CN110107801A - The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment - Google Patents

The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment Download PDF

Info

Publication number
CN110107801A
CN110107801A CN201910361404.6A CN201910361404A CN110107801A CN 110107801 A CN110107801 A CN 110107801A CN 201910361404 A CN201910361404 A CN 201910361404A CN 110107801 A CN110107801 A CN 110107801A
Authority
CN
China
Prior art keywords
tonifying
gas
cabinet
unit
interface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910361404.6A
Other languages
Chinese (zh)
Inventor
张磊
仇文艺
张畅
高佳平
黄煜铭
岳晓萍
蒋骏杰
何蕾
何亦龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd filed Critical Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd
Priority to CN201910361404.6A priority Critical patent/CN110107801A/en
Publication of CN110107801A publication Critical patent/CN110107801A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/002Details of vessels or of the filling or discharging of vessels for vessels under pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/025Special adaptations of indicating, measuring, or monitoring equipment having the pressure as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/026Special adaptations of indicating, measuring, or monitoring equipment having the temperature as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/04Arrangement or mounting of valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/06Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with compressed gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/01Shape
    • F17C2201/0104Shape cylindrical
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/03Orientation
    • F17C2201/032Orientation with substantially vertical main axis
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/05Size
    • F17C2201/056Small (<1 m3)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0323Valves
    • F17C2205/0326Valves electrically actuated
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0323Valves
    • F17C2205/0329Valves manually actuated
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0323Valves
    • F17C2205/0332Safety valves or pressure relief valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0323Valves
    • F17C2205/0335Check-valves or non-return valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/01Pure fluids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0107Single phase
    • F17C2223/0123Single phase gaseous, e.g. CNG, GNC
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/035High pressure (>10 bar)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/036Very high pressure (>80 bar)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/043Pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/0439Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/05Applications for industrial use

Abstract

The present invention provides a kind of round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment, for the tonifying Qi unit to GIS device tonifying Qi when including using, 1 or more the blowdown pipe for the tonifying Qi unit to be connected with GIS device, be fixed at one end of blowdown pipe using when the check valve that is connected with GIS device, for providing the air supply unit of supplement gas source to tonifying Qi unit, main connecting tube for connecting air supply unit and the ventilation of tonifying Qi unit, 2 or more the fans for tonifying Qi unit and air supply unit ventilation and heat, for implementing the gas cylinder electric heater unit of heating to the gas cylinder set in the tonifying Qi bottle and air supply unit set in tonifying Qi unit, for implementing the electric cabinet of master control in tonifying Qi unit, and the connecting cable for air supply unit to be electrically connected with tonifying Qi unit.The present invention using when can be realized the GIS device to the more leak sources of multi-compartment while realizing tonifying Qi, and it is round-the-clock be applicable in, strong applicability, safety is good.

Description

The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment
Technical field
The present invention relates to GIS device making-up air devices, and in particular to a kind of GIS device suitable for the more leak sources of multi-compartment is round-the-clock Making-up air device.
Background technique
GIS device has been widely used in electric system, due to product quality, manufacturing process, mounting condition and ageing equipment Etc. reasons make GIS device there is different degrees of gas leak phenomenon in the long-term use, lead to GIS plenum interior SF6 gas Body pressure is inadequate, influences GIS device insulation and arc extinction performance even initiation accident, for revealing serious GIS gas chamber, finally Solution is power failure Disintegration overhaul, is inherently eliminated defect, stops however, the stoppage in transit of grid equipment cannot simply be drawn, is Situations such as needing to comprehensively consider load, the method for operation, therefore short-term, can not arrange the GIS device of power failure Disintegration overhaul, it can only It maintains to operate normally using electrification tonifying Qi mode.Traditional supplementing method for air generally charges tonifying Qi using artificial scene, existing for Be disadvantageous in that: artificial tonifying Qi is time-consuming and laborious, inefficiency, and SF6 gas cylinder will occur obviously in 10 DEG C of following temperature Frost, be manually not easy tonifying Qi so that equipment crank-up time increase, influence safe distribution of electric power.To solve this problem, GIS is set Standby automatic air supply device has been shown in research, and such as the Chinese patent literature that application publication number is CN104964163A, it discloses one kind SF6 equipment moves all-weather intelligent automatic air supply device, by runing rest be arranged weighing device, heating device, Control device, gas cylinder etc. can be realized the automatic inflating device that SF6 gas is carried out to GIS device;For another example Authorization Notice No. is The Chinese patent literature of CN204420562U, it discloses a kind of SF6 self-filler, Authorization Notice No. is for another example The Chinese patent literature of CN205938513U, it discloses a kind of GIS Constant Pressure Complementary Air Device, above-mentioned apparatus can solve automatic benefit Gas problem.However existing including above-mentioned each device can be realized common technology existing for the same device of automatic inflating device asks Topic has:
First, not having real round-the-clock application power: automatic air supply device generally requires long-play, is currently used for supplying The usually exposed setting of the SF6 gas bomb of gas, no rain-proof, high temperature-proof such as are exposed to the sun at the measures, and rainwater easily causes moisture content to enter GIS Gas chamber causes water content to increase, it is easy to and in insulating materials surface sweating, causes insulation to decline, flashover breakdown occurs when serious, Reduction arc extinguishing ability, shortening equipment life, and the higher gas of water content decomposite a large amount of poisonous and harmful under arcing Substance, directly threat health of human body;When summer high temperature, SF6 steel cylinder is chronically exposed under the conditions of outdoor high temperature, it may occur that explosion thing Therefore there are great security risks, and device internal circuit board, integrated component etc. can not be placed under high temperature for a long time, it may It will cause malfunction or shorten the working life;The SF6 equipment of CN104964163A moves all-weather intelligent automatic air supply device, Its it is so-called it is round-the-clock only by setting heating device solve the problems, such as under low-temperature condition can automatic inflating device, not real meaning On it is round-the-clock.
Second, existing apparatus can only carry out tonifying Qi to single gas chamber within the same time, it is right simultaneously not have a device Multiple gas leakage intervals carry out the function of tonifying Qi.
Third, existing apparatus with the not set anti-pressure-relief measure in GIS device tonifying Qi port, if SF6 gas bomb gas use Complete, junction loosens or pipe breakage, it will causes the serious pressure release of GIS device, short circuit accident occurs, therefore there are biggish peaces Full hidden danger;
Fourth, the general one SF6 gas bomb of primary band of existing apparatus, if GIS gas chamber capacity is larger, and leakage rate compared with Fastly, 1 SF6 gas is using the time with regard to relatively short, it is necessary to manually replace gas cylinder, in such cases automatic inflating device and artificial tonifying Qi Efficiency it is very nearly the same.
Summary of the invention
The purpose of the present invention is: to solve the technical problems existing in the prior art, provide a kind of new construction be suitable for it is more It is spaced the round-the-clock making-up air device of GIS device of more leak sources.
The technical scheme is that the round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment of the invention, It being structurally characterized in that: for the tonifying Qi unit to GIS device tonifying Qi when including using, being used for above-mentioned tonifying Qi unit and GIS device 1 or more connected blowdown pipe, be fixed at one end of blowdown pipe using when the check valve that is connected with GIS device, be used for The air supply unit of supplement gas source is provided to tonifying Qi unit, the main connecting tube for connecting air supply unit and the ventilation of tonifying Qi unit, For 2 or more fans of tonifying Qi unit and air supply unit ventilation and heat, for the tonifying Qi bottle and confession set in tonifying Qi unit The gas cylinder set in gas unit implements the gas cylinder electric heater unit of heating, for implementing the electric cabinet of master control in tonifying Qi unit, And the connecting cable for air supply unit to be electrically connected with tonifying Qi unit.
Further embodiment is: further including blowdown pipe supporting element, above-mentioned blowdown pipe supporting element includes adjustable connecting rod, consolidates Surely the magnet set on the anchor ear of adjustable connecting rod one end and set on the adjustable connecting rod other end.
Further embodiment is: above-mentioned air supply unit includes feeding tank, gas cylinder, remittance control row component, connector, gas output Total connector, weighing sensor and hydraulic forklift;
Above-mentioned feeding tank include cabinet, the top cover above cabinet, set on cabinet top side side cover, be set to cabinet front end Chamber door and universal wheel set on 4 jiaos of cabinet lower end, the side wall of cabinet be equipped with the air grid for ventilation;Gas cylinder For the interior steel cylinder filled with SF6 gas, gas cylinder upper end is equipped with self-styled cut-off joint, and gas cylinder is equipped with 6;The control row's component that converges includes gas collection Pipe, hand-operated valve, threeway, pin end, pressure gauge and escape pipe;One end of escape pipe be fixedly connected with gas collecting tube and with gas collecting tube phase It is logical, the other end closing of gas collecting tube;Hand-operated valve, threeway, pin end and pressure gauge are respectively equipped with 6;One end of each hand-operated valve It is connected with gas collecting tube and communicates, one threeway of another termination of each hand-operated valve is connected with 1 pin end and 1 in each threeway Pressure gauge;Connector is formed by high-pressure hose and in the female connector that high-pressure hose both ends respectively set 1, and connector is equipped with 6, each The female connector of connector one end with converge 1 pin end of the row's of control component and be connected, the female connector of each connector other end and 1 The self-styled cut-off joint of gas cylinder is connected;Gas exports total connector set on the cabinet upper outside of feeding tank and is located under side cover Side;Gas exports the input terminal of total connector and is connected with the output end of escape pipe;Weighing sensor is respectively set in the bottom of each gas cylinder Set 1;Hydraulic forklift is set to the bottom of box of feeding tank.
Further embodiment is: above-mentioned tonifying Qi unit includes tonifying Qi cabinet, mends cylinder package, tonifying Qi pipeline assembly and temperature biography Sensor;
Above-mentioned tonifying Qi cabinet include cabinet body, the upper cover above cabinet body, set on cabinet body top side side lid, be set to cabinet body front end Cabinet door, set on 4 jiaos of cabinet body lower end locking universal wheel and the intracorporal bracket of cabinet can be set to;The side wall of cabinet body is equipped with and is used for The gas grid of ventilation;Mending cylinder package includes that tonifying Qi bottle, Y-type three way type, pressure reducing valve, gas inlet tube, gas outlet tube and weighing pass Sensor;The both ends of gas inlet tube are arranged with input adapter and out splice going splice;The one of the self-styled cut-off joint of tonifying Qi bottle and Y-type three way type End is connected, and the other end of Y-type three way type connects with the out splice going splice of gas inlet tube, the third end of Y-type three way type by pressure reducing valve with it is defeated One end of escape pipe communicates;The input adapter of gas inlet tube is fixed at the upper outside of cabinet body and is located at below the lid of side; Weighing sensor is set to the lower section in cabinet body and being located at tonifying Qi bottle;Tonifying Qi pipeline assembly includes main tracheae, input interface, second-hand Dynamic valve, branch's tracheae, outlet interface, pressure sensor and solenoid valve;Input interface is set to one end of main tracheae, and main tracheae passes through Input interface is connected with the other end for the gas outlet tube for mending cylinder package to be communicated;Second hand-operated valve is set on main tracheae, branch's gas Pipe is equipped with 3 or more, and the other end of main tracheae is communicated with each point of bronchial one end, and each point of bronchial other end is equipped with outlet Interface, each outlet interface are fixed at the upper outside of cabinet body and are located at below the lid of side;On main tracheae and every branch's tracheae Equipped with 1 pressure sensor and 1 solenoid valve;Temperature sensor is set in the cabinet body of tonifying Qi cabinet;
One end of above-mentioned main connecting tube exports total connector with the gas of air supply unit and is connected;The other end of main connecting tube and tonifying Qi The input adapter of the gas inlet tube of the benefit cylinder package of unit is connected;The quantity of blowdown pipe setting and going out for tonifying Qi pipeline assembly Gas interface is identical;One end of every blowdown pipe is connected with the outlet interface of 1 tonifying Qi pipeline assembly, every blowdown pipe it is another 1 above-mentioned check valve is fixed on end;
Said fans are respectively fixedly installed 2 on the lower end surface of the top cover face of feeding tank and the upper cover of tonifying Qi cabinet;Gas cylinder Electric heater unit is arranged in the periphery of each gas cylinder of air supply unit and the tonifying Qi bottle of tonifying Qi unit.
Further embodiment is: above-mentioned electric cabinet is fixed on the bracket in the tonifying Qi cabinet of tonifying Qi unit;Automatically controlled luggage Include cabinet, the touch screen on cabinet, power interface, heating output power port, solenoid valve interface, sensor interface, fan electricity Mouthful, power switch, and be set to the intracorporal circuit device of case, foregoing circuit device include CPU module, wireless communication module, after Electric appliance group and power module, relay group include several relays, and each relay of relay group is electrically connected with CPU module, Wireless communication module and touch screen are electrically connected with CPU module two-way signaling respectively;CPU module passes through sensor interface and each pressure Sensor, each weighing sensor and temperature sensor electrical connection;Each solenoid valve passes through solenoid valve interface and phase in relay group The 1 relay electrical connection answered, gas cylinder electric heater unit pass through heating output power port 1 relay corresponding with relay group Electrical connection, each fan are electrically connected by fan power port with 1 relay in relay group, and power module passes sequentially through power switch External AC220V alternating current when being used with power interface.
The present invention has the effect of positive: (1) the round-the-clock tonifying Qi dress of the GIS device suitable for the more leak sources of multi-compartment of the invention It sets, by overall construction design, can be realized set of device while multiple gas leakage intervals of GIS device are mended automatically Gas, can only be to 1 gas leakage interval automatic inflating device of GIS device, efficiency within the same time compared to prior art set of device Higher, applicability is stronger.(2) the round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment of the invention, pass through by The components such as SF6 gas bomb, electric device are set in feeding tank and tonifying Qi cabinet, in use effective radix saposhnikoviae, rain-proof, anti-riot Utilize gas cylinder electric heater unit to gas cylinder electric heating when shining, and passing through high temperature when fan cooling, low temperature, so as to realize really Round-the-clock application in meaning.(3) the round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment of the invention, sets altogether There are 7 gas cylinders for tonifying Qi, compared to the one SF6 gas bomb of general primary band of same device in the prior art, manually The frequency of replacement gas cylinder is greatly lowered, time saving and energy saving, is improved efficiency.(4) GIS device suitable for the more leak sources of multi-compartment of the invention Round-the-clock making-up air device, by the way that check valve is arranged on blowdown pipe, by the SF6 gas of check valve 5 and GIS device gas leakage interval Input port be connected implement tonifying Qi, check valve can effectively prevent in the prior art automatic air supply device external pipeline because aging fracture or Cause GIS device internal gas to leak in the case where pressure joint disengagement and cause serious ground short circuit accident, it is ensured that safety. (5) the round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment of the invention, by setting by adjustable connecting rod, The blowdown pipe supporting element of anchor ear and magnet composition can prevent the factors such as blowdown pipe self weight, wind from causing junction fatigue or being answered Gas leakage occurs for power, further ensures that tonifying Qi safety.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of air supply unit in Fig. 1;
Fig. 3 is the structural schematic diagram of remittance control row's component in Fig. 2;
Fig. 4 is the structural schematic diagram of connector in Fig. 2;
Fig. 5 is the structural schematic diagram of tonifying Qi unit in Fig. 1;
Fig. 6 is the structural schematic diagram that cylinder package is mended in Fig. 5;
Fig. 7 is the structural schematic diagram of output pipe component in Fig. 5;
Fig. 8 is the structural schematic diagram of electric cabinet in Fig. 5;
Fig. 9 is electrical block diagram of the invention.
Appended drawing reference in above-mentioned attached drawing is as follows:
Air supply unit 1, feeding tank 11, cabinet 11-1, air grid 11-1-1, top cover 11-2, side cover 11-3, chamber door 11-4, ten thousand To wheel 11-5;Gas cylinder 12;Component 13, gas collecting tube 13-1, first manual valve 13-2, threeway 13-3, pin end 13-4, pressure are arranged in the control that converges Power table 13-5, escape pipe 13-6;Connector 14, high-pressure hose 14-1, female connector 14-2, gas export total connector 15;Hydraulic fork Vehicle 16;
Tonifying Qi unit 2, tonifying Qi cabinet 21, cabinet body 21-1, air grid 21-1-1, upper cover 21-2, side lid 21-3, cabinet door 21-4 can lock Only universal wheel 21-5, bracket 21-6,;Cylinder package 22 is mended, tonifying Qi bottle 22-1, Y-type three way type 22-2, pressure reducing valve 22-3 input gas Pipe 22-4, input adapter 22-4-1, out splice going splice 22-4-2, gas outlet tube 22-5, weighing sensor 22-6;Tonifying Qi pipeline assembly 23, main tracheae 23-1, input interface 23-2, the second hand-operated valve 23-3, branch tracheae 23-4, outlet interface 23-5, pressure sensing Device 23-6, solenoid valve 23-7;Temperature sensor 24;
Main connecting tube 3;Blowdown pipe 4;Check valve 5;Blowdown pipe supporting element 6, adjustable connecting rod 61, anchor ear 62, magnet 63;Fan 7;Gas cylinder electric heater unit 8;
Electric cabinet 9, cabinet 91, touch screen 92, power interface 93, heating output power port 94, solenoid valve interface 95, sensor interface 96, fan power port 97, power switch 98;
Connecting cable 100.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
(embodiment 1)
See Fig. 1, the round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment of the present embodiment, mainly by air supply unit 1, tonifying Qi unit 2, main connecting tube 3, blowdown pipe 4, check valve 5, blowdown pipe supporting element 6, fan 7, gas cylinder electric heater unit 8, electricity It controls case 9 and connecting cable 100 forms.
Referring to fig. 2 to Fig. 4, air supply unit 1 mainly arranges component 13, connector 14, gas by feeding tank 11, gas cylinder 12, the control that converges Body exports total connector 15, weighing sensor (not shown) and hydraulic forklift 16 and forms.
Feeding tank 11 is mainly by cabinet 11-1, the top cover 11-2 above cabinet 11, set on the top cabinet 11-1 side Side cover 11-3, the chamber door 11-4 set on the front end cabinet 11-1 and universal wheel 11-5 composition set on 4 jiaos of the lower end cabinet 11-1, Cabinet 11-1 is the hollow of front opening, and the side wall of cabinet 11 is equipped with the air grid 11-1-1 for ventilation.
Gas cylinder 12 is the interior steel cylinder filled with SF6 gas, and 12 upper end of gas cylinder is equipped with self-styled cut-off joint, and gas cylinder 12 is equipped with 3 More than, preferably 6 in the present embodiment, gas cylinder 12 is set in cabinet 11-1 with rain and sun.
Referring to Fig. 3, the control row's component 13 that converges includes gas collecting tube 13-1, hand-operated valve 13-2, threeway 13-3, pin end 13-4, pressure Power table 13-5 and escape pipe 13-6, wherein gas collecting tube 13-1 and escape pipe 13-6 respectively sets 1, one end of escape pipe 13-6 and collection Tracheae 13-1 is fixedly connected and communicates with gas collecting tube 13-1, the other end closing of gas collecting tube 13-1;Hand-operated valve 13-2, threeway 13- 3, pin end 13-4 and pressure gauge 13-5 are respectively equipped with 6;One end of each hand-operated valve 13-2 is connected with gas collecting tube 13-1 to be communicated, 1 pin end 13-4 and 1 pressure are connected on another termination one threeway 13-3, each threeway 13-3 of each hand-operated valve 13-2 Power table 13-5.
Referring to fig. 4, connector 14 respectively sets 1 female connector 14-2 by high-pressure hose 14-1 and at the both ends high-pressure hose 14-1 Composition, connector 14 are equipped with 6, and 1 pin end 13- of row's component 13 is controlled in the female connector 14-2 of each 14 one end of connector and remittance 4 are connected, and the female connector 14-2 of each 14 other end of connector is connected with the self-styled cut-off joint of 1 gas cylinder 12, thus by 6 A gas cylinder 12 and gas collecting tube 13-1 and escape pipe 13-6 is connected.
Still see that Fig. 2, gas export the cabinet 11-1 upper outside that total connector 15 is set to feeding tank 11, and can be by feeding tank 11 Side cover 11-3 block with rain and sun;Phase that gas exports the input terminal of total connector 15 and the output end of escape pipe 13-6 is connected It is logical, it is exported to can be collected the SF6 gas in 6 gas cylinders 12 by remittance control row's component 13 and be exported total connector 15 through gas.
Weighing sensor is respectively arranged 1 in the bottom of each gas cylinder 12, for acquiring the surplus of SF6 gas in gas cylinder 12.
Still see Fig. 1,12 weight of calibrating gas bottle for filling SF6 gas due to one is 50kg, and 6 gas cylinders 12 are expired a bottle weighing and reached 600kg, for convenience scene transport and use are equipped with hydraulic forklift 16 in the bottom cabinet 11-1 of feeding tank 11.
Referring to Fig. 5 to Fig. 7, tonifying Qi unit 2 is mainly by tonifying Qi cabinet 21, benefit cylinder package 22, tonifying Qi pipeline assembly 23 and temperature Sensor 24 is spent to form.
Tonifying Qi cabinet 21 is mainly by cabinet body 21-1, the upper cover 21-2 above cabinet body 21-1, set on the top cabinet body 21-1 one The side lid 21-3 of side, set on the cabinet door 21-4 of the front end cabinet body 21-1, set on 4 jiaos of the lower end cabinet body 21-1 can locking universal wheel 21-5 And for installing the bracket 21-6 composition of electric cabinet 9 in cabinet body 21-1.The side wall of cabinet body 21-1 is equipped with for divulging information The gas grid 21-1-1 of ventilation.
Referring to Fig. 6, mending cylinder package 22 includes tonifying Qi bottle 22-1, Y-type three way type 22-2, pressure reducing valve 22-3, gas inlet tube 22- 4, gas outlet tube 22-5 and weighing sensor 22-6;The both ends of gas inlet tube 22-4 are arranged with input adapter 22-4-1 and output connects Head 22-4-2.
The structure of tonifying Qi bottle 22-1 is identical as gas cylinder 12 above-mentioned, the self-styled cut-off joint and Y-type three way type of tonifying Qi bottle 22-1 One end of 22-2 communicates, and the other end of Y-type three way type 22-2 connects with the out splice going splice 22-4-2 of gas inlet tube 22-4 to be communicated, The third end of Y-type three way type 22-2, which is connected by pressure reducing valve 22-3 with one end of gas outlet tube 22-5, to be communicated;Gas inlet tube 22-4's Input adapter 22-4-1 is fixed at the upper outside of cabinet body 21-1, and can be blocked by the side lid 21-3 of tonifying Qi cabinet 21 and be prevented with rain-proof It shines;Weighing sensor 22-6 is set to the lower section in cabinet body 21-1 and being located at tonifying Qi bottle 22-1, and weighing sensor 22-6 is for acquiring The surplus of SF6 gas in tonifying Qi bottle 22-1.
Referring to Fig. 7, tonifying Qi pipeline assembly 23 includes main tracheae 23-1, input interface 23-2, the second hand-operated valve 23-3, branch Tracheae 23-4, outlet interface 23-5, pressure sensor 23-6 and solenoid valve 23-7.
Input interface 23-2 is set to one end of main tracheae 23-1, and main tracheae 23-1 is by input interface 23-2 and mends gas cylinders group The other end of the gas outlet tube 22-5 of part 22 communicates;Second hand-operated valve 23-3 is set on main tracheae 23-1, branch tracheae 23- 4 are equipped with 3 or more, and the other end of main tracheae 23-1 is communicated with one end of each branch's tracheae 23-4, and each branch's tracheae 23-4's is another One end is equipped with outlet interface 23-5, and each outlet interface 23-5 is fixed at the upper outside of cabinet body 21-1, and can be by tonifying Qi cabinet 21 Side lid 21-3 block with rain and sun;1 pressure sensor 23- is equipped on main tracheae 23-1 and every branch tracheae 23-4 6 and 1 solenoid valve 23-7.Pressure sensor 23-6 is used to detect the air pressure in pipeline when use, and solenoid valve 23-7 is for controlling The on-off of corresponding pipeline gas.
Temperature sensor 24 is fixed in the cabinet body 21-1 of tonifying Qi cabinet 21, for acquiring the letter of the temperature in cabinet body 21-1 Breath.
One end of main connecting tube 3 exports total connector 15 with the gas of air supply unit 1 and is connected;The other end of main connecting tube 3 It is connected with the input adapter 22-4-1 of the gas inlet tube 22-4 of the benefit cylinder package 22 of tonifying Qi unit 2, so that gas supply is single 6 gas cylinders 12 of member 1 can be to the tonifying Qi bottle 22-1 gas supply of the benefit cylinder package 22 of tonifying Qi unit 2.
The quantity that blowdown pipe 4 is arranged is identical as the outlet interface 23-5 of tonifying Qi pipeline assembly 23;One end of every blowdown pipe 4 It is connected with the outlet interface 23-5 of 1 tonifying Qi pipeline assembly 23,1 is fixed on the other end of every blowdown pipe 4 unidirectionally Valve 5, in use, the corresponding implementation tonifying Qi that is connected with the SF6 gas input port at 1 gas leakage interval of GIS device of 1 check valve 5, (one As a GIS device have 7 individual gas chamber intervals), therefore the device of the present embodiment can be realized and an equipment while be set to GIS Standby multiple gas leakage intervals carry out tonifying Qi.By the way that check valve 5 is arranged, automatic air supply device extension tube attached in the prior art can be effectively prevent Road is because of serious ground short circuit thing caused by causing GIS device internal gas to leak in the case where aging fracture or pressure joint disengagement Therefore, it is ensured that safety.
Blowdown pipe supporting element 6 it is preferred that setting, blowdown pipe supporting element 6 by adjustable connecting rod 61, be fixed at The anchor ear 62 of 61 one end of adjustable connecting rod and set on 61 other end of adjustable connecting rod magnet 63 form;Blowdown pipe support The quantity of part 6 is identical as the quantity of blowdown pipe 4, in use, blowdown pipe supporting element 6 is equipped with unidirectionally by its anchor ear 62 and blowdown pipe 4 One end amplexis of valve 5 is adsorbed on GIS device suitable position using magnet 63, and blowdown pipe supporting element 6 can prevent blowdown pipe 4 to be self-possessed Cause junction fatigue or gas leakage is occurred by stress, further ensures that tonifying Qi safety.
The fixation on the lower end surface top cover 11-2 of feeding tank 11 and the lower end surface of the upper cover 21-2 of tonifying Qi cabinet 21 of fan 7 is set It sets, it is preferable that fan 7 is respectively arranged 2 in feeding tank 11 and tonifying Qi cabinet 21.Fan 7 when temperature reaches setting value for opening Move gas cylinder 12 and tonifying Qi in feeding tank 11 when guaranteeing that environment temperature is higher to heat dissipation of drying in feeding tank 11 and tonifying Qi cabinet 21 The safety of tonifying Qi bottle 22-1 and electrical equipment in cabinet 21.
Gas cylinder electric heater unit 8 is in the periphery of each gas cylinder 12 of air supply unit 1 and the tonifying Qi bottle 22-1 of tonifying Qi unit 2 Setting, is heated for temperature down to setting value and to the tonifying Qi bottle 22-1 of gas cylinder 12 when tonifying Qi being needed to operate.Gas cylinder electricity adds Thermal 8 is the prior art, and structure and working principle are not detailed.
Referring to Fig. 8, master control of the electric cabinet 9 for the device of the present embodiment, electric cabinet 9 is fixed at the branch in tonifying Qi cabinet 21 On frame 21-6, electric cabinet 9 include cabinet 91, the touch screen 92 on cabinet 91, power interface 93, heating output power port 94, Solenoid valve interface 95, sensor interface 96, fan power port 97 and power switch 98, and the circuit device in cabinet 91, Circuit device includes CPU module, wireless communication module, relay group and power module, and relay group includes several relays, Each relay of relay group is electrically connected with CPU module, and the on-off of relay is controlled by CPU module, wireless communication module and touching Screen 92 is touched to be electrically connected with CPU module two-way signaling respectively;CPU module is each by sensor interface 96 and tonifying Qi pipeline assembly 23 Pressure sensor 23-6, for acquiring each weighing sensor of SF6 gas surplus in each gas cylinder 12, for acquiring tonifying Qi bottle 22-1 The weighing sensor 22-6 of interior gas surplus and for temperature collection signal temperature sensor 24 be electrically connected;Tonifying Qi pipeline group Each solenoid valve 23-7 of part 23 passes through the 1 relay electrical connection corresponding with relay group of solenoid valve interface 95, each gas cylinder electricity Heating device 8 passes through fan by the 1 relay electrical connection corresponding with relay group of heating output power port 94, each fan 7 Power port 97 is electrically connected with 1 relay in relay group, and power module passes sequentially through power switch 98 and power interface 93 uses When external AC220V alternating current, power module is the mature prior art, knot for providing the working power of device, power module Structure is not detailed.CPU module is built-in with temperature judgment threshold, gas cylinder SF6 gas surplus judgment threshold and pipeline air pressure judgement Threshold value, the control program built in CPU module are simple mature prior art program.Touch screen 92 for realizing threshold value be arranged, Working condition such as shows at the human-computer interaction functions on the spot, and wireless communication module is for realizing the present apparatus and backstage (such as administrative staff Mobile phone etc.) communication, realize to include functions, touch screen 92 and the radio communication molds such as the transmission of working condition message, backstage remote control Block is the mature prior art, is not described further.
Still see Fig. 1, the electrical connection between air supply unit 1 and tonifying Qi unit 2 is realized by connecting cable 100.
The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment of the present embodiment, work when in use are former Reason and process are summarized as follows:
When substation's GIS device gas leakage needs tonifying Qi, by the GIS device whole day candidate suitable for the more leak sources of multi-compartment of the present embodiment Device of air is laid in by the GIS device for needing tonifying Qi, and the gas chamber interval quantity of tonifying Qi is needed according to GIS device, and corresponding setting is mended The outlet interface 23-5 of blowdown pipe 4 and tonifying Qi pipeline assembly 23 is correspondingly connected with by the quantity of tracheae 4 and blowdown pipe supporting element 6 The check valve 5 for being fixed at 4 other end of blowdown pipe and GIS device are needed to the gas input port company at the gas chamber interval of tonifying Qi again afterwards It connects securely, then implements support with blowdown pipe 4 and check valve 5 of the blowdown pipe supporting element 6 to junction, open air supply unit 1 The second hand-operated valve 23-3 of each hand-operated valve 13-2 of component 13 and the tonifying Qi pipeline assembly 23 of tonifying Qi unit 2 are arranged in the control that converges, and connect electricity The power supply for controlling case 9 opens the electricity on the main tracheae 23-1 and respective branch tracheae 23-4 of tonifying Qi pipeline assembly 23 by electric cabinet 9 Magnet valve 23-7 finally opens the tonifying Qi bottle 22-1 of tonifying Qi unit 2 and each gas cylinder 12 of air supply unit 1, can start to GIS device 1 or more gas leakage interval carries out automatic inflating device.During tonifying Qi, each pressure sensor 23-6 of tonifying Qi pipeline assembly 23 is corresponding Superfeed pressure is detected, when reaching setting pressure threshold, electric cabinet 9 closes corresponding solenoid valve 23-7 and stops tonifying Qi, Ruo Ganshi Between if after backstage receive GIS device because leakage pressure be not achieved setting value alarm when, backstage again remotely send tonifying Qi order, electricity Module receives order and is sent to CPU module control case 9 by wireless communication, and CPU module opens tonifying Qi pipeline assembly 23 once again Solenoid valve 23-7 on main tracheae 23-1 and respective branch tracheae 23-4 carries out tonifying Qi, so recycles, to realize to GIS device Implement automatic inflating device in 1 or more gas leakage interval.
In device use process, SF6 gas surplus in each weighing sensor real-time monitoring gas cylinder, when reaching given threshold When, electric cabinet 9 is alarmed to backstage.
In use process, temperature sensor 24 carries out real-time monitoring to temperature, when temperature reaches the upper limit threshold of setting, Electric cabinet 9 starts each fan 7 and works, and heat dissipation is blowed to feeding tank 11 and tonifying Qi cabinet 21, to avoid device in excessively high temperature It spends lower work belt and carrys out risk;When temperature reaches the lower threshold of setting and needs to carry out tonifying Qi, electric cabinet 9 is opened gas cylinder electricity and is added Thermal 8 works, and implements electric heating to each gas cylinder, to guarantee smooth tonifying Qi.
The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment of the present embodiment, 9 electricity of each gas cylinder and electric cabinet Gas component is placed in case, in cabinet, can effectively realize rain and sun in outdoor long-time use process, both safety and can extend gas cylinder With the service life of electrical equipment, insecurity factor is reduced to the maximum extent.
Above embodiments are the explanations to a specific embodiment of the invention, rather than limitation of the present invention, related technology The technical staff in field without departing from the spirit and scope of the present invention, can also make various transformation and variation and obtain To corresponding equivalent technical solution, therefore all equivalent technical solutions should be included into patent protection model of the invention It encloses.

Claims (5)

1. a kind of round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment, it is characterised in that: for giving when including using The tonifying Qi unit of GIS device tonifying Qi, 1 or more the blowdown pipe for the tonifying Qi unit to be connected with GIS device, fixation are set In one end of blowdown pipe using when the check valve that is connected with GIS device, for providing the gas supply of supplement gas source to tonifying Qi unit Unit, for being dissipated for tonifying Qi unit and air supply unit ventilation by the main connecting tube of air supply unit and the ventilation connection of tonifying Qi unit 2 or more fans of heat, for implementing the gas of heating to the gas cylinder set in the tonifying Qi bottle and air supply unit set in tonifying Qi unit Bottle electric heater unit is used to implement the electric cabinet of master control, and is used for air supply unit and tonifying Qi unit in tonifying Qi unit The connecting cable of electrical connection.
2. the GIS device round-the-clock making-up air device according to claim 1 suitable for the more leak sources of multi-compartment, it is characterised in that: It further include blowdown pipe supporting element, the blowdown pipe supporting element includes adjustable connecting rod, is fixed at adjustable connecting rod one end Anchor ear and magnet set on the adjustable connecting rod other end.
3. the GIS device round-the-clock making-up air device according to claim 1 suitable for the more leak sources of multi-compartment, it is characterised in that: The air supply unit includes feeding tank, gas cylinder, converges control row component, connector, gas and export total connector, weighing sensor and hydraulic Fork truck;
The feeding tank include cabinet, the top cover above cabinet, set on cabinet top side side cover, be set to cabinet front end Chamber door and universal wheel set on 4 jiaos of cabinet lower end, the side wall of cabinet be equipped with the air grid for ventilation;Gas cylinder For the interior steel cylinder filled with SF6 gas, gas cylinder upper end is equipped with self-styled cut-off joint, and gas cylinder is equipped with 6;The control row's component that converges includes gas collection Pipe, hand-operated valve, threeway, pin end, pressure gauge and escape pipe;One end of escape pipe be fixedly connected with gas collecting tube and with gas collecting tube phase It is logical, the other end closing of gas collecting tube;Hand-operated valve, threeway, pin end and pressure gauge are respectively equipped with 6;One end of each hand-operated valve It is connected with gas collecting tube and communicates, one threeway of another termination of each hand-operated valve is connected with 1 pin end and 1 in each threeway Pressure gauge;Connector is formed by high-pressure hose and in the female connector that high-pressure hose both ends respectively set 1, and connector is equipped with 6, each The female connector of connector one end with converge 1 pin end of the row's of control component and be connected, the female connector of each connector other end and 1 The self-styled cut-off joint of gas cylinder is connected;Gas exports total connector set on the cabinet upper outside of feeding tank and is located under side cover Side;Gas exports the input terminal of total connector and is connected with the output end of escape pipe;Weighing sensor is respectively set in the bottom of each gas cylinder Set 1;Hydraulic forklift is set to the bottom of box of feeding tank.
4. the GIS device round-the-clock making-up air device according to claim 3 suitable for the more leak sources of multi-compartment, it is characterised in that: The tonifying Qi unit includes tonifying Qi cabinet, mends cylinder package, tonifying Qi pipeline assembly and temperature sensor;
The tonifying Qi cabinet include cabinet body, the upper cover above cabinet body, set on cabinet body top side side lid, be set to cabinet body front end Cabinet door, set on 4 jiaos of cabinet body lower end locking universal wheel and the intracorporal bracket of cabinet can be set to;The side wall of cabinet body is equipped with and is used for The gas grid of ventilation;Mending cylinder package includes that tonifying Qi bottle, Y-type three way type, pressure reducing valve, gas inlet tube, gas outlet tube and weighing pass Sensor;The both ends of gas inlet tube are arranged with input adapter and out splice going splice;The one of the self-styled cut-off joint of tonifying Qi bottle and Y-type three way type End is connected, and the other end of Y-type three way type connects with the out splice going splice of gas inlet tube, the third end of Y-type three way type by pressure reducing valve with it is defeated One end of escape pipe communicates;The input adapter of gas inlet tube is fixed at the upper outside of cabinet body and is located at below the lid of side; Weighing sensor is set to the lower section in cabinet body and being located at tonifying Qi bottle;Tonifying Qi pipeline assembly includes main tracheae, input interface, second-hand Dynamic valve, branch's tracheae, outlet interface, pressure sensor and solenoid valve;Input interface is set to one end of main tracheae, and main tracheae passes through Input interface is connected with the other end for the gas outlet tube for mending cylinder package to be communicated;Second hand-operated valve is set on main tracheae, branch's gas Pipe is equipped with 3 or more, and the other end of main tracheae is communicated with each point of bronchial one end, and each point of bronchial other end is equipped with outlet Interface, each outlet interface are fixed at the upper outside of cabinet body and are located at below the lid of side;On main tracheae and every branch's tracheae Equipped with 1 pressure sensor and 1 solenoid valve;Temperature sensor is set in the cabinet body of tonifying Qi cabinet;
One end of the main connecting tube exports total connector with the gas of air supply unit and is connected;The other end of main connecting tube and tonifying Qi The input adapter of the gas inlet tube of the benefit cylinder package of unit is connected;The quantity of blowdown pipe setting and going out for tonifying Qi pipeline assembly Gas interface is identical;One end of every blowdown pipe is connected with the outlet interface of 1 tonifying Qi pipeline assembly, every blowdown pipe it is another 1 check valve is fixed on end;
The fan is respectively fixedly installed 2 on the lower end surface of the top cover face of feeding tank and the upper cover of tonifying Qi cabinet;Gas cylinder Electric heater unit is arranged in the periphery of each gas cylinder of air supply unit and the tonifying Qi bottle of tonifying Qi unit.
5. the GIS device round-the-clock making-up air device according to claim 4 suitable for the more leak sources of multi-compartment, it is characterised in that: The electric cabinet is fixed on the bracket in the tonifying Qi cabinet of tonifying Qi unit;Electric cabinet includes cabinet, the touch on cabinet Screen, power interface, heating output power port, solenoid valve interface, sensor interface, fan power port, power switch, and it is set to cabinet Interior circuit device, the circuit device include CPU module, wireless communication module, relay group and power module, relay group Including several relays, each relay of relay group is electrically connected with CPU module, wireless communication module and touch screen respectively with The electrical connection of CPU module two-way signaling;CPU module passes through sensor interface and each pressure sensor, each weighing sensor and temperature Spend sensor electrical connection;Each solenoid valve passes through solenoid valve interface 1 relay electrical connection corresponding with relay group, gas cylinder electricity Heating device passes through fan power port by the 1 relay electrical connection corresponding with relay group of heating output power port, each fan It is electrically connected with 1 relay in relay group, power module passes sequentially through external when power switch and power interface use AC220V alternating current.
CN201910361404.6A 2019-04-30 2019-04-30 The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment Pending CN110107801A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910361404.6A CN110107801A (en) 2019-04-30 2019-04-30 The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910361404.6A CN110107801A (en) 2019-04-30 2019-04-30 The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment

Publications (1)

Publication Number Publication Date
CN110107801A true CN110107801A (en) 2019-08-09

Family

ID=67487768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910361404.6A Pending CN110107801A (en) 2019-04-30 2019-04-30 The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment

Country Status (1)

Country Link
CN (1) CN110107801A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110768154A (en) * 2019-11-15 2020-02-07 广州供电局有限公司 Single-component gas supplementing method for mixed gas of gas insulation equipment
CN111692529A (en) * 2020-05-26 2020-09-22 中铁隧道集团二处有限公司 Method for storing oxygen and acetylene in classified manner and supplying oxygen and acetylene in concentrated manner
CN112197166A (en) * 2020-11-18 2021-01-08 广州道柯仪器仪表设备有限公司 Gas cylinder safety cabinet for pressure reducing valve
CN112594546A (en) * 2021-03-08 2021-04-02 氢储(新乡)能源科技有限公司 Solid-state hydrogen storage system of nimble formula
CN113217815A (en) * 2021-05-20 2021-08-06 江苏微导纳米科技股份有限公司 Explosion-proof device
CN114623369A (en) * 2022-01-21 2022-06-14 北京航天发射技术研究所 Air source system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007107713A (en) * 2005-09-16 2007-04-26 Taiyo Nippon Sanso Corp Gas supply method and gas supply device
CN202650948U (en) * 2012-04-20 2013-01-02 山西省电力公司大同供电分公司 SF6 circuit breaker gas automatic compensation device
CN204328465U (en) * 2014-11-20 2015-05-13 河南平高电气股份有限公司 A kind of high-tension switch gear inflator
CN206036653U (en) * 2016-08-30 2017-03-22 富隆电气有限公司 Fill frame of bleeding
CN107893906A (en) * 2017-11-30 2018-04-10 广东电网有限责任公司东莞供电局 A kind of sulfur hexafluoride gas high-efficiency gasification aggregating apparatus
CN208230488U (en) * 2017-12-15 2018-12-14 贵州玖捌汽车大数据贸易服务有限公司 A kind of exhaust devcie for tail gas of vehicle
CN109000149A (en) * 2018-07-13 2018-12-14 国网安徽省电力有限公司检修分公司 A kind of intellectual online making-up air device of SF6 electrical equipment
CN109030749A (en) * 2018-09-04 2018-12-18 广东电网有限责任公司 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system
CN109459184A (en) * 2018-12-13 2019-03-12 广西电网有限责任公司电力科学研究院 The device and its application method of electrical equipment SF6 gas leakage standard source are provided
CN210153543U (en) * 2019-04-30 2020-03-17 国网江苏省电力有限公司常州供电分公司 Be suitable for many intervals many leak source's all-weather air supplement unit of GIS equipment

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007107713A (en) * 2005-09-16 2007-04-26 Taiyo Nippon Sanso Corp Gas supply method and gas supply device
CN202650948U (en) * 2012-04-20 2013-01-02 山西省电力公司大同供电分公司 SF6 circuit breaker gas automatic compensation device
CN204328465U (en) * 2014-11-20 2015-05-13 河南平高电气股份有限公司 A kind of high-tension switch gear inflator
CN206036653U (en) * 2016-08-30 2017-03-22 富隆电气有限公司 Fill frame of bleeding
CN107893906A (en) * 2017-11-30 2018-04-10 广东电网有限责任公司东莞供电局 A kind of sulfur hexafluoride gas high-efficiency gasification aggregating apparatus
CN208230488U (en) * 2017-12-15 2018-12-14 贵州玖捌汽车大数据贸易服务有限公司 A kind of exhaust devcie for tail gas of vehicle
CN109000149A (en) * 2018-07-13 2018-12-14 国网安徽省电力有限公司检修分公司 A kind of intellectual online making-up air device of SF6 electrical equipment
CN109030749A (en) * 2018-09-04 2018-12-18 广东电网有限责任公司 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system
CN109459184A (en) * 2018-12-13 2019-03-12 广西电网有限责任公司电力科学研究院 The device and its application method of electrical equipment SF6 gas leakage standard source are provided
CN210153543U (en) * 2019-04-30 2020-03-17 国网江苏省电力有限公司常州供电分公司 Be suitable for many intervals many leak source's all-weather air supplement unit of GIS equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110768154A (en) * 2019-11-15 2020-02-07 广州供电局有限公司 Single-component gas supplementing method for mixed gas of gas insulation equipment
CN111692529A (en) * 2020-05-26 2020-09-22 中铁隧道集团二处有限公司 Method for storing oxygen and acetylene in classified manner and supplying oxygen and acetylene in concentrated manner
CN112197166A (en) * 2020-11-18 2021-01-08 广州道柯仪器仪表设备有限公司 Gas cylinder safety cabinet for pressure reducing valve
CN112594546A (en) * 2021-03-08 2021-04-02 氢储(新乡)能源科技有限公司 Solid-state hydrogen storage system of nimble formula
CN113217815A (en) * 2021-05-20 2021-08-06 江苏微导纳米科技股份有限公司 Explosion-proof device
CN114623369A (en) * 2022-01-21 2022-06-14 北京航天发射技术研究所 Air source system

Similar Documents

Publication Publication Date Title
CN110107801A (en) The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment
CN108594916A (en) A kind of making-up air device and supplementing method for air of SF6 electrical equipments
CN103107595B (en) Substation automation system in prefabricated transformer substation
CN206633827U (en) A kind of electric automobile high-voltage block terminal with monitoring temperature
CN209561991U (en) A kind of intellectual monitoring preassembled transformer station
CN109000149A (en) A kind of intellectual online making-up air device of SF6 electrical equipment
CN102646546B (en) Intelligent self-energy-obtaining vacuum breaker
CN202771290U (en) Automatic control device of composite insulator water boiling test equipment
CN210153543U (en) Be suitable for many intervals many leak source&#39;s all-weather air supplement unit of GIS equipment
CN205657341U (en) Low -voltage comprehensive distribution box
CN205646820U (en) Take independent harmonic metering modules&#39;s comprehensive monitoring and protection ware
CN208571309U (en) A kind of heat radiating type high-low voltage electric power distribution cabinet
CN207586283U (en) A kind of multi-functional electric energy measuring tank
CN207303712U (en) Power distribution cabinet
CN205938513U (en) GIS constant voltage air supplement unit
CN205039548U (en) Low -voltage reactive power compensation device
CN205407210U (en) Cable branch box
CN209501968U (en) A kind of novel insulator incubator
CN205750607U (en) A kind of transformator integral type is with regard to cabinet
CN209146725U (en) A kind of SF6 gas cylinder heats weighing control system automatically
CN206992794U (en) The general monitor unit and monitoring system of communication switch power
CN207442206U (en) A kind of complete distribution cabinet device of remotely intelligently monitoring high pressure
CN109188141A (en) A kind of heating tube Multi-function experimental test equipment
CN205752824U (en) A kind of novel Metering socket
CN204967111U (en) Intelligent load switch looped netowrk cabinet with communication function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination