CN220246713U - Beret beam rapid dismantling system for railway protection shed tunnel adding project under limited space - Google Patents
Beret beam rapid dismantling system for railway protection shed tunnel adding project under limited space Download PDFInfo
- Publication number
- CN220246713U CN220246713U CN202321650721.8U CN202321650721U CN220246713U CN 220246713 U CN220246713 U CN 220246713U CN 202321650721 U CN202321650721 U CN 202321650721U CN 220246713 U CN220246713 U CN 220246713U
- Authority
- CN
- China
- Prior art keywords
- steel
- bailey
- dismantling
- bailey beam
- lifting hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides a beret beam rapid dismantling system for a railway protection shed tunnel adding project under a limited space, and belongs to the field of railway projects. In the system, a hand hoist is respectively arranged on a bailey beam dismantling hanging rib, an I-steel and a steel pipe column dismantling hanging rib, a steel wire rope hanging belt is sleeved at a node position of the bailey beam, a winch is fixed at a bottom beam at the bottom of a shed tunnel, a pulley installation device is clamped on a parapet wall at the top of the shed tunnel at the moving-out side of the bailey beam, a lifting hook pulley is arranged at the lower end of the pulley installation device, a winch steel wire rope of the winch bypasses the lifting hook pulley after being diverted by a plurality of pulleys and extends to the bailey beam and is connected with the steel wire rope hanging belt, and a crane is further arranged at the moving-out side of the bailey beam. The method solves the problems that after the Bailey beam on the beam column type support is poured and formed in the shed tunnel, the traditional in-situ or lateral dismantling is difficult, the construction progress is slow, the construction risk is high, and the space requirement of the traditional dismantling method cannot be met in the working site environment.
Description
Technical Field
The utility model belongs to the field of railway engineering, and particularly relates to a beret beam rapid dismantling system for a railway protection shed tunnel adding project under a limited space.
Background
In the traditional beam column type support, the bailey beam is arranged on the bottom cross beam, a transverse pulling method is generally adopted for detaching the bailey beam, the bailey beam is transversely pulled to the outer side edge of a member along the bottom cross beam, and an automobile crane is adopted for hanging the bailey beam away from the bottom cross beam in the detaching mode, so that the operation process lacks pulling controllability, and the safety and stability in the detaching process are poor, and certain requirements are also met on an operation site. The patent with the application number of 201710462707.8 discloses a construction method for dismantling a bailey beam of a high-rise building, wherein after the bailey beam is hoisted and stressed to be balanced through a lifting hook lifting ring, the outer side Shan Jiebei bailey beam is dismantled, after an original supporting system is avoided, the bailey beam is gradually lowered from a high-rise by a winch, and the dismantling is completed; the patent with application number 202010450247.9 discloses a method for dismantling a support of a bailey beam in a cross-road and cross-river manner, which comprises the steps of arranging a plurality of sets of platforms for bailey beam set dragging along the same support system in a cross-path manner according to the condition of a field on one side of the bailey beam support system, arranging dragging rollers on the plurality of sets of platforms, and providing power through a winch to longitudinally drag and dismantle the bailey beam. The two methods can solve the problems that most of conventional bailey beam dismantling works have certain defects, and mainly have high requirements on construction sites, the first method needs to have a clear operation site at the lower part of the bailey beam body, the second method needs to have a large construction site, and a plurality of groups of dismantling construction platforms are erected, so that the requirements on an original bailey beam support system are high, for example, the length of the bailey beam is required to be large, the original steel tube support system is more and the distance is short, and the stability of the gravity center in the moving process can be ensured when the bailey beam is longitudinally pulled, so that the overturning can not occur.
In the railway engineering line construction process, the surrounding environment of a mountain tunnel portal is easily affected by rainfall or other reasons, so that landslide or debris flow is caused, the operation engineering line is easily damaged, potential safety hazards are easily caused to trains and passengers, the common tunnel portal needs to be brushed for reinforcement treatment during design construction, along with the rapid development of high-speed railway construction, the higher the safety guarantee requirement on the high-speed railway is, and the construction of a protection shed tunnel is widely applied on the basis of the slope brushing and reinforcement treatment of the tunnel portal.
Aiming at the condition that the protection shed tunnel is constructed as a newly-added project which is changed in the later period, the railway engineering line is completed with construction operations such as track laying, electrification and the like, the engineering line needs to keep construction vehicles to pass, the conventional full framing cast-in-place method cannot meet the cast-in-place construction requirement of the shed tunnel, the beam column type bracket is adopted to complete the construction of the protection shed tunnel, but the beam column type bracket is influenced by the limited space condition of the railway engineering line, and after the shed tunnel is cast and molded, the traditional in-situ or lateral demolition is difficult, the construction progress is slow, the construction risk is high, and the space requirement of the traditional demolition method cannot be met in the working place environment. Aiming at the implementation scene that the protection shed tunnel construction is a later-stage changed newly-added project, the protection shed tunnel construction is newly-added under a railway engineering line, the track and the contact net are arranged under the shed tunnel, the normal construction vehicles of the track need to be kept to pass, and the construction vehicles cannot be directly and integrally landed and dismantled in the tunnel; in order to meet the requirement of erecting a shed tunnel roof pouring support, all the bailey beams are arranged in the middle of a stand column gap, stand column grids are arranged, the bailey beams cannot move transversely to the same dismantling position, in addition, the outer sides of stand column ends of the shed tunnel are narrow in construction site, multiple groups of dismantling platforms are unconditionally arranged, in addition, the distance between two ends of the bottom of each bailey beam to support I-shaped steel main cross beams is 13.5 meters, lateral dragging and dismantling are directly carried out, and once the bailey beams are separated from one side supporting point, the gravity center is unstable, and the railway engineering line is directly overturned to be damaged. Therefore, the beret beam rapid dismantling system for the railway protection shed tunnel additionally-arranged project under the limited space is researched, the dismantling progress is quickened, and the construction safety is ensured.
Disclosure of Invention
Aiming at the technical problems, the utility model provides a fast removal system for the bailey beam of the railway protection shed tunnel extension project under a limited space, which is used for solving the problems that after the bailey beam on a beam column type support is poured and formed in the shed tunnel, the traditional in-situ or lateral removal is difficult, the construction progress is slow, the construction risk is high, and the space requirement of the traditional removal method cannot be met in the working place.
The utility model provides a quick removing system for a bailey beam of an additionally-arranged project of a railway protection shed tunnel under a limited space, which comprises a removing hanging rib, wherein the removing hanging rib comprises a bailey beam removing hanging rib, I-steel and a steel pipe column removing hanging rib, and the bailey beam removing hanging rib is pre-buried in a top plate along the transverse bridge direction of a line; i-steel and steel-pipe column demolish the hanging bar pre-buried in beam body both sides roof beam end steel-pipe column top, the bailey roof beam demolish hanging bar and I-steel and steel-pipe column demolish and install the chain block respectively on the hanging bar, the node position cover of bailey roof beam is equipped with the wire rope sling, the hoist engine is fixed in the sill beam department of shed tunnel bottom, bailey frame shifts out the shed tunnel top parapet card of side and is equipped with "Γ" type pulley installation device, the lower extreme of "Γ" type pulley installation device is equipped with the lifting hook pulley, hoist engine wire rope of hoist engine walks around lifting hook pulley and stretches to bailey roof beam department and is connected with the wire rope sling after a plurality of pulley turn to, the hoist engine has still been arranged to bailey roof beam shift out the side.
In the system for rapidly dismantling the bailey beam, the system further comprises a bailey beam dismantling sliding device, the bailey beam dismantling sliding device is a ︼ type base made of 1cm steel plates, sliding bearings are arranged on the steel plates on two sides of the base, butter is coated on the sliding bearings, friction force born by the bailey beam during extraction is reduced, dismantling time is shortened, two limiting steel bars are fixed on a base bottom plate, the limiting steel bars are clamped on an I-steel main beam, and accordingly the bailey beam is prevented from being taken out when being extracted and slid.
In the rapid beret beam dismantling system, the beret beam dismantling hanging bars are symmetrically arranged along a line center line, the line transverse bridge is three in each row, the distance is 3.75m, the longitudinal bridge is 2 groups, the distance is 2.8m, the hanging hooks are 50mm away from the top surface of the top plate, the bottoms of the top plate steel bars are welded, the hanging hooks exceed the bottom surface of the top plate by 100mm, the net distance between the hanging hook steel bars is 60mm, the hanging hooks phi 28 and the hook length is 375mm; the lifting hook for removing the lifting ribs of the I-steel and steel pipe columns exceeds the bottom surface of the beam body by 100mm, the clearance between the lifting hook steel bars is 60mm, the lifting hook phi is 28, and the length of the hook is 875mm.
In the rapid removal system for the bailey beam, the 'gamma' -shaped pulley installation device is formed by welding 32# I-shaped steel, the upper end of the 'gamma' -shaped pulley installation device is clamped on a parapet wall at the top of a shed tunnel, an arc-shaped lifting hook is fixed at the top of the 'gamma' -shaped pulley installation device and used for a crane to move the device, a lifting hook ring is arranged at the bottom of the 'gamma' -shaped pulley installation device, a lifting hook pulley is hung on the lifting hook ring, a hoist steel wire rope is arranged on the lifting hook pulley in a penetrating manner, the hoist steel wire rope is arranged downwards along a high altitude, and a plurality of pulleys are arranged on a bottom beam and an upright column of the protective shed tunnel and used as a steering device when the hoist recovers the steel wire rope.
Compared with the prior art, the beret beam rapid dismantling system has the following advantages:
1) The utility model is suitable for dismantling construction of the beam column type bailey beam bracket system of the concrete cast-in-situ structure in a limited space, skillfully arranges the windlass and pulley steering device, solves the difficult problem of limited construction sites, reduces the use of other large-tonnage large-scale construction equipment except a crane, does not need to independently set up a dismantling platform, and greatly saves construction cost and construction preparation work.
2) According to the utility model, the chain block is matched with the winch for traction to finish the longitudinal traction of the Bailey beam group, so that the lateral integral dismantling of the Bailey beam group in the Bailey beam bracket system is realized, the single-group dismantling time only takes half an hour, and the influence of the dismantling construction work on railway engineering lines is reduced to the minimum.
3) The lifting mode of the chain block and the repeated adjustment of the dismantling process are used for finishing the stress conversion, the gravity inertia of the Bailey beam group is fully utilized, the Bailey beam is matched for dismantling the sliding device, the rigidity (non-deformation) of the Bailey beam in the dismantling process is effectively ensured, the safe conversion of a stress system in the dismantling process is realized, the gravity center of the Bailey beam group is always in a balanced state, the construction safety is ensured, and the beam column type support dismantling task is high-quality and high-efficiency completed.
Drawings
FIG. 1 is a schematic structural diagram of a beam column type bailey beam bracket system of a concrete cast-in-place structure in limited space before demolition;
FIG. 2 is a front view of FIG. 1;
FIG. 3 is a side view of FIG. 1;
FIG. 4 is a schematic view of the chain block and hoist in place (reverse view of FIG. 1);
fig. 5 is a front view of fig. 4;
FIG. 6 is a schematic view of the partial structure at B in FIG. 4;
fig. 7 is a schematic perspective view of two chain blocks and the bailey beam in approximately vertical stress state when the bailey beam is initially moved out;
fig. 8 is a front view of fig. 7;
fig. 9 is a schematic perspective view of the structure in the state of step 2.3);
fig. 10 is a front view of fig. 9;
FIG. 11 is an enlarged view of a portion of FIG. 10 at A;
FIG. 12 is a schematic perspective view at A;
fig. 13 is a schematic perspective view of the chain block chain near the removal side of the bailey beam in an approximately vertical state;
fig. 14 is a front view of fig. 11;
fig. 15 is a schematic perspective view of the whole set of bailey beams when the center of gravity is pulled out and moved onto the i-steel main beam;
fig. 16 is a front view of fig. 15;
fig. 17 is a schematic view of the bailey beam after removal;
fig. 18 is a schematic view of the removal of the remaining beam column support system except the beret beam;
the steel wire rope hoist comprises a lifting rib for dismantling a 1-bailey beam, a 2-I-shaped steel and steel pipe column, a lifting rib for dismantling a 3-top plate, a 4-beam body, a 5-chain block, a 6-winch, a 61-winch steel wire rope, a 7-crane, a 71-auxiliary lifting rope, a 72-main lifting rope, an 8-gamma-shaped pulley installation device, an 81-arc-shaped lifting hook, an 82-lifting hook ring, an 83-lifting hook pulley, a 9-bottom beam, a 10-upright post, an 11-pulley, a 12-bailey beam, a 13-steel wire rope lifting belt, a 14-I-shaped steel main beam, a 15-steel pipe column, a 16-shed left site, a 17-bailey beam dismantling sliding device, an 18-sliding bearing and a 19-limiting steel bar.
Detailed Description
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples.
Examples
The quick removal system of the bailey beam in the railway protection shed tunnel adding project under the limited space is improved, and comprises a removal hanging rib, wherein the removal hanging rib comprises a bailey beam removal hanging rib 1, I-steel and steel pipe column removal hanging ribs 2, and the bailey beam removal hanging ribs 1 are distributed and pre-buried in a top plate 3 along a line transverse bridge direction; i-steel and steel-pipe column demolish hanging bar 2 pre-buried in beam body 4 both sides roof beam end steel-pipe column top, the bailey roof beam demolish hanging bar 1 and I-steel and steel-pipe column demolish and install hand hoist 5 respectively on the hanging bar 2, the node position cover of bailey roof beam 12 is equipped with wire rope sling 13, hoist engine 6 is fixed in the sill 9 departments of shed tunnel bottom, bailey frame 12 shifts out the shed tunnel top parapet card of side and is equipped with "Γ" type pulley installation device 8, the lower extreme of "Γ" type pulley installation device 8 is equipped with lifting hook pulley 83, hoist engine wire rope 61 of hoist engine 6 is walked around lifting hook pulley 83 and stretches to bailey roof beam 12 department and be connected with wire rope sling 13 after a plurality of pulley 11 turn to, the hoist 7 has still been arranged to bailey roof beam shift out the side.
The protection shed tunnel of the embodiment is 39m long, 13.8m wide and 19m high, the left side of a line is a concrete column (column 10) with a clear distance of 4.8m, the right side of the line is a concrete protection partition wall, a top plate 3 and a cross beam are integrally cast by adopting a cast-in-situ method, and a beam column type bracket is arranged in a limited element space by adopting a construction scheme of '530X 10mm steel pipe column 15+three-spliced I45I-steel main cross beam 14+Bailey beam 12+I20 distribution beam+plate buckle bracket'. The method is characterized in that 8 rows of steel pipe columns 15 are longitudinally arranged, 2 steel pipe columns are arranged in each row, 3I 45I-shaped steel main beams 14 are longitudinally connected, the Bailey beams 12 are transversely arranged at the upper part and are laid in staggered columns, the Bailey beams 12 are arranged in a 2-3-2-3 arrangement and combination mode, engineering line tracks under a shed tunnel are required to keep normal construction vehicles to pass, contact networks are installed, bailey beam supports cannot be directly dismantled in the shed tunnel, under the condition of finite elements, the Bailey beams 12 can only be integrally pulled out from a middle gap of a left side column 10, the left side site 16 of the shed tunnel is narrow, a plurality of large hoisting devices cannot be simultaneously arranged, and the condition that the Bailey beams 12 are directly pulled out is not provided.
Referring to fig. 1 to 16, the specific removal steps are as follows:
1) When the shed tunnel steel bars are bound, pre-burying the bailey beam dismantling hanging bars 1, the I-steel and the steel pipe column dismantling hanging bars 2 in advance, wherein the bailey beam dismantling hanging bars 1 are pre-buried in the top plate 3 along the line transverse bridge direction, the bailey beam dismantling hanging bars 1 are symmetrically arranged along the line central line, the line transverse bridge direction is three in each row, the distance is 3.75m, the longitudinal bridge direction is 2 groups, the distance is 2.8m, the lifting hooks are 50mm from the top surface of the top plate, the lifting hooks are welded at the bottom of the top plate steel bars, the lifting hooks exceed the bottom surface of the top plate by 100mm, the net distance between the lifting hook steel bars is 60mm, the lifting hooks phi 28 and the hook length is 375mm; i-steel and steel pipe column demolish hanging bar 2 pre-buried in beam body 4 both sides roof beam end steel-pipe column top, I-steel and steel pipe column demolish hanging bar 2's lifting hook surpass beam body bottom surface 100mm, lifting hook reinforcing bar clearance 60mm, lifting hook phi 28, crotch length 875mm.
2) And after the roof of the shed tunnel is poured and the equal strength is achieved, the beam column support is dismounted, the dismounting sequence is dismounted from the inside to the outside from the tunnel portal, and the dismounting method is that the chain block 5 is adopted to cooperate with the winch 6 and the crane 7 for dismounting.
2.1 The hoist 6 is fixed at the bottom beam 9 at the bottom of the shed tunnel, a gamma-shaped pulley installation device 8 is clamped and arranged on the parapet wall at the top of the shed tunnel at the moving-out side of the bailey frame 12, the gamma-shaped pulley installation device 8 is formed by welding 32# I-steel, the upper end of the gamma-shaped pulley installation device 8 is clamped and arranged on the parapet wall at the top of the shed tunnel, an arc-shaped lifting hook 81 is fixed at the top and used for a crane 7 to move the device, a lifting hook ring 82 is arranged at the bottom, a lifting hook pulley 83 is hung on the lifting hook ring 82, a hoist steel wire rope 61 is arranged on the lifting hook pulley 83 in a penetrating mode, the hoist steel wire rope 61 is arranged downwards along the high altitude, a plurality of pulleys 11 are arranged on the bottom beam 9 and the upright post 10 and used as a steering device when the hoist 6 retrieves the steel wire rope, and the hoist steel wire rope 61 bypasses the lifting hook pulley 83 and stretches to the bailey beam 12 after being steered by the plurality of pulleys.
2.2 Beginning to dismantle the bailey beam 12, firstly, dismantling the bailey beams 12 of 2 rows and one group close to the upright post end in advance, and specifically, the method comprises the following steps: a steel wire rope sling 13 is sleeved at the top end node position of a second piece of the bailey beam group close to the protective partition wall end and a fourth piece of the bailey beam group, then two bailey beam dismantling hanging ribs 1 are respectively provided with a chain block 5, two chain blocks 5 are respectively hooked on the steel wire rope sling 13 on the second piece of the bailey beam and the fourth piece of the bailey beam group at the oblique sides, two constructors stand on 3 pieces of the bailey beams in a group, after the safety ropes are tied, the bailey beam 12 is subjected to an oblique pulling force F at the moment by pulling the chain block chain, a vertical component force F and a horizontal component force F are generated, the two component forces slowly lift the stressed end of the bailey beam by an oblique angle, and slowly move outwards, when the inclination angle reaches a critical point, the gravity of the bailey beam 12 generates a very large horizontal outwards component force, when the component force is just larger than the friction force between the bailey beam 12 and the I-steel main beam 14, the bailey beam 12 is pulled outwards by the action of gravity to a position where the chain block 5 and the bailey beam 12 are approximately vertical, as shown in fig. 7 and 8, the chain block 5 and the bailey beam 12 are approximately vertical stress, because the friction force between steel is very large, and when the bailey beam 12 is pulled out by gravity, the moving speed of the bailey beam 12 is not very fast, so that the construction safety during the conversion of a stress system can be ensured.
2.3 The chain block chain is pulled continuously, the bailey beam 12 is lifted to a certain height in the upward vertical direction, a bailey beam dismantling sliding device 17 with a sliding bearing above is arranged on the I-shaped steel main beam 14, the bailey beam dismantling sliding device 17 is made of a 1cm steel plate to manufacture a ︼ base, the sliding bearings 18 are arranged on the steel plates at two sides of the base, butter is coated on the sliding bearings 18, friction force born by the bailey beam during extraction is reduced, the dismantling time is shortened, two limit steel bars 19 are arranged on a base bottom plate and clamped on the I-shaped steel main beam 14, the bailey beam dismantling sliding device is prevented from being thrown out during the later bailey beam extraction sliding, then the height of the bailey beam 12 is lowered to the sliding bearings, a lifting hook at the end part of a steel wire rope 61 of a winch is connected to a steel wire sling 13 at a joint of the fourth bailey beam and the fifth bailey beam, and then moving the steel wire rope sling 13 corresponding to the chain block 5 close to the moving-out side of the bailey beam to the joint of the second and third bailey beams, designating one bailey beam removing person to carry out synchronous information with other persons through an interphone, controlling the electric control switch of the winch 6, enabling the winch 6 to work and shrink the length of the winch steel wire rope 61, and matching with the other two persons pulling the chain of the chain block to draw out the bailey beam 12, wherein the other chain block 5 plays a vertical hoisting role on the bailey beam 12 by elongating the length of the chain, and the chain block 5 close to the moving-out side of the bailey beam is shrunk the length of the chain to provide an outward horizontal and vertical hoisting force, as shown in figures 9 and 10.
2.4 When the bailey beam 12 is pulled out to be approximately vertical to the chain of the chain block 5 close to the moving side of the bailey beam, as shown in fig. 11 and 12, stopping the operation of the winch 6, starting to set the auxiliary lifting rope 71 of the crane 7 at the joint of the outer second bailey piece, then removing the other chain block 5, continuing to start the operation of the winch 6, extending the chain length of the chain block 5, continuing to vertically lift the bailey beam 12 until the center of gravity of the whole set of bailey beams 12 is pulled out and moved onto the I-steel main beam 14, as shown in fig. 13 and 14, stopping the operation of the winch 6 again, wherein the center of gravity of the bailey beam 12 is just positioned on the I-steel main beam 14, the whole body is in an equilibrium state, the safety condition is optimal, the lifting hook of the winch 6 is separated from the bailey beam 12, the main lifting rope 72 of the crane 7 is penetrated and the steel wire rope 13 at the joint before the lifting hook of the winch 6, then controlling the main lifting rope 7 to tighten the auxiliary lifting rope, allowing the rope to be mounted at the outer bailey beam 12, and then pulling the whole set 5 and the bailey beam 12 to be pulled out by the whole body, and the whole body is pulled out of the bailey beam 12, and the whole body is pulled out directly from the bailey beam 12 by the whole body, and the whole body is pulled out of the bailey beam 12 in the direction, and the whole body is pulled out of the whole body is pulled out, and the whole body is pulled out by the bailey beam is pulled out, and the whole body, and the bailey beam is pulled out by the whole body, and the whole body is directly, and the bailey beam is pulled out, and directly, and the bailout is pulled and directly, and the bailout by the bailing.
The crank arm trolley is matched with personnel to remove the two chain blocks 5 after construction, the two chain blocks are moved to two rows of pre-buried bailey beam removing hanging bars 1 on two sides of a bailey beam 12 in the middle 3 groups, the bailey beam 12 in the groups has large weight, four chain blocks 5 are needed for balanced and symmetrical removal, the follow-up method is consistent with the above, and all the bailey beams 12 are sequentially pulled out according to the sequence to finish the removal.
2.5 The method comprises the steps of) removing a residual beam column supporting system, removing an I-steel main beam 14 and a steel pipe column 15 at the inner side of a shed tunnel, and maintaining the two sides of a bridge deck of a beam body 4 and a protective partition wall and a column for a certain time, so that the I-steel and the steel pipe column at the lower end are removed by adopting the I-steel pre-buried on the beam body 4, three chain blocks 5 are hung in a penetrating manner, the I-steel main beam 14 is vertically lifted, the chain blocks 5 are continuously hung under the chain blocks 5 in a penetrating manner, the tops of the steel pipe columns 15 are wound by steel wires, the chain blocks are recycled, the chain blocks 5 and the steel pipe columns 15 are vertically stressed, then, cutting of the steel pipe columns 15 is started at the bottom of the shed tunnel, when the lower steel pipe column 15 is removed from the bottom to the top, the I-steel main beam 14 and the steel pipe column 15 at the upper end are kept stressed stably through the chain blocks 5, and after the steel pipe column 15 at the lower end is cut off, the I-steel main beam 14 and the steel pipe column 15 at the upper end are slowly dropped down until the steel pipe column is removed from the bottom, and the transportation site is removed.
The I-steel main beam 14 near the outer side of the upright post 10 bears the stress by using the chain block 5 in the same way, and after the chain block is separated from the top surface of the steel pipe column 15, the steel pipe column 15 is removed from the gap of the steel pipe column 15 by using the crane 7 at the outer side, so that the beam column support system under the limited space condition is removed in the above way, and the rapid removal is completed.
Claims (4)
1. The system is demolishd fast to beret roof beam of engineering is add to railway protection shed tunnel under limited space, its characterized in that: the method comprises the steps of removing hanging ribs, wherein the removing hanging ribs comprise Bailey beam removing hanging ribs (1) and I-steel and steel pipe column removing hanging ribs (2), and the Bailey beam removing hanging ribs (1) are distributed along a line transverse bridge direction and pre-buried in a top plate (3); i-steel and steel-pipe column demolish hanging bar (2) pre-buried in roof beam body (4) both sides beam end steel-pipe column top, the bailey roof beam demolish hanging bar (1) and install hand hoist (5) respectively on I-steel and the steel-pipe column demolish hanging bar (2), the node position cover of bailey roof beam (12) is equipped with wire rope sling (13), hoist engine (6) are fixed in the sill (9) department of shed tunnel bottom, bailey roof beam (12) remove side's shed tunnel top parapet card and are equipped with "Γ" pulley installation device (8), the lower extreme of "Γ" pulley installation device (8) is equipped with lifting hook pulley (83), hoist engine wire rope (61) of hoist engine (6) walk around lifting hook pulley (83) and stretch to bailey roof beam (12) department and be connected with wire rope sling (13) after a plurality of pulley (11) turn to, bailey roof beam removes the side and still has arranged crane (7).
2. The bailey beam quick detach system of claim 1, wherein: the novel Bailey beam dismantling device comprises a Bailey beam dismantling sliding device (17), wherein the Bailey beam dismantling sliding device (17) is a ︼ type base made of 1cm steel plates, sliding bearings (18) are arranged on the steel plates on two sides of the base, butter is coated on the sliding bearings (18), friction force born by the Bailey beam during extraction is reduced, dismantling time is shortened, two limiting steel bars (19) are fixed on a base bottom plate, the limiting steel bars (19) are clamped on an I-steel main beam (14), and the Bailey beam is prevented from being taken out when being extracted and slid.
3. The quick removal system of the bailey beam according to claim 1, wherein the bailey beam removal hanging bars (1) are symmetrically arranged in a line center line, the line cross-bridge direction is three in each row, the distance is 3.75m, the longitudinal bridge direction is 2 groups, the distance is 2.8m, the hanging hooks are 50mm away from the top surface of the top plate and welded at the bottom of the top plate steel bars, the hanging hooks exceed the bottom surface of the top plate by 100mm, the net distance between the hanging hook steel bars is 60mm, the hanging hooks phi 28 and the hook length is 375mm; the lifting hook for dismantling the lifting rib (2) of the I-steel and steel pipe column exceeds the bottom surface of the beam body by 100mm, the net spacing of the lifting hook steel bars is 60mm, the lifting hook phi is 28, and the length of the hook is 875mm.
4. The beret beam rapid dismantling system according to claim 1, wherein the 'Γ' type pulley installation device (8) is formed by welding 32# I-steel, the upper end of the 'Γ' type pulley installation device (8) is clamped on a parapet wall at the top of a shed tunnel, an arc-shaped lifting hook (81) is fixed at the top and used for a crane (7) to move the device, a lifting hook circular ring (82) is arranged at the bottom, a lifting hook pulley (83) is hung on the lifting hook circular ring (82), a hoist steel wire rope (61) is arranged on the lifting hook pulley (83) in a penetrating manner, the hoist steel wire rope (61) is arranged downwards along the high altitude, and a plurality of pulleys (11) are arranged on a bottom beam (9) and an upright post (10) of the protective shed tunnel and used as a steering device when the hoist (6) recovers the steel wire rope.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321650721.8U CN220246713U (en) | 2023-06-27 | 2023-06-27 | Beret beam rapid dismantling system for railway protection shed tunnel adding project under limited space |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321650721.8U CN220246713U (en) | 2023-06-27 | 2023-06-27 | Beret beam rapid dismantling system for railway protection shed tunnel adding project under limited space |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220246713U true CN220246713U (en) | 2023-12-26 |
Family
ID=89267026
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321650721.8U Expired - Fee Related CN220246713U (en) | 2023-06-27 | 2023-06-27 | Beret beam rapid dismantling system for railway protection shed tunnel adding project under limited space |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220246713U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117418483A (en) * | 2023-06-27 | 2024-01-19 | 中铁二局第一工程有限公司 | A method for rapid removal of beam and column supports in limited space of railway engineering lines |
-
2023
- 2023-06-27 CN CN202321650721.8U patent/CN220246713U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117418483A (en) * | 2023-06-27 | 2024-01-19 | 中铁二局第一工程有限公司 | A method for rapid removal of beam and column supports in limited space of railway engineering lines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107338727B (en) | Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof | |
| CN100476076C (en) | Mobile integral construction platform, construction method and special spreader | |
| CN102912730A (en) | Hoisting construction method for single-rib closure rope of large-span reinforced concrete arch bridge | |
| CN104480868A (en) | Beam detaching method for road bridge overpassing operation railway | |
| CN107747282B (en) | On across both wired old bridge overall pulling down methods | |
| CN108316152A (en) | A kind of high pier capping beam construction mobile formwork and its construction technology | |
| CN102653938B (en) | Offshore dismantling construction method for descending movable formwork | |
| CN112591623B (en) | Dismantling method of cable hoisting system of mid-support space Y-shaped steel box arch bridge | |
| CN208122371U (en) | On across the high-speed rail safe guarding shed fast dismounting device of operation line | |
| CN107165062A (en) | A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame | |
| CN110468743B (en) | A mobile hanger and construction method for the renovation of old bridge pier caps | |
| CN118911023A (en) | Disassembling and constructing integrated construction method for removing old rigid frame bridge in-situ newly-built suspension bridge | |
| CN112411394B (en) | A cable hoisting method for a mid-support space Y-shaped steel box arch bridge | |
| CN112252212A (en) | Method for dismantling prestressed concrete variable cross-section continuous beam bridge | |
| CN116853963B (en) | A hoisting device and hoisting method for main beam of cable-stayed bridge | |
| CN201362571Y (en) | Equipment of cross beam for hoisting arch-first and girder-late tied bars arch bridge | |
| CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
| CN112030777B (en) | A down-type mobile formwork support bracket spanning transfer construction method | |
| CN209816682U (en) | Bridge steel box girder aerial working operation platform | |
| CN108277994A (en) | On across the high ferro safe guarding shed quick method for dismounting of operation line | |
| CN210368669U (en) | Hoisting equipment for two-span continuous construction of combined beam | |
| CN220364880U (en) | Suspension bridge catwalk surface net gliding trolley | |
| CN107447666B (en) | A method for dismantling the hanging basket of a single-cable plane cable-stayed bridge | |
| CN119177617A (en) | Bridge pier dismantling construction method of existing bridge | |
| CN116357070B (en) | Granulating tower empty layer hanging template system and ultrahigh granulating tower empty layer construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20231226 |