Prior art keywords
gas
pipeline
solenoid valve
connector
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811028890.1A
Other languages
Chinese (zh)
Inventor
李韬
吴涛
方炜
林淑凡
林俊融
钟国超
饶嘉昌
张宇峰
梁雪敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201811028890.1A priority Critical patent/CN109030749A/en
Publication of CN109030749A publication Critical patent/CN109030749A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/0004Gaseous mixtures, e.g. polluted air
    • G01N33/0009General constructional details of gas analysers, e.g. portable test equipment
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/0004Gaseous mixtures, e.g. polluted air
    • G01N33/0009General constructional details of gas analysers, e.g. portable test equipment
    • G01N33/0027General constructional details of gas analysers, e.g. portable test equipment concerning the detector
    • G01N33/0031General constructional details of gas analysers, e.g. portable test equipment concerning the detector comprising two or more sensors, e.g. a sensor array
    • G01N33/0032General constructional details of gas analysers, e.g. portable test equipment concerning the detector comprising two or more sensors, e.g. a sensor array using two or more different physical functioning modes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N35/00Automatic analysis not limited to methods or materials provided for in any single one of groups G01N1/00 - G01N33/00; Handling materials therefor
    • G01N35/00584Control arrangements for automatic analysers

Landscapes

  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Biochemistry (AREA)
  • Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Combustion & Propulsion (AREA)
  • Pipeline Systems (AREA)

Abstract

The present invention relates to power accessories fields, take mechanism of qi structure, gas-detecting device and SF automatically more particularly, to a kind of6Gas on-line detecting system, to alleviate existing SF6Gas decomposition product, Humidity Detection work have taking that gas and the degree of automation of detection are low, time-consuming for testing result typing.This takes mechanism of qi structure to include connector, the first solenoid valve, take gas unit, the first pipeline and the second pipeline automatically;Connector one end is connect with equipment air hatch, and the other end is connect with the first solenoid valve;Side of first solenoid valve far from connector and the first piping connection;First pipeline is connected to away from one end of connector with the air inlet of gas unit is taken;One end of second pipeline is connected to the gas outlet of gas unit is taken, and the other end is connect with gas containing device.Multiple connectors can be set, and control mechanism controls the energized state of each first solenoid valve, and then controls it and open and be closed, and improves the degree of automation and working efficiency.

Description

Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system
Technical field
The present invention relates to power accessories field, more particularly, to it is a kind of take automatically mechanism of qi structure, gas-detecting device and SF6Gas on-line detecting system.
Background technique
To SF6Charger carries out gas humidity, decomposition product test is a routine of power supply bureau's chemical test profession Experiment work.The test object of humidity is micro-water content, and the test object of decomposition product has H2S、SO2, CO content (unit: uL/ L).The SF that test result analysis goes out6Gas humidity, decomposition product content are to judge equipment whether normal operation and fault condition Important evidence.
The mode that previous chemical test personnel carry out this work is to carry SF6Synthesis analyzer goes to substation, uses SF6 Synthesis analyzer is to SF6Equipment is tested.SF is carried out to equipment at present6The key step of gas test is as follows:
1. connect instrument takes gas connector, air inlet pipe and exhaust pipe, instrument switch is opened.
2. opening SF6Equipment air hatch lid, tightens and takes gas connector and air hatch, carries out taking gas to equipment.
3. the SF taken out6Gas passes through SF6Synthesis analyzer, by the humidity sensor of the inside, H2Sensor, SO2 Sensor, CO sensor, obtain the content of each component gas, and are shown on instrument display screen.
4. taking away gas connector, and lid is covered after hunting leak to air hatch.
5. field results are recorded on paper by testing crew, and judge result, typing is returned to after unit into production System.
Power supply bureau is equipped with only one chemical experiment class at present, and substation and SF6The quantity cumulative year after year of equipment, in addition Substation is far away, and workload increasingly increases, and expends a large amount of manpower and material resources.
Therefore, existing SF6Gas and the degree of automation of detection are low, examine in the presence of taking for gas decomposition product, Humidity Detection work Survey result typing the problem of time-consuming.
Summary of the invention
Mechanism of qi structure, gas-detecting device and SF are taken automatically the purpose of the present invention is to provide a kind of6Gas on-line checking system System, to alleviate existing SF6Gas and the degree of automation of detection are low, detect knot in the presence of taking for gas decomposition product, Humidity Detection work Fruit typing the problem of time-consuming.
In order to solve the above technical problems, technical solution provided by the invention is:
It is a kind of to take mechanism of qi structure automatically, including connector, the first solenoid valve, take gas unit, the first pipeline and the second pipeline;
Described connector one end is connect with equipment air hatch, and the other end is connect with first solenoid valve;
Side of first solenoid valve far from the connector and first piping connection;
First pipeline is connected to away from one end of the connector with the air inlet for taking gas unit;
One end of second pipeline is connected to the gas outlet for taking gas unit, and the other end and gas containing device connect It connects.
Further,
Second pipeline is provided with a plurality of branch line, and every branch line connects with a second solenoid valve It connects.
Further,
Pass through the first piping connection between the second solenoid valve and first solenoid valve.
Further,
First pipeline and second pipeline are stainless steel tube.
A kind of gas-detecting device, including mechanism of qi structure and testing agency are taken automatically, the testing agency and second pipe Road takes one end of gas unit to connect far from described.
Further,
The testing agency includes exhaust emissions pipeline, and the exhaust emissions pipeline is used to will test the gas discharge of completion The testing agency.
Further,
It further include control host;The control host and first solenoid valve, the second solenoid valve and the detection Mechanism is electrically connected.
A kind of SF6Gas on-line detecting system, including gas-detecting device, it is described to take gas connector and the SF automatically6Gas High-tension apparatus takes gas interface to connect.
Further,
SO is provided in the testing agency2Sensor, CO sensor, H2Sensor and dew point transducer.
Further,
It further include auto flow controller, the auto flow controller is installed on second pipeline, and is located at described Inside testing agency.
In conjunction with above technical scheme, the beneficial effect that the present invention reaches is:
One kind takes mechanism of qi structure to include connector, the first solenoid valve, take gas unit, the first pipeline and the second pipeline automatically;Connector One end is connect with equipment air hatch, and the other end is connect with the first solenoid valve;Side of first solenoid valve far from connector and the first pipe Road connection;First pipeline is connected to away from one end of connector with the air inlet of gas unit is taken;One end of second pipeline and take gas unit Gas outlet connection, the other end connect with gas containing device.
Operator when taking gas, keeps the first solenoid valve logical using the on-off electricity condition of control the first solenoid valve of software control Electric and in the open state, gas, which will enter from equipment to be checked through air hatch, connector, the first solenoid valve and the first pipeline, takes gas Unit enters corresponding gas containing device and gas detection equipment through the second pipeline after.After taking gas, operator makes The first solenoid valve is powered off with control software and is in closed state, can carry out subsequent detection work to the gas.In addition, Corresponding control program can also be developed, its time interval as required is made to carry out control system of switching on or off electricity to the first solenoid valve, into And realize and take gas automatically, improve the degree of automation.
Multiple connectors can be set in the present invention, develop the power on/off that corresponding control module controls each first solenoid valve State, and then control the unlatching and closure of a plurality of first pipeline.Operator can according to the actual situation and needs, setting take gas The multiple gas chambers of equipment to be checked are carried out that gas is taken to operate, after taking gas by the power off time at interval and each first solenoid valve respectively It carries out the follow-up work such as detecting, related data will be automatically stored and be uploaded to database.One wheel takes gas detection after circulation terminates, The automatic next round that carries out is taken into air-flow journey in the time of setting.The present invention, which can be realized, takes gas automatically to more gas chambers, and only needs Relevant control parameter is set in advance can be taken gas automatically, substantially increased the degree of automation for taking gas process, shortened The gas time that installation, disassembly and operator hurry back and forth in the process is taken, and then is improved work efficiency.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the main view provided in an embodiment of the present invention for taking mechanism of qi structure automatically;
Fig. 2 is the piping connection schematic diagram provided in an embodiment of the present invention for taking mechanism of qi structure automatically;
Fig. 3 is SF provided in an embodiment of the present invention6The schematic diagram of gas on-line detecting system.
Icon: 100- takes mechanism of qi structure automatically;200- testing agency;300- controls host;400- auto flow controller; 110- connector;120- takes gas unit;121- air inlet;122- second solenoid valve;The gas outlet 123-;124- quick coupling;130- First pipeline;The second pipeline of 140-;141- branch line;The first solenoid valve of 150-;210- exhaust emissions pipeline;220-SO2It passes Sensor;230-CO sensor;240-H2Sensor;250- dew point transducer.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
Embodiment 1 to embodiment 3 is described in detail with reference to the accompanying drawing:
Embodiment 1
It present embodiments provides one kind and takes mechanism of qi structure 100 automatically, please with reference to Fig. 1 to Fig. 3.Fig. 1 is that the present invention is implemented The main view for taking mechanism of qi structure automatically that example provides;Fig. 2 takes the piping connection of mechanism of qi structure to show automatically to be provided in an embodiment of the present invention It is intended to;Fig. 3 is SF provided in an embodiment of the present invention6The schematic diagram of gas on-line detecting system.
Including connector 110, the first solenoid valve 150, take gas unit 120, the first pipeline 130 and the second pipeline 140;Connector 110 one end are connect with equipment air hatch, and the other end is connect with the first solenoid valve 150;First solenoid valve 150 is far from connector 110 Side is connect with the first pipeline 130;First pipeline 130 deviates from one end of connector 110 and takes the air inlet 121 of gas unit 120 Connection;One end of second pipeline 140 is connected to the gas outlet 123 of gas unit 120 is taken, and the other end is connect with gas containing device.
Operator when taking gas, makes the first solenoid valve using the on-off electricity condition of control the first solenoid valve of software control 150 150 energizations are simultaneously in the open state, and gas will be from equipment to be checked through air hatch, connector 110, the first solenoid valve 150 and first Pipeline 130, which enters, takes gas unit 120, enters corresponding gas containing device and gas detection equipment through the second pipeline 140 after. After taking gas, operator powers off the first solenoid valve 150 using control software and is in closed state, can be to the gas Carry out subsequent detection work.Furthermore it is also possible to develop corresponding control program, make its time interval as required to first Solenoid valve 150 carries out control system of switching on or off electricity, and then realizes and take gas automatically, improves the degree of automation.
Multiple connectors 110 can be set in the present embodiment, develop corresponding control module and control each first solenoid valve 150 On-off electricity condition, and then control the unlatching and closure of a plurality of first pipeline 130.Operator can according to the actual situation and need It wants, setting takes the power off time at gas interval and each first solenoid valve 150, to the multiple gas chambers of equipment to be checked carries out that gas is taken to grasp respectively Make, carries out the follow-up work such as detecting after taking depressed beam, related data will be automatically stored and be uploaded to database.One wheel takes gas to detect After circulation terminates, the automatic next round that carries out is taken into air-flow journey within the set time.It is provided in this embodiment to take mechanism of qi structure automatically 100 can be realized and take gas automatically to more gas chambers, and relevant control parameter need to only be set in advance can be taken gas automatically, greatly The degree of automation for taking gas process is improved greatly, shortens the time that installation during taking gas, disassembly and operator hurry back and forth, into And it improves work efficiency.
In the optinal plan of the present embodiment, more preferably,
Second pipeline 140 is provided with a plurality of branch line 141, every branch line 141 with a second solenoid valve 122 Connection.
When to multiple gas chambers carrying out that gas is taken to operate, control software keeps the first solenoid valve 150 connecting with the first gas chamber logical Electric and in the open state, the first solenoid valve 150 of other gas chambers is in close state, the gas of the first gas chamber through connector 110, First solenoid valve 150 and the first pipeline 130, which enter, takes gas unit 120, after taking gas, closes the first electromagnetism of the branch road Valve 150, opens the second solenoid valve 122 of the branch road, and the gas of the first gas chamber enters gas detection equipment, the detection of the first gas chamber After the completion, the second solenoid valve 122 for closing the branch road, the branch connecting with the second gas chamber repeat aforesaid operations to complete second The detection work of gas chamber gas, multiple gas chambers successively carry out, until completing the gas detection work of all gas chambers.Control software is pressed The progress of gas detection work is taken according to the time control next round of setting.
When taking gas to one of equipment or gas chamber, the connector 110 being attached thereto, 150 and of the first solenoid valve are opened Second solenoid valve 122, the first solenoid valve 150 and second solenoid valve 122 of other routes are in closed state.When gas flows through When the second pipeline 140, since other second solenoid valves 122 are in close state, gas cannot be introduced into its branch line 141, The case where can be avoided chaotic each route gas, influence experimental data.
Further,
It is connected between second solenoid valve 122 and the first solenoid valve 150 by the first pipeline 130.
Second solenoid valve 122, which is contained in, takes gas unit 120.It takes and is provided with quick coupling 124 on gas unit 120, the first pipe Road 130 is connected to quick coupling 124.It takes gas unit 120 to be provided with multiple quick couplings 124, multiple connectors can be installed simultaneously 110, by controlling the on-off of the first solenoid valve 150, realizes and take gas to operate distinct device or different gas chamber.Second solenoid valve 122 effect is, when gas containing device or subsequent other equipment break down, can close second solenoid valve 122, It is repaired, gas is avoided to be discharged into air.
In the optinal plan for taking gas unit 120, more preferably,
Taking gas unit 120 includes relay, power supply and CPU, and relay, power supply, CPU and second solenoid valve 122 electrically connect It connects.By the control of CPU, the auto switching of second solenoid valve 122 can be realized.Operator, which need to only operate, carries the CPU's Machine can carry out taking gas, simple and convenient, save the time.
In the optinal plan of the present embodiment, more preferably,
First pipeline 130 and the second pipeline 140 are stainless steel tube.
Corrosion resistance, the intensity of stainless steel tube are higher, and are connected firmly, and are not in that midway falls off, is broken and bending Dead angle and the problem of block pipeline.
Embodiment 2
The embodiment is another preferred embodiment arranged side by side with 1 phase of embodiment, 1 institute of embodiment except distinguishing feature Disclosed technical solution belongs to range disclosed in the present embodiment, skill disclosed in the embodiment 1 except distinguishing feature Art scheme is not repeated to describe.
A kind of gas-detecting device is present embodiments provided, please with reference to Fig. 1 to Fig. 3.Fig. 1 is the embodiment of the present invention What is provided takes the main view of mechanism of qi structure automatically;Fig. 2 takes the piping connection of mechanism of qi structure to illustrate automatically to be provided in an embodiment of the present invention Figure;Fig. 3 is SF provided in an embodiment of the present invention6The schematic diagram of gas on-line detecting system.
Including taking mechanism of qi structure 100 and testing agency 200 automatically, testing agency 200 and the separate of the second pipeline 140 take gas list One end connection of member 120.
Operator when taking gas, makes the first solenoid valve using the on-off electricity condition of control the first solenoid valve of software control 150 150 energizations are simultaneously in the open state, and gas will be from equipment to be checked through air hatch, connector 110, the first solenoid valve 150 and first Pipeline 130, which enters, takes gas unit 120, enters testing agency 200 through the second pipeline 140 after and carries out gas detection.Take depressed beam Afterwards, operator powers off the first solenoid valve 150 and is in closed state using control software.Furthermore it is also possible to develop corresponding Control program, so that its time interval as required is carried out control system of switching on or off electricity to the first solenoid valve 150, and then realize and take automatically Gas improves the degree of automation.
Multiple connectors 110 can be set in the present embodiment, and control software makes the first solenoid valve 150 connecting with the first gas chamber It is powered and in the open state, the first solenoid valve 150 of other gas chambers is in close state, and the gas of the first gas chamber is through connector 110, the first solenoid valve 150 and the first pipeline 130, which enter, takes gas unit 120, after taking gas, closes the first electricity of the branch road Magnet valve 150, opens the second solenoid valve 122 of the branch road, and the gas of the first gas chamber enters gas detection equipment, the inspection of the first gas chamber After the completion of survey, the second solenoid valve 122 of the branch road is closed, the branch that connect with the second gas chamber repeats aforesaid operations to complete the The detection work of two gas chamber gases, multiple gas chambers successively carry out, until completing the gas detection work of all gas chambers.Control software The progress of gas detection work is taken according to the time control next round of setting.The present embodiment can be realized taking automatically to more gas chambers Gas, and relevant control parameter need to only be set in advance can be taken gas automatically, substantially increase the automation journey for taking gas process Degree shortens the time that installation during taking gas, disassembly and operator hurry back and forth, and then improves work efficiency.
In the optinal plan of the present embodiment, more preferably,
Testing agency 200 is internally provided with the sensor of multiple and different types, each sensor can correspondingly to gas into Row detection, manufacturer can carry out type selecting installation to sensor according to experiment needs.
In the optinal plan of the present embodiment, more preferably,
Testing agency 200 includes exhaust emissions pipeline 210, and exhaust emissions pipeline 210 is used to will test the gas row of completion Testing agency 200 out.
Gas needs will test the gas discharge testing agency 200 of completion, prevents it from influencing subsequent detection after detecting Step, so that experimental data is inaccurate.
In the optinal plan of the present embodiment, more preferably,
Gas-detecting device further includes control host 300;Control host 300 and the first solenoid valve 150, second solenoid valve 122 and testing agency 200 be electrically connected.
Control host 300 can remotely control the on off operating mode of the first solenoid valve 150 and second solenoid valve 122, Jin Ershi Now remotely control gas-detecting device provided in this embodiment takes gas automatically.The testing result of testing agency 200 can be transmitted To control host 300, realizes on-line monitoring, without the manually recorded result of staff and be transported to experimental data center, it is quasi- True rate and efficiency are significantly improved.
Embodiment 3
The embodiment is another preferred embodiment arranged side by side with embodiment 1 and 2 phase of embodiment, except distinguishing feature Technical solution disclosed in embodiment 1 and embodiment 2 belongs to range disclosed in the present embodiment, except distinguishing feature Technical solution disclosed in embodiment 1 and embodiment 2 is not repeated to describe.
Present embodiments provide a kind of SF6Gas on-line detecting system, please with reference to Fig. 1 to Fig. 3.Fig. 1 is the present invention The main view for taking mechanism of qi structure automatically that embodiment provides;Fig. 2 takes the pipeline of mechanism of qi structure to connect automatically to be provided in an embodiment of the present invention Connect schematic diagram;Fig. 3 is SF provided in an embodiment of the present invention6The schematic diagram of gas on-line detecting system.
Including gas-detecting device, gas connector 110 and SF are taken automatically6Gas high pressure equipment takes gas interface to connect.
Operator when taking gas, makes the first solenoid valve using the on-off electricity condition of control the first solenoid valve of software control 150 150 energizations are simultaneously in the open state, and gas will be from equipment to be checked through air hatch, connector 110, the first solenoid valve 150 and first Pipeline 130, which enters, takes gas unit 120, enters gas detection mechanism 200 through the second pipeline 140 after.After taking gas, people is manipulated Member powers off the first solenoid valve 150 using control software and is in closed state, can carry out subsequent detection work to the gas Make.Furthermore it is also possible to develop corresponding control program, lead to its time interval as required to the first solenoid valve 150 Power-off control, and then realize and take gas automatically, improve the degree of automation.
SF6Gas high pressure equipment includes multiple gas chambers, needs SF indoor to each gas6Gas is detected.The present embodiment The SF of offer6Multiple connectors 110 can be arranged in gas on-line detecting system, and control software makes connect with the first gas chamber first The energization of solenoid valve 150 is simultaneously in the open state, and the first solenoid valve 150 of other gas chambers is in close state, the gas of the first gas chamber Body enters through connector 110, the first solenoid valve 150 and the first pipeline 130 takes gas unit 120, after taking gas, closes branch road The first solenoid valve 150, open the second solenoid valve 122 of the branch road, the gas of the first gas chamber enters gas detection equipment, After the completion of the detection of one gas chamber, the second solenoid valve 122 of the branch road is closed, the branch connecting with the second gas chamber repeats aforesaid operations To complete the detection work of the second gas chamber gas, multiple gas chambers are successively carried out, until completing the gas detection work of all gas chambers. Control software takes the progress of gas detection work according to the time control next round of setting.
The present embodiment, which can be realized, takes gas automatically to more gas chambers, and relevant control parameter need to only be set in advance can be into Row takes gas automatically, substantially increases the degree of automation for taking gas process, shortens installation during taking gas, disassembly and operator The time hurried back and forth, and then improve work efficiency.
In the optinal plan of the present embodiment, more preferably,
SO2 sensor 220, CO sensor 230, H2S sensor 240 and dew point transducer are provided in testing agency 200 250。
To SF6Charger carries out gas humidity, decomposition product test is a routine of power supply bureau's chemical test profession Experiment work.The test object of humidity is micro-water content, and the test object of decomposition product has H2S、SO2, CO content.Therefore, it is examining Setting SO2 sensor 220, CO sensor 230, H2S sensor 240 and dew point transducer 250 in mechanism 200 are surveyed, with completion pair SF6The detection of gas humidity, decomposition product.
In the optinal plan of the present embodiment, more preferably,
SF6Gas on-line detecting system further includes auto flow controller 400, and auto flow controller 400 is installed on Two pipelines 140, and be located inside testing agency 200.
Due to SF6The pressure of each gas chamber of gas high pressure equipment is not quite similar, and SO2 sensor 220 in testing agency 200, The flow of CO sensor 230, H2S sensor 240 and dew point transducer 250 is constant, and shares 140 conduct of the second pipeline Its air inlet pipeline, therefore, it is necessary to the SF from each gas chamber6Gas carries out the adjusting of pressure or flow.Flow is controlled automatically Device 400 processed can automatically control the SF from each gas chamber6Gas flow makes it be adjusted to certain value, guarantees from each gas chamber SF6Gas can be normally carried out detection.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of take mechanism of qi structure automatically, which is characterized in that including connector, the first solenoid valve, take gas unit, the first pipeline and second Pipeline;
Described connector one end is connect with equipment air hatch, and the other end is connect with first solenoid valve;
Side of first solenoid valve far from the connector and first piping connection;
First pipeline is connected to away from one end of the connector with the air inlet for taking gas unit;
One end of second pipeline is connected to the gas outlet for taking gas unit, and the other end is connect with gas containing device.
2. according to claim 1 take mechanism of qi structure automatically, which is characterized in that second pipeline is provided with a plurality of branched pipe Road, every branch line are connect with a second solenoid valve.
3. according to claim 2 take mechanism of qi structure automatically, which is characterized in that the second solenoid valve and first electromagnetism Pass through the first piping connection between valve.
4. according to claim 1 take mechanism of qi structure automatically, which is characterized in that first pipeline and second pipeline are equal For stainless steel tube.
5. a kind of including the gas-detecting device according to any one of claims 1-4 for taking mechanism of qi structure automatically, which is characterized in that It further include testing agency, the testing agency takes one end of gas unit to connect with second pipeline far from described.
6. gas-detecting device according to claim 5, which is characterized in that the testing agency includes tail gas discharging pipe The testing agency is discharged in road, the gas that the exhaust emissions pipeline is used to will test completion.
7. gas-detecting device according to claim 5, which is characterized in that further include control host;The control host It is electrically connected with first solenoid valve, the second solenoid valve and the testing agency.
8. a kind of includes the SF such as the described in any item gas-detecting devices of claim 5-76Gas on-line detecting system, it is special Sign is, described to take gas connector and the SF automatically6Gas high pressure equipment takes gas interface to connect.
9. SF according to claim 86Gas on-line detecting system, which is characterized in that be provided in the testing agency SO2Sensor, CO sensor, H2Sensor and dew point transducer.
10. SF according to claim 86Gas on-line detecting system, which is characterized in that it further include auto flow controller, The auto flow controller is installed on second pipeline, and is located inside the testing agency.
CN201811028890.1A 2018-09-04 2018-09-04 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system Pending CN109030749A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811028890.1A CN109030749A (en) 2018-09-04 2018-09-04 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811028890.1A CN109030749A (en) 2018-09-04 2018-09-04 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system

Publications (1)

Publication Number Publication Date
CN109030749A true CN109030749A (en) 2018-12-18

Family

ID=64624045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811028890.1A Pending CN109030749A (en) 2018-09-04 2018-09-04 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system

Country Status (1)

Country Link
CN (1) CN109030749A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109884260A (en) * 2019-04-12 2019-06-14 国网江苏省电力有限公司 A kind of air-path control system, method and gas insulated combined electrical equipment GIS device
CN110107801A (en) * 2019-04-30 2019-08-09 国网江苏省电力有限公司常州供电分公司 The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment
CN112344216A (en) * 2020-10-19 2021-02-09 广西电网有限责任公司百色供电局 Multi-loop automatic control device of SF6 gas recovery device

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040089064A1 (en) * 2002-11-05 2004-05-13 Toru Kidokoro Evaporated fuel treatment device for internal combustion engine
CN1987412A (en) * 2006-12-27 2007-06-27 郑州赛奥电子有限公司 SF6 gas density relay corrector and its detecting method
CN201867324U (en) * 2010-11-17 2011-06-15 郑州光力科技股份有限公司 Sulfur hexafluoride (SF6) gas sampling detection device
CN103424291A (en) * 2013-08-12 2013-12-04 中国船舶重工集团公司第七一九研究所 Multi-channel gas sampling radiation monitoring device and working method thereof
CN203894243U (en) * 2013-12-27 2014-10-22 广东电网公司电力科学研究院 Automatic sulfur hexafluoride online sampling and detecting device
CN104198393A (en) * 2014-04-29 2014-12-10 贵州电力试验研究院 On-line monitoring system and method for SF6 decomposition gas components in electrical equipment
CN104596931A (en) * 2015-02-12 2015-05-06 国家电网公司 Multichannel sulfur hexafluoride insulating electric equipment online monitoring device and method
CN204405385U (en) * 2015-01-23 2015-06-17 广州南方电力集团技术有限公司 The full-automatic sampling apparatus of a kind of sulfur hexafluoride gas
CN204495624U (en) * 2015-02-10 2015-07-22 中国南方电网有限责任公司超高压输电公司检修试验中心 One carries out SF 6the coupling arrangement that gas sample detects
CN205192812U (en) * 2015-09-08 2016-04-27 广东电网有限责任公司电力科学研究院 Gaseous automatic sampling device of portable sulfur hexafluoride
CN106000022A (en) * 2016-07-08 2016-10-12 珠海经济特区恒迪科技有限公司 Method and device for online micro water treatment of SF6 electrical equipment
CN106647605A (en) * 2016-12-28 2017-05-10 国网江苏省电力公司检修分公司 Intelligent gas supplementation and mini-amount water monitoring device for SF6 electrical equipment
CN206321621U (en) * 2016-12-09 2017-07-11 上海欧秒电力监测设备有限公司 Sulfur hexafluoride decomposer on-line monitoring system
CN206906338U (en) * 2017-06-02 2018-01-19 江苏森海电气有限公司 A kind of SF6 gas analyzing apparatus
CN206987925U (en) * 2017-06-14 2018-02-09 北京福田戴姆勒汽车有限公司 The catalytic reaction cell and exhaust gas processing device of exhaust gas processing device
CN108168138A (en) * 2018-01-02 2018-06-15 珠海格力电器股份有限公司 Outdoor unit, air-conditioning system and control method
CN209247724U (en) * 2018-09-04 2019-08-13 广东电网有限责任公司 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040089064A1 (en) * 2002-11-05 2004-05-13 Toru Kidokoro Evaporated fuel treatment device for internal combustion engine
CN1987412A (en) * 2006-12-27 2007-06-27 郑州赛奥电子有限公司 SF6 gas density relay corrector and its detecting method
CN201867324U (en) * 2010-11-17 2011-06-15 郑州光力科技股份有限公司 Sulfur hexafluoride (SF6) gas sampling detection device
CN103424291A (en) * 2013-08-12 2013-12-04 中国船舶重工集团公司第七一九研究所 Multi-channel gas sampling radiation monitoring device and working method thereof
CN203894243U (en) * 2013-12-27 2014-10-22 广东电网公司电力科学研究院 Automatic sulfur hexafluoride online sampling and detecting device
CN104198393A (en) * 2014-04-29 2014-12-10 贵州电力试验研究院 On-line monitoring system and method for SF6 decomposition gas components in electrical equipment
CN204405385U (en) * 2015-01-23 2015-06-17 广州南方电力集团技术有限公司 The full-automatic sampling apparatus of a kind of sulfur hexafluoride gas
CN204495624U (en) * 2015-02-10 2015-07-22 中国南方电网有限责任公司超高压输电公司检修试验中心 One carries out SF 6the coupling arrangement that gas sample detects
CN104596931A (en) * 2015-02-12 2015-05-06 国家电网公司 Multichannel sulfur hexafluoride insulating electric equipment online monitoring device and method
CN205192812U (en) * 2015-09-08 2016-04-27 广东电网有限责任公司电力科学研究院 Gaseous automatic sampling device of portable sulfur hexafluoride
CN106000022A (en) * 2016-07-08 2016-10-12 珠海经济特区恒迪科技有限公司 Method and device for online micro water treatment of SF6 electrical equipment
CN206321621U (en) * 2016-12-09 2017-07-11 上海欧秒电力监测设备有限公司 Sulfur hexafluoride decomposer on-line monitoring system
CN106647605A (en) * 2016-12-28 2017-05-10 国网江苏省电力公司检修分公司 Intelligent gas supplementation and mini-amount water monitoring device for SF6 electrical equipment
CN206906338U (en) * 2017-06-02 2018-01-19 江苏森海电气有限公司 A kind of SF6 gas analyzing apparatus
CN206987925U (en) * 2017-06-14 2018-02-09 北京福田戴姆勒汽车有限公司 The catalytic reaction cell and exhaust gas processing device of exhaust gas processing device
CN108168138A (en) * 2018-01-02 2018-06-15 珠海格力电器股份有限公司 Outdoor unit, air-conditioning system and control method
CN209247724U (en) * 2018-09-04 2019-08-13 广东电网有限责任公司 Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范存德: "《液压技术手册》", 31 May 2004, 辽宁科学技术出版社, pages: 1767 - 1769 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109884260A (en) * 2019-04-12 2019-06-14 国网江苏省电力有限公司 A kind of air-path control system, method and gas insulated combined electrical equipment GIS device
CN110107801A (en) * 2019-04-30 2019-08-09 国网江苏省电力有限公司常州供电分公司 The round-the-clock making-up air device of GIS device suitable for the more leak sources of multi-compartment
CN112344216A (en) * 2020-10-19 2021-02-09 广西电网有限责任公司百色供电局 Multi-loop automatic control device of SF6 gas recovery device

Similar Documents

Publication Publication Date Title
CN109030749A (en) Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system
CN106644620B (en) Detachable multifunctional gas automatic acquisition method and device
CN104715580A (en) Self-calibrated type GIS indoor sulfur hexafluoride gas leakage monitoring and alarming system
KR100849399B1 (en) Multi-area gas leakage detection system using single gas detector
CN209247724U (en) Automatically mechanism of qi structure, gas-detecting device and SF are taken6Gas on-line detecting system
CN203825781U (en) Self-calibration type sulfur hexafluoride gas leakage monitoring alarm device in GIS chamber
JP7379397B2 (en) Purge monitoring device
KR101064274B1 (en) Gas sampling purge apparatus
CN209372805U (en) SF6Gas on-line detecting system
CN208254887U (en) A kind of gas monitoring system suitable for underground coal mine
CN110609120A (en) Gas multi-path online monitoring system
CN214668982U (en) Full-automatic verification quality control device of online monitoring instrument
CN210953961U (en) Gas multi-path online monitoring system
CN210572192U (en) Water oxygen particle analysis and detection system
CN211487615U (en) Online pH value detection system
CN107014962A (en) A kind of atmospheric monitoring system and its monitoring method
CN210623058U (en) Performance detection control device for electric air compressor for new energy vehicle
CN209928602U (en) Gas alarm calibrating device
CN208156843U (en) A kind of toxic air alarm device automatic calibrator
CN220872447U (en) Automatic quality control gas circuit device for on-line air monitoring
JP3733646B2 (en) Gas shut-off device
CN210626066U (en) Device for detecting safety of special gas equipment
CN110005959A (en) A kind of gas pipeline makings analysis integration detection device
CN108008085A (en) The poison gas concentration monitoring device of diverse location in a kind of tail gas treatment device
CN217505313U (en) Sampling device and analyzer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination