CN217501272U - Isolated column for construction - Google Patents

Isolated column for construction Download PDF

Info

Publication number
CN217501272U
CN217501272U CN202220162977.3U CN202220162977U CN217501272U CN 217501272 U CN217501272 U CN 217501272U CN 202220162977 U CN202220162977 U CN 202220162977U CN 217501272 U CN217501272 U CN 217501272U
Authority
CN
China
Prior art keywords
groove
sides
fence
positioning
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220162977.3U
Other languages
Chinese (zh)
Inventor
杜锴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Tailei Engineering Co ltd
Original Assignee
Binzhou Tailei Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou Tailei Engineering Co ltd filed Critical Binzhou Tailei Engineering Co ltd
Priority to CN202220162977.3U priority Critical patent/CN217501272U/en
Application granted granted Critical
Publication of CN217501272U publication Critical patent/CN217501272U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a fence for construction, the on-line screen storage device comprises a base, first logical groove has all been seted up to the both sides at base top, the inside in first logical groove is provided with the gag lever post, the inside of base and the both sides that are located first logical groove have all seted up first spout, the top of base is provided with first fence, the both sides at first fence top all have the second fence through hinge swing joint, the equal fixed mounting in bottom of second fence both sides has the second locating lever, the equal fixed mounting in top of first fence both sides has first locating lever. The utility model discloses a set up first isolated column and second isolated column and keep apart the building site, carry on spacingly through setting up the thread groove to the threaded rod, drive the motor through setting up the mounting groove, drive the threaded rod through setting up the motor, carry on spacingly through setting up the gag lever post to first isolated column, prevent that first isolated column from taking place to rock at the in-process that removes.

Description

Isolated column for construction
Technical Field
The utility model relates to a construction technical field specifically is a fence for construction.
Background
The building construction refers to the production activity in the engineering construction implementation stage, is the construction process of various buildings, also can be said to be the process of changing various lines on the design drawing into a real object in appointed place, it includes foundation engineering construction, major structure construction, roofing engineering construction, decoration engineering construction, etc., the place of construction operation is called "construction site" or "job site", also called building site, when the building construction, need to use the fence to keep apart, and the isolated fence that uses at present is inconvenient to be adjusted the height, and when transporting, is inconvenient folding, thereby has influenced the practicality of isolated fence.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fence for construction possesses the advantage of convenient transportation and being convenient for adjust, has solved the fence that uses at present and has inconvenient highly adjusting, and when the transportation, inconvenient folding to the problem of fence practicality has been influenced.
In order to achieve the above object, the utility model provides a following technical scheme: an isolation fence for building construction comprises a base, wherein first through grooves are formed in two sides of the top of the base, limiting rods are arranged in the first through grooves, first sliding grooves are formed in the base and located on two sides of the first through grooves, a first isolation fence is arranged at the top of the base, second isolation fences are movably connected to two sides of the top of the first isolation fence through hinges, second positioning rods are fixedly arranged at the bottoms of two sides of the second isolation fence, first positioning rods are fixedly arranged at the tops of two sides of the first isolation fence, accommodating grooves are formed in the first positioning rods, positioning clamp frames are arranged in the accommodating grooves, clamping grooves are formed in the second positioning rods, second through grooves are formed in the second positioning rods and located on the side, away from the clamping grooves, and fixing rods are arranged in the second through grooves, the inside of second locating lever and the both sides that are located the second groove all seted up the second spout, the mounting groove has been seted up to the center department of first isolated column bottom, the inside fixed mounting of mounting groove has the motor, the thread groove has been seted up to the inside center department of base, the inside rotation of thread groove is connected with the threaded rod.
Preferably, one side of the positioning clamp frame, which is relatively far away from the positioning clamp frame, is provided with a fixing groove, and the fixing rod penetrates through the fixing groove to the inside of the positioning clamp frame.
Preferably, the inside sliding connection of second spout has the second slider, the one side that the second slider is close to relatively and the both sides fixed connection of dead lever.
Preferably, a spring is fixedly mounted inside the second sliding groove and on one side, relatively far away from the second sliding block, of the second sliding groove, and the positioning clamp frame penetrates through the top of the second positioning rod through the clamping groove.
Preferably, the first sliding block is connected to the inside of the first sliding groove in a sliding manner, and one side, close to the first sliding block, of the first sliding block is fixedly connected with the two sides of the limiting rod.
Preferably, the top of gag lever post and the bottom fixed connection of first isolated column, the output shaft of motor and the top fixed connection of threaded rod.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up first isolated column and second isolated column and keep apart the building site, carry on spacingly to the threaded rod through setting up the thread groove, drive the motor through setting up the mounting groove, drive the threaded rod through setting up the motor, carry on spacingly to first isolated column through setting up the gag lever post, prevent that first isolated column from taking place to rock at the in-process that removes, lead to the groove through setting up the second and hold the dead lever, fix the locator card frame through setting up the fixed rod, thereby fix the junction of second isolated column and first isolated column, it is inconvenient to highly adjusting to have solved the isolated column of using at present simultaneously, and when the transportation, inconvenient folding, thereby the problem of isolated column practicality has been influenced.
2. The utility model discloses a set up the fixed slot and carry on spacingly to the dead lever, carry on spacingly to the second slider through setting up the second spout, prevent that the second slider from taking place to rock at the in-process that removes, carry on spacingly to the both sides of dead lever through setting up the second slider, prevent that the dead lever from taking place to rock at the in-process that removes, cushion the second slider through setting up the spring, carry on spacingly to first slider through setting up first spout, prevent that first slider from taking place to rock at the in-process that removes, carry on spacingly to the gag lever post through setting up first slider, prevent that the gag lever post from taking place to rock at the in-process that removes.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional structure of the present invention;
fig. 3 is a partially enlarged view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a base; 2. a limiting rod; 3. a first isolated column; 4. a first positioning rod; 5. a second isolated column; 6. a second positioning rod; 7. positioning a clamp frame; 8. fixing the rod; 9. a threaded rod; 10. a first through groove; 11. a first slider; 12. a first chute; 13. a thread groove; 14. a spring; 15. mounting grooves; 16. a motor; 17. accommodating grooves; 18. a second through groove; 19. a second chute; 20. a second slider; 21. a card slot; 22. and fixing the grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, an isolation fence for building construction comprises a base 1, wherein first through grooves 10 are formed on both sides of the top of the base 1, a limiting rod 2 is arranged inside the first through groove 10, first sliding grooves 12 are formed in the base 1 and on both sides of the first through groove 10, a first isolation fence 3 is arranged on the top of the base 1, second isolation fences 5 are movably connected to both sides of the top of the first isolation fence 3 through hinges, second positioning rods 6 are fixedly arranged at the bottoms of both sides of the second isolation fence 5, first positioning rods 4 are fixedly arranged at the tops of both sides of the first isolation fence 3, accommodating grooves 17 are formed in the first positioning rods 4, positioning clamp frames 7 are arranged in the accommodating grooves 17, clamping grooves 21 are formed in the second positioning rods 6, second through grooves 18 are formed in the second positioning rods 6 and on the sides of the clamping grooves 21 which are far away from each other, a fixed rod 8 is arranged in the second through groove 18, a second sliding groove 19 is arranged in the second positioning rod 6 and positioned at two sides of the second through groove 18, a mounting groove 15 is arranged at the center of the bottom of the first isolation fence 3, a motor 16 is fixedly mounted in the mounting groove 15, a thread groove 13 is arranged at the center of the inner part of the base 1, a threaded rod 9 is rotatably connected in the thread groove 13, the first isolation fence 3 and the second isolation fence 5 are arranged to isolate a construction site, the threaded rod 9 is limited by the thread groove 13, the motor 16 is driven by the mounting groove 15, the threaded rod 9 is driven by the motor 16, the first isolation fence 3 is limited by the limiting rod 2, the first isolation fence 3 is prevented from shaking in the moving process, the fixed rod 8 is accommodated by the second through groove 18, and the positioning clamp frame 7 is fixed by the fixed rod 8, thereby fixing the joint of the second isolation fence 5 and the first isolation fence 3, the side of the positioning clamp frame 7 which is far away from is provided with a fixed groove 22, the fixed rod 8 penetrates into the positioning clamp frame 7 through the fixed groove 22, the fixed rod 8 is limited by the arranged fixed groove 22, the inside of the second sliding groove 19 is connected with a second sliding block 20 in a sliding way, the side of the second sliding block 20 which is close to is fixedly connected with the two sides of the fixed rod 8, the second sliding block 20 is limited by the arranged second sliding groove 19, the second sliding block 20 is prevented from shaking in the moving process, the two sides of the fixed rod 8 are limited by the arranged second sliding block 20, the fixed rod 8 is prevented from shaking in the moving process, the spring 14 is fixedly arranged in the second sliding groove 19 and at the side of the second sliding block 20 which is far away from, the positioning clamp frame 7 penetrates to the top of the second positioning rod 6 through the clamping groove 21, cushion second slider 20 through setting up spring 14, the inside sliding connection of first spout 12 has first slider 11, one side that first slider 11 is close to relatively and gag lever post 2's both sides fixed connection, it is spacing to carry out first slider 11 through setting up first spout 12, prevent that first slider 11 from taking place to rock at the in-process that removes, it is spacing to carry out gag lever post 2 through setting up first slider 11, prevent that gag lever post 2 from taking place to rock at the in-process that removes, the top of gag lever post 2 and the bottom fixed connection of first isolated column 3, the output shaft of motor 16 and the top fixed connection of threaded rod 9.
During the use, when carrying out height-adjusting to the whole, open motor 16 earlier, drive threaded rod 9 through motor 16 and rotate to make gag lever post 2 drive first slider 11 and upwards remove, first isolated column 3 moves upwards simultaneously, with the upset of second isolated column 5, insert the inside of second locating lever 6 through draw-in groove 21 with locator card frame 7, loosen dead lever 8 at last, fix the junction of second isolated column 5 and first isolated column 3 under the effect of spring 14.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a fence for construction, includes base (1), its characterized in that: the novel adjustable positioning device is characterized in that first through grooves (10) are formed in two sides of the top of the base (1), limiting rods (2) are arranged in the first through grooves (10), first sliding grooves (12) are formed in the base (1) and located on two sides of the first through grooves (10), first isolation fences (3) are arranged on the top of the base (1), second isolation fences (5) are movably connected to two sides of the top of the first isolation fences (3) through hinges, second positioning rods (6) are fixedly arranged at the bottoms of two sides of the second isolation fences (5), first positioning rods (4) are fixedly arranged at the tops of two sides of the first isolation fences (3), accommodating grooves (17) are formed in the first positioning rods (4), positioning clamp frames (7) are arranged in the accommodating grooves (17), clamping grooves (21) are formed in the second positioning rods (6), the inside of second locating lever (6) just is located draw-in groove (21) and has seted up second logical groove (18) to one side of keeping away from relatively, the inside of second logical groove (18) is provided with dead lever (8), the inside of second locating lever (6) just is located the both sides of second logical groove (18) and has all seted up second spout (19), the center department of first isolated column (3) bottom has seted up mounting groove (15), the inside fixed mounting of mounting groove (15) has motor (16), the inside center department of base (1) has seted up thread groove (13), the inside rotation of thread groove (13) is connected with threaded rod (9).
2. The partition fence for building construction according to claim 1, characterized in that: the fixing device is characterized in that a fixing groove (22) is formed in one side, far away from the positioning clamp frame (7), of the positioning clamp frame, and the fixing rod (8) penetrates through the fixing groove (22) to the inside of the positioning clamp frame (7).
3. The partition fence for building construction according to claim 1, characterized in that: the inside sliding connection of second spout (19) has second slider (20), the one side that second slider (20) is close to relatively and the both sides fixed connection of dead lever (8).
4. The partition fence for building construction according to claim 3, characterized in that: the spring (14) is fixedly mounted in the second sliding groove (19) and located on one side, far away from the second sliding block (20), of the second sliding block, and the positioning clamp frame (7) penetrates through the top of the second positioning rod (6) through the clamping groove (21).
5. The partition fence for building construction according to claim 1, characterized in that: the inside sliding connection of first spout (12) has first slider (11), one side that first slider (11) is close to relatively and the both sides fixed connection of gag lever post (2).
6. The partition fence for building construction according to claim 1, characterized in that: the top of gag lever post (2) and the bottom fixed connection of first isolated column (3), the output shaft of motor (16) and the top fixed connection of threaded rod (9).
CN202220162977.3U 2022-01-20 2022-01-20 Isolated column for construction Expired - Fee Related CN217501272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220162977.3U CN217501272U (en) 2022-01-20 2022-01-20 Isolated column for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220162977.3U CN217501272U (en) 2022-01-20 2022-01-20 Isolated column for construction

Publications (1)

Publication Number Publication Date
CN217501272U true CN217501272U (en) 2022-09-27

Family

ID=83343574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220162977.3U Expired - Fee Related CN217501272U (en) 2022-01-20 2022-01-20 Isolated column for construction

Country Status (1)

Country Link
CN (1) CN217501272U (en)

Similar Documents

Publication Publication Date Title
CN217501272U (en) Isolated column for construction
CN112549213A (en) Diversified processingequipment of furniture raw and other materials processing usefulness
CN112975433B (en) Indoor building decoration ceiling aluminum alloy buckle plate forming and processing system
CN216228282U (en) Adjustable vertical lathe workstation in inclination
CN214418598U (en) A frock clamp for steel construction production
CN213867398U (en) Green building materials guardrail template strutting arrangement based on zinc alloy
CN212689400U (en) Roof daylighting panel based on architectural design
CN211277987U (en) Jig for processing punch
CN210255242U (en) Clamp for processing middle frame of mobile phone
CN210281721U (en) Chamfering device for steel bar production
CN216356561U (en) A photovoltaic module adjustable bracket for photovoltaic green house
CN212956559U (en) Foundation ditch safety device that town road construction was used
CN217344405U (en) Ground nail processing welding set for tent of camping
CN214685155U (en) Automatic mounting device for inner and outer wrap angles
CN214994997U (en) Rotatable formula stone material curtain
CN219387772U (en) Height-adjustable fence gate
CN218194734U (en) Turnover device for steel structure production line
CN214952302U (en) Hoisting type gasoline core drilling machine
CN218875743U (en) Guillootine is used in door plant production
CN209999373U (en) Cutting frame for cutting kinds of wood
CN218521733U (en) Concrete formwork is used in construction of water conservancy water and electricity dam
CN212578069U (en) Automobile starting motor seat processingequipment convenient to adjust
CN216176962U (en) Portable window frame chamfering device
CN212583310U (en) Protection plate for building construction
CN214639558U (en) Automatic grid cutting device for frying basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220927

CF01 Termination of patent right due to non-payment of annual fee