CN217499829U CN202221475119.0U CN202221475119U CN217499829U CN 217499829 U CN217499829 U CN 217499829U CN 202221475119 U CN202221475119 U CN 202221475119U CN 217499829 U CN217499829 U CN 217499829U
Authority
CN
China
Prior art keywords
prefabricated panel
subassembly
drainage
slab structure
pavement slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221475119.0U
Other languages
Chinese (zh)
Inventor
翟玉桥
冯涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Shouke Railway Equipment Co ltd
Original Assignee
Hebei Shouke Railway Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Shouke Railway Equipment Co ltd filed Critical Hebei Shouke Railway Equipment Co ltd
Priority to CN202221475119.0U priority Critical patent/CN217499829U/en
Application granted granted Critical
Publication of CN217499829U publication Critical patent/CN217499829U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a rubber granule pavement slab structure that permeates water, including prefabricated panel, the both ends symmetry of prefabricated panel is equipped with the installation block board to the installation block board on two continuous prefabricated panels is connected through the block subassembly, has seted up flutedly on the prefabricated panel, is equipped with drainage subassembly on the recess, and is equipped with buffer base layer on the recess, and prefabricated panel top still is equipped with the infiltration subassembly, infiltration subassembly and drainage subassembly phase-match. The utility model discloses a mutually supporting of above-mentioned mechanism can adopt mechanical hoist and mount to lay after ground is level, artifical intensity is low, man-hour is few, maintain simply, and one shot construction shaping can save the curb and lay and connect through the block subassembly, can guarantee to carry out the block when laying and connect spacingly, and stability when guaranteeing to connect avoids taking place the dislocation, guarantees the fastness of laying.

Description

Rubber particle permeable pavement slab structure
Technical Field
The utility model relates to a pavement slab technical field specifically is a rubber granule pavement slab structure that permeates water.
Background
The common urban sidewalk pavement is constructed by manually paving different types of pavement bricks on a flat three-in-one pavement according to design requirements or functional requirements. The pavement bricks of sidewalks are made of cement flower floor bricks, granite ground blocks and strong extrusion type sintered bricks.
However, the above structures all have certain disadvantages when being laid:
for example, the cement flower floor tile is non-skid, non-compressive, easy to break, easy to fade, poor in toughness, non-alkali-resistant, acid-resistant, easy to weather, poor in freeze-thaw performance and high in repair rate;
granite ground block: non-skid, non-compression, easy crushing, poor toughness, strong radiation and reflection and high cost;
forced extrusion type sintered brick: shale or clay is required in the material and is not damaged by high-temperature roasting.
The volume of the pavement brick is generally not large, the pavement brick needs to be manually paved at about 200mm 50mm, the labor intensity is high, the construction period is long, the brick body is thin, the pressure resistance is small, the pavement brick is easy to break, the maintenance period is short, and the construction and maintenance cost is relatively high. Therefore, the rubber particle permeable pavement slab structure is provided to solve the problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rubber granule pavement slab structure that permeates water to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a rubber granule pavement slab structure that permeates water, includes prefabricated panel, and the both ends symmetry of prefabricated panel is equipped with the installation block board to the installation block board on two continuous prefabricated panels is connected through the block subassembly, has seted up the recess on the prefabricated panel, is equipped with the drainage subassembly on the recess, and is equipped with the buffering basic unit on the recess, and prefabricated panel top still is equipped with the infiltration subassembly, infiltration subassembly and drainage subassembly phase-match.
Preferably, in order to facilitate installation, ensure stability in the installation process and avoid dislocation, the clamping assembly comprises limiting clamping blocks which are equidistantly arranged on one of the installation clamping plates; the clamping assembly further comprises a limiting clamping groove which is arranged on the other mounting clamping plate at equal intervals and matched with the limiting clamping block, and oblique rubber pads are symmetrically arranged on the side wall of the limiting clamping groove.
Preferably, for the convenience is hoisted whole, can need not the manual work and operate, improves the efficiency of laying, and equal symmetry is equipped with on two installation splice boards and lifts by crane the sleeve pipe, and the inside equidistance of prefabricated panel is equipped with steel strand wires.
Preferably, in order to accelerate water drainage on the road surface and avoid accumulation, the drainage assembly comprises an inclined guide plate arranged on the groove, drainage holes are formed in the lower end of the inclined guide plate at equal intervals, and the drainage assembly further comprises a drainage pipe arranged on the prefabricated panel, and the drainage holes are communicated with the drainage pipe.
Preferably, in order to avoid rainwater accumulation and accelerate drainage, the water seepage assembly comprises mounting holes which are arranged on the prefabricated panel at equal intervals, the mounting holes are positioned above the drainage pipe, and the mounting holes are communicated with the drainage pipe; the mounting panel is fixedly arranged in the mounting hole, and the mounting panel is provided with leakage grooves at equal intervals.
Preferably, in order to improve the water permeability, and ensure the overall mechanical property, the buffer base layer comprises a buffer rubber layer, a water permeability layer, a coarse sand layer, a reinforcing layer and a concrete layer are sequentially arranged under the buffer rubber layer, and the concrete layer is clamped with the oblique guide plate.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the prefabricated panel is prepared by adopting a prefabricated mode, the whole area is large, the floor can be paved by adopting mechanical hoisting after being leveled, the labor intensity is low, the working time is less, the maintenance is simple, the one-step construction molding can be realized, the paving of kerbs can be omitted, in addition, the connection through the clamping assembly can ensure the clamping connection limiting during the paving, the stability during the connection is ensured, the dislocation is avoided, and the paving firmness is ensured;
(2) and can be when rainy day through the drainage subassembly that is equipped with and the infiltration subassembly, collect the water on the road surface fast inside the drain pipe, and then can unify it and discharge, avoid the rainwater to save, guarantee the comfort level of pedestrian when walking, and the buffering basic unit can guarantee antiskid, the matte and better water permeability concrete ponding not in addition, rubber granule is elastic, and freeze-thaw resistance is better.
Drawings
Fig. 1 is a schematic structural view of a rubber particle permeable pavement slab structure provided by the utility model;
fig. 2 is a schematic view of a partial structure of a pavement structure of a rubber particle permeable sidewalk provided by the present invention;
fig. 3 is a schematic view of a partial structure of a drainage assembly in a pavement slab structure of a rubber particle permeable sidewalk provided by the present invention;
fig. 4 is a schematic structural view of a buffer base layer in a pavement slab structure of a rubber particle permeable pavement;
fig. 5 is one of the schematic structural diagrams of the prefabricated panels in the pavement slab structure of the permeable sidewalk made of rubber particles provided by the present invention;
fig. 6 is the second schematic structural diagram of the prefabricated panel in the pavement slab structure of the permeable sidewalk made of rubber particles.
In the figure: 1. prefabricating a panel; 2. installing a clamping plate; 3. hoisting the sleeve; 4. a drain pipe; 5. a limiting clamping groove; 6. an oblique rubber pad; 7. a buffer base layer; 8. a limiting clamping block; 9. mounting a plate; 10. a leak groove; 11. steel strand wires; 12. an oblique baffle; 13. mounting holes; 14. a drain hole; 15. a cushion rubber layer; 16. a water seepage layer; 17. a coarse sand layer; 18. a reinforcing layer; 19. a concrete layer; 20. a blind road; 21. prefabricating a well cover mounting hole; 22. and (6) prefabricating the tree pits.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1-4, a rubber particle permeable pavement slab structure comprises a prefabricated slab 1, the whole prefabricated slab adopts a reinforced rubber particle concrete prefabricated structure, the thickness of the pavement slab is more than 200mm, the pavement slab can replace curbstones, and the compression strength and the breaking strength are high;
the two ends of the prefabricated panel 1 are symmetrically provided with installation clamping plates 2, wherein the installation clamping plates 2, the inclined rubber pads 6 and the concrete layer 19 are made of the same material as that of the prefabricated panel 1, and a reinforced rubber particle concrete prefabricated structure is adopted;
and the installation clamping plates 2 on the two connected prefabricated panels 1 are connected through the clamping components, a groove is formed in each prefabricated panel 1, a drainage component is arranged on each groove, a buffer base layer 7 is arranged on each groove, a water seepage component is further arranged at the top end of each prefabricated panel 1, and the water seepage component is matched with the drainage component.
Through mutually supporting of above-mentioned mechanism, can adopt machinery hoist and mount to lay after ground is level, artifical intensity is low, man-hour is few, maintain simply, one shot construction shaping can save the curb and lay and connect through the block subassembly, can guarantee to carry out the block when laying and connect spacingly, stability when guaranteeing to connect avoids taking place the dislocation, guarantees the fastness of laying.
Example two
Referring to fig. 1-4, the locking assembly includes a plurality of locking blocks 8 equidistantly disposed on one of the locking plates 2; the clamping assembly further comprises limiting clamping grooves 5 which are equidistantly formed in the other mounting clamping plate 2 and matched with the limiting clamping blocks 8, and oblique rubber pads 6 are symmetrically arranged on the side walls of the limiting clamping grooves 5, wherein the oblique rubber pads 6 are prepared by crushing waste rubber into particles as raw materials, so that the tightness during clamping can be improved, and the prefabricated panel 1 can be conveniently laid;
all the symmetry is equipped with hoisting sleeve 3 on two installation splice plates 2, and the inside equidistance of prefabricated panel 1 is equipped with steel strand wires 11, and wherein both all carry out pre-buried integrated into one piece when prefabricated panel 1 machine-shaping, can improve stability, and hoisting sleeve 3 can conveniently adopt lifting device to hoist it, and then conveniently lays, and steel strand wires 11 can improve holistic mechanical properties simultaneously.
Prepare into prefabricated panel 1 through adopting prefabricated mode, whole area is great, can adopt mechanical hoist and mount to lay after the ground is leveled, artifical intensity is low, man-hour is few, maintain simply, and one shot construction shaping can save the curb and lay and connect through the block subassembly, can guarantee to carry out the block when laying and connect spacingly, and stability when guaranteeing to connect avoids taking place the dislocation, guarantees the fastness of laying.
EXAMPLE III
Referring to fig. 1-4, the drainage assembly includes an oblique flow guide plate 12 disposed on the groove, which facilitates the flow of the permeated water into the drainage pipe 4 through the drainage holes 14, so as to avoid the surface accumulation of the water, and drainage holes 14 are disposed at the lower end of the oblique flow guide plate 12 at equal intervals, the drainage assembly further includes a drainage pipe 4 disposed on the prefabricated panel 1, the drainage holes 14 are communicated with the drainage pipe 4, the drainage assembly includes mounting holes 13 disposed at equal intervals on the prefabricated panel 1, the mounting holes 13 are located above the drainage pipe 4, and the mounting holes 13 are communicated with the drainage pipe 4; the inside fixed mounting panel 9 that is equipped with of mounting hole 13, the constant distance has seted up the small opening 10 on the mounting panel 9, and buffer base 7 includes buffer rubber layer 15, is equipped with water seepage layer 16, coarse sand layer 17, enhancement layer 18 and concrete layer 19 under buffer rubber layer 15 in proper order to concrete layer 19 and the 12 looks block of oblique guide plate that appear.
Through the drainage subassembly that is equipped with and infiltration subassembly can be when the rainy day, collect water on the road surface to drain pipe 4 inside fast, and then can unify it and discharge, avoid the rainwater to save, guarantee the comfort level of pedestrian when the walking, and buffering basic unit 7 can guarantee antiskid, inferior light and also better water permeability concrete does not ponding, rubber granule is elastic, and freeze-thaw resistance is better.
Example four
Referring to fig. 5, for the prefabricated panel 1, the structure shown in fig. 5 can be adopted, the prefabricated panel 1 is provided with prefabricated well cover mounting holes 21 and a blind road 20, the prefabricated well cover mounting holes 21 can facilitate the installation of the well cover during the laying process, the installation efficiency is greatly improved, and the blind road 20 can facilitate the walking of the blind person and is more convenient to use.
EXAMPLE five
Referring to fig. 6, for the prefabricated panel 1, the structure shown in fig. 6 can be adopted, the prefabricated panel 1 is provided with the prefabricated tree pit 22 and the blind sidewalk 20, so that green plants can be conveniently planted during laying, the prefabricated tree pit and the blind sidewalk are prepared by a prefabricated method, later-stage splicing is not needed, laying efficiency is greatly improved, the blind sidewalk 20 can facilitate the blind person to walk, and the use is more convenient.
The working principle is as follows: when the utility model is used, after the paved road surface is leveled, the lifting sleeve 3 is fixedly connected through the lifting device, the lifting sleeve can be lifted, the labor intensity is low, the working hours are less, the maintenance is simple, the construction is formed in one step, the adjacent mounting clamping plates 2 are clamped in a limiting way through the limiting clamping blocks 8 and the limiting clamping grooves 5, the inclined rubber pads 6 can improve the friction force, the clamping connection limiting is ensured when the paving is carried out, the stability when the connection is ensured, the dislocation is avoided, the paving firmness is ensured, when the rainwater is discharged, the water permeation can be accelerated under the action of the water seepage layer 16 and the coarse sand layer 17, the drainage is carried out through the inclined guide plate 12, the drainage hole is discharged into the drainage pipe 4 through the drainage hole 14, the drainage collection is carried out, meanwhile, the mounting plate 9 fixedly arranged on the prefabricated panel 1 can collect and discharge the rainwater through the upper leakage groove 10, and then avoid the rainwater to save, guarantee the comfort level of pedestrian when walking, through mutually supporting of above-mentioned mechanism, can adopt mechanical hoist and mount to lay after ground is leveled, artifical intensity is low, man-hour is few, maintain simply, the one shot construction shaping can save the curb and lay and connect through the block subassembly, can guarantee to carry out the block when laying and connect spacingly, stability when guaranteeing to connect avoids taking place the dislocation, guarantees the fastness of laying.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a rubber granule pavement slab structure that permeates water, includes prefabricated panel (1), its characterized in that: the both ends symmetry of prefabricated panel (1) is equipped with installation block board (2) to installation block board (2) on two continuous prefabricated panel (1) are connected through the block subassembly, the recess has been seted up on prefabricated panel (1), be equipped with the drainage subassembly on the recess, and be equipped with buffering basic unit (7) on the recess, prefabricated panel (1) top still is equipped with the infiltration subassembly, the infiltration subassembly with the drainage subassembly phase-match.
2. The rubber particle permeable pavement slab structure of claim 1, wherein: the clamping assembly comprises limiting clamping blocks (8) which are equidistantly arranged on one of the mounting clamping plates (2);
the block subassembly still includes that the equidistance is seted up in another installation cardboard (2) go up with spacing clamping block (8) assorted spacing draw-in groove (5), and the symmetry is equipped with oblique rubber pad (6) on the lateral wall of spacing draw-in groove (5).
3. The rubber particle permeable pavement slab structure of claim 2, wherein: two all the symmetry is equipped with on installation block board (2) and lifts by crane sleeve pipe (3), prefabricated panel (1) inside equidistance is equipped with steel strand wires (11).
4. The rubber particle permeable pavement slab structure of claim 3, wherein: the drainage assembly comprises an inclined guide plate (12) arranged on the groove, drainage holes (14) are formed in the lower end of the inclined guide plate (12) at equal intervals, the drainage assembly further comprises a drainage pipe (4) arranged on the prefabricated panel (1), and the drainage holes (14) are communicated with the drainage pipe (4).
5. The rubber particle permeable pavement slab structure of claim 4, wherein: the water seepage assembly comprises mounting holes (13) which are equidistantly formed in the prefabricated panel (1), the mounting holes (13) are located above the drain pipe (4), and the mounting holes (13) are communicated with the drain pipe (4);
the mounting hole (13) is internally and fixedly provided with a mounting plate (9), and the mounting plate (9) is equidistantly provided with a leakage groove (10).
6. The rubber particle water permeable pavement slab structure of claim 5, wherein: the buffer base layer (7) comprises a buffer rubber layer (15), a water seepage layer (16), a coarse sand layer (17), a reinforcing layer (18) and a concrete layer (19) are sequentially arranged below the buffer rubber layer (15), and the concrete layer (19) is clamped with the oblique guide plate (12).
CN202221475119.0U 2022-06-13 2022-06-13 Rubber particle permeable pavement slab structure Active CN217499829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221475119.0U CN217499829U (en) 2022-06-13 2022-06-13 Rubber particle permeable pavement slab structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221475119.0U CN217499829U (en) 2022-06-13 2022-06-13 Rubber particle permeable pavement slab structure

Publications (1)

Publication Number Publication Date
CN217499829U true CN217499829U (en) 2022-09-27

Family

ID=83359842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221475119.0U Active CN217499829U (en) 2022-06-13 2022-06-13 Rubber particle permeable pavement slab structure

Country Status (1)

Country Link
CN (1) CN217499829U (en)

Similar Documents

Publication Publication Date Title
CN204728165U (en) Ecological permeable road surface
CN103343503B (en) Bridge-type prefabricated reinforced concrete trough slab wear resistant road surface structural system and construction method
CN217499829U (en) Rubber particle permeable pavement slab structure
CN110863405B (en) Assembled photovoltaic power generation-high-performance concrete pavement structure and construction method
CN110056071B (en) Municipal rainwater pipeline assembly module and construction method
CN209703229U (en) A kind of recyclable prefabricated plate paving structure
CN218345835U (en) Novel town road pavement structure
CN110983907A (en) Assembled self-draining sidewalk
CN212895755U (en) Urban road sidewalk drainage device
CN210140780U (en) Anti-clogging ecological permeable box culvert
CN211571230U (en) Assembled parking area
CN211689719U (en) Drainage type concrete road
CN211472017U (en) A permeable pavement for sponge city construction
CN203429528U (en) Bridge-type precast-reinforced-concrete-trough-plate wear-resistant pavement structure system
CN113062168A (en) Method for improving water permeability of pavement
CN213173181U (en) Ground cement brick
CN218116030U (en) Prevent surface gathered water's novel pavement structure of mating formation
CN211646666U (en) Outdoor natural water collecting and recycling system for stepped building group
CN217629220U (en) Novel water permeability floor tile
CN214497575U (en) Assembled river surge retaining wall
CN213896607U (en) Pervious concrete
CN217298503U (en) Municipal construction road structure
CN214497060U (en) Drainage road
CN218147591U (en) Prefabricated sidewalk plate
CN217997694U (en) Permeable pavement structure for building water supply and drainage

Legal Events