CN217400325U - Roofing eaves mouth template bearing structure - Google Patents

Roofing eaves mouth template bearing structure Download PDF

Info

Publication number
CN217400325U
CN217400325U CN202221120494.3U CN202221120494U CN217400325U CN 217400325 U CN217400325 U CN 217400325U CN 202221120494 U CN202221120494 U CN 202221120494U CN 217400325 U CN217400325 U CN 217400325U
Authority
CN
China
Prior art keywords
floor
steel plate
supporting steel
support
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221120494.3U
Other languages
Chinese (zh)
Inventor
刘洋
黄满强
王璐
桂庆玲
靳壮壮
苏博
敖凌宇
罗成
杨波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN202221120494.3U priority Critical patent/CN217400325U/en
Application granted granted Critical
Publication of CN217400325U publication Critical patent/CN217400325U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a roofing eaves mouth template bearing structure, include: one end of the supporting steel plate is fixedly connected to a floor slab of a floor at the lower part of the roof ram, and one end of the supporting steel plate, which is far away from the floor slab, is provided with a stay cable; the stay cable is fixedly connected with one end of the supporting steel plate far away from the floor slab, and the other end of the stay cable is fixedly connected with a floor above the floor slab where the supporting steel plate is located; the scaffold is built between the supporting steel plate and the roof ram. The problems that in the prior art, the construction cost of a high-rise building is too high and the feasibility is poor are solved.

Description

Roofing eaves mouth template bearing structure
Technical Field
The utility model relates to a roofing eaves mouth template bearing structure belongs to template support technical field.
Background
In the construction of high floors, if a roof cantilever exists on a high floor, if the supporting height of a roof cantilever formwork exceeds 8m, the roof cantilever is required to be supported by a scaffold according to the requirement of safety management regulations of a project with high risk (construction quality number [ 2018 ] 31), belonging to a project with high risk on a certain scale, and the existing scaffold supporting structure is a floor type scaffold and needs to be built from the ground to the roof cantilever, so that the problem that the construction cost of the high-rise building is too high and the feasibility is poor due to the fact that the scaffold is built from the ground and consumes more materials is solved.
Disclosure of Invention
The to-be-solved technical problem of the utility model is: the utility model provides a roofing eaves mouth template bearing structure to overcome prior art's not enough.
The technical scheme of the utility model is that: a roofing cornice template support structure comprising:
one end of the supporting steel plate is fixedly connected to a floor slab of a floor at the lower part of the roof ram, and one end of the supporting steel plate, which is far away from the floor slab, is provided with a stay cable;
the stay cable is fixedly connected with one end of the supporting steel plate far away from the floor slab, and the other end of the stay cable is fixedly connected with a floor above the floor slab where the supporting steel plate is located;
the scaffold is built between the supporting steel plate and the roof ram.
Further, still include:
and one end of the support rod is fixedly connected to the floor slab on the next floor where the support steel plate is located, and the other end of the support rod is fixedly connected to the support steel plate.
Furthermore, the bracing piece includes more than one, and the tie point of the floor of the next floor of every bracing piece and supporting steel plate place floor is located a bit, and the distance that the tie point of every bracing piece and supporting steel plate place floor is different.
Further, the method also comprises the following steps:
and one end of the floor slab support is fixedly connected to the next floor slab of the floor where the supporting steel plate is located, and the other end of the floor slab support is fixedly connected to the lower part of the floor slab of the floor where the supporting steel plate is located.
Further, still include:
the board that picks supports, it supports one end fixed connection on supporting steel plate place floor to pick the board, picks board support other end fixed connection and picks on the board template at the roofing.
The utility model has the advantages that: compared with the prior art, the utility model discloses a with supporting steel plate one end fixed connection on the floor of board lower part is chosen to the roofing, the other end passes through cable fixed connection on the floor above propping the steel plate place floor, thereby make supporting steel plate horizontal direction rigidity, vertical direction receives the pulling force of cable in addition and makes supporting steel plate choose the floor part and receive the pulling force that makes progress, thereby make supporting steel plate choose the floor part and can bear load, can build the scaffold frame on supporting steel plate, and needn't build the scaffold frame from ground, thereby reduced the material that the scaffold frame consumes, the expense is lower.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
In order to better understand the technical scheme, the technical scheme is described in detail in the following with reference to the attached drawings and the detailed description.
Example 1 was carried out:
for solving prior art and building scaffold 8 from ground and consume the material many, the relatively poor problem of feasibility, refer to fig. 1, this embodiment provides a roofing eaves mouth template bearing structure, include: one end of the supporting steel plate 2 is fixedly connected to a floor slab of a floor at the lower part of the roof ram 1, and one end of the supporting steel plate 2, which is far away from the floor slab, is provided with a stay cable 4; the inhaul cable 4 is fixedly connected with one end, far away from the floor, of the supporting steel plate 2, and the other end of the inhaul cable 4 is fixedly connected to the floor above the floor where the supporting steel plate 2 is located; the scaffold 8 is built between the supporting steel plate 2 and the roof ram 1.
During the use, through with 2 one end fixed connection of supporting steel plate on the floor of 1 lower part of board is chosen to the roofing, the other end passes through cable 4 fixed connection on the floor above the floor of supporting steel plate place, thereby make 2 horizontal direction rigidity of supporting steel plate, vertical direction receives the pulling force of cable 4 in addition and makes supporting steel plate 2 choose the floor part and receive the pulling force that makes progress, thereby make supporting steel plate 2 choose the floor part and can bear load, can build scaffold 8 on supporting steel plate 2, and needn't build scaffold 8 from ground, thereby the material that scaffold 8 consumed has been reduced, the expense is lower.
Further, still include: and the supporting rod 3, one end of the supporting rod 3 is fixedly connected to the floor slab on the next floor where the supporting steel plate 2 is located, and the other end of the supporting rod 3 is fixedly connected to the supporting steel plate 2.
Support force is provided for the support steel plate 2 through the support rod 3, the bearing capacity of the support steel plate 2 is further improved, and the load of the inhaul cable 4 is reduced.
Further, the number of the support rods 3 is more than one, the connection point of each support rod 3 and the floor slab on the next floor of the floor where the support steel plate 2 is located at one point, and the distance between the connection point of each support rod 3 and the support steel plate 2 and the floor slab where the support steel plate 2 is located is different.
Can provide the support for the whole suspension part of the supporting steel plate 2 and avoid the bending of the supporting steel plate 2.
Further, the method also comprises the following steps: and one end of the floor slab support 5 is fixedly connected to the floor slab on the next floor slab of the floor where the supporting steel plate 2 is located, and the other end of the floor slab support 5 is fixedly connected to the lower part of the floor slab of the floor where the supporting steel plate 2 is located.
And the bearing capacity of the next floor of the floor where the supporting steel plate 2 is positioned is improved through the floor support 5.
Further, still include: and the plate picking support 6 is fixedly connected to the floor where the support steel plate 2 is located at one end of the plate picking support 6, and the other end of the plate picking support 6 is fixedly connected to the plate picking template 7 on the roof.
Through picking up the board and supporting 6, for the roof picks up board template 7 and provides the holding power, promote the roof and pick up the bearing capacity of board template 7.
The foregoing is a more detailed description of the present invention, taken in conjunction with the specific preferred embodiments thereof, and it is not intended that the invention be limited to the specific embodiments shown and described. To the utility model belongs to the technical field of ordinary technical personnel, do not deviate from the utility model discloses under the prerequisite of design, can also make a plurality of simple deductions or replacement, all should regard as belonging to the utility model discloses a protection scope.

Claims (5)

1. The utility model provides a roofing eaves mouth template bearing structure which characterized in that includes:
one end of the supporting steel plate (2) is fixedly connected to a floor slab of a floor at the lower part of the roof ram (1), and one end, far away from the floor slab, of the supporting steel plate (2) is provided with a stay cable (4);
the stay cable (4) is fixedly connected with one end, far away from the floor, of the supporting steel plate (2), and the other end of the stay cable (4) is fixedly connected to a floor above the floor where the supporting steel plate (2) is located;
the scaffold (8) is built between the supporting steel plate (2) and the roof ram (1).
2. The roofing cornice template support structure of claim 1, further comprising:
the support rod (3), bracing piece (3) one end fixed connection is on the floor of the next floor of supporting steel plate (2) place floor, and bracing piece (3) other end fixed connection is on supporting steel plate (2).
3. A roof cornice formwork support structure according to claim 2, wherein the number of the support rods (3) is more than one, the connection point of each support rod (3) and the floor slab of the next floor of the floor where the support steel plate (2) is located is at one point, and the distance between the connection point of each support rod (3) and the support steel plate (2) and the floor slab where the support steel plate (2) is located is different.
4. The roofing cornice formwork support structure of claim 1, further comprising:
floor supports (5), floor supports (5) one end fixed connection is on the next floor of supporting steel plate (2) place floor, and floor supports (5) other end fixed connection is in the floor lower part of supporting steel plate (2) place floor.
5. The roofing cornice template support structure of claim 1, further comprising:
and the cantilever plate support (6), one end of the cantilever plate support (6) is fixedly connected to the floor where the support steel plate (2) is arranged, and the other end of the cantilever plate support (6) is fixedly connected to the roof cantilever plate template (7).
CN202221120494.3U 2022-05-10 2022-05-10 Roofing eaves mouth template bearing structure Active CN217400325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221120494.3U CN217400325U (en) 2022-05-10 2022-05-10 Roofing eaves mouth template bearing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221120494.3U CN217400325U (en) 2022-05-10 2022-05-10 Roofing eaves mouth template bearing structure

Publications (1)

Publication Number Publication Date
CN217400325U true CN217400325U (en) 2022-09-09

Family

ID=83143391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221120494.3U Active CN217400325U (en) 2022-05-10 2022-05-10 Roofing eaves mouth template bearing structure

Country Status (1)

Country Link
CN (1) CN217400325U (en)

Similar Documents

Publication Publication Date Title
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN102116051A (en) Layer-by-layer overhanging structure lifting method
CN202731104U (en) Novel reinforcing mesh sheet support structure
CN217400325U (en) Roofing eaves mouth template bearing structure
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN210635627U (en) Large-scale lifting machine for outer wall decoration
CN110043035B (en) Post-cast strip construction supporting method
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN217536675U (en) Multilayer reinforcing steel bar mounting and supporting system device for cast-in-situ box girder beam
CN113387281B (en) Construction method of alternate conversion attachment system of externally attached tower crane
CN210684349U (en) Assembled gantry crane track foundation
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN112239187A (en) Demolish lift hydraulic locomotive
CN219080936U (en) Lifting adjustable all-steel climbing frame
CN215710948U (en) Lift goes out roofing buttress device
CN101824918A (en) Construction method for dividing unit to prefabricate bearing bent frame
CN217812572U (en) Super high-rise building construction is with turnover formula steel stair
CN218028866U (en) Unloading overhanging scaffold structure
CN203961239U (en) High-altitude overhanging awning construction operation platform
CN215101636U (en) Tower crane high altitude adheres to conversion system
CN212292575U (en) Nonstandard layer tower crane dysmorphism adheres to system
CN215829977U (en) A suspended door formula support for high altitude tower building vestibule fitment
CN209760878U (en) Steel frame beam for steel structure factory building
CN218405069U (en) A platform is tied up to whole formula of climbing reinforcing bar for pier stud construction
CN211447956U (en) But reuse's reinforcing bar processing shed structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant