CN217498420U - A hoist for tower crane hoist and mount ALC panel - Google Patents

A hoist for tower crane hoist and mount ALC panel Download PDF

Info

Publication number
CN217498420U
CN217498420U CN202221373502.5U CN202221373502U CN217498420U CN 217498420 U CN217498420 U CN 217498420U CN 202221373502 U CN202221373502 U CN 202221373502U CN 217498420 U CN217498420 U CN 217498420U
Authority
CN
China
Prior art keywords
district
alc
tower crane
hoist
hold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221373502.5U
Other languages
Chinese (zh)
Inventor
杨小三
王圳
袁和春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202221373502.5U priority Critical patent/CN217498420U/en
Application granted granted Critical
Publication of CN217498420U publication Critical patent/CN217498420U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a hoist for tower crane hoist and mount ALC panel, including base and locating component, the base is including linking up the transition region and holding the district, it keeps away from to hold district one end bottom and installs the setting element to link up the transition region, it has four stands to hold district upper surface side fixed mounting, rings are all installed at the top of every stand, it rotates through the hinge to hold the district lateral part and installs the rail guard, connect through locking structure between rail guard and the stand, and the top of two rail guards all is provided with the multiunit locating part, it is provided with the positioning hole group that corresponds with the locating part position in the district to hold, locating component passes through locating part and locating hole demountable installation on holding district and rail guard. The method is suitable for ALC plates of various specifications and lengths, and the construction site has no unloading platform, and the external scaffold is not removed in time. The construction method has the advantages of low manufacturing cost, convenience and simplicity in use, repeated use, lowered construction cost, obvious improvement on construction efficiency and capability of further ensuring construction operation safety.

