CN217461215U - Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate - Google Patents

Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate Download PDF

Info

Publication number
CN217461215U
CN217461215U CN202220140604.6U CN202220140604U CN217461215U CN 217461215 U CN217461215 U CN 217461215U CN 202220140604 U CN202220140604 U CN 202220140604U CN 217461215 U CN217461215 U CN 217461215U
Authority
CN
China
Prior art keywords
steel
reinforced concrete
parapet
bearing plate
floor bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220140604.6U
Other languages
Chinese (zh)
Inventor
李琨鹏
张彪
胡帅
王硕
邢文浩
郭东东
李昱
曾庆瑜
朱蓉蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202220140604.6U priority Critical patent/CN217461215U/en
Application granted granted Critical
Publication of CN217461215U publication Critical patent/CN217461215U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a reinforced concrete parapet unilateral template props up establishes structure on steel construction building carrier plate, including the steel construction girder steel, be fixed with the steel sheet on the steel construction girder steel, the steel sheet includes diaphragm and riser, and some of diaphragm are fixed on the steel construction girder steel, and the setting of encorbelmenting of another part, the riser is located the top of the one end of encorbelmenting, and diaphragm and steel construction girder steel upper berth are equipped with the building carrier plate, and the top of building carrier plate is provided with the plank sheathing, flitch secondary joist, two steel pipe fossil fragments, and it is regional to form the parapet between plank sheathing and the riser, the plank sheathing, flitch secondary joist, wear to be equipped with the split bolt between the two steel pipe fossil fragments. The L-shaped steel plate that encorbelments is fixed on steel structure girder steel, and the steel sheet is as die block and side form, then only need lay the template in inboard one side and can accomplish the template and prop up and establish, need not set up external scaffolding, saves a large amount of manpower and materials, has improved the efficiency of construction.

Description

Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate
Technical Field
The utility model belongs to steel construction parapet construction field, in particular to reinforced concrete parapet unilateral template props up establishes structure on steel construction building carrier plate.
Background
The parapet wall is a short wall around the roof of a building, and has the main functions of maintaining safety, and applying waterproof pressed bricks at the bottom to prevent water seepage of a waterproof layer or overflow of roof rainwater. According to the building technical regulation, the parapet is regarded as the function of the railing, if the building is above 10 stories and the height is not less than 1.2m, and in order to avoid the buster from being intentionally heightened, the height is also regulated to be not more than 1.5m at most.
To the structural reinforced concrete parapet of building carrier plate in the steel construction building, current parapet template is established and is applicable to frame construction or the shear wall structure of setting up outer scaffold when being under construction, can carry out the template simultaneously in parapet inside and outside both sides when parapet template is established, the fixed of primary and secondary fossil fragments, however, in the construction of multilayer steel construction, often need not set up outer scaffold, only be used for parapet construction to set up outer scaffold and need consume great manpower and materials.
SUMMERY OF THE UTILITY MODEL
The utility model provides a reinforced concrete parapet unilateral template props up structure on steel construction building carrier plate for solve current parapet template and prop up and set up the frame construction or the shear wall structure that set up outer scaffold frame when being applicable to the construction, can carry out the template simultaneously in parapet inside and outside both sides when parapet template is propped up, the fixed of primary and secondary fossil fragments, however, in the construction of multilayer steel construction, often need not set up outer scaffold frame, only be used for parapet construction to set up the technical problem that outer scaffold frame need consume great manpower and materials.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a reinforced concrete parapet unilateral template props up and establishes structure on steel construction building carrier plate, includes the steel construction girder steel, be fixed with the steel sheet on the steel construction girder steel, the steel sheet includes diaphragm and riser, some of diaphragm is fixed on the steel construction girder steel, and the setting of encorbelmenting of another part, the riser is located the top of the one end of encorbelmenting, diaphragm and steel construction girder steel upper berth are equipped with the building carrier plate, and the top of building carrier plate is provided with plank sheathing, flitch secondary joist, two steel pipe fossil fragments, forms the parapet region between plank sheathing and the riser, wears to be equipped with between riser, plank sheathing, flitch secondary joist, the two steel pipe fossil fragments to the stay bolt.
Through adopting above-mentioned technical scheme, fixed L shaped steel board of encorbelmenting on the steel construction girder steel, the steel sheet is as die block and side form, then only need lay the template in inboard one side and can accomplish the template and prop up and establish, need not set up external scaffolding, saves a large amount of manpower and materials, has improved the efficiency of construction.
Preferably, the transverse plate is connected to the steel beam of the steel structure in a welding mode.
By adopting the technical scheme, the construction is convenient, and the connection strength is high.
Preferably, the transverse plate and the floor support plate are welded at an interval of 275mm, and the length of each welding position is 25 mm.
Through adopting above-mentioned technical scheme, the joint strength of steel sheet and floor carrier plate is good.
Preferably, the flitch secondary keel is 50mm x 100mm and is vertically arranged with a horizontal spacing of 200 mm.
Through adopting above-mentioned technical scheme, the secondary joist size is reasonable, and arrangement structure stability is high.
Preferably, the thickness of the wood template is 15 mm.
Through adopting above-mentioned technical scheme, satisfy and pour the support.
Preferably, the length of the transverse plate is 200 mm.
Through adopting above-mentioned technical scheme, can guarantee the width of parapet and guarantee with the joint strength of steel construction crossbeam.
Preferably, the diameter of the double steel pipe main keel is 48 mm.
By adopting the technical scheme, the integral connection effect is good,
Preferably, the double-steel-pipe main keel is provided with an upper row and a lower row on the batten secondary keel.
Through adopting above-mentioned technical scheme, joint strength is high.
The beneficial effects of the utility model are embodied in: the L-shaped steel plate that encorbelments is fixed on steel structure girder steel, and the steel sheet is as die block and side form, then only need lay the template in inboard one side and can accomplish the template and prop up and establish, need not set up external scaffolding, saves a large amount of manpower and materials, has improved the efficiency of construction.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention; the primary objects and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description.
Drawings
Fig. 1 is a schematic view of the overall structure of the embodiment of the present invention.
Reference numerals: 1. a steel structural beam; 2. a steel plate; 21. a horizontal plate, 22 and a vertical plate; 3. a floor deck; 4. a wood template; 5. a batten secondary keel; 6. double steel tube keel; 7. a parapet area; 8. and (4) oppositely pulling the bolts.
Detailed Description
The technical solutions of the present invention are described in detail below by way of examples, which are only exemplary and can be used only for explaining and explaining the technical solutions of the present invention, but not for explaining the limitations of the technical solutions of the present invention.
If fig. 1, a reinforced concrete parapet unilateral template erects structure on steel construction building carrier plate, including steel construction girder steel 1, be fixed with steel sheet 2 on the steel construction girder steel 1, steel sheet 2 includes diaphragm 21 and riser 22, a part of diaphragm 21 is fixed on steel construction girder steel 1, the setting of encorbelmenting of another part, riser 22 is located the top of the one end of encorbelmenting, diaphragm 21 and 1 upper berth of steel construction girder steel are equipped with building carrier plate 3, building carrier plate 3's top is provided with plank sheathing 4, flitch secondary joist 5, two steel pipe fossil fragments 6, form the regional 7 of parapet between plank sheathing 4 and the riser 22, plank sheathing 4, flitch secondary joist 5, wear to be equipped with split bolt 8 between two steel pipe fossil fragments 6.
The L-shaped steel plate 2 that an overhang is fixed on steel structure girder steel 1, and steel plate 2 is as die block and side form, then only need lay the template in inboard one side and can accomplish the template and prop up and establish, need not set up external scaffolding, saves a large amount of manpower and materials, has improved the efficiency of construction.
Diaphragm 21 welded connection is on steel construction girder steel 1, and construction convenience, joint strength is high. Diaphragm 21 and building carrier plate 3 interval 275mm welding, every department's welding length 25mm, the joint strength of steel sheet 2 and building carrier plate 3 is good.
Wooden square secondary joist 5 is 50mm 100mm and vertical layout, and horizontal interval 200mm, secondary joist size is reasonable, and arrangement structure stability is high. The thickness of the wood formwork 4 is 15mm, and the requirement for pouring support is met.
The length of diaphragm 21 is 200mm, can guarantee the width of parapet and guarantee with the joint strength of steel construction crossbeam. The diameter of two steel pipe main joist is 48mm, and whole connection is effectual, two rows about two steel pipe main joist are provided with on flitch secondary joist 5, and joint strength is high.
The concrete construction process comprises the following steps of processing a thin steel plate template → welding the thin steel plate template with steel beams for supporting a floor support plate → laying the steel structure floor support plate → binding reinforcing steel bars of the parapet wall → erecting the wood template on the inner side of the parapet wall → installing main and auxiliary keels outside the wood template on the inner side of the parapet wall → installing split bolts → pouring concrete of the parapet wall.
(1) Processing a thin steel plate template, wherein the section of the thin steel plate template is L-shaped, the height of a vertical face is determined according to the height of the parapet wall, and the length of a plane is 200 mm;
(2) welding the thin steel plate template with the steel beam for supporting the floor bearing plate, wherein the length of each fillet weld section is 25mm, and the center distance of each weld section is 275mm
(3) Laying the steel structure floor bearing plate, namely laying the steel structure floor bearing plate according to construction drawings;
(4) binding the parapet reinforcing steel bars, namely finishing binding the parapet reinforcing steel bars according to the construction drawing;
(5) supporting a wood template on the inner side of the parapet wall, and mounting a wood template with the thickness of 15 mm;
(6) installing main and secondary keels outside the wood templates on the inner side of the parapet wall, firstly, vertically arranging 50 mm-100 mm battens, fixing the battens at a horizontal interval of 200mm, and then, firmly fixing the phi 48 double-steel-pipe main keel by using phi 16 split bolts;
(7) pouring parapet concrete according to the drawing to complete parapet construction.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be considered by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention.

Claims (8)

1. The utility model provides a reinforced concrete parapet unilateral template props up establishes structure on steel construction floor carrier plate which characterized in that: including steel construction girder steel (1), be fixed with steel sheet (2) on steel construction girder steel (1), steel sheet (2) are including diaphragm (21) and riser (22), some of diaphragm (21) are fixed on steel construction girder steel (1), and another part is encorbelmented and is set up, riser (22) are located the top of the one end of encorbelmenting, diaphragm (21) and steel construction girder steel (1) upper berth are equipped with floor bearing plate (3), and the top of floor bearing plate (3) is provided with plank sheathing (4), flitch secondary joist (5), two steel pipe fossil fragments (6), forms parapet region (7) between plank sheathing (4) and riser (22), wears to be equipped with between riser (22), plank sheathing (4), flitch secondary joist (5), two steel pipe fossil fragments (6) to draw bolt (8).
2. The supporting structure of the single-side formwork of the reinforced concrete parapet on the steel structure floor bearing plate according to claim 1, characterized in that: the transverse plate (21) is connected to the steel structure beam (1) in a welding mode.
3. The single-side formwork erecting structure for the reinforced concrete parapet on the steel structure floor bearing plate, as claimed in claim 2, is characterized in that: the transverse plate (21) and the floor bearing plate (3) are welded at intervals of 275mm, and the welding length of each position is 25 mm.
4. The supporting structure of the single-side formwork of the reinforced concrete parapet on the steel structure floor bearing plate according to claim 3, characterized in that: the wood square secondary keel (5) is 50mm x 100mm and is vertically arranged, and the horizontal distance is 200 mm.
5. The supporting structure of the single-side formwork of the reinforced concrete parapet on the steel structure floor bearing plate according to claim 4, characterized in that: the thickness of the wood template (4) is 15 mm.
6. The supporting structure of the single-side formwork of the reinforced concrete parapet on the steel structure floor bearing plate according to claim 5, characterized in that: the length of the transverse plate (21) is 200 mm.
7. The supporting structure of the single-side formwork of the reinforced concrete parapet on the steel structure floor bearing plate according to claim 6, characterized in that: the diameter of two steel pipe main joist is 48 mm.
8. The supporting structure of the single-side formwork of the reinforced concrete parapet on the steel structure floor bearing plate according to claim 7, characterized in that: the double-steel-pipe main keel is provided with an upper row and a lower row on the batten secondary keel (5).
CN202220140604.6U 2022-01-19 2022-01-19 Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate Active CN217461215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220140604.6U CN217461215U (en) 2022-01-19 2022-01-19 Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220140604.6U CN217461215U (en) 2022-01-19 2022-01-19 Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate

Publications (1)

Publication Number Publication Date
CN217461215U true CN217461215U (en) 2022-09-20

Family

ID=83261735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220140604.6U Active CN217461215U (en) 2022-01-19 2022-01-19 Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate

Country Status (1)

Country Link
CN (1) CN217461215U (en)

Similar Documents

Publication Publication Date Title
CN104563494A (en) Transformation supporting system for socket disc-lock steel tube support and construction method
CN204475846U (en) A kind of conversion support system for socket joint dish button steel tube frame
CN214942353U (en) Combined supporting structure of cantilever plate
CN217461215U (en) Reinforced concrete parapet unilateral template props up and establishes structure on steel construction floor carrier plate
CN107700840A (en) Formwork structure
CN210289118U (en) Tower concrete structure sharp roof template system
CN218061031U (en) Mounting and reinforcing device for non-dismantling die beam and plate
CN217439544U (en) Building top outer vertical surface overhanging structure template supporting system
CN207277211U (en) Large steel pipe truss for bent cap cast-in-place construction
CN215671013U (en) Go out roofing concrete structure monolithic pouring construction system
CN210396093U (en) Double-shear wall deformation joint steel formwork
CN102454298B (en) Large-sized reinforced concrete construction of frame beam method
CN212478538U (en) Deformation joint wall body erecting structure
CN212129218U (en) Basement outer wall single face formwork system
CN208380071U (en) One kind can quick despatch metal floor template system
CN204510550U (en) A kind of interlayer sitting formula unit curtain wall system
CN210316016U (en) Quick assembling joint structure with steel skeleton structure
CN101701493B (en) Template support system of box type girder cast-in-place concrete floor plate of steel frame construction
CN218375199U (en) Face vertical concrete structure's in limit prefabricated exterior sheathing on girder steel
CN217151150U (en) Overhanging steel truss formwork supporting platform for aluminum mould-full concrete outer wall
CN220247717U (en) Novel reinforcing apparatus of roofing parapet
CN104831628A (en) Permanent formwork of bridge deck of multi-girder steel mixing structure bridge
CN218345930U (en) Bridge structure
CN211007652U (en) Roof supporting structure for capping stiff hollow column
CN216130472U (en) Exempt from formwork steel concrete combination stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant