CN217439564U - Can assemble pre-buried spool positioner of aluminium mould - Google Patents

Can assemble pre-buried spool positioner of aluminium mould Download PDF

Info

Publication number
CN217439564U
CN217439564U CN202220665684.7U CN202220665684U CN217439564U CN 217439564 U CN217439564 U CN 217439564U CN 202220665684 U CN202220665684 U CN 202220665684U CN 217439564 U CN217439564 U CN 217439564U
Authority
CN
China
Prior art keywords
intermediate part
shape
buried
line pipe
positioning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220665684.7U
Other languages
Chinese (zh)
Inventor
王好喜
陈卓
陆元柱
郭坤
孙小飞
王凯
王志祥
张植
李召蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Bureau Of China Construction Corp
Original Assignee
Second Construction Bureau Of China Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Bureau Of China Construction Corp filed Critical Second Construction Bureau Of China Construction Corp
Priority to CN202220665684.7U priority Critical patent/CN217439564U/en
Application granted granted Critical
Publication of CN217439564U publication Critical patent/CN217439564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a can assemble pre-buried spool positioner of aluminium mould, including first end, at least one intermediate part, second end, the first end the second end all with the intermediate part is provided with grafting structure. The utility model can be detachably connected with the aluminum mould, so that the follow-up mould removal is convenient to detach, and the turnover multiplexing of the device is realized; through the arranged splicing structure, all parts of the device can be conveniently connected, the number of the middle parts can be freely selected according to the use requirement, and then the middle parts are assembled together, so that the flexibility of the device in use is improved; through frustum shape cell structure and the inclined plane formula interface that sets up, can prevent effectively to destroy the integrality of this device when demolising the aluminium mould to can leave the recess the same with the device size at the bottom of a beam after the form removal, the degree of depth is 2-3cm, makes things convenient for later stage spool to lengthen, need not carry out the overlength pipeline cutting work again by the manual work simultaneously.

Description

Can assemble pre-buried spool positioner of aluminium mould
Technical Field
The utility model relates to an electromechanical pre-buried technical field in the building engineering aluminium mould, concretely relates to can assemble pre-buried spool positioner of aluminium mould.
Background
In the construction of building engineering, sometimes to satisfy electromechanical wiring needs, the spool needs to be pre-buried in the roof beam. The method adopted in the prior art is as follows: positioning and perforating are carried out on the beam bottom aluminum mould, and the embedded line pipe is inserted into the hole, so that the functions of positioning and preventing concrete from entering the embedded line pipe to block the line pipe are achieved; and after the die is removed, cutting redundant line pipes, reserving 2-3cm, and facilitating later pipeline lengthening work.
However, the problem that the aluminum plate (aluminum mold) is damaged exists in the construction mode, time and labor are wasted due to the fact that the aluminum plate is thick and the hole is opened, sometimes, the wire pipe is located in the independent supporting position and cannot be opened, the hole needs to be moved for opening again, and therefore the aluminum mold pre-embedded wire pipe positioning device capable of being assembled is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that: how to solve the trompil that pre-buried spool construction methods exists in current roof beam and waste time and energy, spool location is located independent support department sometimes, can't carry out the trompil, needs to shift the problem of trompil again, provides one kind and can assemble the pre-buried spool positioner of aluminium mould, has solved the problem that the trompil destroys the aluminium mould, has improved the efficiency of construction, effectively solves simultaneously because of the lower part has independent support and the inaccurate scheduling problem in location that causes.
The utility model discloses a solve above-mentioned technical problem through following technical scheme, the utility model discloses a first end, at least one intermediate part, second end, the first end the second end all with the intermediate part is provided with grafting structure, the first end with between the intermediate part the second end with pass through between the intermediate part grafting structure realizes dismantling the connection, the first end the second end can be dismantled with the aluminium mould and be connected, set up the preformed hole with pre-buried spool same diameter on the intermediate part, the one end of pre-buried spool inserts during the construction in the preformed hole.
Furthermore, the first end portion, the middle portion and the second end portion are all made of rubber materials.
Furthermore, the first end part, the middle part and the second end part are all frustum-shaped, and the height is 2-3 cm.
Furthermore, the middle positions of the first end part and the second end part are both provided with connecting holes in a penetrating mode, and when the first end part and the second end part are connected with an aluminum die, tapping screws penetrate through the connecting holes to be in threaded connection with the aluminum die.
Furthermore, the grafting structure includes oblique slot of L shape, oblique inserted block of L shape sets up respectively to the oblique inserted block of L shape first end with on the both sides contact surface of intermediate part junction/the second end with on the both sides contact surface of intermediate part junction, wherein first end/only be provided with the oblique inserted block of a pair of L shape oblique slot/L shape on the second end, the both ends of intermediate part are provided with the oblique inserted block of a pair of L shape oblique slot/L shape respectively.
Further, the two L-shaped oblique slots/blocks of a pair are symmetrically arranged about the axis of the first/second end/middle portion.
Furthermore, the L-shaped inclined insertion slot and the first end portion/the second end portion are an integral component, the L-shaped inclined insertion block and the first end portion/the second end portion are an integral component, and the L-shaped inclined insertion slot, the L-shaped inclined insertion block and the middle portion are an integral component.
Furthermore, the contact surfaces of the L-shaped inclined slots and the L-shaped inclined insertion blocks are inclined surfaces, and the distance between the inclined surfaces is gradually increased from top to bottom.
Compared with the prior art, the utility model has the following advantages: through the detachable connection with the aluminum mold, the subsequent mold removal is convenient to detach, and the turnover reuse of the device is realized; through the arranged splicing structure, all parts of the device can be conveniently connected, the number of the middle parts can be freely selected according to the use requirement, and then the middle parts are assembled together, so that the flexibility of the device in use is improved; through frustum shape cell structure and the inclined plane formula interface that sets up, can prevent effectively to destroy the integrality of this device when demolising the aluminium mould to can leave the recess the same with the device size at the bottom of a beam after the form removal, the degree of depth is 2-3cm, makes things convenient for later stage spool to lengthen, need not carry out the overlength pipeline cutting work again by the manual work simultaneously.
Drawings
Fig. 1 is an exploded view of the structure of the present invention (with only one intermediate section);
fig. 2 is a schematic view of the connection between the middle portion and the embedded line pipe.
Detailed Description
The embodiments of the present invention will be described in detail below, and the present embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation manner and a specific operation process are given, but the scope of the present invention is not limited to the following embodiments.
As shown in fig. 1-2, the present embodiment provides a technical solution: the utility model provides a pre-buried spool positioner of aluminium mould can assemble, includes first end 1, at least one intermediate part 3, second end 2, first end 1 second end 2 all with intermediate part 3 is provided with grafting structure, first end 1 with between the intermediate part 3 second end 2 with pass through between the intermediate part 3 grafting structure realizes dismantling the connection, first end 1 second end 2 can dismantle with the aluminium mould and be connected, set up the preformed hole 31 with pre-buried spool 5 same diameter on the intermediate part 3, the one end of pre-buried spool 5 inserts during the construction in the preformed hole 31. Through the detachable connection with the aluminum mold, the subsequent mold removal is convenient to detach, and the turnover reuse of the device is realized; through the grafting structure that sets up, can conveniently couple together each part of device, can freely select the quantity of intermediate part according to the user demand, and then assemble together, improve the flexibility of device when using.
In the present embodiment, the first end portion 1, the intermediate portion 3, and the second end portion 2 are made of a rubber material, and thus the requirements of the strength and the flexibility of the device can be satisfied.
In this embodiment, the first end portion 1, the middle portion 3 and the second end portion 2 are frustum-shaped, the height is 2-3cm, the aluminum die is convenient to detach, a groove with the same size as the device is reserved at the bottom of the beam after the die is detached, the depth is 2-3cm, the later-stage line pipe extension is facilitated, and meanwhile, the long line pipe cutting work is not needed manually.
In this embodiment, preformed hole 31 with pre-buried spool 5 all has the same diameter, has both made things convenient for pre-buried spool to insert smoothly like this, has also effectively prevented during the concrete gets into pre-buried spool 5, and the jam phenomenon that the concrete entering caused when concrete placement can not exist.
In this embodiment, a connection hole 4 is formed through the middle position of each of the first end portion 1 and the second end portion 2, when the device is connected with an aluminum mold, a tapping screw penetrates through the connection hole 4 to be in threaded connection with the aluminum mold, so that the position of the whole device can be fixed on the aluminum mold, fixing points are reserved at two ends of the device to play a role in positioning, and the effect that the device is not deformed during installation and concrete pouring is achieved.
In this embodiment, the grafting structure includes oblique slot 11 of L shape, oblique inserted block 21 of L shape sets up respectively to the oblique inserted block 11 of L shape, L shape first end 1 with on the both sides contact surface of intermediate part 3 junction/second end 2 with on the both sides contact surface of intermediate part 3 junction, wherein first end 1/only be provided with oblique inserted block 21 of a pair of L shape oblique slot 11/L shape on the second end 2, the both ends of intermediate part 3 are provided with oblique inserted block 21 of a pair of L shape oblique slot 11/L shape respectively.
In the present embodiment, the two L-shaped slanted slots 11/L-shaped slanted insertion blocks 21 of a pair are arranged symmetrically with respect to the axis of the first end portion 1/second end portion 2/middle portion 3.
In this embodiment, the L-shaped inclined insertion slot 11 and the first end portion 1/the second end portion 2 are an integral component, the L-shaped inclined insertion block 21 and the first end portion 1/the second end portion 2 are an integral component, and the L-shaped inclined insertion slot 11, the L-shaped inclined insertion block 21 and the middle portion 3 are an integral component.
In this embodiment, the contact surfaces of the L-shaped inclined insertion groove 11 and the L-shaped inclined insertion block 21 are inclined surfaces, the distance between the inclined surfaces increases gradually from top to bottom, and the bell and spigot are made into inclined surfaces, so that the integrity of the device can be effectively prevented from being damaged when the aluminum die is removed.
The working principle is as follows: during construction, firstly determining the number of embedded conduits 5 as required, namely determining the number of middle parts 3 in the device, then mutually inserting the connected middle parts 3 together through L-shaped inclined slots 11 and L-shaped inclined insertion blocks 21, then determining the positions of the first end parts 1/the second end parts 2 according to the positions of the embedded conduits 5, arranging screw holes at corresponding positions on an aluminum mould, then inserting the first end parts 1 and the second end parts 2 to two ends of the combined middle parts 3 to form a complete device, penetrating self-tapping screws into connecting holes 4 to be in threaded connection with the aluminum mould after the integrated assembly, and finally inserting embedded sleeves 4 into reserved holes 31 with the same diameter as the embedded sleeves, so that concrete pouring can be carried out; after a period of time, the die is removed, a groove with the same size as the device is reserved at the bottom of the beam after the die is removed, the depth is 2-3cm, the later-stage line pipe lengthening is facilitated, and meanwhile, the overlong pipeline cutting work is not needed manually.
In summary, the assembled aluminum mould embedded wire pipe positioning device is detachably connected with the aluminum mould, so that the subsequent mould disassembly is convenient to disassemble, and the turnover and reuse of the device are realized; through the arranged splicing structure, all parts of the device can be conveniently connected, the number of the middle parts can be freely selected according to the use requirement, and then the middle parts are assembled together, so that the flexibility of the device in use is improved; through frustum shape cell structure and inclined plane formula interface that sets up, can effectively prevent to destroy the integrality of this device when demolising the aluminium mould to can leave the recess the same with the device size at the bottom of a beam after the form removal, the degree of depth is 2-3cm, makes things convenient for the later stage spool to lengthen, need not the manual work simultaneously and carries out overlength pipeline cutting work again.
Although embodiments of the present invention have been shown and described, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art without departing from the scope of the present invention.

Claims (8)

1. The utility model provides a can assemble pre-buried spool positioner of aluminium mould which characterized in that: including first end, at least one intermediate part, second end, first end the second end all with the intermediate part is provided with grafting structure, first end with between the intermediate part the second end with pass through between the intermediate part grafting structure realizes dismantling the connection, first end the second end can be dismantled with the aluminium mould and be connected, set up the preformed hole with pre-buried spool same diameter on the intermediate part, the one end of pre-buried spool inserts during the construction in the preformed hole.
2. The positioning device for the pre-buried line pipe of the assembled aluminum mold according to claim 1, wherein: the first end part, the middle part and the second end part are all made of rubber materials.
3. The positioning device for the pre-buried line pipe of the assembled aluminum mold according to claim 2, wherein: the first end part, the middle part and the second end part are all frustum-shaped and have the height of 2-3 cm.
4. The positioning device for the pre-buried line pipe of the assembled aluminum mold according to claim 3, wherein: and the middle positions of the first end part and the second end part are both provided with connecting holes in a penetrating way, and the first end part and the second end part penetrate through the connecting holes to be in threaded connection with an aluminum die through self-tapping screws when being connected with the aluminum die.
5. The positioning device for the pre-buried line pipe of the assembled aluminum mold according to claim 4, wherein: the plug-in structure includes oblique slot of L shape, oblique inserted block of L shape sets up respectively to the oblique inserted block of L shape first end with on the both sides contact surface of intermediate part junction/the second end with on the both sides contact surface of intermediate part junction, wherein first end/only be provided with oblique inserted block of a pair of L shape oblique slot/L shape on the second end, the both ends of intermediate part are provided with oblique inserted block of a pair of L shape oblique slot/L shape respectively.
6. The positioning device for the pre-buried line pipe of the assembled aluminum mold according to claim 5, wherein: the two L-shaped slanted slots/L-shaped slanted insertion blocks of a pair are symmetrically arranged with respect to the axis of the first/second end/middle portion.
7. The positioning device for the pre-buried line pipe of the assembled aluminum mold according to claim 6, wherein: the L-shaped inclined slot and the first end part/the second end part are integrated members, the L-shaped inclined insertion block and the first end part/the second end part are integrated members, and the L-shaped inclined slot, the L-shaped inclined insertion block and the middle part are integrated members.
8. The positioning device for the pre-embedded line pipe of the assembled aluminum mold according to claim 7, wherein: the contact surfaces of the L-shaped inclined slots and the L-shaped inclined insertion blocks are inclined surfaces, and the distance between the inclined surfaces of the L-shaped inclined slots and the L-shaped inclined insertion blocks is gradually increased from top to bottom.
CN202220665684.7U 2022-03-24 2022-03-24 Can assemble pre-buried spool positioner of aluminium mould Active CN217439564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220665684.7U CN217439564U (en) 2022-03-24 2022-03-24 Can assemble pre-buried spool positioner of aluminium mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220665684.7U CN217439564U (en) 2022-03-24 2022-03-24 Can assemble pre-buried spool positioner of aluminium mould

Publications (1)

Publication Number Publication Date
CN217439564U true CN217439564U (en) 2022-09-16

Family

ID=83214946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220665684.7U Active CN217439564U (en) 2022-03-24 2022-03-24 Can assemble pre-buried spool positioner of aluminium mould

Country Status (1)

Country Link
CN (1) CN217439564U (en)

Similar Documents

Publication Publication Date Title
CN109415896A (en) The system and method that wall for precast shear wall is connect with wall
CN112411864A (en) Groove-free masonry construction method based on BIM technology and prefabricated building blocks and groove building blocks
CN217439564U (en) Can assemble pre-buried spool positioner of aluminium mould
CN111535482A (en) Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN214194660U (en) Prefabricated cable shaft of cordwood system equipment
CN213015382U (en) Combined mechanism of aluminum die and PC (polycarbonate) wallboard
CN213654236U (en) Mortise-tenon type reserved pipe groove die
CN210482730U (en) Prefabricated strong and weak current box masonry component
CN209620589U (en) A kind of fixing templates
CN113594985A (en) Laminated plate wire pipe embedded part and using method thereof
CN213198101U (en) Prefabricated coincide floor mould
CN114899773B (en) Socket joint type spool joint and use method thereof
CN219599875U (en) Special forming equipment for producing light composite wallboard
CN206558991U (en) A kind of line box mounting and positioning device
CN108385726B (en) Pouring system and pouring method for assembled template type micro underground comprehensive pipe rack
CN218597751U (en) Pre-buried air conditioner hole casing instrument that can have enough to meet need use
CN215331482U (en) Cast-in-place slab beam embedded line pipe module
CN215858305U (en) Expansion joint or post-cast strip department pipe mounting structure
CN218563059U (en) Deviation prevention and leakage prevention device for embedding line pipe in aluminum alloy template in advance
CN219840378U (en) Be used for shear force wall concealed fire box construction template
CN216518032U (en) Reinforced concrete segment
CN214658767U (en) Bamboo tube fair-faced concrete template
CN215928650U (en) U-shaped clamping groove beam-penetrating sleeve fixing die
CN221031427U (en) Hole structure is exempted from to pre-buried PVC spool in structure beam bottom
CN215830012U (en) Aluminum mould beam bottom tapping-free wire pipe positioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant