CN217526974U - Chlorine purification device with leakage alarm function - Google Patents

Chlorine purification device with leakage alarm function Download PDF

Info

Publication number
CN217526974U
CN217526974U CN202221632534.2U CN202221632534U CN217526974U CN 217526974 U CN217526974 U CN 217526974U CN 202221632534 U CN202221632534 U CN 202221632534U CN 217526974 U CN217526974 U CN 217526974U
Authority
CN
China
Prior art keywords
chlorine
purification device
pipe
chlorine purification
square pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221632534.2U
Other languages
Chinese (zh)
Inventor
刘树伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huaquan Tuopu Technology Co ltd
Original Assignee
Shenzhen Huaquan Tuopu Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huaquan Tuopu Technology Co ltd filed Critical Shenzhen Huaquan Tuopu Technology Co ltd
Priority to CN202221632534.2U priority Critical patent/CN217526974U/en
Application granted granted Critical
Publication of CN217526974U publication Critical patent/CN217526974U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Separation Of Gases By Adsorption (AREA)

Abstract

The utility model discloses a chlorine purification device with leak alarm function, including square pipe support and heater, the surface front end of square pipe support is provided with the protection network, and turns right from a left side and has set gradually the PLC switch board and be used for consolidating heat retaining chlorine purification subassembly in the internal surface bottom of square pipe support, the heater is installed in the top of chlorine purification subassembly, the below of chlorine purification subassembly is connected with the trunk line that admits air, the siren is installed to the surface top of square pipe support, and the internal surface below of square pipe support is provided with gaseous detector. This chlorine purification device with leak alarming function compares with current ordinary chlorine purification device, and PLC switch board and siren and gas detector electric connection, whether gas detector can leak by real-time detection chlorine, if detect the chlorine and leak the back, start by PLC switch board control alarm, warn personnel on every side for this chlorine purification device possesses the alarming function of revealing, security when can promoting the use.

Description

Chlorine purification device with leakage alarm function
Technical Field
The utility model relates to a sewage treatment technical field specifically is a chlorine purification device with leak alarming function.
Background
The sewage treatment is a process of purifying sewage according to the requirement of discharging the sewage into a certain water body or reusing the sewage, and a chlorine purification device is required to be used during sewage treatment and is used for purifying chlorine.
As in application No.: CN201920043580.0, the utility model discloses a novel chlorine purification device, including protective housing, main body equipment, a PLC control cabinet, adsorption reactor and chlorine leakage detection probe, main body equipment is installed in the protective housing, main body equipment is also provided with a matched PLC control cabinet which is independently placed, main body equipment comprises an adsorption reactor, a chlorine leakage detection probe and a bottom plate, the adsorption reactor and the chlorine leakage detection probe are both installed on the bottom plate, the PLC control cabinet is also connected with the chlorine leakage detection probe through a cable, the bottom end of the adsorption reactor is communicated with an air inlet pipe, and the top end of the adsorption reactor is communicated with a purified air outlet pipe; the utility model discloses a chlorine purification device which realizes the purposes of meeting the new construction or the reconstruction of small nonferrous metal processing enterprises, reducing the construction and purchase cost, reducing the production cost of the enterprises and reducing the management cost of the enterprises; can detect whether chlorine leaks, control main body equipment and get into the blowback reduction state, improve the purification efficiency of chlorine, avoid leaking chlorine and take place danger, the security is high, convenient to use.
The new chlorine purification plant similar to the above application currently suffers from the following drawbacks:
the existing chlorine purification device can only detect gas leakage and cannot timely send out an alarm to warn surrounding workers, so that the safety of the workers is easily damaged.
Therefore, in view of the above, research and improvement are made on the existing structure and defects, and a chlorine purification device with a leakage alarm function is provided, so as to achieve the purpose of higher practical value.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a chlorine purification device with leak alarming function to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a chlorine purification device with leak alarming function, includes square pipe support and heater, the surface front end of square pipe support is provided with the protection network, and turns right from a left side and has set gradually the PLC switch board and be used for consolidating heat retaining chlorine purification subassembly in the internal surface bottom of square pipe support, the heater is installed in the top of chlorine purification subassembly, the below of chlorine purification subassembly is connected with the trunk line that admits air, the siren is installed to the surface top of square pipe support, and is provided with gaseous detector below the internal surface of square pipe support, the supplementary fixed subassembly that is used for consolidating stable is installed to internal surface one side of square pipe support, and supplementary fixed subassembly is including installation cover, rod cover, the body of rod and staple bolt, one side of installation cover is fixed with the rod cover, and the internal surface slidable mounting of rod cover has the body of rod, one side of the body of rod is fixed with the staple bolt.
Further, the chlorine purification subassembly includes adsorption reactor, steel wire support and the inner tank body, and adsorption reactor's internal surface is fixed with the steel wire and supports, the internal surface that the steel wire supported is provided with the inner tank body.
Furthermore, the axis of the steel wire support coincides with the axis of the inner tank body, and the inner tank body is cylindrical.
Further, the surface of the trunk line that admits air down has set gradually into chlorine small transfer line, has entered argon gas small transfer line and electric check valve one from last, and the surface of entering chlorine small transfer line turns right from a left side and installs chlorine flow control valve, chlorine electromagnetic flowmeter and chlorine electric ball valve one in proper order, the surface of entering argon gas small transfer line turns right from a left side and installs argon gas flow control valve and argon gas electromagnetic flowmeter in proper order.
Further, the main air inlet pipeline is communicated with the chlorine inlet branch pipeline, and the main air inlet pipeline is communicated with the argon inlet branch pipeline.
Further, one side of chlorine purification subassembly is connected with the trunk line of giving vent to anger, and the surface of the trunk line of giving vent to anger down has set gradually electric stop valve two, goes out chlorine small transfer line and high-temperature gas small transfer line from last, the surface mounting who goes out the chlorine small transfer line has chlorine electric ball valve two, the surface mounting of high-temperature gas small transfer line has argon electric ball valve.
Further, staple bolt and main air inlet pipe way fixed connection, and the axis of staple bolt coincides mutually with the axis of the body of rod.
Compared with the prior art, the beneficial effects of the utility model are that: the chlorine purification device has a heat insulation structure, the tank body part is reinforced, the chlorine purification device has a leakage alarm function, the safety in use can be improved, and the chlorine purification device has a pipeline supporting structure, so that leakage caused by instability of a pipeline is avoided;
1. the utility model has the advantages that through the arrangement of the adsorption reactor, the steel wire support and the inner tank body, the adsorption reactor and the inner tank body form a hollow double-layer shell, the hollow double-layer shell has good heat preservation and insulation effects, and the hollow layer is supported and filled by the steel wire, so that the overall rigidity of the tank body part is improved, the chlorine purification device has a heat preservation structure, and the tank body part is reinforced;
2. the utility model discloses a setting of siren and gas detector, PLC switch board and siren and gas detector electric connection, gas detector can real-time detection chlorine leak, if detect chlorine leak after, control the siren by PLC switch board and start, warn personnel on every side for this chlorine purification device possesses the alarm function of revealing, can promote the security when using;
3. the utility model discloses a setting of installation cover, rod cover, the body of rod and staple bolt, installation cover are installed on the square pipe support, and the staple bolt is installed on the trunk line that admits air, and rod cover and the body of rod are used for supporting installation cover and staple bolt to support and stabilize the trunk line that admits air, consolidate it, and the body of rod can follow the rod cover flexible, and the compensation is supported the distance, makes this chlorine purification device possess pipeline bearing structure, avoids the pipeline unstability to cause and reveals.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall front sectional structure of the present invention;
fig. 3 is a schematic view of a three-dimensional sectional structure of the chlorine gas purification assembly of the present invention.
In the figure: 1. a square pipe frame; 2. a protective net; 3. a chlorine purification component; 301. an adsorption reactor; 302. supporting by using a steel wire; 303. an inner tank body; 4. a heater; 5. a PLC control cabinet; 6. a main air inlet pipeline; 7. a first electric stop valve; 8. a chlorine inlet branch pipeline; 9. a chlorine flow regulating valve; 10. a chlorine electromagnetic flow meter; 11. a chlorine electric ball valve I; 12. an argon inlet branch pipe; 13. an argon flow regulating valve; 14. an argon electromagnetic flow meter; 15. a main air outlet pipeline; 16. a second electric stop valve; 17. a chlorine branch pipeline is led out; 18. a chlorine electric ball valve II; 19. a high temperature gas branch pipe; 20. argon gas electric ball valve; 21. an alarm; 22. a gas detector; 23. an auxiliary fixing component; 2301. installing a sleeve; 2302. a rod sleeve; 2303. a rod body; 2304. and (5) hooping.
Detailed Description
As shown in fig. 1-2, a chlorine purification device with a leakage alarm function comprises a square pipe frame 1 and a heater 4, a protective net 2 is arranged at the front end of the outer surface of the square pipe frame 1, a PLC control cabinet 5 and a chlorine purification assembly 3 for reinforcing and preserving heat are sequentially arranged at the bottom of the inner surface of the square pipe frame 1 from left to right, the heater 4 is installed above the chlorine purification assembly 3, an air inlet main pipe 6 is connected below the chlorine purification assembly 3, an argon inlet branch pipe 8, an argon inlet branch pipe 12 and an electric stop valve I7 are sequentially arranged on the outer surface of the air inlet main pipe 6 from top to bottom, a chlorine flow regulating valve 9, a chlorine electromagnetic flowmeter 10 and an electric chlorine ball valve I11 are sequentially installed on the outer surface of the chlorine inlet main pipe 8 from left to right, an argon gas flow regulating valve 13 and an argon gas electromagnetic flowmeter 14 are sequentially installed on the outer surface of the argon inlet branch pipe 12, the air inlet main pipe 6 and the chlorine inlet branch pipe 8 are communicated with each other, the air inlet main pipe 6 and the argon gas outlet branch pipe 12 are communicated with each other, one side of the chlorine outlet main pipe 3 is connected with a chlorine purification assembly 15, a high-temperature gas detector 22 is installed on the outer surface of the PLC control cabinet, a gas detection instrument 21, a high temperature alarm detection instrument 22 is installed on the outer surface of the electric stop valve 17, and an alarm pipeline 17 are sequentially installed on the outer surface of the air pipe frame 21, personnel around the warning, make this chlorine purification device possess and reveal alarming function, can promote the security when using, square pipe frame 1's internal surface one side is installed and is used for consolidating stable supplementary fixed subassembly 23, and supplementary fixed subassembly 23 is including installation cover 2301, pole cover 2302, body of rod 2303 and staple bolt 2304, one side of installation cover 2301 is fixed with pole cover 2302, and the internal surface slidable mounting of pole cover 2302 has body of rod 2303, one side of body of rod 2303 is fixed with staple bolt 2304, staple bolt 2304 and the trunk line 6 fixed connection that admits air, and staple bolt 2304's axis and body of rod 2303's axis coincide mutually, installation cover 2301 is installed on square pipe frame 1, staple bolt 2304 is installed on the trunk line 6 that admits air, pole cover 2302 and body of rod 2303 are used for supporting installation cover 2301 and staple bolt 2304, thereby support and stabilize the trunk line 6 that admits air, consolidate it, and the body of rod 2303 can stretch out and draw back along pole cover 2302, the compensation support distance, make this purification device possess the pipeline supporting structure, avoid the pipeline unstability to cause the pipeline to reveal.
As shown in fig. 3, the chlorine purification assembly 3 includes an adsorption reactor 301, a steel wire support 302 and an inner tank 303, the steel wire support 302 is fixed on the inner surface of the adsorption reactor 301, the inner tank 303 is disposed on the inner surface of the steel wire support 302, the central axis of the steel wire support 302 coincides with the central axis of the inner tank 303, the inner tank 303 is cylindrical, the adsorption reactor 301 and the inner tank 303 form a hollow double-layer shell, which has a good heat preservation and insulation effect, and the hollow layer is filled with the steel wire support 302, so as to improve the rigidity of the whole tank, so that the chlorine purification device has a heat preservation structure, and the tank is reinforced.
The working principle is as follows: when the chlorine purifying device with the leakage alarm function is used, firstly, the PLC control cabinet 5 is connected with the chlorine flow regulating valve 9, the chlorine electromagnetic flowmeter 10, the chlorine electric ball valve I11, the argon flow regulating valve 13, the argon electromagnetic flowmeter 14, the electric stop valve II 16, the chlorine electric ball valve II 18, the argon electric ball valve 20, the alarm 21 and the gas detector 22 through cables, the PLC control cabinet 5 is used for controlling the chlorine flow regulating valve 9, the chlorine electromagnetic flowmeter 10, the chlorine electric ball valve I11, the argon flow regulating valve 13, the argon electromagnetic flowmeter 14, the electric stop valve II 16, the chlorine electric ball valve II 18, the argon electric ball valve 20, the alarm 21 and the gas detector 22 to work, when in purification operation, chlorine enters the main inlet pipe 6 through the chlorine inlet branch pipe 8 and then enters the adsorption reactor 301, the chlorine which reaches the standard after purification treatment is led out from the main gas outlet pipeline 15 and the branch gas outlet pipeline 17 at the top of the adsorption reactor 301, when the adsorption reactor 301 is used for a period of time, the purification energy is reduced, at the moment, the system can enter a heating reduction operation state according to the setting, argon enters the main gas inlet pipeline 6 through the branch gas inlet pipeline 12 and then enters the adsorption reactor 301, the PLC control cabinet 5 controls the heater 4 to directly heat the tank body and the adsorption element, the high-temperature gas led out from the top of the system enters a tail gas recoverer in a station room through the main gas outlet pipeline 15 and the branch high-temperature gas pipeline 19, the harmlessness treatment is carried out on the harmful chlorine blown back, the harmful chlorine reaches the standard and is discharged, the adsorption reactor 301 and the inner tank body 303 form a hollow double-layer shell, the hollow double-layer shell has good heat preservation and insulation effects, the hollow layer is supported and filled with steel wires 302, the rigidity of the whole body part of the tank body is improved, the PLC control cabinet 5 is electrically connected with the alarm 21 and the gas detector 22, gaseous detector 22 can real-time detection chlorine leak, if detect chlorine leak the back, control siren 21 by PLC switch board 5 and start, personnel on every side of warning, installation cover 2301 is installed on square pipe support 1, staple bolt 2304 is installed on inlet trunk line 6, pole cover 2302 and the body of rod 2303 are used for supporting installation cover 2301 and staple bolt 2304, thereby it stabilizes inlet trunk line 6 to support, consolidate it, and the body of rod 2303 can be followed the pole cover 2302 and stretch out and draw back, the compensation support distance, this is exactly this chlorine purification device's that has leakage alarm function theory of operation.

Claims (7)

1. The utility model provides a chlorine purification device with leak alarming function, includes square pipe support (1) and heater (4), a serial communication port, the surface front end of square pipe support (1) is provided with protection network (2), and turns right from a left side and set gradually PLC switch board (5) and be used for consolidating heat retaining chlorine purification subassembly (3) the internal surface bottom of square pipe support (1), install in the top of chlorine purification subassembly (3) heater (4), the below of chlorine purification subassembly (3) is connected with main intake pipe way (6), siren (21) are installed to the surface top of square pipe support (1), and the internal surface below of square pipe support (1) is provided with gaseous detector (22), the internal surface one side of square pipe support (1) is installed and is used for consolidating stable supplementary fixed subassembly (23), and supplementary fixed subassembly (23) including installation cover (2301), pole cover (2302), the body of rod (2303) and staple bolt (2304), one side of installation cover (1) is fixed with pole cover (2302), and the internal surface slidable mounting of pole cover (2302) has the body of rod (2303), the body of rod (2303) one side fixed with the staple bolt (2304).
2. The chlorine purification device with the leakage alarm function as claimed in claim 1, wherein the chlorine purification assembly (3) comprises an adsorption reactor (301), a steel wire support (302) and an inner tank body (303), the steel wire support (302) is fixed on the inner surface of the adsorption reactor (301), and the inner tank body (303) is arranged on the inner surface of the steel wire support (302).
3. The chlorine purification device with the leakage alarm function as claimed in claim 2, wherein the central axis of the steel wire support (302) coincides with the central axis of the inner tank (303), and the inner tank (303) is cylindrical.
4. The chlorine purification device with the leakage alarm function according to claim 1, wherein the outer surface of the main inlet pipe (6) is provided with a chlorine inlet branch pipe (8), an argon inlet branch pipe (12) and a first electric stop valve (7) from top to bottom in sequence, the outer surface of the chlorine inlet branch pipe (8) is provided with a chlorine flow regulating valve (9), a chlorine electromagnetic flowmeter (10) and a chlorine electric ball valve (11) from left to right in sequence, and the outer surface of the argon inlet branch pipe (12) is provided with an argon flow regulating valve (13) and an argon electromagnetic flowmeter (14) from left to right in sequence.
5. Chlorine purification device with leak alarm function according to claim 4, characterized in that the main inlet pipe (6) and the branch inlet pipe (8) are connected to each other, and the main inlet pipe (6) and the branch inlet pipe (12) are connected to each other.
6. The chlorine purification device with the leakage alarm function according to claim 1, wherein one side of the chlorine purification assembly (3) is connected with a main gas outlet pipe (15), the outer surface of the main gas outlet pipe (15) is sequentially provided with a second electric stop valve (16), a chlorine outlet branch pipe (17) and a high-temperature gas branch pipe (19) from top to bottom, the outer surface of the chlorine outlet branch pipe (17) is provided with a second electric chlorine ball valve (18), and the outer surface of the high-temperature gas branch pipe (19) is provided with an electric argon ball valve (20).
7. The chlorine purification device with the leakage alarm function as claimed in claim 1, wherein the hoop (2304) is fixedly connected with the main air inlet pipeline (6), and the central axis of the hoop (2304) coincides with the central axis of the rod body (2303).
CN202221632534.2U 2022-06-28 2022-06-28 Chlorine purification device with leakage alarm function Active CN217526974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221632534.2U CN217526974U (en) 2022-06-28 2022-06-28 Chlorine purification device with leakage alarm function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221632534.2U CN217526974U (en) 2022-06-28 2022-06-28 Chlorine purification device with leakage alarm function

Publications (1)

Publication Number Publication Date
CN217526974U true CN217526974U (en) 2022-10-04

Family

ID=83420977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221632534.2U Active CN217526974U (en) 2022-06-28 2022-06-28 Chlorine purification device with leakage alarm function

Country Status (1)

Country Link
CN (1) CN217526974U (en)

Similar Documents

Publication Publication Date Title
CN110107801A (en) The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment
CN217526974U (en) Chlorine purification device with leakage alarm function
CN208827685U (en) A kind of ultraviolet light solidification pipeline rehabilitation vehicle
CN1915456B (en) Horizontal type lifesaving escaping cabin in twin bodies
CN203867522U (en) Electromagnetic heater for oil well outlet
CN206267923U (en) A kind of anti-explosion diesel engine for mine
CN205742273U (en) A kind of fiberglass pipe gallery
CN112113141A (en) Novel integrated LNG gasification gas supply system
CN207833319U (en) A kind of Generator Stator Cooling system with overpressure protection function
CN206755131U (en) Electric steam raising plant
CN217978330U (en) Chlorine gas vaporization device with leakage detection function
CN215951456U (en) Energy-saving organic waste gas catalytic combustion integrated waste gas tower
CN213063890U (en) Safety valve centralized arrangement of natural gas compressor unit
CN210568792U (en) Indoor heating device based on new forms of energy
CN220737022U (en) Pollution emission reduction device for ozone pollution control
CN210801126U (en) Multifunctional oxidation furnace steam drum
CN214502120U (en) Cut body oil stove with oil leak alarm structure
CN209564538U (en) Fire-fighting water mists pump group
CN114659817B (en) Sodium fire resistance performance test system and test method for special structure
CN217520324U (en) Water bath type vaporizer
CN108755924A (en) A kind of integrated prefabricated pumping plant with automatic exhaust and remote monitoring function
CN218047231U (en) Spraying and absorption tower technology operating mode monitoring devices
CN220854179U (en) Heater detection test bed
CN220815742U (en) Drainage pump station of shield tunnel
CN217062254U (en) Automatic protection system of lithium battery energy storage cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant