CN217580529U CN202221441975.4U CN202221441975U CN217580529U CN 217580529 U CN217580529 U CN 217580529U CN 202221441975 U CN202221441975 U CN 202221441975U CN 217580529 U CN217580529 U CN 217580529U
Authority
CN
China
Prior art keywords
wall
well
supporting
fixedly connected
open caisson
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221441975.4U
Other languages
Chinese (zh)
Inventor
童洋
杨新安
杨帆
邱子芮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yucheng Qianli Construction Engineering Co ltd
Original Assignee
Wuhan Yucheng Qianli Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yucheng Qianli Construction Engineering Co ltd filed Critical Wuhan Yucheng Qianli Construction Engineering Co ltd
Priority to CN202221441975.4U priority Critical patent/CN217580529U/en
Application granted granted Critical
Publication of CN217580529U publication Critical patent/CN217580529U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides an integration sewage treatment pump station open caisson supporting construction, including the wall of a well, the inside of the wall of a well is equipped with supporting mechanism, the outer wall of the wall of a well is made by first concrete layer, the inner wall of the wall of a well is made by second concrete layer, be equipped with the steel construction layer between first concrete layer and the second concrete layer, supporting mechanism is including the supporting plate of locating wall of a well inner chamber both sides, two equal fixedly connected with backup pads of opposite side of two supporting plates, all support the pole through installation mechanism fixedly connected with between the opposite side of a plurality of backup pads, a side surface middle part fixedly connected with light of one of them backup pad, supporting mechanism through being equipped with is strutted the processing to the wall of a well, wherein all be equipped with a backplate in the inside both sides of the wall of a well, and install a fender pole through installation mechanism, and then support the pole play and support a backplate and make it paste tight wall of a well, thereby avoid the wall of a well to receive the soil layer extrusion to lead to the condition of a well to the damage to appear, in order to accomplish the open caisson construction more safely.

Description

Open caisson supporting construction of integration sewage treatment pump station
Technical Field
The utility model relates to an open caisson supporting construction technical field specifically is an integration sewage treatment pump station open caisson supporting construction.
Background
The sewage pump station is an important component of a sewage system, the construction of the sewage treatment pump station is particularly important for sewage treatment, a sunk well is required to be used in the construction of the sewage treatment pump station, the sunk well is a shaft-shaped structure, soil is dug in the sunk well, the sunk well is sunk to a designed elevation after overcoming the frictional resistance of a well wall by means of self gravity, then concrete bottom sealing is carried out, and the well wall is filled with a well hole, so that the sunk well becomes a foundation of a bridge pier or other structures, the sunk well pump station is generally used when a containment device is constructed on a basement lane and a station hydraulic foundation, the well wall of the sunk well needs to be supported in the construction process of the sunk well, construction is completed better and more safely, the supporting effect of the existing sunk well supporting structure is poor, the use is inconvenient, and certain trouble is caused to the construction of the sunk well.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an integration sewage treatment pump station open caisson supporting construction to solve the not good problem of using inconveniently of current open caisson supporting construction's that above-mentioned background art provided supporting effect.
In order to achieve the above object, the utility model provides a following technical scheme: an open caisson supporting structure of an integrated sewage treatment pump station comprises a well wall, wherein a supporting mechanism is arranged inside the well wall, the outer wall of the well wall is made of a first concrete layer, the inner wall of the well wall is made of a second concrete layer, and a steel structure layer is arranged between the first concrete layer and the second concrete layer;
the supporting mechanism comprises supporting plates arranged on two sides of the inner cavity of the well wall, two supporting plates are fixedly connected to the opposite sides of the supporting plates, and a plurality of supporting rods are fixedly connected between the opposite sides of the supporting plates through mounting mechanisms.
In order to make better installation supporting mechanism, as the utility model relates to an optimal scheme: installation mechanism is including seting up two screw holes at backup pad one side top, one side of screw hole is provided with the mounting panel, one side through thread connection of mounting panel has two screws, two one side of screw rod corresponds threaded connection with two screw holes, prop up the guard bar fixed connection between two mounting panels.
In order to make and avoid the connecting piece to rust and damage, conduct the utility model relates to an optimal scheme: and one end of each of the plurality of screw rods is sleeved with a protective cap.
In order to make better dismouting helmet, as the utility model relates to an optimal scheme: the outer surface of the protective cap is provided with anti-skid stripes.
In order to make the night work of being convenient for, as the utility model relates to a preferred scheme: the middle part of one side surface of one of the supporting plates is fixedly connected with an illuminating lamp.
In order to make better waterproof, as the utility model relates to a preferred scheme: the inner wall fixedly connected with waterproof board of the wall of a well, prop up backplate fixed connection in waterproof board surface.
In order to make supporting mechanism more firm, as the utility model relates to a preferred scheme: and a plurality of stabilizing rods are fixedly connected between every two adjacent supporting rods.
In order to make this supporting construction normal use, as the utility model relates to a preferred scheme: one of them one side surface top fixedly connected with battery case of backup pad, the positive one side edge fixedly connected with flush mounting plate of switch of battery case, flush mounting plate and the inside battery electric connection of battery case, light and flush mounting plate electric connection of switch.
Compared with the prior art, the beneficial effects of the utility model are that:
1) The supporting mechanism is arranged to support the well wall, wherein supporting plates are arranged on two sides in the well wall, the supporting rods are arranged through the mounting mechanism, and the supporting rods are used for supporting the supporting plates to be attached to the well wall, so that the damage of the well wall caused by extrusion of the soil layer is avoided, and the open caisson construction is completed better and more safely;
2) Through the installation mechanism that sets up so that dismouting bracing piece is carried out as required, wherein the equal fixedly connected with mounting panel in both ends of bracing piece, screw hole in the screw rod that runs through threaded connection with mounting panel both sides corresponds the backup pad carries out the screw in to accomplish the installation of bracing piece, and the head of screw rod is equipped with the lag and protects, rusts in order to avoid it in moist underground, thereby leads to follow-up unable normal demolising, and it is more convenient to use.
Drawings
Fig. 1 is a schematic structural diagram of embodiment 1 of the present invention;
fig. 2 is a schematic sectional view of a partial structure in front view according to embodiment 1 of the present invention;
fig. 3 is a schematic cross-sectional view of a well wall in embodiment 1 of the present invention;
fig. 4 is a schematic exploded view of the mounting mechanism according to embodiment 1 of the present invention;
fig. 5 is a schematic structural view of embodiment 2 of the present invention.
In the figure: 1. a well wall; 11. a first concrete layer; 12. a steel structural layer; 13. a second concrete layer; 2. a support mechanism; 21. supporting the guard plate; 22. a support plate; 23. a support bar; 3. an installation mechanism; 31. a threaded hole; 32. a screw; 33. mounting a plate; 34. a protective cap; 35. anti-slip stripes; 4. a waterproof sheet; 5. a lighting lamp; 6. a battery case; 7. a switch panel; 8. and (4) stabilizing the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the present invention provides a technical solution: an open caisson supporting structure of an integrated sewage treatment pump station comprises a well wall 1, wherein a supporting mechanism 2 is arranged inside the well wall 1, the outer wall of the well wall 1 is made of a first concrete layer 11, the inner wall of the well wall 1 is made of a second concrete layer 13, and a steel structure layer 12 is arranged between the first concrete layer 11 and the second concrete layer 13;
the supporting mechanism 2 comprises supporting plates 21 arranged on two sides of the inner cavity of the well wall 1, two supporting plates 22 are fixedly connected to opposite sides of the two supporting plates 21, and supporting rods 23 are fixedly connected between opposite sides of the supporting plates 22 through the mounting mechanisms 3.
In this embodiment: the mounting mechanism 3 comprises two threaded holes 31 arranged at the top of one side of the support plate 22, a mounting plate 33 is arranged at one side of each threaded hole 31, two screws 32 are connected to one side of each mounting plate 33 in a penetrating and threaded manner, one sides of the two screws 32 are correspondingly connected with the two threaded holes 31 in a threaded manner, and the support rod 23 is fixedly connected between the two mounting plates 33.
During specific use, the screw rods 32 on the two sides of the mounting plate 33 are screwed into and locked with the threaded holes 31 in the supporting plate 22, the mounting plate 33 is fixed at one end of the supporting rod 23, and the supporting rod 23 is mounted on the supporting plate 22.
In this embodiment: one end of each of the plurality of screws 32 is sleeved with a protective cap 34.
When the special tool is used, the protective cap 34 is sleeved at one end of the screw 32, so that the special tool is more corrosion-resistant under wet ground, and the follow-up normal removal is ensured.
In this embodiment: the outer surface of each of the plurality of protective caps 34 is provided with anti-slip stripes 35.
When the protective cap is used specifically, the outer surface of the protective cap 34 is provided with the anti-skid stripes 35, so that the protective cap 34 can be conveniently assembled and disassembled by a user.
In this embodiment: the middle part of one side surface of one of the supporting plates 22 is fixedly connected with an illuminating lamp 5.
When the multifunctional night lamp is used specifically, the arranged illuminating lamp 5 works to illuminate at night, so that night work can be better carried out.
In this embodiment: the inner wall of the well wall 1 is fixedly connected with a waterproof plate 4, and the supporting and protecting plate 21 is fixedly connected to the surface of the waterproof plate 4.
When the supporting structure is used specifically, the waterproof plate 4 is arranged to reduce the influence of accumulated water generated on the surface of the well wall 1 on the supporting structure.
Example 2
Referring to FIG. 5: in order to further achieve a better supporting effect, the present embodiment is characterized by the following differences from embodiment 1: a plurality of stabilizing rods 8 are fixedly connected between two adjacent supporting rods 23.
During the specific use, add between two adjacent bracing poles 23 and be equipped with a plurality of firm poles 8, link together two bracing poles 23 to strengthen its structural strength, thereby strut the effect better.
In this embodiment: one side surface top fixedly connected with battery case 6 of one of them backup pad 22, the positive one side edge fixedly connected with flush mounting plate of switch 7 of battery case 6, flush mounting plate of switch 7 and the inside battery electric connection of battery case 6, light 5 and flush mounting plate of switch 7 electric connection.
When the lighting lamp is used specifically, the lighting lamp 5 is convenient to operate and control through the arranged switch panel 7.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and equivalents may be made without departing from the spirit and scope of the invention.

Claims (8)

1. The utility model provides an integration sewage treatment pump station open caisson supporting construction, includes the wall of a well (1), its characterized in that: a supporting mechanism (2) is arranged inside the well wall (1), the outer wall of the well wall (1) is made of a first concrete layer (11), the inner wall of the well wall (1) is made of a second concrete layer (13), and a steel structure layer (12) is arranged between the first concrete layer (11) and the second concrete layer (13);
the supporting mechanism (2) comprises supporting plates (21) arranged on two sides of an inner cavity of the well wall (1), two supporting plates (22) are fixedly connected to opposite sides of the supporting plates (21), and a plurality of supporting rods (23) are fixedly connected between opposite sides of the supporting plates (22) through mounting mechanisms (3).
2. The open caisson supporting structure of the integrated sewage treatment pump station according to claim 1, wherein: installation mechanism (3) are including seting up two screw holes (31) at backup pad (22) one side top, one side of screw hole (31) is provided with mounting panel (33), one side through thread of mounting panel (33) is connected with two screw rods (32), two one side and two screw hole (31) of screw rod (32) correspond threaded connection, prop up and protect pole (23) fixed connection between two mounting panels (33).
3. The open caisson supporting structure of the integrated sewage treatment pump station according to claim 2, wherein: one end of each screw rod (32) is sleeved with a protective cap (34).
4. The integrated sewage treatment pump station open caisson supporting structure of claim 3, wherein: the outer surfaces of the protective caps (34) are provided with anti-skid stripes (35).
5. The open caisson supporting structure of the integrated sewage treatment pump station according to claim 1, wherein: the middle part of one side surface of one of the supporting plates (22) is fixedly connected with an illuminating lamp (5).
6. The open caisson supporting structure of the integrated sewage treatment pump station according to claim 1, wherein: the inner wall fixedly connected with waterproof board (4) of wall of a well (1), backplate (21) fixed connection is in waterproof board (4) surface.
7. The open caisson supporting structure of the integrated sewage treatment pump station according to claim 1, wherein: a plurality of stabilizing rods (8) are fixedly connected between every two adjacent supporting rods (23).
8. The open caisson supporting structure of the integrated sewage treatment pump station according to claim 5, wherein: one of them one side surface top fixedly connected with battery case (6) of backup pad (22), the positive one side edge fixedly connected with switch panel (7) of battery case (6), switch panel (7) and the inside battery electric connection of battery case (6), light (5) and switch panel (7) electric connection.
CN202221441975.4U 2022-06-06 2022-06-06 Open caisson supporting construction of integration sewage treatment pump station Active CN217580529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221441975.4U CN217580529U (en) 2022-06-06 2022-06-06 Open caisson supporting construction of integration sewage treatment pump station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221441975.4U CN217580529U (en) 2022-06-06 2022-06-06 Open caisson supporting construction of integration sewage treatment pump station

Publications (1)

Publication Number Publication Date
CN217580529U true CN217580529U (en) 2022-10-14

Family

ID=83529198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221441975.4U Active CN217580529U (en) 2022-06-06 2022-06-06 Open caisson supporting construction of integration sewage treatment pump station

Country Status (1)

Country Link
CN (1) CN217580529U (en)

Similar Documents

Publication Publication Date Title
CN217580529U (en) Open caisson supporting construction of integration sewage treatment pump station
CN206545230U (en) A kind of Combined type power communication well
CN213952248U (en) Small-size supporting system suitable for deep foundation pit
CN211369204U (en) High stability combination formula steel construction building curtain
CN216428047U (en) Warning device for dam reservoir
CN218990683U (en) Building design roofing pin-connected panel waterproof construction
CN216766987U (en) Rail guard that stability is high for hydraulic engineering construction
CN218301280U (en) Photovoltaic curtain wall assembly
CN111669117A (en) Waterproof installation assembly for planar photovoltaic power generation component
CN214740464U (en) Municipal construction scene is with enclosing fender convenient to dismouting
CN218715751U (en) Concatenation formula construction guardrail
CN220440605U (en) Novel solar photovoltaic power generation tile
CN217231664U (en) Slope protection structure of river channel side slope
CN220335817U (en) Protective device for water conservancy side slope
CN209948344U (en) Power protection device for temporary power utilization in building construction
CN217631991U (en) Waterproof structure for skylight of pitched roof
CN216312644U (en) Weak current engineering cable pile
CN221096092U (en) Protection encloses fender with auxiliary support structure
CN218881818U (en) Assembled warning fence for construction site of constructional engineering
CN218209324U (en) Prevent solar energy navigation mark lamp of turning on one's side
CN211549125U (en) Protector for engineering safety management
CN210685582U (en) Gardens ancient building protection fence
CN217269252U (en) Water conservancy construction safety device
CN214328940U (en) Stirring stake stagnant water curtain structure
CN215056044U (en) Rail guard for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant