CN217557611U - Suspension operation platform device - Google Patents

Suspension operation platform device Download PDF

Info

Publication number
CN217557611U
CN217557611U CN202221056554.XU CN202221056554U CN217557611U CN 217557611 U CN217557611 U CN 217557611U CN 202221056554 U CN202221056554 U CN 202221056554U CN 217557611 U CN217557611 U CN 217557611U
Authority
CN
China
Prior art keywords
wire rope
steel wire
connecting plate
bearing
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221056554.XU
Other languages
Chinese (zh)
Inventor
张建均
王金国
梅吉林
张贵科
陈虹君
张东明
邵正鹏
魏宝龙
张一�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 2 Engineering Co Ltd
Yalong River Hydropower Development Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Yalong River Hydropower Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd, Yalong River Hydropower Development Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN202221056554.XU priority Critical patent/CN217557611U/en
Application granted granted Critical
Publication of CN217557611U publication Critical patent/CN217557611U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses unsettled operation platform device, operation platform sets up the problem when solving bulky bottom plate concreting, 1 st in the relative both sides of bulky bottom plate concreting face, 2 erect the level line both ends of base face pre-buried 1 respectively, 2 reinforcing bar or stock, bearing wire rope's one end is connected with 1 st reinforcing bar or stock, bearing wire rope passes the other end of slip steel pipe and passes through basket of flowers bolt and pre-buried 2 nd reinforcing bar or stock and be connected, the coating has the lubricating grease layer on the bearing wire rope, 1 st, 2 the connecting plate is linked into whole with the both ends of slip steel pipe respectively, work platform's both ends respectively with 1 st, 2 the connecting plate is connected, 1 st, 2 erect and be fixed with 1 st on the base face respectively, 2 electric block, 1 st, 2 electric block is respectively through 1 st, 2 traction wire rope and 1 st, 2 the connecting plate is connected. The working platform is dragged to move left and right by the traction steel wire ropes of the electric hoists on the two sides, so that the working platform can be moved to a required position to carry out operation. The utility model discloses simple manufacture, simple to operate, whole weight is less, and is with low costs, and safe and reliable can dismantle back reuse.

Description

Suspended operation platform device
Technical Field
The utility model relates to a unsettled operation platform device that is used for during operation of the bulky concrete of bottom plate to throw off with the concrete face and carries out the operation.
Background
With the continuous development of the hydropower industry, because the concrete of part of the bottom plate of a large and medium hydropower station is irregular in shape, is in the forms of twisted surfaces, inclined surfaces or combination and the like, the height difference of the shape is large, an operation platform on the upper part of the bottom plate usually adopts a steel bar sample frame or a steel pipe sample frame for operation, and an operator needs to depend on the sample frame for operation, so that the appearance quality of the concrete is inevitably affected. The steel bar sample frame or the steel pipe sample frame is complex to manufacture, inconvenient to install and disassemble, incapable of being reused and high in cost.
Disclosure of Invention
The utility model aims at providing a simple to operate, safe and reliable is convenient for install and is demolishd, does not influence concrete appearance quality, but reuse's a unsettled operation platform device.
The purpose of the utility model is realized like this:
a suspension operation platform device is characterized in that a 1 st steel bar or a 2 nd steel bar or an anchor rod 1 is embedded at two ends of a horizontal connecting line of a 1 st vertical base plane and a 2 nd vertical base plane on two opposite sides of a large-size bottom plate concrete pouring surface respectively, one end of a bearing steel wire rope 2 is connected with the 1 st steel bar or the anchor rod 1, the bearing steel wire rope 2 penetrates through the other end of a sliding steel pipe 4 and is connected with the embedded 2 nd steel bar or the anchor rod through a turnbuckle 3, a lubricating grease layer is coated on the bearing steel wire rope 2, the 1 st connecting plate and the 2 nd connecting plate are respectively connected with two ends of the sliding steel pipe 4 into a whole, two ends of a working platform 10 are respectively connected with the 1 st connecting plate and the 2 nd connecting plate, the 1 st vertical base plane and the 2 nd vertical base plane are respectively fixed with a 1 st electric hoist 6 and 8, and the 1 st electric hoist 6 and the 2 nd electric hoist 8 are respectively connected with the 1 st connecting plate and the 2 nd connecting plate through a 1 st traction steel wire rope 7 and a 9.
The utility model has the advantages as follows:
the utility model discloses a rotation turn flower basket bolt tensioning bearing wire rope. The sliding steel pipe penetrates into the bearing steel wire rope, lubricating grease is coated on the bearing steel wire rope to reduce sliding friction, the working platform and the sliding steel pipe are connected into a whole, and the working platform is pulled to move left and right by the traction steel wire ropes of the electric hoists on the two sides, so that the working platform can be moved to a required position to perform operation. Wherein the working platform is formed by welding profile steels and is light and reliable.
The utility model discloses unsettled operation platform device can reach required position fast and carry out the operation after guaranteeing concrete placement, and simple manufacture, the installation is dismantled conveniently, and is with low costs, reuse many times, and greatly increased has enough to meet the need and has used the number of times to prolong life, moreover, the steam generator is simple in structure, convenient operation, the effect is showing, the material source is wide, the construction is simple swift, according to hydraulic and hydroelectric engineering bottom plate concrete construction condition and engineering characteristics, only need make the adjustment slightly to its device, can extensively be used for various bulky bottom plate concrete to carry out the operation.
Drawings
Fig. 1 is a structural diagram of the present invention.
Detailed Description
A suspension operation platform device is characterized in that a 1 st steel bar or a 2 nd steel bar or an anchor rod 1 is embedded in two ends of a horizontal connecting line of a 1 st and a 2 nd vertical foundation rock surfaces on two opposite sides of a large-size bottom plate concrete pouring surface respectively, one end of a bearing steel wire rope 2 is connected with the 1 st steel bar or the anchor rod 1, the other end of the bearing steel wire rope 2 penetrating through a sliding steel pipe 4 is connected with the embedded 2 nd steel bar or the anchor rod through a turnbuckle 3, a lubricating grease layer is coated on the bearing steel wire rope 2, the 1 st and 2 nd connecting plates are respectively connected with two ends of the sliding steel pipe 4 into a whole, two ends of a working platform 10 are respectively connected with the 1 st and 2 nd connecting plates, the 1 st and 2 nd vertical foundation planes are respectively fixed with a 1 st and 2 nd electric hoists 6 and 8, and the 1 st and 2 nd electric hoists 6 and 8 are respectively connected with the 1 st and 2 nd connecting plates through 1 st and 2 nd traction steel wire ropes 7 and 9.
Referring to fig. 1, the suspended operation platform device comprises embedded steel bars or anchor rods 1, a bearing steel wire rope 2, a turn buckle 3, a sliding steel pipe 4, lubricating grease 5, a # 1 electric hoist 6, a # 1 traction steel wire rope 7, a # 2 electric hoist 8, a # 2 traction steel wire rope 9 and a working platform 10.
The utility model discloses preparation, installation the utility model discloses the method as follows:
suspended operation platform device manufacturing
The working platform is processed according to the size of a design drawing in a processing factory, and the electric hoist, the flower basket bolt and the steel wire rope are shaped.
Mounting of suspended operation platform device
When the steel bar-reinforced concrete foundation is installed, firstly, embedded steel bars or anchor rods 1 are fixed on two sides (if the concrete surface is adopted, the steel bars are embedded into the concrete in advance before pouring, if the concrete surface is adopted, mortar is mixed by a forced mixer after drilling by a hand drill, the mortar is injected by a grouting machine, and finally the anchor rods are inserted into holes), one side is used for connecting bearing steel wires 2 with the embedded anchor rods 1 through basket bolts 3, then sliding steel pipes 4 penetrate into the bearing steel wire ropes 2, lubricating grease 5 is coated on the bearing steel wire ropes 2 to reduce sliding friction, then the bearing steel wire ropes 2 are connected with the embedded steel bars or anchor rods 1 on the other side, the basket bolts 3 are rotated to tension the bearing steel wire ropes 2, and finally, a working platform 10 which is processed in advance is fixed on the sliding steel pipes 6.
After the suspended operation platform is erected, the 1# electric hoist 6 and the 2# electric hoist 8 are fixed on the two side walls, and then the working platform 10 is connected with the 1# traction steel wire rope 7 and the 2# traction steel wire rope 9 on the 1# electric hoist 6 and the 2# electric hoist 8 into a whole.
(III) operation of suspended operation platform device
The working platform 10 is pulled to move left and right by using the 1# traction steel wire rope 7 and the 2# traction steel wire rope 9 on the 1# electric hoist 6 and the 2# electric hoist 8, so that the working platform 8 is quickly moved to a required position to carry out operation.

Claims (1)

1. The suspended operation platform device is characterized in that the 1 st and 2 nd steel bars or anchor rods (1) are embedded in the two ends of a horizontal connecting line of the vertical base planes of the two opposite sides of a large-volume floor concrete pouring surface respectively, one end of a bearing steel wire rope (2) is connected with the 1 st steel bar or anchor rod (1), the other end of the bearing steel wire rope (2) penetrating through a sliding steel pipe (4) is connected with the embedded 2 nd steel bar or anchor rod through a turn buckle (3), a lubricating grease layer is coated on the bearing steel wire rope (2), the 1 st and 2 nd connecting plates are respectively connected with the two ends of the sliding steel pipe (4) into a whole, the two ends of a working platform (10) are respectively connected with the 1 st and 2 nd connecting plates, the 1 st and 2 nd vertical base planes are respectively fixed with the 1 st and 2 nd electric hoists (6) and 8), and the 1 st and 2 nd electric hoists (6 and 8) are respectively connected with the 1 st and 2 nd connecting plates through the 1 nd and 2 nd traction steel wire hoists (7 and 9).
CN202221056554.XU 2022-05-06 2022-05-06 Suspension operation platform device Active CN217557611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221056554.XU CN217557611U (en) 2022-05-06 2022-05-06 Suspension operation platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221056554.XU CN217557611U (en) 2022-05-06 2022-05-06 Suspension operation platform device

Publications (1)

Publication Number Publication Date
CN217557611U true CN217557611U (en) 2022-10-11

Family

ID=83474176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221056554.XU Active CN217557611U (en) 2022-05-06 2022-05-06 Suspension operation platform device

Country Status (1)

Country Link
CN (1) CN217557611U (en)

Similar Documents

Publication Publication Date Title
CN104153587B (en) A kind of built with ribbed bricks body of wall assembly construction method
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN102720432A (en) Self-propelled underground boring jumbo
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN102518300A (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN217557611U (en) Suspension operation platform device
CN219652543U (en) Sliding steering lifting device for unitized curtain wall plate
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
CN113957919B (en) Gravity type round caisson concrete breast wall bottom die supporting system
CN113513031B (en) Anchor cable construction method
CN202659248U (en) Self-propelled tunnel drilling jumbo
CN210194445U (en) Vertical transportation self-lifting system for slip form construction
CN112227369B (en) Cover-excavation top-down construction permanent steel pipe stand column installation construction method
CN211849855U (en) Gravity type slip form system for cast-in-place concrete trapezoid open trench
CN213171212U (en) A hoisting apparatus for building engineering
CN204198329U (en) Anchor pole hanging device
CN206986897U (en) A kind of tethered sliding formula toe slab grouting system
CN206878390U (en) A kind of bearing for long-distance cable machinery laying
CN207048333U (en) Lattice formula steel-pipe column and cloth machine base connecting device
CN108729855B (en) Drilling and mounting integrated anchor rod construction equipment and using method thereof
CN110965628A (en) Gravity type slip form system for cast-in-place concrete trapezoid open trench
CN214192283U (en) Large-diameter pipe jacking lifting device
CN217681712U (en) Novel triangular support frame for drilling and coring
CN218145440U (en) Large-scale aqueduct template hoist and mount balancing unit
CN219012596U (en) Shaft sealing disc structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant