CN217438908U - A high-efficient high pressure spouts stake machine soon for handling weak soil - Google Patents

A high-efficient high pressure spouts stake machine soon for handling weak soil Download PDF

Info

Publication number
CN217438908U
CN217438908U CN202220423031.8U CN202220423031U CN217438908U CN 217438908 U CN217438908 U CN 217438908U CN 202220423031 U CN202220423031 U CN 202220423031U CN 217438908 U CN217438908 U CN 217438908U
Authority
CN
China
Prior art keywords
block
fixed
fixedly mounted
efficient high
stake machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220423031.8U
Other languages
Chinese (zh)
Inventor
万旭
李明啓
万太禄
万明明
万晓
梁鑫
牟军军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Juntai Jiuheng Construction Group Co ltd
Original Assignee
Qingdao Juntai Water Conservancy Geotechnical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Juntai Water Conservancy Geotechnical Co ltd filed Critical Qingdao Juntai Water Conservancy Geotechnical Co ltd
Priority to CN202220423031.8U priority Critical patent/CN217438908U/en
Application granted granted Critical
Publication of CN217438908U publication Critical patent/CN217438908U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a stake machine is spouted soon to high-efficient high pressure for handling weak soil, including base substrate, base substrate's top fixed mounting has the box, the equal movable mounting in the left and right sides of fixed block has the joint structure. This a stake machine is spouted soon to high-efficient high pressure for handling weak soil, through setting up the joint structure, pass through the bottom of joint structrual installation at the slip casting pipe with the fixed block, through manual rotation turning block, rotate the restriction that makes it break away from the stopper with the joint piece, then extract the dead lever and drive the joint piece and go out, make between fixed block and the slip casting pipe can the quickly separating, the convenience is washd shower nozzle and spray tube on the fixed block, can avoid being used for anticorrosive mud to solidify in the spray tube, cause the condition that the spray tube blockked up, it has the flexibility to dismantle and use with the erection site, through setting up the athey wheel, because the land of job site is more loose, it caves in to cause the stake machine of spouting soon easily, athey wheel area of contact is great, more make things convenient for the construction of spouting the stake machine to go on soon.

Description

A high-efficient high pressure spouts stake machine soon for handling weak soil
Technical Field
The utility model relates to a foundation stabilization technical field specifically is a high-efficient high pressure spouts stake machine soon for handling weak soil among the building site.
Background
The jet grouting method is also called as jet grouting method, referred to as jet grouting pile for short, and is a high-pressure jet grouting method in the seventies of the twentieth century, and the eight and ninety years are comprehensively developed and applied in China, and practices prove that the method has good effect on treating silt, mucky soil, cohesive soil, silt soil, sandy soil, artificial filling soil, gravel soil and the like, the jet grouting pile machine utilizes a drilling machine to drill a jet grouting pipe and a nozzle at a designed height at the bottom of a pile, and prepared slurry is jetted from a nozzle at the edge of the grouting pipe at high speed after obtaining huge energy through a high-pressure generating device to form a liquid flow with highly concentrated energy to directly damage the soil body, and in the jetting process, a drill rod is lifted while rotating to ensure that the slurry and the soil body are fully stirred and mixed to form a columnar solidification body with a certain diameter in the soil, so that the foundation is reinforced, and the construction is generally divided into two working flows, firstly drilling and then spraying, then drilling and spraying, then lifting and stirring, ensuring the proportion and quality of soil slurry of each meter of pile, leveling the field before construction, adopting plain soil as roadbed filling (filling clay in the range of two-side embankments, sidewalks and non-motor driven lanes), and performing pile-forming experimental construction before construction so as to determine proper cement slurry concentration, slurry spraying amount, slurry spraying pressure, slurry spraying lifting speed and other construction process parameters, thereby providing a basis for formal construction, wherein the number of test piles is not less than 5.
At present, current shaft spouts stake machine soon still has certain weak point, spout the shower nozzle of machine soon for fixed knot constructs, be difficult to dismantle and wash the shower nozzle, long-term in the past, it can solidify in the shower nozzle to be used for anticorrosive polymer to restore the daub, cause the shower nozzle to block up, the result of use is relatively poor, moreover, the connecting hole is passed to the most adoption bolt of current dismantlement mode, reuse nut locks the bolt, it is harder during installation and dismantlement, operating personnel's work efficiency has been reduced, therefore, it spouts the stake machine soon to need to provide a high-efficient high pressure for handling the weak soil and solves the above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The not enough to prior art, the utility model provides a high-efficient high pressure spouts stake machine soon for handling weak soil possesses advantages such as convenient to detach and installation, has solved current dismantlement and the more problem that wastes time and energy of installation.
For realizing above-mentioned convenient to detach and installation purpose, the utility model provides a following technical scheme: a high-efficiency high-pressure rotary jet pile machine for treating soft soil comprises a base substrate, wherein a box body is fixedly mounted at the top of the base substrate, a telescopic hose is fixedly mounted at the top of the box body, a fixed substrate is fixedly mounted at the top of the base substrate, a fixed sleeve is fixedly mounted at the right side of the fixed substrate, a pump box is fixedly mounted at the top of the fixed sleeve, a grouting pipe is sleeved inside the fixed sleeve, a fixed block is movably mounted at the bottom of the grouting pipe, clamping structures are movably mounted at the left side and the right side of the fixed block, and the clamping blocks are rotated to be separated from the limit of a limit block by manually rotating a rotating block through setting the clamping structures and then being pulled out to drive the clamping blocks to go out, so that the fixed block and the grouting pipe can be quickly separated, a spray head and a spray pipe on the fixed block can be conveniently cleaned, and the slurry for corrosion prevention can be prevented from being solidified in the spray pipe, the condition of spray pipe blockage is caused, and the disassembly, the installation and the use are more flexible;
the joint structure includes the turning block, the right side movable mounting of fixed block has the turning block, the left side fixed mounting of turning block has the dead lever, the left side fixed mounting of dead lever has the joint piece, the draw-in groove has all been seted up to the left and right sides of slip casting pipe.
Furthermore, the inner top wall and the inner bottom wall of the clamping groove are fixedly provided with limiting blocks.
Further, the top fixed mounting of base plate has the promotion handle, the top fixed mounting of base plate has article to place the case.
Further, a spray head is movably mounted at the bottom of the grouting pipe, and a rotary spraying solidification body is sleeved on the outer surface of the spray head.
Furthermore, a high-pressure clean water pump, an air compressor and a high-pressure mud pump are fixedly mounted inside the pump box, and crawler wheels are fixedly mounted on the front surface and the back surface of the base plate.
Furthermore, the rotating block is matched with the limiting block, and the rotating block and the clamping groove are mutually clamped.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
the high-efficiency high-pressure rotary jet pile machine for processing soft soil is characterized in that a clamping structure is arranged, a fixing block is arranged at the bottom of a grouting pipe through the clamping structure through mutual matching of a clamping block, a fixing rod, a rotating block and a clamping groove, the rotating block is manually rotated to enable the clamping block to be separated from the limit of a limiting block, then the fixing rod is pulled out to drive the clamping block to go out, so that the fixing block and the grouting pipe can be quickly separated, a spray head and a spray pipe on the fixing block can be conveniently cleaned, can avoid the situation that slurry for corrosion prevention is solidified in the spray pipe to cause the blockage of the spray pipe, has more flexibility in disassembly, assembly and use, and is provided with the crawler wheels, because the land on the construction site is loose, the jet grouting pile machine is easy to sink, the contact area of the crawler wheel is large, the pressure intensity can be reduced, the construction of the jet grouting pile machine is more convenient to carry out, and the problems that the existing disassembly and assembly are time-consuming and labor-consuming are solved.
Drawings
FIG. 1 is a schematic view of the structure of the jet grouting pile machine of the present invention;
FIG. 2 is a front sectional view of the jet grouting pile machine of the present invention;
fig. 3 is a schematic view of the clamping structure of the present invention.
In the figure: the device comprises a base plate 1, a pushing handle 2, an article placing box 3, a crawler wheel 4, a box body 5, a telescopic hose 6, a pump box 7, a fixed base plate 8, a grouting pipe 9, a clamping structure 10, a clamping block 101, a fixed rod 102, a rotating block 103, a clamping groove 104, a rotary spraying consolidation body 11, a fixed block 12 and a fixed sleeve 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the high-efficiency high-pressure jet grouting pile machine for processing soft soil in the embodiment includes a base substrate 1, a box 5 is fixedly installed on the top of the base substrate 1, a flexible hose 6 is fixedly installed on the top of the box 5, a fixed substrate 8 is fixedly installed on the top of the base substrate 1, a fixed sleeve 13 is fixedly installed on the right side of the fixed substrate 8, a pump box 7 is fixedly installed on the top of the fixed sleeve 13, a grouting pipe 9 is sleeved inside the fixed sleeve 13, a fixed block 12 is movably installed at the bottom of the grouting pipe 9, and clamping structures 10 are movably installed on the left side and the right side of the fixed block 12;
the clamping structure 10 comprises a rotating block 103, the rotating block 103 is movably mounted on the right side of the fixing block 12, a fixing rod 102 is fixedly mounted on the left side of the rotating block 103, a clamping block 101 is fixedly mounted on the left side of the fixing rod 102, and clamping grooves 104 are formed in the left side and the right side of the grouting pipe 9.
When the method is implemented, the method comprises the following steps:
1) firstly, the clamping block 101 is rotated to be separated from the limit of the limiting block by manually rotating the rotating block 103;
2) then, by arranging the crawler wheel 4, the rotary jet pile machine is easy to sink due to loose land on a construction site, and the crawler wheel 4 has larger contact area, so that the generation of pressure intensity can be reduced, and the construction of the rotary jet pile machine is more convenient to carry out;
3) then the fixing rod 102 is pulled out to drive the clamping block 101 to go out;
4) finally, the fixed block 12 and the grouting pipe 9 can be quickly separated, so that a spray head and a spray pipe on the fixed block 12 can be conveniently cleaned, and the slurry for corrosion prevention can be prevented from being solidified in the spray pipe.
In conclusion, the high-efficiency high-pressure jet grouting pile machine for processing soft soil has the advantages that by arranging the clamping structure 10, the fixed block 12 is arranged at the bottom of the grouting pipe 9 through the clamping structure 10 through the mutual matching among the clamping block 101, the fixed rod 102, the rotating block 103 and the clamping groove 104, the clamping block 101 is rotated to be separated from the limit of the limiting block through the manual rotation of the rotating block 103, then the fixed rod 102 is pulled out to drive the clamping block 101 out, so that the fixed block 12 and the grouting pipe 9 can be quickly separated, a spray head and a spray pipe on the fixed block 12 can be conveniently cleaned, the situation that the spray pipe is blocked due to the fact that anticorrosive slurry is solidified in the spray pipe can be avoided, the disassembly and the installation are more flexible, and the crawler wheel 4 is arranged, because the land on the construction site is looser, the jet grouting pile machine is easy to sink, the contact area of the crawler wheel 4 is larger, and the pressure can be reduced, the construction of the rotary jet pile machine is more convenient to carry out, and the problems that the existing disassembly and assembly is time-consuming and labor-consuming are solved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a stake machine is spouted soon to high-efficient high pressure for handling soft soil, includes base plate (1), its characterized in that: the automatic grouting device is characterized in that a box body (5) is fixedly mounted at the top of the base substrate (1), a telescopic hose (6) is fixedly mounted at the top of the box body (5), a fixed substrate (8) is fixedly mounted at the top of the base substrate (1), a fixed sleeve (13) is fixedly mounted on the right side of the fixed substrate (8), a pump box (7) is fixedly mounted at the top of the fixed sleeve (13), a grouting pipe (9) is sleeved inside the fixed sleeve (13), a fixed block (12) is movably mounted at the bottom of the grouting pipe (9), and clamping structures (10) are movably mounted on the left side and the right side of the fixed block (12);
joint structure (10) include turning block (103), the right side movable mounting of fixed block (12) has turning block (103), the left side fixed mounting of turning block (103) has dead lever (102), the left side fixed mounting of dead lever (102) has joint piece (101), draw-in groove (104) have all been seted up to the left and right sides of slip casting pipe (9).
2. The efficient high-pressure jet grouting pile machine for treating soft soil according to claim 1, characterized in that: the inner top wall and the inner bottom wall of the clamping groove (104) are fixedly provided with limiting blocks.
3. The efficient high-pressure jet grouting pile machine for treating soft soil according to claim 1, characterized in that: the top fixed mounting of base plate (1) has promotion handle (2), the top fixed mounting of base plate (1) has article to place case (3).
4. The efficient high-pressure jet grouting pile machine for treating soft soil according to claim 1, characterized in that: the bottom of the grouting pipe (9) is movably provided with a spray head, and the outer surface of the spray head is sleeved with a rotary spraying consolidation body.
5. The efficient high-pressure jet grouting pile machine for treating soft soil according to claim 1, characterized in that: the high-pressure clean water pump, the air compressor and the high-pressure slurry pump are fixedly mounted inside the pump box (7), and the crawler wheels (4) are fixedly mounted on the front side and the back side of the base substrate (1).
6. The efficient high-pressure jet grouting pile machine for treating soft soil according to claim 1 or 2, characterized in that: the rotating block (103) is matched with the limiting block, and the rotating block (103) is clamped with the clamping groove (104).
CN202220423031.8U 2022-03-01 2022-03-01 A high-efficient high pressure spouts stake machine soon for handling weak soil Active CN217438908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220423031.8U CN217438908U (en) 2022-03-01 2022-03-01 A high-efficient high pressure spouts stake machine soon for handling weak soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220423031.8U CN217438908U (en) 2022-03-01 2022-03-01 A high-efficient high pressure spouts stake machine soon for handling weak soil

Publications (1)

Publication Number Publication Date
CN217438908U true CN217438908U (en) 2022-09-16

Family

ID=83213661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220423031.8U Active CN217438908U (en) 2022-03-01 2022-03-01 A high-efficient high pressure spouts stake machine soon for handling weak soil

Country Status (1)

Country Link
CN (1) CN217438908U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117514197A (en) * 2023-12-11 2024-02-06 济南中优城市发展投资集团有限公司 Reinforcement device for jet grouting and reinforcement method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117514197A (en) * 2023-12-11 2024-02-06 济南中优城市发展投资集团有限公司 Reinforcement device for jet grouting and reinforcement method thereof
CN117514197B (en) * 2023-12-11 2024-04-02 济南中优城市发展投资集团有限公司 Reinforcement device for jet grouting and reinforcement method thereof

Similar Documents

Publication Publication Date Title
CN102322058B (en) Construction process and equipment for downhole impacting high-pressure jet grouting pile
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN101736760B (en) Construction method of prestressed anti-floating anchor rod
CN107338789B (en) A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake
CN203452083U (en) Rotary expanding pile construction equipment and grout feeding device
CN206956714U (en) Down-the-hole impacts rotating spraying mixture pile construction equipment
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN103343544A (en) Construction method for large-scale open caisson
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN201826303U (en) Long-spiral high/low-pressure multi-pipe self-drilling type mixing jet grouting pile forming device
CN110984852B (en) Triaxial stirring stake machine with function of rectifying
CN217438908U (en) A high-efficient high pressure spouts stake machine soon for handling weak soil
CN105155550A (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN108149682A (en) A kind of slip casting casing device and the pile foundation drilling construction method using the casing device
CN215632116U (en) Protective railing device
CN207862925U (en) A kind of slip casting casing device
JP4679705B2 (en) Equipment for constructing mechanically stirred air cement milk mixed pressure feeding method
CN106592514A (en) Construction method of old city riverway piling wall integrated vertical type retaining wall
CN208563316U (en) Large-diameter cast-in-place pile bottom loose soil sediment treatment device
CN111254877A (en) Channel deep ballast rapid construction method
CN112176954A (en) Construction method for newly excavated channel
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN207905710U (en) A kind of fast pore-creating device of sandy soil dewatering well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230801

Address after: 266000 157-20 Qingjiang Road, Shibei District, Qingdao City, Shandong Province

Patentee after: Shandong Juntai Jiuheng Construction Group Co.,Ltd.

Address before: 266000 157-20 Qingjiang Road, Shibei District, Qingdao City, Shandong Province

Patentee before: Qingdao Juntai water conservancy geotechnical Co.,Ltd.

TR01 Transfer of patent right