CN217439550U - Building construction template anchor clamps - Google Patents

Building construction template anchor clamps Download PDF

Info

Publication number
CN217439550U
CN217439550U CN202221228917.3U CN202221228917U CN217439550U CN 217439550 U CN217439550 U CN 217439550U CN 202221228917 U CN202221228917 U CN 202221228917U CN 217439550 U CN217439550 U CN 217439550U
Authority
CN
China
Prior art keywords
threaded rod
template
connecting plate
block
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221228917.3U
Other languages
Chinese (zh)
Inventor
许亚明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Huahui Construction Engineering Co ltd
Original Assignee
Nantong Huahui Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Huahui Construction Engineering Co ltd filed Critical Nantong Huahui Construction Engineering Co ltd
Priority to CN202221228917.3U priority Critical patent/CN217439550U/en
Application granted granted Critical
Publication of CN217439550U publication Critical patent/CN217439550U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a construction template anchor clamps, include: the adjusting and fixing mechanism and the extruding and fixing mechanism are arranged on the base; wherein, adjust fixed establishment and include a plurality of splint, a plurality of U-shaped pieces of fixedly connected with on the splint, the inside swing joint of U-shaped piece has the connecting plate, through taking the connecting plate out from the U-shaped piece, press from both sides the template of concrete stand in the middle of two connecting plates, then twist the connecting plate with the third threaded rod again in, rotate the second threaded rod and drive the briquetting and extrude the connecting plate, make connecting plate press from both sides tight template, it drives first threaded rod to rotate the third knob, first threaded rod promotes the clamp plate and extrudees the template of other both sides, thereby accomplish the centre gripping fastening to the template of concrete stand, the template to the concrete stand that can be quick carries out the centre gripping, and be difficult to lead to the junction to become flexible because of receiving external force, reliable fastness has, prevent to take place the not hard up deformation condition that causes of template.

Description

Building construction template anchor clamps
Technical Field
The utility model relates to a construction technical field specifically is a construction form anchor clamps.
Background
The building formwork is a temporary support structure, which is manufactured according to the design requirements, so that the concrete structure and the components are formed according to the specified positions and geometric dimensions, the correct positions of the components are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of carrying out the template engineering is to guarantee concrete engineering quality and construction safety, accelerate the construction progress and reduce the engineering cost, and the template of opposite post usually uses square anchor clamps to the centre gripping of the four sides of stand.
Current anchor clamps carry out the centre gripping to the template of opposition post, through inserting the triangle iron sheet in the through-hole after the equipment is accomplished, carry out the adjustment of fore-and-aft distance and fix the anchor clamps, triangle iron male mode receives external force easily and takes place to become flexible, leads to anchor clamps fixed effect poor, can not effectively prevent when the template takes place to warp for this reason, provides a construction template anchor clamps.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction formwork clamp to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a construction form clamp comprising: the adjusting and fixing mechanism and the extruding and fixing mechanism are arranged on the base;
the adjusting and fixing mechanism comprises a plurality of clamping plates, a plurality of U-shaped blocks are fixedly connected to the clamping plates, a connecting plate is movably connected to the inside of each U-shaped block, a sliding groove is formed in the inside of each U-shaped block, a plurality of third threaded rods are connected to the connecting plate in a threaded mode and are connected to the inside of the sliding groove in a sliding mode, a second knob is fixedly connected to one end, away from the connecting plate, of each third threaded rod, a second threaded rod is connected to the inner threads of each U-shaped block in a threaded mode, a pressing block is rotatably connected to one end of each second threaded rod, and the pressing block is movably connected to the inside of each U-shaped block;
wherein, extrusion fixed establishment includes a plurality of fixed blocks, fixed block fixed connection in on the splint, the inside threaded connection of fixed block has first threaded rod, the one end of first threaded rod is rotated and is connected with the clamp plate, first threaded rod is kept away from the one end fixedly connected with third knob of clamp plate.
Preferably, the outer portion of the first threaded rod is fixedly connected with a plurality of rod bodies, and the rod bodies are connected to the inner portion of the fixing block in a sliding mode.
Preferably, one end of the rod body, which is far away from the pressing plate, is fixedly connected with a limiting block.
Preferably, the pressing block is slidably connected to the inside of the U-shaped block.
Preferably, the connecting plate is slidably connected to the inside of the U-shaped block.
Preferably, one end, far away from the pressing block, of the second threaded rod is fixedly connected with a first knob.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses when using, through taking the connecting plate out from the U-shaped piece, press from both sides the template of concrete stand in the middle of two connecting plates, then twist the third threaded rod again in the connecting plate, it extrudees the connecting plate to rotate the second threaded rod and drive the briquetting, make the connecting plate press from both sides tight template, it drives first threaded rod to rotate the third knob, first threaded rod promotes the clamp plate and extrudees the template of other both sides, thereby the centre gripping fastening to the template of concrete stand is accomplished, can be quick carry out the centre gripping to the template of concrete stand, and be difficult to lead to the junction not hard up because of receiving external force, reliable fastness has, prevent the deformation condition that the not hard up and cause of taking place template.
Drawings
FIG. 1 is a schematic structural view of the formwork clamp for building construction according to the present invention;
FIG. 2 is a schematic structural view of a connecting plate in the formwork clamp for building construction according to the present invention;
fig. 3 is the utility model discloses a structural schematic of briquetting in the construction formwork anchor clamps.
In the figure: 1. a splint; 2. a U-shaped block; 3. a first knob; 4. a second knob; 5. a limiting block; 6. a first threaded rod; 7. a chute; 8. a second threaded rod; 9. a fixed block; 10. a third knob; 11. pressing into blocks; 12. a rod body; 13. pressing a plate; 14. a connecting plate; 15. a third threaded rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
a construction form clamp comprising: adjusting and fixing mechanism and extruding and fixing mechanism.
As shown in fig. 1 to 3, the adjusting and fixing mechanism is composed of: adjust fixed establishment and include a plurality of splint 1, a plurality of U-shaped piece 2 of fixedly connected with on splint 1, the inside swing joint of U-shaped piece 2 has connecting plate 14, spout 7 has been seted up to the inside of U-shaped piece 2, threaded connection has a plurality of third threaded rod 15 on connecting plate 14, 15 sliding connection of third threaded rod is in the inside of spout 7, the one end fixedly connected with second knob 4 of connecting plate 14 is kept away from to third threaded rod 15, the inside threaded connection of U-shaped piece 2 has second threaded rod 8, the one end of second threaded rod 8 is rotated and is connected with briquetting 11, 11 swing joint of briquetting is in the inside of U-shaped piece 2.
As shown in fig. 1 to 3, the principle of the adjustment fixing mechanism: when the template of the concrete upright column is clamped, the second knob 4 is rotated, the two third threaded rods 15 at the same ends of the two connecting plates 14 are unscrewed, then the connecting plates 14 are pulled out from the U-shaped block 2, the template of the concrete upright column is clamped between the two connecting plates 14, then the connecting plates 14 are stretched into the U-shaped block 2 again, the second knob 4 is rotated to drive the third threaded rods 15 to be screwed into the connecting plates 14 again, meanwhile, the second threaded rods 8 are rotated to drive the pressing blocks 11 to move, the connecting plates 14 are extruded, and the connecting plates 14 are clamped with the template.
As shown in fig. 1, the extrusion fixing mechanism is composed of: extrusion fixed establishment includes a plurality of fixed blocks 9, and fixed block 9 fixed connection is on splint 1, and the inside threaded connection of fixed block 9 has first threaded rod 6, and the one end of first threaded rod 6 is rotated and is connected with clamp plate 13, and the one end fixedly connected with third knob 10 of clamp plate 13 is kept away from to first threaded rod 6.
As shown in fig. 1, the principle of the press-fixing mechanism: and rotating the third knob 10 to drive the first threaded rod 6, pushing the pressing plate 13 by the first threaded rod 6, and extruding the templates on the other two sides by the pressing plate 13 so as to clamp and fasten the templates of the concrete column.
In order to prevent the rod body 12 from sliding out of the fixing block 9, a limiting block 5 is fixedly connected to one end, far away from the pressing plate 13, of the rod body 12.
In order to rotate the second threaded rod 8 conveniently, one end, far away from the pressing block 11, of the second threaded rod 8 is fixedly connected with the first knob 3.
According to the technical scheme, the working steps of the scheme are summarized and carded: when the template of the concrete upright post is clamped, the second knob 4 is rotated, two third threaded rods 15 at the same ends of the two connecting plates 14 are unscrewed, then the connecting plates 14 are pulled out from the U-shaped block 2, the template of the concrete upright post is clamped between the two connecting plates 14, then the connecting plates 14 are stretched into the U-shaped block 2 again, the second knob 4 is rotated to drive the third threaded rods 15 to be screwed into the connecting plates 14 again, meanwhile, the second threaded rods 8 are rotated to drive the pressing blocks 11 to move, the connecting plates 14 are extruded, the template is clamped by the connecting plates 14, the third knob 10 is rotated to drive the first threaded rods 6, the first threaded rods 6 push the pressing plates 13, the pressing plates 13 extrude the templates at the other two sides, and therefore the clamping and fastening of the template of the concrete upright post are completed.
To sum up: the utility model discloses when using, take out in 2 through following the U-shaped piece with connecting plate 14, press from both sides the template of concrete stand in the middle of two connecting plates 14, then twist third threaded rod 15 again in connecting plate 14, it extrudees connecting plate 14 to rotate second threaded rod 8 and drive briquetting 11, make connecting plate 14 press from both sides tight template, it drives first threaded rod 6 to rotate third knob 10, first threaded rod 6 promotes clamp plate 13 and extrudees the template of other both sides, thereby accomplish the centre gripping fastening to the template of concrete stand, the template to the concrete stand that can be quick carries out the centre gripping, and be difficult to lead to the junction to become flexible because of receiving external force, reliable fastness has, prevent to take place the not hard up deformation condition that causes of template.
The part not involved in the utility model is the same as the prior art or can be realized by adopting the prior art. Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction formwork clamp which characterized in that includes: the adjusting and fixing mechanism and the extruding and fixing mechanism are arranged on the base;
the adjusting and fixing mechanism comprises a plurality of clamping plates (1), a plurality of U-shaped blocks (2) are fixedly connected to the clamping plates (1), a connecting plate (14) is movably connected to the inside of each U-shaped block (2), a sliding groove (7) is formed in the inside of each U-shaped block (2), a plurality of third threaded rods (15) are in threaded connection to the connecting plate (14), the third threaded rods (15) are connected to the inside of the sliding grooves (7) in a sliding mode, a second knob (4) is fixedly connected to one end, far away from the connecting plate (14), of each third threaded rod (15), a second threaded rod (8) is in threaded connection to the inside of each U-shaped block (2), a pressing block (11) is rotatably connected to one end of each second threaded rod (8), and the pressing block (11) is movably connected to the inside of each U-shaped block (2);
wherein, extrusion fixed establishment includes a plurality of fixed blocks (9), fixed block (9) fixed connection in on splint (1), the internal thread of fixed block (9) is connected with first threaded rod (6), the one end of first threaded rod (6) is rotated and is connected with clamp plate (13), keep away from first threaded rod (6) the one end fixedly connected with third knob (10) of clamp plate (13).
2. The building construction formwork clamp of claim 1, wherein: the outside fixedly connected with a plurality of bodies of rod (12) of first threaded rod (6), body of rod (12) sliding connection in the inside of fixed block (9).
3. The building construction formwork clamp of claim 2, wherein: and one end of the rod body (12) far away from the pressing plate (13) is fixedly connected with a limiting block (5).
4. The building construction formwork clamp of claim 1, wherein: the pressing block (11) is connected to the inside of the U-shaped block (2) in a sliding mode.
5. The building construction formwork clamp of claim 1, wherein: the connecting plate (14) is connected with the inside of the U-shaped block (2) in a sliding way.
6. The building construction formwork clamp of claim 1, wherein: one end, far away from the pressing block (11), of the second threaded rod (8) is fixedly connected with a first knob (3).
CN202221228917.3U 2022-05-23 2022-05-23 Building construction template anchor clamps Active CN217439550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221228917.3U CN217439550U (en) 2022-05-23 2022-05-23 Building construction template anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221228917.3U CN217439550U (en) 2022-05-23 2022-05-23 Building construction template anchor clamps

Publications (1)

Publication Number Publication Date
CN217439550U true CN217439550U (en) 2022-09-16

Family

ID=83222108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221228917.3U Active CN217439550U (en) 2022-05-23 2022-05-23 Building construction template anchor clamps

Country Status (1)

Country Link
CN (1) CN217439550U (en)

Similar Documents

Publication Publication Date Title
CN213234265U (en) House building foundation construction is with pouring template
CN217439550U (en) Building construction template anchor clamps
CN212053755U (en) Template anchor clamps of building engineering construction usefulness
CN212210424U (en) Strain clamp convenient to lock and used for strain insulator-string set
CN212071690U (en) Convenient fixed mould processing anchor clamps in batches
CN215631620U (en) Concrete building template for civil engineering
CN215168022U (en) Adjustable building template fixing frame
CN212384915U (en) Bus duct shell welding jig device
CN213174761U (en) Pulling-on piece formula aluminum alloy shear wall template reinforcing apparatus
CN208777709U (en) A kind of building assembly Corner clamp
CN216109726U (en) Building construction template anchor clamps
CN218091986U (en) Aluminum formwork for building convenient to splice fast
CN211597732U (en) High-strength light building template
CN217353575U (en) High-rise dwelling house mixes outer wall aluminum alloy template k board reinforcing apparatus entirely
CN217750126U (en) Steel bar welding platform for building engineering
CN212201296U (en) Template clamping device for building reinforcement
CN214996047U (en) Connecting and locking device for building template
CN217106173U (en) Building construction template anchor clamps
CN220218221U (en) Assistant fixture for assembling steel structural parts
CN213448490U (en) Bridge pile bidirectional concrete pouring positioning device
CN218862118U (en) Building construction template anchor clamps
CN216949535U (en) Wall body strutting arrangement is used to worker's civil construction
CN211897859U (en) Bridge building templates link for civil engineering
CN214220643U (en) High-rise residential building reinforced concrete positioning construction equipment
CN217104616U (en) Found quick formwork fixture device of rimstone back

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant