CN218715751U - Concatenation formula construction guardrail - Google Patents

Concatenation formula construction guardrail Download PDF

Info

Publication number
CN218715751U
CN218715751U CN202222976339.8U CN202222976339U CN218715751U CN 218715751 U CN218715751 U CN 218715751U CN 202222976339 U CN202222976339 U CN 202222976339U CN 218715751 U CN218715751 U CN 218715751U
Authority
CN
China
Prior art keywords
positioning
guardrail
fixed
component
subassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222976339.8U
Other languages
Chinese (zh)
Inventor
汤德刚
古德勇
张福生
陈泳鑫
汪文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group No5 Construction Co ltd
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group No5 Construction Co ltd
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group No5 Construction Co ltd, China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group No5 Construction Co ltd
Priority to CN202222976339.8U priority Critical patent/CN218715751U/en
Application granted granted Critical
Publication of CN218715751U publication Critical patent/CN218715751U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a splicing type construction guardrail, which comprises upright columns symmetrically arranged at two sides of a guardrail body, wherein a connecting structure is arranged between the upright columns and the guardrail body, the connecting structure comprises a positioning component and a fixing component arranged inside the positioning component, a rotating component is arranged at the outer side of the fixing component, and a covering component is arranged at the top of the positioning component; through the locating component of design, fixed subassembly, runner assembly and cover subassembly isotructure, replaced original bolted connection structure, compare in original connected mode, the benefit of this kind of design lies in, when carrying out the equipment concatenation to the guardrail, need not with the help of like extra instrument such as screwdriver, bare-handed alright completion concatenation operation, has promoted the efficiency of carrying out the concatenation to the guardrail, has brought the convenience for the concatenation personnel, is favorable to guaranteeing normal construction progress.

Description

Concatenation formula construction guardrail
Technical Field
The utility model belongs to the technical field of the guardrail, concretely relates to concatenation formula construction guardrail.
Background
In the building work progress, need completely cut off the construction site, avoid outside personnel to enter into the construction site, just need use the construction guardrail this moment, utilize the guardrail to keep off and protect in the periphery in building site, played good safety protection effect, guaranteed construction safety.
The guardrail is when using, needs assemble the concatenation to it earlier, but current connected mode generally is mostly bolted connection, when carrying out the concatenation operation, not only need rotate the operation with the help of extra instrument such as screwdriver, still need carry out a lot of bolts, brings inconvenience for the equipment concatenation of guardrail, influences the construction progress, consequently, needs to design a mosaic structure in addition and solves this problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concatenation formula construction guardrail to current guardrail equipment operation that proposes in solving above-mentioned background is inconvenient, the problem of concatenation inefficiency.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concatenation formula construction guardrail, includes that fence body symmetry sets up the stand in fence body both sides, be provided with connection structure between stand and the fence body, connection structure includes locating component to and set up the fixed subassembly in locating component inside, the outside of fixed subassembly is provided with runner assembly, locating component's top is provided with covers the subassembly.
Preferably, the positioning assembly comprises a positioning pile fixed on the surface of the upright post and a positioning block fixed on the surface of the rail body, and one side of the positioning pile is provided with a positioning groove connected with the positioning block.
Preferably, the fixing assembly comprises a through hole formed in one side of the positioning pile and a screw rod arranged inside the through hole, and a screw hole in threaded connection with the screw rod is formed inside the positioning block.
Preferably, the rotating assembly comprises a fixing plate fixed at the outer end of the screw rod and a rotary plate fixed at the outer side of the fixing plate.
Preferably, cover the subassembly including rotating the spiral cover that sets up at the spud top to and set up the rubber buffer in the spiral cover bottom, the inside of constant head tank is embedded into to the rubber buffer, the outer end of spiral cover is provided with dials the piece.
Preferably, the surface of the fence body is provided with a suspension structure, the suspension structure comprises a hook component arranged on the outer side of the fence body, the hook component comprises a back plate and a metal hook arranged on the outer side of the back plate, and a limiting component is arranged between the hook component and the fence body.
Preferably, the limiting assembly comprises a limiting groove formed in the surface of the rail body, a fixing block is fixed to one side of the back plate, a connecting hole penetrates through the inside of the fixing block, and the connecting hole is formed in the outer surface of the limiting groove in a sleeved mode.
Preferably, the inner wall of the connecting hole is provided with a rubber sleeve, and the rubber sleeve is in pressing contact with the limiting groove.
Compared with the prior art, the beneficial effects of the utility model are that:
through the locating component, fixed subassembly, runner assembly of design and cover subassembly isotructure, replaced original bolted connection structure, compare in original mode, the benefit of this kind of design lies in, when carrying out the equipment concatenation of guardrail, need not with the help of extra instrument, bare-handed alright completion concatenation operation has promoted the efficiency of concatenation, is favorable to guaranteeing normal construction progress.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a side cross-sectional view of the connection structure of fig. 1 according to the present invention;
fig. 3 is a side cross-sectional view of the suspension structure of fig. 1 in accordance with the present invention;
in the figure: 100. a column; 200. a hurdle body; 300. a connecting structure; 301. a positioning assembly; 3011. positioning a groove; 3012. positioning blocks; 3013. positioning the pile; 302. a fixing assembly; 3021. a through hole; 3022. a screw hole; 3023. a screw; 303. a rotating assembly; 3031. a fixing sheet; 3032. rotating the sheet; 304. a cover assembly; 3041. screwing a cover; 3042. a rubber plug; 3043. a shifting block; 400. a suspension structure; 401. a hook assembly; 4011. a back plate; 4012. a metal hook; 402. a restraining component; 4021. a limiting groove; 4022. a rubber sleeve; 4023. a fixed block; 4024. and connecting the holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a concatenation formula construction guardrail, set up stand 100 at fence 200 both sides including fence 200 symmetry, the major structure of guardrail has been constituted, be provided with connection structure 300 between stand 100 and the fence 200, play the connection effect, connection structure 300 includes locating component 301, accomplish the location between stand 100 and the fence 200, and set up at the inside fixed subassembly 302 of locating component 301, play the fixed connection effect, the outside of fixed subassembly 302 is provided with runner assembly 303, conveniently rotate the operation, locating component 301's top is provided with covers subassembly 304, locating component 301 through the design, fixed subassembly 302, runner assembly 303 and cover subassembly 304 isotructure, original bolted connection structure has been replaced, compare in original mode, the benefit of this kind of design lies in, when carrying out the equipment concatenation of guardrail, need not with the help of extra instrument, bare-handed alright completion concatenation operation, the efficiency of concatenation has been promoted, be favorable to guaranteeing normal construction progress.
In this embodiment, preferably, the positioning assembly 301 includes a positioning pile 3013 fixed on the surface of the upright 100 and a positioning block 3012 fixed on the surface of the rail body 200, and a positioning slot 3011 connected to the positioning block 3012 is formed on one side of the positioning pile 3013, so as to complete the positioning function and facilitate the installation of the upright 100 and the rail body 200.
In this embodiment, preferably, the fixing assembly 302 includes a through hole 3021 opened on one side of the positioning pile 3013, and a screw 3023 arranged inside the through hole 3021, and a screw hole 3022 screwed with the screw 3023 is opened inside the positioning block 3012, so as to fix the positioning block 3012 inside the positioning slot 3011.
In this embodiment, it is preferable that the rotating assembly 303 includes a fixing plate 3031 fixed at an outer end of the screw 3023, and a rotating plate 3032 fixed at an outer side of the fixing plate 3031, so as to facilitate the rotation of the screw 3023.
In this embodiment, preferably, the covering assembly 304 includes a rotary cover 3041 rotatably disposed on the top of the positioning pile 3013, and a rubber plug 3042 disposed at the bottom of the rotary cover 3041, the rubber plug 3042 is embedded into the positioning slot 3011 to shield the positioning slot 3011, and a toggle block 3043 is disposed at the outer end of the rotary cover 3041.
In this embodiment, it is preferred, the surface of fence body 200 is provided with suspension structure 400, suspension structure 400 is including setting up the couple subassembly 401 in the fence body 200 outside, and couple subassembly 401 includes backplate 4011 to and set up the metal hook 4012 in the backplate 4011 outside, and usable metal hook 4012 hangs safety slogan or construction tool, has promoted the functionality of guardrail, is provided with restriction subassembly 402 between couple subassembly 401 and the fence body 200, has guaranteed couple subassembly 401's stability.
In this embodiment, preferably, the limiting assembly 402 includes a limiting groove 4021 opened on the surface of the fence body 200, a fixing block 4023 is fixed on one side of the back plate 4011, a connecting hole 4024 is formed through the inside of the fixing block 4023, and the connecting hole 4024 is sleeved on the outer surface of the limiting groove 4021 to limit and fix the hook assembly 401.
In this embodiment, it is preferable that the inner wall of the connection hole 4024 is provided with a rubber sleeve 4022, and the rubber sleeve 4022 is in pressing contact with the restriction groove 4021, thereby ensuring the stability of the restriction assembly 402.
The utility model discloses a theory of operation and use flow: when the guardrail is spliced, firstly, a positioning block 3012 is put into the positioning slot 3011 to complete the positioning connection between the upright post 100 and the guardrail body 200, then the screw cap 3041 is turned over, the rubber plug 3042 extends into the positioning slot 3011 to cover the positioning slot 3011, then the screw rod 3023 is put into the through hole 3021, the rotary sheet 3032 is rotated to complete the threaded connection between the screw rod 3023 and the screw hole 3022, the positioning block 3012 is fixed in the positioning slot 3011, and the assembly and splicing of the guardrail are completed; when the guardrail is used, the safety slogan or construction tools can be hung by utilizing the hook component 401, the functionality of the guardrail is improved, the normal use of the guardrail is facilitated, the installation stability of the hook component 401 is guaranteed by the design of the limiting component 402, and the guardrail is prevented from falling off.
Although embodiments of the present invention have been shown and described (with particularity and detail in the foregoing description), it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a concatenation formula construction guardrail, includes that fence body (200) symmetry sets up stand (100) in fence body (200) both sides, its characterized in that: be provided with connection structure (300) between stand (100) and hurdle (200), connection structure (300) are including locating component (301) to and set up at the inside fixed subassembly (302) of locating component (301), the outside of fixed subassembly (302) is provided with runner assembly (303), the top of locating component (301) is provided with covers subassembly (304).
2. The splice construction guardrail of claim 1, characterized in that: the positioning component (301) comprises a positioning pile (3013) fixed on the surface of the upright post (100) and a positioning block (3012) fixed on the surface of the fence body (200), and one side of the positioning pile (3013) is provided with a positioning groove (3011) connected with the positioning block (3012).
3. The splice construction guardrail of claim 2, wherein: the fixing assembly (302) comprises a through hole (3021) formed in one side of the positioning pile (3013) and a screw rod (3023) arranged in the through hole (3021), and a screw hole (3022) in threaded connection with the screw rod (3023) is formed in the positioning block (3012).
4. The splice construction guardrail of claim 1, characterized in that: the rotating assembly (303) comprises a fixed plate (3031) fixed at the outer end of the screw rod (3023) and a rotary plate (3032) fixed at the outer side of the fixed plate (3031).
5. The splice construction guardrail of claim 1, characterized in that: the covering component (304) comprises a rotary cover (3041) rotatably arranged at the top of the positioning pile (3013) and a rubber plug (3042) arranged at the bottom of the rotary cover (3041), the rubber plug (3042) is embedded into the positioning groove (3011), and a poking block (3043) is arranged at the outer end of the rotary cover (3041).
6. The splice construction guardrail of claim 1, characterized in that: the surface of fence body (200) is provided with suspension structure (400), suspension structure (400) is including setting up couple subassembly (401) in the fence body (200) outside, couple subassembly (401) are including backplate (4011) to and set up metal hook (4012) in the backplate (4011) outside, be provided with between couple subassembly (401) and fence body (200) and restrict subassembly (402).
7. The splice construction guardrail of claim 6, wherein: the limiting assembly (402) comprises a limiting groove (4021) formed in the surface of the fence body (200), a fixing block (4023) is fixed to one side of the back plate (4011), a connecting hole (4024) is formed in the fixing block (4023) in a penetrating mode, and the outer surface of the limiting groove (4021) is sleeved with the connecting hole (4024).
8. The splice construction guardrail of claim 7, wherein: the inner wall of the connecting hole (4024) is provided with a rubber sleeve (4022), and the rubber sleeve (4022) is in extrusion contact with the limiting groove (4021).
CN202222976339.8U 2022-11-09 2022-11-09 Concatenation formula construction guardrail Active CN218715751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222976339.8U CN218715751U (en) 2022-11-09 2022-11-09 Concatenation formula construction guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222976339.8U CN218715751U (en) 2022-11-09 2022-11-09 Concatenation formula construction guardrail

Publications (1)

Publication Number Publication Date
CN218715751U true CN218715751U (en) 2023-03-24

Family

ID=85610243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222976339.8U Active CN218715751U (en) 2022-11-09 2022-11-09 Concatenation formula construction guardrail

Country Status (1)

Country Link
CN (1) CN218715751U (en)

Similar Documents

Publication Publication Date Title
CN218715751U (en) Concatenation formula construction guardrail
CN211973117U (en) Road and bridge rail guard
CN212984857U (en) Highway bridge construction foundation ditch protector
CN212743544U (en) Electric power tower adopting I-shaped tower grounding device
CN210342850U (en) High-strength cement telegraph pole
CN211446627U (en) Strutting arrangement is used in bridge construction
CN211229607U (en) Face limit and protect shaped steel guardrail
CN219471738U (en) Assembled fence
CN213015269U (en) Fixing support for constructional engineering
CN212130450U (en) Simple device for drilling and sealing holes for geological survey of fourth system
CN220081049U (en) Railing for foundation pit protection
CN216713042U (en) Supporting construction of high stability foundation ditch construction
CN215290190U (en) Slope reinforcing structure
CN217231664U (en) Slope protection structure of river channel side slope
CN218766316U (en) Connecting rod structure for tunnel segment pulling resistance test
CN210217345U (en) Urban environment is with afforestation rail
CN216739699U (en) Protective structure of hydraulic and hydroelectric engineering side slope
CN216553322U (en) Rotatable aluminum fence stand column
CN213418704U (en) Civil engineering is with enclosing fender device
CN221895792U (en) Foundation pit support with good stability
CN215859449U (en) Retaining fixing device is enclosed in construction
CN219753196U (en) Combined type soil and water conservation net
CN214463224U (en) A security fence for hydraulic and hydroelectric engineering
CN216476132U (en) Pre-buried formula piping shaft
CN212726350U (en) Convenient-to-ventilate electric power calandria structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant