CN212358002U - Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform - Google Patents

Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform Download PDF

Info

Publication number
CN212358002U
CN212358002U CN202020326580.4U CN202020326580U CN212358002U CN 212358002 U CN212358002 U CN 212358002U CN 202020326580 U CN202020326580 U CN 202020326580U CN 212358002 U CN212358002 U CN 212358002U
Authority
CN
China
Prior art keywords
pier
construction platform
hanging basket
fixed
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020326580.4U
Other languages
Chinese (zh)
Inventor
申世靖
韩胜利
张卓伟
李永旗
国旗
刘超
陆占锋
陈红旭
幸欢
张少波
崔岚岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
1st Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
1st Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 1st Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN202020326580.4U priority Critical patent/CN212358002U/en
Application granted granted Critical
Publication of CN212358002U publication Critical patent/CN212358002U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a movable pier stud crossbeam prestressing force stretch-draw stores pylon construction platform relates to bridge construction technical field, including embracing mound collar tie roof beam, vertical string basket and hoisting accessory, it is used for dismantling the cover and locates outside the pier stud to embrace mound collar tie roof beam, vertical string basket with it is fixed to embrace mound collar tie roof beam, vertical string basket bottom is equipped with operation platform, just vertical string basket is used for locating one side that the crossbeam was kept away from to the pier stud, hoisting accessory is fixed in vertical string basket top, the utility model has the characteristics of do not receive earth's surface environment influence.

Description

Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform
Technical Field
The utility model relates to a bridge construction technical field, concretely relates to movable pier stud crossbeam prestressing force stretch-draw stores pylon construction platform.
Background
In the prestressed tensioning construction of a pier column cross beam, a temporary support platform is generally required to be erected so as to facilitate the movement of constructors and the installation of equipment such as a jack, an oil pump and the like in the construction process. In the process of tensioning construction, a jack for tensioning needs to be temporarily hoisted and then installed in front of an anchorage device, so that a jack suspension frame needs to be manufactured. The construction amount of the traditional pier stud beam tensioning temporary support platform is large, the requirement on earth surface bearing capacity is high, the water area construction is difficult, and the stability of a high pier stud beam support is not easy to control.
SUMMERY OF THE UTILITY MODEL
To the defect that exists among the prior art, the utility model aims to provide a movable pier stud crossbeam prestressing force stretch-draw stores pylon construction platform has the characteristics that do not receive earth's surface environmental impact.
In order to achieve the above purpose, the utility model adopts the technical proposal that:
first aspect provides a movable pier stud crossbeam prestressing force stretch-draw stores pylon construction platform, includes:
the pier holding ring beam is detachably sleeved outside the pier column;
the vertical hanging basket is fixed with the pier-embracing ring beam, an operating platform is arranged at the bottom of the vertical hanging basket, and the vertical hanging basket is arranged on one side, far away from the cross beam, of the pier column;
and the lifting device is fixed at the top of the vertical hanging basket.
On the basis of the technical scheme, the pier-holding ring beam comprises a ring beam main body and a plurality of limiting rods, the two ends of each limiting rod are detachably fixed with the ring beam main body, and the limiting rods and the ring beam main body enclose a containing area for containing the pier stud.
On the basis of the technical scheme, the limiting rod comprises section steel and a connecting steel plate, one side of the connecting steel plate is fixed with the section steel, and the other side of the connecting steel plate is detachably fixed with the ring beam main body.
On the basis of the technical scheme, the top of the vertical hanging basket is provided with a plurality of hanging rods, and the lifting device is fixed on the hanging rods.
On the basis of the technical scheme, the prestress tensioning hanging rack construction platform further comprises a walking channel, one end of the walking channel is fixed with the vertical hanging basket, the other end of the walking channel is fixed with the pier-embracing ring beam and extends to one side, far away from the vertical hanging basket, of the pier-embracing ring beam.
On the basis of the technical scheme, a hanging ladder for connecting the top and the bottom is arranged in the vertical hanging basket, and the hanging ladder is close to the walking channel.
On the basis of the technical scheme, the guardrail is arranged at the bottom of the vertical hanging basket.
On the basis of the technical scheme, the lifting device is a chain block.
On the basis of the technical scheme, lifting lugs are arranged at the tops of the pier-holding ring beam and the vertical hanging basket.
Compared with the prior art, the utility model has the advantages of:
the utility model discloses a movable pier stud crossbeam prestressing force stretch-draw stores pylon construction platform through the mound collar tie roof beam of embracing that sets up, can stretch-draw stores pylon construction platform with the prestressing force on whole being fixed in the pier stud to avoid appearing traditional pier stud crossbeam stretch-draw temporary stand platform and set up the engineering volume great, require highly to the earth's surface bearing capacity, and the problem of waters construction difficulty.
Drawings
Fig. 1 is an installation schematic view of a prestressed tension hanging rack construction platform in the embodiment of the utility model;
fig. 2 is a partially enlarged schematic view of a prestressed tension hanging rack construction platform according to an embodiment of the present invention;
fig. 3 is a top view of the prestressed tension hanging rack construction platform in the embodiment of the present invention;
fig. 4 is the embodiment of the utility model provides an in the embodiment of the side view of prestressing force stretch-draw stores pylon construction platform.
In the figure: the method comprises the following steps of 1-pier-embracing gird, 11-gird body, 12-limiting rod, 121-section steel, 122-connecting steel plate, 2-vertical hanging basket, 21-operating platform, 22-hanging rod, 23-guardrail, 3-running channel, 4-pier stud, 5-cross beam and 6-prestressed steel bundle.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
Referring to fig. 1 and 3, the embodiment of the utility model provides a movable pier stud crossbeam prestressing force stretch-draw stores pylon construction platform, including embracing pier collar tie beam 1, vertical string of basket 2 and hoisting accessory, embrace pier collar tie beam 1 and be used for dismantling the cover and locate the pier stud 4 outside, vertical string of basket 2 with embrace pier collar tie beam 1 fixed, vertical string of basket 2 bottom is equipped with operation platform 21, and vertical string of basket 2 is used for locating the pier stud 4 and keeps away from one side of crossbeam 5, hoisting accessory is fixed in vertical string of basket 2 top to lift by crane jack.
Through the mound ring beam 1 of embracing that sets up, it can overlap and locate on pier stud 4, thereby guarantee that prestressing force stretch-draw stores pylon construction platform can wholly be fixed in on pier stud 4, after prestressing force stretch-draw stores pylon construction platform wholly is fixed in on pier stud 4, operating personnel is located and accomplishes lifting by crane to the jack through hoisting accessory on operation platform 21, and remove the jack and accomplish the stretch-draw to prestressing force steel strand 6 to the position of stretch-draw prestressing force steel strand 6 on pier stud 4, this prestressing force stretch-draw stores pylon construction platform is unsettled to be fixed in on pier stud 4 promptly, directly not support subaerial, and then avoid appearing traditional pier stud crossbeam stretch-draw temporary support platform and set up the engineering volume great, it is high to earth's surface bearing capacity requirement, and the problem of waters construction difficulty.
Referring to fig. 1 and 2, the pier-embracing gird 1 comprises a gird body 11 and a plurality of limiting rods 12, wherein two ends of each limiting rod 12 are detachably fixed with the gird body 11, the limiting rods 12 and the gird body 11 enclose to form an accommodating area for accommodating pier columns, wherein, the ring beam main body 11 comprises a cross rod and a vertical rod which are connected to form a frame structure, by fixing the limiting rod 12 and the ring beam main body 11, when the pier stud 4 passes through the accommodating section, the pier-embracing gird 1 and the pier stud 4 are fixed in the radial direction by the fixing action of the limiting rod 12, and meanwhile, when the prestressed tension hanging rack construction platform is fixed, should embrace mound collar tie beam 1 and should be located crossbeam 5, through crossbeam 5's limiting displacement, place this prestressing force stretch-draw stores pylon construction platform and slide downwards along the axial of pier stud 4, and then can be fixed in prestressing force stretch-draw stores pylon construction platform on the pier stud 4.
The limiting rod 12 comprises a section steel 121 and a connecting steel plate 122, one side of the connecting steel plate 122 is fixed with the section steel 121, the other side of the connecting steel plate 122 is detachably fixed with the ring beam main body 11, wherein two connecting steel plates 122 are arranged at two ends of the section steel 121 respectively and are welded with the section steel 121 through connecting plates, the connecting steel plate 122 and the ring beam main body 11 are provided with matched threaded holes, when the limiting rod 12 is fixed with the ring beam main body 11, the fixing is completed through the threaded holes which are fixed on the connecting steel plate 122 and the ring beam main body 11 through bolts, at the moment, the section steel 121 and the ring beam main body 11 jointly complete the limiting on the pier stud 4, further, one connecting steel plate 122 is arranged, the connecting steel plate 122 is welded with the section steel 121 through the connecting plates, the connecting steel plate 122 and the ring beam main body 11 are provided with matched threaded holes, the fixing is completed through the threaded holes, and completes the limit of the pier stud 4 with the ring beam main body 11.
Referring to fig. 1 and 3, 2 tops of vertical hanging basket are equipped with a plurality of rods 22 that hang, and hoisting accessory is fixed in on hanging the rod 22, preferably, hoisting accessory is chain block, a plurality of rods 22 that hang through setting up, stability when can guaranteeing hoisting accessory is fixed, and then guarantee hoisting accessory when lifting by crane the jack, can steady rise, the condition of rocking appears when having avoided hoisting accessory to lift by crane the jack, lead to the condition that the jack collides pier stud 4 isotructure, cause the jack to damage, through a plurality of settings that hang the rod 22 promptly, can guarantee that the jack is safe and steady to promote to preset position, and then ensured going on smoothly of construction operation.
Referring to fig. 1, 3 and 4, the prestressed tension hanging rack construction platform further comprises a walking channel 3, one end of the walking channel 3 is fixed with a vertical hanging basket 2, the other end of the walking channel 3 is fixed with a pier embracing ring beam 1 and extends to one side of the pier embracing ring beam 1 far away from the vertical hanging basket 2, further, a hanging ladder for connecting the top and the bottom is arranged in the vertical hanging basket 2 and is arranged close to the walking channel 3, wherein when the prestressed tension hanging rack construction platform is fixed, an operator is positioned on a cross beam 5 with a constructed superstructure, a crane lifts the prestressed tension hanging rack construction platform to a pier column 4, the operator completes fixing of the pier embracing ring beam 1 by matching with the crane, after fixing of the pier embracing ring beam 1 is completed, the operator moves to the vertical hanging basket 2 through the walking channel 3 and enters the vertical hanging basket 2 through the hanging ladder, and completes lifting of a jack for tensioning and tensioning operation of a prestressed steel bundle 6 in the vertical hanging basket 2.
Referring to fig. 1 and 4, the guardrail 23 is arranged at the bottom of the vertical hanging basket 2, and the safety of operators who construct in the vertical hanging basket 2 can be ensured by the arrangement of the guardrail 23, so that the overall safety performance of the prestressed tension hanging rack construction platform is improved.
Embrace mound gird 1 and vertical string 2 tops of basket and all be equipped with the lug, through the setting of lug, can provide the hoisting point when lifting by crane prestressing force stretch-draw stores pylon construction platform through the loop wheel machine, avoid the loop wheel machine to lift by crane prestressing force stretch-draw stores pylon construction platform direct action on embracing mound gird 1 and/or vertical string basket 2, and because the effort when lifting by crane is great, the condition of embracing mound gird 1 or vertical string basket 2 damage deformation appears, and then guaranteed the efficiency of construction to 6 stretch-draws of prestressing force steel bunch.
Referring to fig. 1 to 4, an embodiment of the present invention further provides a construction method using the above prestressed tension hanging rack construction platform, including the following steps:
hoisting the prestressed tensioning hanging frame construction platform and moving the prestressed tensioning hanging frame construction platform to the pier stud 4, and detachably sleeving the pier-holding ring beam 1 outside the pier stud 4;
and hoisting the jack for tensioning to the position of the prestressed steel strand 6 on the pier stud 4 by using the hoisting device so as to finish the tensioning operation of the prestressed steel strand 6.
The more specific construction method comprises the following steps: the prestressed tensioning hanging frame construction platform is hung beside the pier stud 4 through an automobile crane or other equipment, the limiting rod 12 is not installed at the moment, the ring beam main body 11 is over against the pier stud 4, an operator pulls the prestressed tensioning hanging frame construction platform to the pier stud 4 through a rope, and the ring beam main body 11 is embedded and sleeved on the pier stud 4; in the installation process, operators do not enter the prestressed tension hanging rack construction platform, and all operations are completed on the cross beam 5;
after the ring beam main body 11 is embedded and sleeved on the pier stud 4, the limiting rod 12 is adjusted to the installation position, the limiting rod 12 and the ring beam main body 11 are connected into a whole through a bolt, and at the moment, the installation of the prestressed tensioning hanger construction platform is completed;
after the prestressed tension hanging rack construction platform is installed, an operator can move to the vertical hanging basket 2 through the traveling channel 3 on the prestressed tension hanging rack construction platform, the vertical hanging basket 2 is provided with a vertical hanging ladder, and the operator can reach the operation platform 21 through the vertical hanging ladder to perform operation construction;
the hanging rod 22 of the chain block is arranged above the operating platform 21 at the bottom, in the construction process, the chain block is hung through the hanging rod 22 to lift the jack for tensioning, and the tensioning operation of the prestressed steel bundle 6 is performed through the jack for tensioning, so that the manual operation difficulty is reduced, and the construction safety is ensured.
The present invention is not limited to the above embodiments, and for those skilled in the art, a plurality of improvements and decorations can be made without departing from the principle of the present invention, and these improvements and decorations are also considered to be within the protection scope of the present invention. Those not described in detail in this specification are within the skill of the art.

Claims (9)

1. The utility model provides a movable pier stud crossbeam prestressing force stretch-draw stores pylon construction platform which characterized in that includes:
the pier holding ring beam (1), the pier holding ring beam (1) is detachably sleeved outside the pier column (4);
the vertical hanging basket (2) is fixed with the pier-embracing ring beam (1), an operating platform (21) is arranged at the bottom of the vertical hanging basket (2), and the vertical hanging basket (2) is arranged on one side, away from the cross beam (5), of the pier column (4);
the lifting device is fixed at the top of the vertical hanging basket (2).
2. The movable construction platform for the prestressed tensioning pylon of the pier column and the crossbeam of claim 1, wherein: embrace mound gird (1) including gird main part (11) and a plurality of gag lever post (12), gag lever post (12) both ends with gird main part (11) can be dismantled fixedly, just gag lever post (12) with gird main part (11) enclose to close and form the holding interval that holds the pier stud.
3. The movable construction platform for prestressed tension pylons of pier columns and beams as claimed in claim 2, wherein: the limiting rod (12) comprises section steel (121) and a connecting steel plate (122), one side of the connecting steel plate (122) is fixed to the section steel (121), and the other side of the connecting steel plate is detachably fixed to the ring beam main body (11).
4. The movable construction platform for the prestressed tensioning pylon of the pier column and the crossbeam of claim 1, wherein: the top of the vertical hanging basket (2) is provided with a plurality of hanging rods (22), and the lifting device is fixed on the hanging rods (22).
5. The movable construction platform for the prestressed tensioning pylon of the pier column and the crossbeam of claim 1, wherein: the prestress tensioning hanging rack construction platform further comprises a walking channel (3), one end of the walking channel (3) is fixed with the vertical hanging basket (2), the other end of the walking channel (3) is fixed with the pier surrounding beam (1) and extends to the side, away from the vertical hanging basket (2), of the pier surrounding beam (1).
6. The movable construction platform for prestressed tension pylons of pier columns and beams as claimed in claim 5, wherein: the vertical hanging basket (2) is internally provided with a hanging ladder for connecting the top and the bottom, and the hanging ladder is arranged close to the walking channel (3).
7. The movable construction platform for the prestressed tensioning pylon of the pier column and the crossbeam of claim 1, wherein: and a guardrail (23) is arranged at the bottom of the vertical hanging basket (2).
8. The movable construction platform for the prestressed tensioning pylon of the pier column and the crossbeam of claim 1, wherein: the lifting device is a chain block.
9. The movable construction platform for the prestressed tensioning pylon of the pier column and the crossbeam of claim 1, wherein: lugs are arranged at the tops of the pier-holding ring beam (1) and the vertical hanging basket (2).
CN202020326580.4U 2020-03-16 2020-03-16 Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform Active CN212358002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020326580.4U CN212358002U (en) 2020-03-16 2020-03-16 Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020326580.4U CN212358002U (en) 2020-03-16 2020-03-16 Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform

Publications (1)

Publication Number Publication Date
CN212358002U true CN212358002U (en) 2021-01-15

Family

ID=74146179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020326580.4U Active CN212358002U (en) 2020-03-16 2020-03-16 Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform

Country Status (1)

Country Link
CN (1) CN212358002U (en)

Similar Documents

Publication Publication Date Title
CN111335187B (en) Construction process for triangular area of open-web rigid frame bridge
CN107313360B (en) Sliding cable type support-free support replacing operation platform
CN109835826B (en) Self-climbing type heavy elevator
CN111335172A (en) Movable pier column cross beam prestress tensioning hanging frame construction platform and construction method
CN102296548B (en) Hydraulic truss type moving hanging basket for bridge maintenance and construction method thereof
CN212358002U (en) Movable pier column crossbeam prestressing force stretch-draw stores pylon construction platform
CN209835475U (en) Self-climbing type heavy elevator
CN102493353A (en) Method for hoisting large equipment in bridge construction and pier top lifting frame
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN203715115U (en) Supporting point structure for self-hoisting system of portal crane
CN214328562U (en) Outer cantilever construction hanging bracket for viaduct
CN210134442U (en) Steel cofferdam system of transferring in succession
CN209923780U (en) Suspended support of segment prefabricated bent cap
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN113005909A (en) Construction method for modifying hoisting positioning device by corrugated steel web asynchronous cradle
CN103375029A (en) Prestressed dome hoisting cantilever crane
CN112281845A (en) Installation fixing and verticality adjusting integrated device for overlong pile foundation reinforcement cage
CN209353229U (en) A kind of bridge construction tensioning rack
CN101457516B (en) Multilayer horizontal stay fixing method
CN212771954U (en) Pier and bent cap integral type construction platform
CN216339064U (en) Fence mounting platform for bridge pier crane
CN220246713U (en) Beret beam rapid dismantling system for railway protection shed tunnel adding project under limited space
CN109110655B (en) T-shaped crown block of cable crane and matched cable saddle
CN109160423B (en) Lower hanging type multi-tower continuous span cable crane with T-shaped crown block and crown block tower span method thereof
CN217629469U (en) High pier stud owner muscle hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant