CN217480725U - Skirting board combined connecting device for building construction - Google Patents

Skirting board combined connecting device for building construction Download PDF

Info

Publication number
CN217480725U
CN217480725U CN202220154117.5U CN202220154117U CN217480725U CN 217480725 U CN217480725 U CN 217480725U CN 202220154117 U CN202220154117 U CN 202220154117U CN 217480725 U CN217480725 U CN 217480725U
Authority
CN
China
Prior art keywords
board
skirting board
grillage
skirting
elastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220154117.5U
Other languages
Chinese (zh)
Inventor
吕茁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Qianmiao Construction Engineering Co ltd
Original Assignee
Jiangsu Qianmiao Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Qianmiao Construction Engineering Co ltd filed Critical Jiangsu Qianmiao Construction Engineering Co ltd
Priority to CN202220154117.5U priority Critical patent/CN217480725U/en
Application granted granted Critical
Publication of CN217480725U publication Critical patent/CN217480725U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a skirting board built-up connection device for construction, including first skirting board, the side position joint of first skirting board has the second skirting board, the side position joint of second skirting board has the third skirting board, first skirting board includes first grillage, first elastic connection block, first joint board and first well core plate, the bottom fixedly connected with grillage of first grillage, the side central point of first grillage puts and first center plate fixed connection, first well core plate's both ends position is through first elastic connection block and first joint board looks elastic connection, the second skirting board includes second grillage, first connecting groove, second elastic connection block, second joint board and second well core plate, first connecting groove has been seted up to the one end of second grillage. The utility model discloses a baseboard built-up connection device for construction through the setting of structure, realizes inner built-up connection's purpose.

Description

Skirting board combined connecting device for building construction
Technical Field
The utility model relates to a building construction equipment technical field specifically is a skirting board built-up connection device for construction.
Background
Skirting boards, also called foot skirting boards or foot margin lines, are an important structural node at the intersection of the floor and the wall surface. The skirting board has two functions: firstly, the protective effect covers the joint between the floor and the wall surface, so that the wall body and the floor surface are combined firmly, the deformation of the wall body is reduced, and the damage caused by external force collision is avoided; secondly, the decorative effect, in the design of the room, the waist line and the skirting line (skirting board) play the visual balance.
According to the chinese patent No. CN201920804245.8, the utility model discloses a wooden skirting board structure, which comprises a wall body, a batten strip for leveling the wall body and a wooden skirting board, wherein the batten strip is placed on one side of the wall body close to the outside; the wooden skirting board is used for separating a part of the wall body covered by the wall body from the outside, and is arranged on one side surface of the batten strip opposite to the joint surface of the wall body; the wood skirting board is formed by splicing at least two wood skirting boards, one side end of each wood skirting board is a sharp corner end, the other opposite side end of each wood skirting board is a concave corner end embedded with the sharp corner end, and the sharp corner end of each wood skirting board is used for being embedded with the concave corner end of the other wood skirting board. The utility model discloses a wood skirting board structure, through the mutual gomphosis concatenation of a plurality of sub-wood skirting boards, effectively reduce the clearance of wood skirting board, improve the interior decoration quality, wood skirting board passes through the connecting piece with the wall body simultaneously and realizes dismantling the connection, and it is more convenient to use, but present skirting board exists following problem:
the phenomenon that the combined connection is inconvenient exists, certain inconvenience is caused, and improvement is needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a skirting board built-up connection device for construction to the problem of proposing in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a skirting board combined connecting device for building construction comprises a first skirting board, wherein a second skirting board is clamped at the side end of the first skirting board, and a third skirting board is clamped at the side end of the second skirting board;
first baseboard includes first grillage, first elastic connection piece, first joint board and first well board, the bottom fixedly connected with grillage of first grillage, the side central point of first grillage puts and first well board fixed connection, first well board's both ends position is through first elastic connection piece and first joint board looks elastic connection.
Preferably, the second skirting board includes second grillage, first connecting groove, second elastic connecting block, second joint board and second well core plate, first connecting groove has been seted up to the one end of second grillage, the other end center and the second center plate fixed connection of second grillage, second elastic connecting block and second joint board elastic connection are mutually passed through at both ends around the second well core plate.
Preferably, the third skirting board includes third grillage and second connecting groove, the second connecting groove has been seted up to the side position of third grillage.
Preferably, the first connecting groove is clamped with the first elastic connecting block, the first clamping plate and the first central plate.
Preferably, the second connecting groove is in clamping connection with the second elastic connecting block, the second clamping plate and the second center plate.
Preferably, the bottoms of the second plate frame and the third plate frame are both provided with foot plate frames.
Compared with the prior art, the beneficial effects of the utility model are that:
one, through installing first baseboard, second baseboard, third baseboard, can carry out mutual combination between first baseboard, second baseboard, the third baseboard, realize mutual connection, conveniently carry out quick fixed, realize holistic built-up connection work, conveniently construct production work, help carrying out quick connection combination, conveniently carry out the high-efficient production purpose of integration.
Two, through installing first elastic connection block, first joint board, first well core plate, first joint board accessible first elastic connection block and first center core plate elastic connection mutually, and first joint board is connected in the inner of first connecting slot through first well core plate's effect, realize the support connection work with first connecting slot, and first well core plate's top is equipped with the lug with first connecting slot adaptation, conveniently realize the protection at top, avoid appearing the phenomenon of album ash in the first connecting slot.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
fig. 2 is a schematic structural view of a first skirting board of the present invention;
fig. 3 is a schematic structural view of a second skirting board of the present invention;
fig. 4 is a schematic structural view of a third skirting board of the present invention.
In the figure: 1-a first skirting board; 2-a second skirting board; 3-a third skirting board; 4-a first plate frame; 5-a foot plate frame; 6-a first elastic connecting block; 7-a first clamping plate; 8-a first centerboard; 9-a second plate rack; 10-a first connecting groove; 11-a second elastic connecting block; 12-a second clamping plate; 13-a second centre plate; 14-a third plate rack; 15-second connecting groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a skirting board combined connecting device for building construction comprises a first skirting board 1, wherein a second skirting board 2 is clamped at the side end position of the first skirting board 1, and a third skirting board 3 is clamped at the side end position of the second skirting board 2;
first baseboard 1 includes first grillage 4, baseboard frame 5, first elastic connection block 6, first joint board 7 and first well core plate 8, the bottom fixedly connected with baseboard frame 5 of first grillage 4, the side central point of first grillage 4 puts and first well core plate 8 looks fixed connection, first well core plate 8's both ends position is through first elastic connection block 6 and first joint board 7 looks elastic connection, through installing first baseboard 1, second baseboard 2, third baseboard 3, first baseboard 1, second baseboard 2, can carry out mutual combination between the third baseboard 3, realize mutual connection, conveniently carry out quick fixed, realize holistic combined connection work, conveniently carry out construction production work, help carrying out quick connection combination, conveniently carry out the high-efficient production mesh of integration.
The second skirting board 2 comprises a second board frame 9, a first connecting groove 10, a second elastic connecting block 11, a second clamping board 12 and a second central board 13, the first connecting groove 10 is formed in one end of the second board frame 9, the other end center of the second board frame 9 is fixedly connected with the second central board 13, the front end and the rear end of the second central board 13 are elastically connected with the second clamping board 12 through the second elastic connecting block 11, the third skirting board 3 comprises a third board frame 14 and a second connecting groove 15, the side end position of the third board frame 14 is provided with the second connecting groove 15, the first connecting groove 10 is in clamping connection with the first elastic connecting block 6, the first clamping board 7 and the first central board 8, the second connecting groove 15 is in clamping connection with the second elastic connecting block 11, the second clamping board 12 and the second central board 13, the bottom of the second board frame 9 and the third board frame 14 is provided with the board frame 5, and the first elastic connecting block 6, the second connecting groove 10, the second elastic connecting block 12 and the second connecting groove 13 are mounted, First joint board 7, first well board 8, first joint board 7 accessible first elastic connection piece 6 and first well board 8 looks elastic connection, and first joint board 7 is connected at the inner of first connecting slot 10 through the effect of first well board 8, realizes the support connection work with first connecting slot 10, and the top of first well board 8 is equipped with the lug with first connecting slot 10 adaptation, conveniently realizes the protection at top, avoids appearing the phenomenon of collection ash in the first connecting slot 10.
The working principle is as follows: when the working is needed, a user places and installs the third skirting board 3, then connects the second skirting board 2 with the third skirting board 3, realizes the connection with the second connecting groove 15 through the second elastic connecting block 11, the second clamping plate 12 and the second central plate 13, the second clamping plate 12 realizes the clamping with the second connecting groove 15 due to the elastic action of the second clamping plate 12, realizes the mutual installation, then installs the first skirting board 1 with the second skirting board 2, inserts the first elastic connecting block 6, the first clamping plate 7 and the first central plate 8 into the first connecting groove 10 to realize the mutual clamping fixation, conveniently performs the integral combination connection of the first skirting board 1, the second skirting board 2 and the third skirting board 3, realizes the connection with the wall body through the rear ends of the first skirting board 1, the second skirting board 2 and the third skirting board 3, the whole fixed installation work is realized, and the work is finished.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a skirting board built-up connection device for construction, includes first skirting board (1), its characterized in that: a second skirting board (2) is clamped at the side end position of the first skirting board (1), and a third skirting board (3) is clamped at the side end position of the second skirting board (2);
first baseboard (1) includes first grillage (4), baseboard frame (5), first elastic connection block (6), first joint board (7) and first well board (8), the bottom fixedly connected with baseboard frame (5) of first grillage (4), the side central point of first grillage (4) puts and first well board (8) looks fixed connection, the both ends position of first well board (8) is through first elastic connection block (6) and first joint board (7) looks elastic connection.
2. The skirting board combination connecting device for building construction of claim 1, wherein: second baseboard (2) include second grillage (9), first connecting groove (10), second elastic connecting block (11), second joint board (12) and second well board (13), first connecting groove (10) have been seted up to the one end of second grillage (9), the other end center and the well board (13) looks fixed connection of second grillage (9), both ends are passed through second elastic connecting block (11) and second joint board (12) looks elastic connection around the well board (13) of second.
3. The skirting board combination connecting device for building construction of claim 2, wherein: third baseboard (3) includes third grillage (14) and second connecting groove (15), second connecting groove (15) have been seted up to the side position of third grillage (14).
4. The skirting board combination connecting device for building construction of claim 3, wherein: the first connecting groove (10) is clamped with the first elastic connecting block (6), the first clamping plate (7) and the first central plate (8).
5. The skirting board combination connecting device for building construction of claim 4, wherein: and the second connecting groove (15) is clamped with the second elastic connecting block (11), the second clamping plate (12) and the second central plate (13).
6. The skirting board combination connecting device for building construction of claim 5, wherein: the bottoms of the second plate frame (9) and the third plate frame (14) are both provided with foot plate frames (5).
CN202220154117.5U 2022-01-20 2022-01-20 Skirting board combined connecting device for building construction Expired - Fee Related CN217480725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220154117.5U CN217480725U (en) 2022-01-20 2022-01-20 Skirting board combined connecting device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220154117.5U CN217480725U (en) 2022-01-20 2022-01-20 Skirting board combined connecting device for building construction

Publications (1)

Publication Number Publication Date
CN217480725U true CN217480725U (en) 2022-09-23

Family

ID=83303784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220154117.5U Expired - Fee Related CN217480725U (en) 2022-01-20 2022-01-20 Skirting board combined connecting device for building construction

Country Status (1)

Country Link
CN (1) CN217480725U (en)

Similar Documents

Publication Publication Date Title
CN217480725U (en) Skirting board combined connecting device for building construction
KR101225549B1 (en) Ceiling acoustics panel having improved sound aborption functions
CN209807471U (en) High waterproof fiberboard table and chair
CN210713649U (en) Wooden floor with waterproof ability
CN210395711U (en) Environment-friendly sound absorption inner wall structure
CN216984361U (en) Clean convenient honor certificate storage frame
CN209769746U (en) Detachable sofa
CN208891839U (en) A kind of easy-to-dismount desk
CN218714720U (en) Front-back staggered buckle type skirting line
CN209942165U (en) Gymnasium is with novel ventilation leg wire of making an uproar that falls
CN206487018U (en) A kind of exhibition room partition wall component
CN205382685U (en) Corner connecting formula of being convenient for baseboard
CN216766855U (en) Combined protective fence structure for building construction
CN210345071U (en) Novel aluminum product baseboard decorative line lamp
CN203424582U (en) Frame type wardrobe
CN210263597U (en) Cover bone vertical connection spare
CN218479445U (en) Sound-absorbing and noise-reducing aluminum veneer
CN210264039U (en) Mounting structure of cloakroom
CN210086620U (en) Ceiling structure that protection nature is strong
CN216865858U (en) Thick edge-covered impact-resistant baseboard
CN211242125U (en) Metal section bar for office desk screen glass frame
CN220954373U (en) Mute waterproof scratch-proof floor
CN215254275U (en) Universal skirting line with any radian
CN218091475U (en) Unit type curtain wall water-proof and drainage structure
CN210541254U (en) Face lid strengthening rib structure of paper handkerchief machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220923

CF01 Termination of patent right due to non-payment of annual fee