Description

A hoist for tower crane hoist and mount ALC panel
Technical Field
The utility model belongs to the construction field, concretely relates to a hoist for tower crane hoist and mount ALC panel is applicable to the ALC panel of various specification length, and the job site does not have the platform of unloading, the condition that the external scaffolding did not in time demolish. The construction method has the advantages of low manufacturing cost, convenience and simplicity in use, repeated use, reduction in construction cost, remarkable improvement in construction efficiency and capability of further ensuring construction operation safety.
Background
When the ALC plate is hoisted by the tower crane on the existing construction site, the ALC plate is used in a multi-matching unloading platform, but due to the process connection problem, before the ALC plate is hoisted and goes upstairs, the unloading platform needs to be constructed and lifted along with the main body structure, so that the ALC plate is not used in the process of hoisting, or the unloading platform needs to be installed secondarily, the construction cost is increased, the construction progress is delayed, and the potential safety hazard in the construction process is increased.
Disclosure of Invention
In order to solve the technical problem, the inventor reachs through practice and summary the technical scheme of the utility model, be applicable to the ALC panel of various specification length, and the job site does not have the platform of unloading, the condition that outer scaffold frame was not in time demolishd. The construction method has the advantages of low manufacturing cost, convenience and simplicity in use, repeated use, lowered construction cost, obvious improvement on construction efficiency and capability of further ensuring construction operation safety.
The utility model discloses a hoist for tower crane hoist and mount ALC panel, including base and locating component, the base is including linking up the transition region and holding the district, it keeps away from to hold district one end bottom and installs the setting element to link up the transition region, it has four stands to hold district upper surface side fixed mounting, rings are all installed at the top of every stand, it rotates through the hinge to hold the district lateral part and installs the rail guard, connect through locking structure between rail guard and the stand, and the top of two rail guards all is provided with the multiunit locating part, it is provided with the positioning hole group that corresponds with the locating part position in the district to hold, locating component passes through locating part and locating hole demountable installation on holding district and rail guard. Utilize location punch combination and locating part to fix a position the both ends of subassembly installation at ALC panel, the lateral part passes through the rail guard simultaneously and is connected as an organic wholely with the stand through locking structure, and then realizes spacing work all around of ALC panel, at the during operation, hangs the hoist to window opening department, utilizes the setting element to hook the building, and it is stable to keep, unloads the ALC panel from linking up transition zone department safe high efficiency afterwards.
In the scheme of the application, the improvement is made that the positioning piece comprises a fixed sleeve arranged at the bottom of the engagement transition area and a rotating rod rotatably arranged in the fixed sleeve, and the side part of the rotating rod is abutted against the engagement transition area when the rotating rod is in a vertical state.
In the scheme of the application, the improvement is made that the locking structure comprises a metal hanging piece arranged on the guard rail and a metal door hook arranged on the upright post and hooked with the metal hanging piece.
Make following improvement in this application scheme, metal door hook is including running through the couple body on the stand to and install the stand back to metal lacing film one side and the torsional spring of suit in the couple body outside, be provided with the waist type hole with couple looks adaptation on the metal lacing film.
The improvement is made as follows in this application scheme, locating component includes that the horizontal interlude is in two locating parts that the position corresponds the inserted bar one, vertical interlude is in the inside inserted bar two of location punch combination to and be used for connecting the right angle fastener of inserted bar one and inserted bar two.
In the scheme of the application, the improvement is that the base comprises a plurality of cross beams and two longitudinal beams which are welded, and steel plates are fixedly arranged at the tops of the cross beams and the longitudinal beams.
Compared with the prior art, the utility model discloses can obtain following technological effect:
compared with the prior art, the technical scheme of the utility model, installation and use are very simple and convenient, not only can solve the condition that the job site does not have the platform of unloading, can select suitable feed inlet department according to the construction position of hoist and mount material as required simultaneously, avoid the secondary transport, it is also safer, time saving, labor saving, the most important characteristic can be different according to the specification length of ALC panel, install the hoist in a flexible way, with this ALC panel hoist and mount that satisfy various specifications, the suitability is extremely strong, and can repeat cyclic utilization, greatly reduced construction cost. The utility model discloses the material that the preparation installation was used is the common building construction material in market and job site, is convenient for make the installation. Once drop into, can have enough to meet the need the use repeatedly, easy operation, the practicality is extremely strong.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front view of the overall structure of the present invention;
fig. 3 is a top view of the overall structure of the present invention;
fig. 4 is a schematic view of the overall structure of the positioning assembly of the present invention;
FIG. 5 is a first connection diagram of the positioning member and the base according to the present invention;
FIG. 6 is a second connection diagram of the positioning member and the base according to the present invention;
FIG. 7 is a partial enlarged view of the junction between the metal door hook and the metal hanger plate according to the present invention;
fig. 8 is a top view of the junction between the metal door hook and the metal hanging piece of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
The application of the principles of the present invention will be further described with reference to the accompanying drawings and specific embodiments.
Example 1
As shown in FIGS. 1 to 8, a lifting appliance for lifting ALC plates by a tower crane comprises a base 10 and a positioning assembly, wherein the base 10 comprises a plurality of cross beams and two longitudinal beams which are welded together, and steel plates are fixedly mounted at the tops of the cross beams and the longitudinal beams.
The base 10 is divided according to the region and then includes linking transition area 11 and holding area 12, links up transition area 11 and keeps away from holding area 12 one end bottom and install setting element 13, and setting element 13 is including installing fixed cover 131 and the rotation of linking transition area 11 bottom and installing the inside rotary rod 132 of fixed cover 131, and its lateral part and linking transition area 11 butt when rotary rod 132 is in vertical state. When the ALC board is mounted on the chassis, the rotating rod 132 is rotated to one side in advance, hidden under the chassis 10, and then the ALC board is placed on the chassis.
Four upright posts 14 are fixedly mounted on the side of the upper surface of the containing area 12, a hanging ring 15 is mounted at the top of each upright post 14, a protective guard 16 is rotatably mounted on the side of the containing area 12 through a hinge, the protective guard 16 is connected with the upright posts 14 through a locking structure, the locking structure comprises metal hanging pieces 18 mounted on the protective guard 16 and metal door hooks 19 mounted on the upright posts 14 and hooked with the metal hanging pieces 18, each metal door hook 19 comprises a hook body penetrating through the upright posts 14 and a torsion spring mounted on one side of the upright posts 14 opposite to the metal hanging pieces 18 and sleeved on the outer sides of the hook bodies, and waist-shaped holes matched with the hook bodies are formed in the metal hanging pieces 18. After the ALC board is installed, the protective guard 16 is turned upwards, and then the metal hanging piece 18 is locked through the metal door hook 19, the locking process is that the hook body is rotated for a certain angle to enable the hook body to pass through the waist-shaped hole, then the hook body is released, the hook body is reset to the initial state under the action of the torsion spring, hooking connection is achieved, and the ALC board needs to be placed again and then the ALC board is unlocked and then locked again.
The top of two rail guards 16 all is provided with multiunit locating part 17, is provided with the location punch combination that corresponds with locating part 17 position on the district 12 of holding, and locating component passes through locating part 17 and locating hole demountable installation on the district 12 of holding and rail guards 16, and locating component includes that transversely alternate in the inserted bar of two locating parts 17 that the position corresponds 110, vertical alternate in the inside inserted bar of location punch combination two 111 to and be used for connecting the right angle fastener 112 of inserted bar one 110 and inserted bar two 111. The ALC board is longitudinally limited through the first inserted link 110 and the second inserted link 111 through the limiting part 17 and the positioning hole group, so that the phenomenon that the ALC board shakes loosely or even falls off in the hoisting process is avoided, and the safety and the reliability of the hoisting tool are improved.
In use, the rotating rod 132 is first rotated to one side, hidden under the base 10, and then the ALC board is placed on the base 10, and then the lateral protective fences 16 are turned upward, and realize the locking through metal door hook 19 and metal lacing film 18, realize the installation with base 10 with locating component through locating part 17 and location punch combination, position is injectd around carrying out ALC panel, hang ALC panel to the arbitrary window entrance to a cave of target layer window with its cooperation crane at last, linking transition zone 11 of hoist gos deep into the window entrance to a cave, the concrete structure of windowsill can be caught on to the rotary rod 132 of base 10 lower extreme, make hoist overall stability, the manual work will be close to the locating component who links up 11 one ends in transition zone and demolish again, with panel consignment to the floor in situ, so far this utility model relates to a whole the feeding of hoist for tower crane hoist ALC panel, hoist, transportation, the operation work of unloading is accomplished.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a hoist for tower crane hoist and mount ALC panel, a serial communication port, including base and locating component, the base is including linking up the transition region and holding the district, it keeps away from to hold district one end bottom and installs the setting element to link up the transition region, it has four stands to hold district upper surface side fixed mounting, rings are all installed at the top of every stand, it rotates through the hinge to hold the district lateral part and installs the rail guard, connect through locking structure between rail guard and the stand, and the top of two rail guards all is provided with the multiunit locating part, it is provided with the location punch combination that corresponds with the locating part position in the district to hold, locating component passes through locating part and locating hole demountable installation on holding district and rail guard.
2. The lifting tool for tower crane lifting of ALC boards as claimed in claim 1, wherein said positioning element comprises a fixing sheath installed at the bottom of the transition area and a rotating rod rotatably installed inside the fixing sheath, and its side part abuts against the transition area when the rotating rod is in vertical state.
3. The lifting appliance for lifting the ALC (automatic level gauge) plates by the tower crane as claimed in claim 1, wherein said locking structure comprises a metal hanging piece installed on the guard rail and a metal door hook installed on the upright post and hooked with the metal hanging piece.
4. The lifting appliance for lifting the ALC (automatic level gauge) board by the tower crane as claimed in claim 3, wherein the metal door hook comprises a hook body penetrating through the column and a torsion spring installed on one side of the column back to the metal hanging piece and sleeved outside the hook body, and the metal hanging piece is provided with a waist-shaped hole matched with the hook body.
5. The lifting appliance for hoisting the ALC (automatic level gauge) board by the tower crane according to claim 1, wherein the positioning assembly comprises a first inserted bar which is transversely inserted into two corresponding position limiting parts, a second inserted bar which is vertically inserted into the positioning hole group, and a right-angle fastener which is used for connecting the first inserted bar and the second inserted bar.
6. The lifting appliance for lifting the ALC (automatic level gauge) board by the tower crane as claimed in claim 1, wherein the base comprises a plurality of cross beams and two longitudinal beams welded together, and steel plates are fixedly installed at the tops of the cross beams and the longitudinal beams.
CN202221373502.5U 2022-06-02 2022-06-02 A hoist for tower crane hoist and mount ALC panel Active CN217498420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221373502.5U CN217498420U (en) 2022-06-02 2022-06-02 A hoist for tower crane hoist and mount ALC panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221373502.5U CN217498420U (en) 2022-06-02 2022-06-02 A hoist for tower crane hoist and mount ALC panel

Publications (1)

Publication Number Publication Date
CN217498420U true CN217498420U (en) 2022-09-27

Family

ID=83357214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221373502.5U Active CN217498420U (en) 2022-06-02 2022-06-02 A hoist for tower crane hoist and mount ALC panel

Country Status (1)

Country Link
CN (1) CN217498420U (en)

Similar Documents

Publication Publication Date Title
US4611784A (en) Safety lock for jump scaffolding
CN112431399A (en) Hanging basket for building outer wall and mounting method thereof
JP4163177B2 (en) Scaffolding system
CN108332310A (en) A kind of installation method of outdoor machine of air-conditioner
CN217498420U (en) A hoist for tower crane hoist and mount ALC panel
JP3950800B2 (en) Suspension scaffold
US11280097B2 (en) Ladder-based winch-powered plank scaffold
CN213143808U (en) Scaffold for constructional engineering
CN210393552U (en) Novel cross-shaped upper beam structure
CN211286565U (en) Climbing frame
CN113027140A (en) Reverse ceiling aluminum plate installation method and system
CN216865914U (en) High-rise building light well construction platform
WO2010023209A2 (en) A method and apparatus for erecting a mobile scaffold tower
JP5476051B2 (en) Base and lifting mobile scaffold
CN218507434U (en) Assembled component hoisting device
US20220213700A1 (en) Ladder-based winch-powered plank scaffold
CN220036560U (en) Suspension type cage ladder
CN217999035U (en) Safety rope fixing climbing component for building construction and safety rope fixing structure
CN113682921A (en) Simple hoistway platform
CN211444796U (en) Glass curtain wall mounting crane
CN220167456U (en) Novel double-side hanging type steel structure welding hanging basket
CN210767918U (en) Hook seat for protection net of cantilever plate
CN218493202U (en) Suspension type packway
CN212671122U (en) Scaffold for building construction
CN214364852U (en) Integrated device for mounting steel jacking structure of high and large concrete column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant