Prior art keywords
platform
welded
rod
platform skeleton
installation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221474532.5U
Other languages
Chinese (zh)
Inventor
鹿自兴
黄惠轩
董海龙
刘恒
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seventh Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Seventh Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seventh Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Seventh Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN202221474532.5U priority Critical patent/CN217419361U/en
Application granted granted Critical
Publication of CN217419361U publication Critical patent/CN217419361U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a portable bridge hangs encloses basket installation device, including pier and platform skeleton, vertical crossbeam has been placed at the top of pier, vertical crossbeam's bottom and platform skeleton's top all weld solid fixed ring, gu fixed ring's surface mounting has wire rope, platform skeleton's skin weld has the gusset plate, the gusset rod has all been welded on the surface of gusset plate and platform skeleton, the rail guard subassembly is installed at the top of platform skeleton. The utility model provides an generally adopt the mobile crane to hoist personnel's equipment in the hanging of enclosing basket installation, if there is pier shaft height too high or can't hoist and mount the operation for a long time, will have and hinder the process engineering time, increase the construction risk, can't guarantee construction node and quality, if there is the davit to move or during the topography condition does not allow hoist and mount the operation for a long time, hanging flower basket mounting platform is unstable, leads to the installation degree of difficulty to increase, increases the problem of operation risk.

Description

Portable bridge hanging surrounding basket installation device
Technical Field
The utility model relates to a railway bridge construction technical field specifically is a portable bridge hangs and encloses basket installation device.
Background
The railway bridge is a railway crossing river, lake, strait, valley or other obstacles, and is a structure built for realizing the three-dimensional crossing of the railway line and the railway line or road, at present, most of the railway bridge is that pier hanging and enclosing baskets are firstly installed and then erected, the pier hanging and enclosing baskets are very convenient to install when the girders are not erected, the pier hanging and enclosing baskets are installed firstly and then erected according to the requirements of construction progress and the like, a truck crane is generally adopted to hoist personnel equipment in the process of installing the hanging and enclosing baskets, the truck crane is adopted to install the hanging and enclosing baskets under the top cap of a pier body, if the pier body height is too high or the hanging operation cannot be carried out for a long time, the process construction time is delayed, the safety of construction operators cannot be ensured by using the truck crane, the construction risk is increased, the construction node and quality cannot be ensured, and if the hanging arm is moved or the terrain condition does not allow the long-time hoisting operation to be carried out, the hanging flower basket mounting platform is unstable, leads to the installation of hanging enclosing basket to increase the installation degree of difficulty, increases the operation risk, leads to the construction to impel slowly.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a portable bridge hangs and encloses basket installation device, possess easy operation, it is convenient, the suitability is high, greatly practice thrift installation time and reduced the advantage of construction risk in the installation, solved and generally adopted the truck crane to hoist personnel's equipment in hanging and enclosing basket installation, if there is pier shaft height too high or can't hoist and mount the operation for a long time, will exist and hinder the process engineering time, increase the construction risk, can't guarantee construction node and quality, if there is the davit to move or during the operation of hoisting is not allowed for a long time to the relief condition, hanging flower basket mounting platform is unstable, lead to the installation degree of difficulty to strengthen, increase the problem of operation risk.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a portable bridge hangs encloses basket installation device, includes pier and platform skeleton, the longitudinal girder has been placed at the top of pier, solid fixed ring has all been welded to the bottom of longitudinal girder and the top of platform skeleton, gu fixed ring's surface mounting has wire rope, the skin weld of platform skeleton has the gusset plate, the gusset plate has all been welded on the surface of gusset plate and platform skeleton the gusset rod, the rail guard subassembly is installed at the top of platform skeleton, the welding of one side of longitudinal girder has the connecting rod, the welding of the top of platform skeleton has the backup pad, the connecting plate has all been welded to the front side and the rear side at platform skeleton top.
Preferably, the guard rail assembly comprises a vertical rod and a protection rod, the bottom of the vertical rod is welded with the top of the platform framework, and the surface of the protection rod is welded with the surface of the vertical rod.
Preferably, the surface of the connecting plate is respectively welded with a first reinforcing plate and a second reinforcing plate, and the bottoms of the first reinforcing plate and the second reinforcing plate are welded with the top of the platform framework.
Preferably, the surface mounting of connecting plate has the U template, one side threaded inlay of U template is connected with the lead screw, the one end of lead screw is inlayed through the bearing activity and is connected with the fixed plate, the other end welding of lead screw has the hand wheel, one side welding of fixed plate has the guide bar, the one end of guide bar runs through the U template and extends to its outside, guide bar and U template sliding connection.
Preferably, lifting lugs are welded at the tops of the longitudinal beams, the longitudinal beams are I10I-shaped steel, and the supporting plates are steel plates with the thickness of 5 mm.
Preferably, the connecting plate and the reinforcing plate are 10# channel steel, the reinforcing rod is phi 16 twisted steel, the steel wire rope is phi 1.5cm, and the surface of the connecting plate is provided with mounting holes.
Preferably, the vertical rods and the protective rods are phi 16 threaded steel bars, and the platform framework is a 10# channel steel.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a pier, the platform skeleton, the longitudinal beam, gu fixed ring, wire rope, the gusset plate, the anchor strut, the rail guard subassembly, the connecting rod, backup pad and connecting plate cooperate, and the operation is simple, and is convenient, and the suitability is high, greatly practice thrift installation time and reduced the advantage of construction risk in the installation, solved and generally adopted the mobile crane to hoist personnel's equipment in the hanging basket installation, if there is pier shaft height too high or can't hoist and mount the operation for a long time, will have and hinder the process engineering time of construction, increase the construction risk, can't guarantee construction node and quality, if there is the davit to move or the topography condition not allow hoist and mount the operation for a long time, hanging basket mounting platform is unstable, lead to the installation to increase the degree of difficulty, increase the problem of operation risk.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic bottom perspective view of the present invention;
FIG. 3 is a perspective view of the platform framework and longitudinal and transverse beams of the present invention;
FIG. 4 is the perspective view of the connection assembly and the connection plate
In the figure: 1 pier, 2 platform frameworks, 3 longitudinal and transverse beams, 4 fixing rings, 5 steel wire ropes, 6 reinforcing plates, 7 reinforcing rods, 8 protective guard components, 81 vertical rods, 82 protective rods, 9 connecting rods, 10 supporting plates, 11 connecting plates, 12 reinforcing plates I, 13 reinforcing plates II, 14 connecting components, 141U-shaped plates, 142 screw rods, 143 fixing plates, 144 hand wheels, 145 guide rods and 15 lifting lugs.
Detailed Description
Referring to fig. 1-4, a portable bridge hanging basket installation device comprises a bridge pier 1 and a platform framework 2, wherein a longitudinal beam 3 is placed at the top of the bridge pier 1, fixing rings 4 are welded at the bottom of the longitudinal beam 3 and the top of the platform framework 2, a steel wire rope 5 is installed on the surface of each fixing ring 4, a reinforcing plate 6 is welded on the surface of the platform framework 2, reinforcing rods 7 are welded on the surfaces of the reinforcing plate 6 and the platform framework 2, a guard rail assembly 8 is installed at the top of the platform framework 2, a connecting rod 9 is welded at one side of the longitudinal beam 3 and one side of the transverse beam 3, a support plate 10 is welded at the top of the platform framework 2, and connecting plates 11 are welded at the front side and the rear side of the top of the platform framework 2;
the protective guard assembly 8 comprises a vertical rod 81 and a protective rod 82, the bottom of the vertical rod 81 is welded with the top of the platform framework 2, the surface of the protective rod 82 is welded with the surface of the vertical rod 81, and through arrangement of the vertical rod 81 and the protective rod 82, a barrier is formed to protect constructors, accidents caused by falling from high altitude are avoided, and the operation safety is improved;
the first reinforcing plate 12 and the second reinforcing plate 13 are respectively welded on the surface of the connecting plate 11, the bottoms of the first reinforcing plate 12 and the second reinforcing plate 13 are respectively welded with the top of the platform framework 2, and the first reinforcing plate 12 and the second reinforcing plate 13 are arranged to reinforce the space between the platform framework 2 and the connecting plate 11, so that the connecting plate 11 is more stable;
the surface of the connecting plate 11 is provided with a U-shaped plate 141, one side of the U-shaped plate 141 is in threaded embedded connection with a screw rod 142, one end of the screw rod 142 is movably embedded and connected with a fixing plate 143 through a bearing, the other end of the screw rod 142 is welded with a hand wheel 144, one side of the fixing plate 143 is welded with a guide rod 145, one end of the guide rod 145 penetrates through the U-shaped plate 141 and extends to the outside of the U-shaped plate, the guide rod 145 is in sliding connection with the U-shaped plate 141, the two adjacent connecting plates 11 are fixed through the arrangement of the U-shaped plate 141, the screw rod 142, the fixing plate 143, the hand wheel 144 and the guide rod 145, and therefore the two platform frameworks 2 are connected and fixed to form a finished supporting platform, the mounting device is more stable, and meanwhile construction of construction personnel around the bridge pier 1 is facilitated;
lifting lugs 15 are welded at the tops of the longitudinal beams 3, the longitudinal beams 3 are I10I-shaped steel, the supporting plates 10 are 5mm thick steel plates, the longitudinal beams 3 can be conveniently lifted by arranging the lifting lugs 15, and constructors can conveniently walk on the platform framework 2 by arranging the supporting plates 10;
the connecting plate 11 and the reinforcing plate 6 are 10# channel steel, the reinforcing rod 7 is phi 16 twisted steel, the steel wire rope 5 is phi 1.5cm steel wire rope, mounting holes are formed in the surface of the connecting plate 11, the reinforcing plate 6 and the reinforcing rod 7 are arranged to reinforce the platform framework 2, and meanwhile, a support plate 10 is prevented from being broken and falling off;
the vertical rods 81 and the guard rods 82 are phi 16 threaded steel bars, and the platform framework 2 is a 10# channel steel.
When the bridge is used, a longitudinal and transverse beam 3 with I10I-steel mileage is longitudinally placed in the middle on two sides of a base stone on the top of a bridge pier 1 during installation to ensure uniform stress, 8 steel wire ropes 5 are adopted to connect the longitudinal and transverse beam 3 with a construction platform consisting of a platform framework 2, a reinforcing plate 6, a reinforcing rod 7, a guard rail assembly 8 and a support plate 10, the two construction platforms can be connected and fixed by bolts after hoisting is completed, meanwhile, a connecting assembly 14 can be clamped on the surface of a connecting plate 11, a hand wheel 144 is rotated to rotate a screw rod 142, a fixing plate 143 is moved under the guiding and limiting action of a guide rod 145, the connecting assembly 14 is fixed on the surface of the connecting plate 11 to reinforce the two construction platforms, the height of the construction platforms is adjusted according to the height of the embedded channel, the platform height is 1.5 meters away from the position of the embedded channel, construction is convenient for operators to construct, and after the operation platforms are installed and fixed, the embedded channel is cleaned, the pier hanging surrounding baskets are sequentially installed, the working efficiency is improved, the time for moving the frame hoisting equipment in construction is saved, the construction safety is guaranteed, edge protection measures are installed around the construction platform, the construction safety risk of workers is greatly reduced, the construction difficulty is reduced, the difficulty for cleaning the embedded channel by the workers in high altitude is reduced, and the construction operation can be better carried out.
In summary, the following steps: this portable bridge hangs encloses basket installation device, through pier 1, platform skeleton 2, vertical and horizontal roof beam 3, solid fixed ring 4, wire rope 5, gusset plate 6, anchor strut 7, rail guard subassembly 8, connecting rod 9, backup pad 10 and connecting plate 11 cooperate, solved and generally adopted the truck crane to hoist personnel's equipment in hanging encloses basket installation, if there is pier shaft height too high or can't hoist the operation for a long time, will have and delay the process engineering time, increase the construction risk, can't guarantee construction node and quality, if there is the davit to move or the topography condition does not allow to hoist the operation for a long time, hanging flower basket mounting platform is unstable, lead to the installation degree of difficulty to increase, increase the problem of operation risk.

Claims (7)

1. The utility model provides a portable bridge hangs encloses basket installation device, includes pier (1) and platform skeleton (2), its characterized in that: longitudinal beam (3) have been placed at the top of pier (1), solid fixed ring (4) have all been welded at the bottom of longitudinal beam (3) and the top of platform skeleton (2), the surface mounting of solid fixed ring (4) has wire rope (5), the skin weld of platform skeleton (2) has reinforcing plate (6), reinforcing plate (6) and the surface of platform skeleton (2) have all been welded reinforcing rod (7), rail guard subassembly (8) are installed at the top of platform skeleton (2), one side welding of longitudinal beam (3) has connecting rod (9), the top welding of platform skeleton (2) has backup pad (10), connecting plate (11) have all been welded to the front side and the rear side at platform skeleton (2) top.
2. The portable bridge hanging basket installation device of claim 1, wherein: the protective guard assembly (8) comprises a vertical rod (81) and a protective rod (82), the bottom of the vertical rod (81) is welded with the top of the platform framework (2), and the surface of the protective rod (82) is welded with the surface of the vertical rod (81).
3. The portable bridge hanging basket installation device of claim 1, wherein: the surface of connecting plate (11) has welded reinforcing plate one (12) and reinforcing plate two (13) respectively, the bottom of reinforcing plate one (12) and reinforcing plate two (13) all welds with the top of platform skeleton (2).
4. The portable bridge hanging basket installation device of claim 1, wherein: the surface mounting of connecting plate (11) has U template (141), one side screw thread of U template (141) is inlayed and is connected with lead screw (142), the one end of lead screw (142) is inlayed through the bearing activity and is connected with fixed plate (143), the other end welding of lead screw (142) has hand wheel (144), one side welding of fixed plate (143) has guide bar (145), the one end of guide bar (145) runs through U template (141) and extends to its outside, guide bar (145) and U template (141) sliding connection.
5. The portable bridge hanging basket installation device of claim 1, wherein: lifting lugs (15) are welded at the tops of the longitudinal beams (3), the longitudinal beams (3) are I10I-shaped steel, and the supporting plates (10) are 5mm thick steel plates.
6. The portable bridge hanging basket installation device of claim 1, wherein: the connecting plate (11) and the reinforcing plate (6) are 10# channel steel, the reinforcing rod (7) is phi 16 twisted steel, the steel wire rope (5) is a phi 1.5cm steel wire rope, and mounting holes are formed in the surface of the connecting plate (11).
7. The portable bridge hanging basket installation device of claim 2, wherein: the vertical rod (81) and the guard rod (82) are phi 16 twisted steel bars, and the platform framework (2) is a No. 10 channel steel.
CN202221474532.5U 2022-06-14 2022-06-14 Portable bridge hangs encloses basket installation device Active CN217419361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221474532.5U CN217419361U (en) 2022-06-14 2022-06-14 Portable bridge hangs encloses basket installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221474532.5U CN217419361U (en) 2022-06-14 2022-06-14 Portable bridge hangs encloses basket installation device

Publications (1)

Publication Number Publication Date
CN217419361U true CN217419361U (en) 2022-09-13

Family

ID=83170463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221474532.5U Active CN217419361U (en) 2022-06-14 2022-06-14 Portable bridge hangs encloses basket installation device

Country Status (1)

Country Link
CN (1) CN217419361U (en)

Similar Documents

Publication Publication Date Title
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN217419361U (en) Portable bridge hangs encloses basket installation device
CN102425123A (en) Combined type protection shed frame and construction method thereof
CN111335172A (en) Movable pier column cross beam prestress tensioning hanging frame construction platform and construction method
CN112030777A (en) Descending movable formwork support bracket crossing type transfer construction method
CN112627045A (en) Hang basket template scissors cat ladder
CN214658662U (en) Core concrete cover plate construction operation platform
CN212245935U (en) High mound girder steel top pushes away equipment hoist device
CN202039299U (en) Totally-closed hanging basket
CN201933423U (en) Movable type protecting canopy frame
CN211646007U (en) Bridge pier hanging surrounding basket construction platform
CN211522919U (en) Steel case roof beam both sides anticollision barrier installation frock
CN210766433U (en) Trapezoidal hanging basket structure
CN210151602U (en) Railway operation line-crossing highway beam body dismantling beam bottom protection platform
CN209923791U (en) Workpiece for cross-line construction of formwork suspension casting combined system
CN220789446U (en) Assembled guy rope hanging basket tensioning construction platform
CN215164722U (en) A construction platform for steel landing stage superstructure installation
CN110847060A (en) Big portal tension trolley
CN215160401U (en) Steel-concrete combined bridge small longitudinal beam lifting device
CN212358002U (en) Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform
CN216551569U (en) Auxiliary tool truss for installing bottom maintenance track of high-altitude bridge floor
CN214737445U (en) Firm type platform is used in construction of continuous rigid frame bridge
CN215887940U (en) Self-suspension type prestress tension construction platform
CN215660998U (en) Precast beam tensioning equipment convenient to remove