, second springs 18 are fixedly connected to the top and the bottom of the inner side of the movable plate 15, one end, away from the movable plate 15, of the second spring 18 is fixedly connected with the inner wall of the box body 13, second clamping columns 19 are fixedly connected to, the diameter of the inner cavity of the first through groove is larger than that of the pull rod 16, the outer side of the anti-shaking mechanism 14 is provided with a second through groove, the diameter of the inner cavity of the second through groove is larger than that of the second clamping column 19, the outer side of the limit plate 5 is provided with a third through groove, the diameter of the inner cavity of the third through groove is larger than that of the first clamping column 6, the diameter of the inner cavity of the first clamping groove 4 is larger than that of the first clamping column 6, the anti-shaking mechanism 14 comprises a sliding sleeve 141, the inner side of the sliding sleeve 141 is fixedly connected with the outer side of the movable plate 15, the inner cavity of the sliding sleeve 141 is slidably connected with a sliding rod 142, both ends of the sliding rod 142 are fixedly connected with fixing blocks 143, the outer side of the fixing blocks 143 is fixedly connected with the inner wall of the box body 13, the outer end of the second clamping column 19 is provided with an inclination, the diameter of the inner cavity of the second clamping groove 12 is larger than that of, play the fixed effect of chucking to supporting the alignment jig 3, can effectually prevent to support the alignment jig 3 and drop, stability when increasing the use of supporting the alignment jig 3, through setting up fixture block 11, second draw-in groove 12 and second card post 19, play the fixed effect of chucking to loading board 10, prevent that loading board 10 from droing, stability when increasing the use of loading board 10, through setting up anti-shake mechanism 14, stable effect when moving to activity board 15, the problem that the activity board 15 appears rocking when moving has been solved, stability when having increased activity board 15 and having moved, through setting up pull rod 16 and pull block 17, play the effect of conveniently pulling activity board 15, through setting up second spring 18, play the effect that resets to activity board 15 and second card post 19, through setting up first draw-in groove 4, limiting plate 5, first card post 6, pull ring 7, limiting block 8, first spring 9, The clamping block 11, the second clamping groove 12, the box body 13, the anti-shaking mechanism 14, the movable plate 15, the pull rod 16, the pull block 17, the second spring 18 and the second clamping column 19 are matched with each other, the advantage of convenient assembly of the scaffold for building construction is achieved, when workers install the scaffold for building construction, the installation time of the workers can be effectively shortened, time and labor are saved when the workers install the scaffold, meanwhile, the stability of the scaffold is improved, the labor capacity of the workers is reduced, the working efficiency of the workers is improved, and the scaffold is convenient to use by the workers.
When the scaffold is used, a worker firstly pulls the pull ring 7, the pull ring 7 moves to drive the first clamping column 6 to leave the inner cavity of the limit plate 5, then the one end of the supporting adjusting frame 3 is clamped into the inner cavity of the limit plate 5, then the pull ring 7 is loosened, the limiting block 8 is reset through the pulling force of the first spring 9, the limiting block 8 resets to drive the pull ring 7 and the first clamping column 6 to reset, so that the first clamping column 6 is clamped into the inner cavity of the first clamping groove 4, the worker respectively clamps the four ends of the two supporting adjusting frames 3, so that the stability of the scaffold can be effectively improved, then the bearing plate 10 is placed at the top of the supporting tube 1, the clamping block 11 is clamped into the inner cavity of the supporting tube 1 by pressing the bearing plate 10, the second clamping column 19 starts to move through the inclination of the second clamping column 19, the second clamping column 19 moves to drive the movable plate 15 to start to move, the movable, meanwhile, the movable plate 15 moves and presses the second spring 18, so that the second spring 18 deforms, when the second clamping groove 12 moves to the position of the second clamping column 19, the movable plate 15 resets through the elastic force of the second spring 18, the movable plate 15 resets to ensure that the second clamping column 19 is clamped into the inner cavity of the second clamping groove 12, so as to prevent the bearing plate 10 from falling off, when the bearing plate 10 is disassembled, the pull block 17 is pulled, the pull block 17 moves to drive the pull rod 16 to start moving, the pull rod 16 moves to drive the movable plate 15 to start moving, the movable plate 15 moves to drive the second clamping column 19 to leave the inner cavity of the second clamping groove 12, and then the bearing plate 10 is taken down, so that when a scaffold for building construction is installed by a worker, the installation time of the worker can be effectively shortened, the time and labor are saved when the worker installs the scaffold, the stability of the scaffold is increased, the labor amount of the worker is reduced, the scaffold is convenient for workers to use, thereby achieving the advantage of convenient assembly of the scaffold for building construction.
The standard parts used in the application document can be purchased from the market, and can be customized according to the description of the specification and the description of the attached drawings, the specific connection mode of each part adopts conventional means such as mature bolts, rivets, welding and the like in the prior art, and machines, parts and equipment adopt conventional models in the prior art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a scaffold frame for construction, includes stay tube (1), its characterized in that: the top and the bottom of the inner side of the supporting tube (1) are fixedly connected with fixed tubes (2), the front and the back of the supporting tube (1) are provided with supporting and adjusting frames (3), four ends of each supporting and adjusting frame (3) are provided with first clamping grooves (4), four corners of the front and the back of the supporting tube (1) are fixedly connected with limiting plates (5), an inner cavity of each limiting plate (5) is provided with a first clamping column (6), one end of each first clamping column (6) penetrates through the inner cavity of each first clamping groove (4), the other end of each first clamping column (6) penetrates through the outer side of each limiting plate (5) and is fixedly connected with a pull ring (7), the surface of each first clamping column (6) is fixedly connected with a limiting block (8), the surface of each first clamping column (6) is sleeved with a first spring (9), two ends of each first spring (9) are fixedly connected with the inner side of each limiting block (8) and the outer side of each limiting plate (5), the top of the supporting tube (1) is provided with a supporting plate (10), four corners of the bottom of the supporting plate (10) are fixedly connected with clamping blocks (11), the bottom of each clamping block (11) penetrates through the inner cavity of the supporting tube (1), the inner side of each clamping block (11) is provided with a second clamping groove (12), the top of the inner side of the supporting tube (1) is fixedly connected with a box body (13), the top and the bottom of the inner cavity of the box body (13) are respectively provided with an anti-shaking mechanism (14), the inner side of each anti-shaking mechanism (14) is fixedly connected with a movable plate (15), the center of the inner side of each movable plate (15) is fixedly connected with a pull rod (16), one end, far away from the movable plate (15), of each pull rod (16) penetrates through the outer side of the box body (13) and is fixedly connected with a pull block (17), and the top, one end, far away from the movable plate (15), of the second spring (18) is fixedly connected with the inner wall of the box body (13), a second clamping column (19) is fixedly connected to the outer side of the movable plate (15), and one end, far away from the movable plate (15), of the second clamping column (19) penetrates through an inner cavity of the second clamping groove (12).
2. A scaffold for construction according to claim 1, wherein: a first through groove is formed in the inner side of the shaking prevention mechanism (14), the diameter of the inner cavity of the first through groove is larger than that of the pull rod (16), a second through groove is formed in the outer side of the shaking prevention mechanism (14), and the diameter of the inner cavity of the second through groove is larger than that of the second clamping column (19).
3. A scaffold for construction according to claim 1, wherein: the third through groove is formed in the outer side of the limiting plate (5), the diameter of the inner cavity of the third through groove is larger than that of the first clamping column (6), and the diameter of the inner cavity of the first clamping groove (4) is larger than that of the first clamping column (6).
4. A scaffold for construction according to claim 1, wherein: the anti-shaking mechanism (14) comprises a sliding sleeve (141), the inner side of the sliding sleeve (141) is fixedly connected with the outer side of the movable plate (15), a sliding rod (142) is connected to the inner cavity of the sliding sleeve (141) in a sliding manner, fixed blocks (143) are fixedly connected to the two ends of the sliding rod (142), and the outer side of each fixed block (143) is fixedly connected with the inner wall of the box body (13).
5. A scaffold for construction according to claim 1, wherein: the outer end of the second clamping column (19) is provided with a slope, and the diameter of the inner cavity of the second clamping groove (12) is larger than that of the second clamping column (19).
CN201921708575.3U 2019-10-13 2019-10-13 Scaffold for building construction Expired - Fee Related CN211572472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921708575.3U CN211572472U (en) 2019-10-13 2019-10-13 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921708575.3U CN211572472U (en) 2019-10-13 2019-10-13 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN211572472U true CN211572472U (en) 2020-09-25

Family

ID=72529281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921708575.3U Expired - Fee Related CN211572472U (en) 2019-10-13 2019-10-13 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN211572472U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681723A (en) * 2020-12-11 2021-04-20 宁波华康陆鼎建设有限公司 Large-volume concrete pouring structure and construction method thereof
CN112746734A (en) * 2020-12-12 2021-05-04 重庆新久融工程机械设备有限公司 Folding scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681723A (en) * 2020-12-11 2021-04-20 宁波华康陆鼎建设有限公司 Large-volume concrete pouring structure and construction method thereof
CN112746734A (en) * 2020-12-12 2021-05-04 重庆新久融工程机械设备有限公司 Folding scaffold

Similar Documents

Publication Publication Date Title
CN211572472U (en) Scaffold for building construction
CN212176083U (en) Connecting component for assembly type building
CN201635399U (en) Length-adjustable auxiliary back arris for supporting mold plate
CN216142459U (en) Independent support system for post-cast strip
CN208363574U (en) A kind of convenient clamping type climbing frame limit safety lock
CN212370205U (en) Preparation device of environment-friendly viscous dust removal cloth impregnation liquid
CN210396119U (en) Aluminum die dismounting structure
CN112160575A (en) Bearing frame convenient for height adjustment for building construction
CN209941894U (en) Assembled house frame
CN210067027U (en) Novel steel frame structure convenient to disassemble and assemble
CN212772839U (en) Spider man node support for steel structure engineering
CN215858457U (en) Exhibition hall curtain of easily buildding fast and dismantling
CN220539109U (en) Reinforcing structure of assembled overhead ground
CN214995532U (en) Mounting frame structure of housing construction's panel
CN214384094U (en) Building construction isolated column
CN219702752U (en) Hand-held type steel ruler cleaning device
CN215195911U (en) Detachable medium-efficiency bag filter
CN216553024U (en) Concrete formwork for civil engineering
CN210947121U (en) Light steel structure convenient to installation
CN218814415U (en) Connection structure of assembled light partition plate
CN214574973U (en) Assembled curtain wall assembling device for building design
CN217581170U (en) Scaffold for building construction
CN215107317U (en) Assembled beam slab aluminium mould quick assembly disassembly structure
CN220539229U (en) House building template installation fixed knot constructs
CN214061816U (en) High-sensitivity non-negative-pressure water supply vacuum suppressor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

Termination date: 20211013

CF01 Termination of patent right due to non-payment of annual fee