CN216109726U - Building construction template anchor clamps - Google Patents

Building construction template anchor clamps Download PDF

Info

Publication number
CN216109726U
CN216109726U CN202121901971.5U CN202121901971U CN216109726U CN 216109726 U CN216109726 U CN 216109726U CN 202121901971 U CN202121901971 U CN 202121901971U CN 216109726 U CN216109726 U CN 216109726U
Authority
CN
China
Prior art keywords
fixing frame
fixedly connected
bolt
fixed frame
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121901971.5U
Other languages
Chinese (zh)
Inventor
符周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yuanjian Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121901971.5U priority Critical patent/CN216109726U/en
Application granted granted Critical
Publication of CN216109726U publication Critical patent/CN216109726U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of template fixtures, and particularly relates to a template fixture for building construction, which comprises a first fixing frame, wherein a second fixing frame is arranged at the left end of the first fixing frame, fixing rods are arranged in the first fixing frame and the second fixing frame in a penetrating manner, a plurality of threaded holes are formed in the fixing rods, a first bolt is connected with the first fixing frame in a threaded manner, the first bolt penetrates through the first fixing frame and is connected into the threaded holes in a threaded manner, lower sleeve blocks are fixedly connected in the first fixing frame and the second fixing frame, and upper sleeve blocks are lapped in the lower sleeve blocks; according to the utility model, the circular concrete structure can be clamped and fixed by arranging the semicircular clamping groove, the upper sleeve block is extruded through the concrete solidification expansion, so that the upper sleeve block is driven to extrude the spring and the second supporting plate, and then the sliding plate on the second supporting plate is driven to slide in the sliding groove, so that the force generated by the concrete solidification expansion can be effectively decomposed.

Description

Building construction template anchor clamps
Technical Field
The utility model belongs to the technical field of template clamps, and particularly relates to a construction template clamp of a clinical stethoscope for infectious diseases.
Background
The building construction is the production activity in the construction implementation stage of the engineering construction, is the construction process of various buildings, also can be said to be the process of changing various lines on the design drawing into real objects in the appointed place, it includes foundation engineering construction, major structure construction, roofing engineering construction, decoration engineering construction, etc., generally need the building template in the building construction, the building template is a kind of temporary supporting structure, make according to the design requirement, make concrete structure, component according to the specified position, geometric dimensions shaping, keep its correct position, and bear building template dead weight and external load acting on it, the purpose to carry on template engineering, it is quality and construction safety of guaranteeing the concrete engineering, accelerate the construction progress and reduce the engineering cost.
The existing template clamp has poor toughness, the clamp can be broken when the concrete solidification volume changes, the normal operation of building construction is influenced, the construction cost is increased, the clamp is inconvenient to stretch out and draw back, the clamp can not be adjusted according to the size and the shape of a cast concrete column, the working efficiency is low, and the cost is increased.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a building construction template clamp which has the characteristics of construction cost reduction, strong practicability and the like.
In order to achieve the purpose, the utility model provides the following technical scheme: a building construction template clamp comprises a first fixed frame, wherein a second fixed frame is arranged at the left end of the first fixed frame, a fixed rod penetrates through the first fixed frame and the second fixed frame, a plurality of threaded holes are arranged in the fixed rod, the first fixing frame is internally threaded with a first bolt which passes through the first fixing frame and is connected in the threaded hole, the first fixing frame and the second fixing frame are both fixedly connected with a lower sleeve block, an upper sleeve block is lapped in the lower sleeve block, one end of the upper sleeve block is fixedly connected with a clamping plate, the lower sleeve block is fixedly connected with a first supporting plate, a groove is arranged in the first supporting plate, a sliding groove is arranged in the groove, a sliding plate is connected in the sliding groove in a sliding manner, one end fixedly connected with second backup pad of slide, the one end fixed connection of second backup pad is in last cover.
Preferably, the second fixing frame is internally threaded with a second bolt, and the second bolt penetrates through the second fixing frame and is in threaded connection with the threaded hole.
Preferably, the surface of first backup pad and second backup pad wears to be equipped with the spring, the one end fixed connection of spring is in lower cover, the other end fixed connection of spring is in last cover.
Preferably, a clamping groove is formed in the clamping plate, and the clamping groove is semicircular in shape.
Preferably, the rear ends of the first fixing frame and the second fixing frame are fixedly connected with a plurality of supporting rods, and the rear ends of the supporting rods are fixedly connected with plugs.
Compared with the prior art, the utility model has the beneficial effects that:
in the utility model, the circular concrete structure can be clamped and fixed by arranging the semicircular clamping groove, the upper sleeve block is extruded through the solidification and expansion of the concrete, so that the upper sleeve block is driven to extrude the spring and the second supporting plate, then the sliding plate on the second supporting plate is driven to slide in the sliding groove, so that the force generated by the solidification and expansion of the concrete can be effectively decomposed, the toughness of the template clamp is effectively improved, the service life of the template clamp is ensured, the cost of building construction is reduced, the first fixing frame and the second fixing frame can be moved left and right by connecting the first bolt and the second bolt in different threaded holes through threads, the length of the fixing rods can be conveniently adjusted, therefore, the size of the clamp can be adjusted according to the size of concrete, the problem that the clamp cannot be used when concrete columns of different sizes are clamped is solved, the working efficiency is improved, and the labor intensity of workers is reduced.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic cross-sectional view of the front view of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a schematic cross-sectional view of the first support plate and the second support plate according to the present invention;
FIG. 4 is a schematic structural view of a support rod according to the present invention;
in the figure: 1. a first fixed frame; 2. a second fixed frame; 3. fixing the rod; 4. a threaded hole; 5. a first bolt; 6. a second bolt; 7. a lower sleeve block; 8. sleeving a sleeve block; 9. a splint; 10. a first support plate; 11. a groove; 12. a chute; 13. a slide plate; 14. a second support plate; 15. a spring; 16. a clamping groove; 17. a support bar; 18. and (4) a plug.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: a building construction template clamp comprises a first fixed frame 1, wherein a second fixed frame 2 is arranged at the left end of the first fixed frame 1, fixing rods 3 penetrate through the first fixed frame 1 and the second fixed frame 2, a plurality of threaded holes 4 are formed in the fixing rods 3, a first bolt 5 is in threaded connection with the first fixed frame 1, the first bolt 5 penetrates through the first fixed frame 1 and is in threaded connection with the threaded holes 4, the first fixed frame 1 and the second fixed frame 2 can be moved leftwards and rightwards through the threaded connection of the first bolt 5 and a second bolt 6 in different threaded holes 4, the length of the fixing rod 3 is convenient to adjust, so that the size of the clamp can be adjusted according to the size of concrete, the problem that the clamp cannot be used when clamping concrete columns with different sizes is solved, the working efficiency is improved, the labor intensity of workers is reduced, a lower sleeve block 7 is fixedly connected in the first fixed frame 1 and the second fixed frame 2, overlap joint has last cover block 8 in the lower cover block 7, the one end fixedly connected with splint 9 of going up cover block 8, the first backup pad 10 of fixedly connected with in the cover block 7 down, recess 11 has been seted up in the first backup pad 10, spout 12 has been seted up in the recess 11, sliding connection has slide 13 in the spout 12, the one end fixedly connected with second backup pad 14 of slide 13, the one end fixed connection of second backup pad 14 is in last cover block 8, extrudees upper cover block 8 through the concrete setting inflation to drive upper cover block 8 extrusion spring 15 and second backup pad 14, then drive slide 13 on the second backup pad 14 and slide in spout 12 and can effectually decompose the power that the concrete setting inflation produced, the toughness of effectual promotion template anchor clamps has guaranteed the life of template anchor clamps, reduces the cost of construction.
Specifically, the second fixed frame 2 female connection has a second bolt 6, the second bolt 6 passes the fixed frame 2 threaded connection of second in screw hole 4.
Specifically, a spring 15 penetrates through the surfaces of the first supporting plate 10 and the second supporting plate 14, one end of the spring 15 is fixedly connected in the lower sleeve block 7, and the other end of the spring 15 is fixedly connected in the upper sleeve block 8.
Specifically, a clamping groove 16 is formed in the clamping plate 9, the clamping groove 16 is semicircular, and the semicircular clamping groove 16 can clamp and fix a circular concrete structure.
Specifically, the equal fixedly connected with a plurality of bracing piece 17 in the rear end of the fixed frame of first 1 and the second 2, the rear end fixedly connected with plug 18 of bracing piece 17.
The working principle and the using process of the utility model are as follows: when the utility model is used, after the template clamp is moved to a proper position, the first bolt 5 and the second bolt 6 are rotated to ensure that the first bolt 5 and the second bolt 6 are both separated from the threaded hole 4, then the first fixing frame 1 and the second fixing frame 2 are pushed to the proper position, the first fixing frame 1 and the second fixing frame 2 are placed on the surface of the concrete column, then the first fixing frame 1 and the second fixing frame 2 are pulled to the proper position, then the first bolt 5 and the second bolt 6 are rotated to ensure that the first bolt 5 and the second bolt 6 are both in threaded connection in the proper threaded hole 4, thereby not only fixing the fixing rod 3, but also clamping and fixing the concrete column, then the plug 18 is inserted into the soil to fix the template clamp, when the concrete is solidified and expanded, the compression force generated by the solidification and expansion of the concrete extrudes the upper sleeve block 8, thereby make 8 extrusion springs 15 of upper cover block and second backup pad 14 to make 15 contractions of spring, drive the second backup pad 14 in addition slide 13 and slide in spout 12, under the effect of the elastic force of spring 15, thereby can offset the oppression power that the concrete solidification inflation produced, thereby slow down the damage of oppression power to the template anchor clamps.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a construction formwork clamp, includes first fixed frame (1), its characterized in that: the fixing frame is characterized in that a second fixing frame (2) is arranged at the left end of the first fixing frame (1), a fixing rod (3) is arranged in the first fixing frame (1) and the second fixing frame (2) in a penetrating mode, a plurality of threaded holes (4) are formed in the fixing rod (3), a first bolt (5) is connected to the first fixing frame (1) in an internal threaded mode, the first bolt (5) penetrates through the first fixing frame (1) and is connected to the threaded holes (4) in a threaded mode, a lower sleeve block (7) is fixedly connected to the first fixing frame (1) and the second fixing frame (2) in an internal threaded mode, an upper sleeve block (8) is connected to the lower sleeve block (7) in an internal overlapping mode, a clamping plate (9) is fixedly connected to one end of the upper sleeve block (8), a first supporting plate (10) is fixedly connected to the lower sleeve block (7) in an internal threaded mode, a groove (11) is formed in the first supporting plate (10), and a sliding groove (12) is formed in the groove (11), a sliding plate (13) is connected in the sliding groove (12) in a sliding mode, a second supporting plate (14) is fixedly connected to one end of the sliding plate (13), and one end of the second supporting plate (14) is fixedly connected to the inside of the upper sleeve block (8).
2. The building construction formwork clamp of claim 1, wherein: the fixed frame of second (2) female connection has second bolt (6), second bolt (6) pass the fixed frame of second (2) threaded connection in screw hole (4).
3. The building construction formwork clamp of claim 1, wherein: the surface of first backup pad (10) and second backup pad (14) wears to be equipped with spring (15), the one end fixed connection of spring (15) is in nest block (7) down, the other end fixed connection of spring (15) is in last nest block (8).
4. The building construction formwork clamp of claim 1, wherein: a clamping groove (16) is formed in the clamping plate (9), and the clamping groove (16) is semicircular.
5. The building construction formwork clamp of claim 1, wherein: the utility model discloses a fixed frame of first fixed frame (1) and second, the equal fixedly connected with a plurality of bracing piece (17) in rear end of the fixed frame of first fixed frame (1) and second (2), the rear end fixedly connected with plug (18) of bracing piece (17).
CN202121901971.5U 2021-08-14 2021-08-14 Building construction template anchor clamps Active CN216109726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121901971.5U CN216109726U (en) 2021-08-14 2021-08-14 Building construction template anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121901971.5U CN216109726U (en) 2021-08-14 2021-08-14 Building construction template anchor clamps

Publications (1)

Publication Number Publication Date
CN216109726U true CN216109726U (en) 2022-03-22

Family

ID=80725964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121901971.5U Active CN216109726U (en) 2021-08-14 2021-08-14 Building construction template anchor clamps

Country Status (1)

Country Link
CN (1) CN216109726U (en)

Similar Documents

Publication Publication Date Title
CN216109726U (en) Building construction template anchor clamps
CN212224623U (en) Building construction template anchor clamps
CN115637839B (en) Quick assembly disassembly structure for building scaffold
CN211830142U (en) Comprehensive support that underground pipe gallery engineering used
CN216305148U (en) Shear force wall construction light reinforcing bar fixture is built in room
CN214785880U (en) Connection structure of clear water concrete outer wall and external scaffolding
CN205591507U (en) Scaffold frame of easily dismantling
CN213539678U (en) Scaffold frame of building engineering construction
CN210450627U (en) Hydraulic quick die clamping device
CN210917759U (en) Construction locking device for building steel structure
CN210738128U (en) Building safety protection net
CN209799372U (en) Lintel template building construction clamp
CN215329923U (en) Prevent foundation pit supporting construction that sinks
CN220645151U (en) High-strength steel overhanging scaffold anchoring structure
CN109024682B (en) Pipe gallery anchorage device core mould compaction stabilizing device
CN217439550U (en) Building construction template anchor clamps
CN213767353U (en) Metal pipe fitting protection device
CN217104616U (en) Found quick formwork fixture device of rimstone back
CN218952862U (en) Be used for pre-buried sleeve pipe fixing device
CN210768830U (en) Adjustable fixture for tunnel secondary lining steel bars
CN217268859U (en) I-steel entrance to a cave shaping template
CN212146894U (en) Inspection shaft regulating ring production mould
CN212784680U (en) Right-angle hanging plate
CN213742429U (en) A setting device for outer frame first layer protection
CN220828065U (en) Reinforced wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221115

Address after: 232000 Comprehensive Building 106, Huangwei Village Street, Nihe Town, Panji District, Huainan City, Anhui Province

Patentee after: Anhui Yuanjian Construction Engineering Co.,Ltd.

Address before: 410004 Hunan Construction Technology Research Institute, 15th floor, Jiangong new town, No. 788, Section 1, Furong South Road, Tianxin District, Changsha City, Hunan Province

Patentee before: Fu Zhou