CN217399422U - Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam - Google Patents

Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam Download PDF

Info

Publication number
CN217399422U
CN217399422U CN202220859531.6U CN202220859531U CN217399422U CN 217399422 U CN217399422 U CN 217399422U CN 202220859531 U CN202220859531 U CN 202220859531U CN 217399422 U CN217399422 U CN 217399422U
Authority
CN
China
Prior art keywords
base
steel
suspension bridge
upper base
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220859531.6U
Other languages
Chinese (zh)
Inventor
王镜越
孙正茂
田力
全成
董蕾
赵明富
侯云江
谭子书
郑明波
赵欣
李青乐
田淑云
刘国权
王在军
余祖梁
张小付
吕寒秋
罗建新
唐佰贤
付华
张阳华
彭韬
张毅
高浪
宋志泉
谢智宇
任小坤
胡刚
罗海燕
吴作香
查天戟
黎波
陆成福
贾勇
盛韶东
刘均
欧泽余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Highway Engineering Group Co Ltd
Original Assignee
Guizhou Highway Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Highway Engineering Group Co Ltd filed Critical Guizhou Highway Engineering Group Co Ltd
Priority to CN202220859531.6U priority Critical patent/CN217399422U/en
Application granted granted Critical
Publication of CN217399422U publication Critical patent/CN217399422U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an edge-facing protective structure used during hoisting and welding construction of a suspension bridge steel truss stiffening girder, which comprises a base structure with a lateral opening, wherein a plurality of base structures are clamped on a steel girder panel and are fixed through fastening bolts, a vertical rod is fixedly arranged on the top surface of the base structure, a plurality of through holes are arranged at intervals along the height direction of the vertical rod, and a plurality of base structures are connected through a plurality of steel wire ropes; the base structure comprises a long-strip-shaped upper base and a long-strip-shaped lower base, one end of the upper base is fixedly connected with one end of the lower base through a connecting steel plate, the upper base, the connecting steel plate and the lower base form an Contraband-shaped structure with a lateral opening, and a fastening bolt penetrating through the top and the bottom of the upper base is arranged on the upper base. In the use, with base structure joint in the reservation notch position department of girder steel top surface, screw up fastening bolt for lower base upwards supports the bottom surface of girder steel panel, under the common clamping effect of fastening bolt and lower base, can firmly fix the base structure on the girder steel panel.

Description

Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam
Technical Field
The utility model relates to a protective structure, especially a suspension bridge steel truss stiffening beam face limit protective structure of using when hoist and mount welding construction.
Background
Suspension bridge is at girder steel segment hoist and mount in-process, the process is frequent in turn, after girder steel hoist and mount take one's place, and before setting up permanent protection, based on the safety protection requirement, need set up and face the interim protection that limit safety protection structure is used for hoist and mount in-process, face limit safety protection and also need frequently install and demolish, and the bridge floor is about 200m from gorge bottom average distance, the timeliness of facing limit safety protection installation and demolising, fastness and warning nature requirement are all higher, thereby ensure the safety in the whole suspension bridge girder steel construction, consequently must construct interim safety protection.
In the current tradition in the industry of industry faces frontier defense, all be steel construction surface with steel pipe or reinforcing bar weld into protective structure, cause the damage to the steel construction like this easily, install moreover and dismantle very inconveniently, this protective structure belongs to disposable input moreover, can not used repeatedly.
Disclosure of Invention
An object of the utility model is to provide a use when suspension bridge steel truss stiffening beam hoist and mount welding construction faces limit protective structure. The edge-facing protective structure can not damage the steel structure, is very convenient to mount and dismount, and can be repeatedly used.
The technical scheme of the utility model: the edge-facing protective structure comprises base structures with lateral openings, wherein a plurality of base structures are clamped on a steel beam panel and are fixed through fastening bolts, vertical upright rods are fixedly arranged on the top surfaces of the base structures, a plurality of through holes are formed in the vertical upright rods at intervals along the height direction of the vertical upright rods, and the base structures are connected through a plurality of steel wire ropes; the base structure comprises a long-strip-shaped upper base and a long-strip-shaped lower base, one end of the upper base is fixedly connected with one end of the lower base through a connecting steel plate, the upper base, the connecting steel plate and the lower base form an Contraband-shaped structure with a lateral opening, and a fastening bolt penetrating through the top and the bottom of the upper base is arranged on the upper base.
In the limb protective structure who uses during aforementioned suspension bridge steel truss stiffening beam hoist and mount welding construction, the wire rope both ends are connected with the rope clip, and the rope clip joint is in the department of penetrating hole.
In the use face limit protective structure during aforementioned suspension bridge steel truss stiffening beam hoist and mount welding construction, go up the base and form with the channel-section steel preparation with lower base, vertical pole setting uses the angle steel preparation to form.
In the edge protection structure for the suspension bridge steel truss stiffening girder during hoisting and welding construction, the number of the fastening bolts is more than or equal to 2, and the distance between adjacent bolts is more than 5 cm.
In the edge protection structure for hoisting and welding the suspension bridge steel truss stiffening girder, the distance between the upper base and the lower base is at least 1cm greater than the thickness of the steel girder panel.
In the temporary edge protection structure used during hoisting and welding construction of the suspension bridge steel truss stiffening girder, the vertical rods are higher than or equal to 1.2m, and the distance between adjacent penetrating holes is 30-40 cm.
The utility model has the advantages that: compared with the prior art, the utility model discloses a couple together upper and lower base with connecting steel plate, constitute the base structure of Contraband type, and be provided with fastening bolt and vertical pole setting on last base, wire rope forms protective structure after passing vertical pole setting, in the use, with base structure joint in the reservation notch position department of girder steel top surface, tighten fastening bolt, make the bottom surface that supports the girder steel panel upwards of lower base, under the common clamping action of fastening bolt and lower base, can firmly fix the base structure on the girder steel panel. Should face limit protective structure and can not construct the damage to the steel knot, it is very convenient to install and dismantle moreover, through using the contrast, should face limit protective structure and can improve more than 1 times than traditional welded structure work efficiency, this protective structure repeatedly usable moreover.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged partial schematic view of FIG. 1;
fig. 3 is a side view of fig. 1.
Reference numerals: 1-upper base, 2-connecting steel plate, 3-lower base, 4-fastening bolt, 5-vertical upright rod, 6-penetrating hole, 7-steel wire rope, 8-steel beam panel and 9-rope clip.
Detailed Description
The present invention will be further described with reference to the drawings and examples, which should not be construed as a limitation to the present invention.
The embodiment of the utility model provides a: what use during suspension bridge steel truss stiffening girder hoist and mount welding construction faces limit protective structure, as shown in figure 1-3, including side direction open-ended base structure, a plurality of base structure joint is on girder steel panel 8 to fix through fastening bolt 4, base structure top surface welded fastening is provided with 1 vertical pole setting 5, vertical pole setting 5 is provided with 2-3 holes 6 of wearing along its direction of height interval, connects through many wire rope 7 between a plurality of base structures and constitutes whole face limit protective structure. The base structure comprises a long-strip-shaped upper base 1 and a long-strip-shaped lower base 3, one ends of the upper base 1 and the lower base 3 are fixedly connected through a connecting steel plate 2, the upper base 1, the connecting steel plate 2 and the lower base 3 form an Contraband-shaped structure with a lateral opening, and a fastening bolt 4 penetrating through the top and the bottom of the upper base 1 is arranged on the upper base 1.
Two ends of the steel wire rope 7 are connected with rope clamps 9, and the rope clamps 9 are clamped at the penetration holes 6. The tensioned steel wire rope 7 is limited and fixed by using a rope clamp 9.
Go up base 1 and lower base 3 and form with the channel-section steel preparation, vertical pole setting 5 uses the angle steel preparation to form, and convenient for material selection.
This face limit protection architecture, through 2 channel-section steels preparation honest upper base 1 and lower base 3, rethread connecting plate 2 becomes a whole with upper base 1 and the welding of lower base 3, opens two bolt holes at upper base 1 top for penetrate fastening bolt 4. Base structure installs in the reservation notch position department of girder steel top surface during the use, and during base structure's side direction opening was gone into to girder steel panel 8 cards, through fastening bolt 4's fastening effect to utilize the counter-force principle of base 3 channel-section steel down, form counter-force structure, through the fastening bolt 4 at top, exert normal pressure, with the frictional force of base 3 channel-section steel and girder steel panel 8 under the increase bottom, thereby play firm effect. The wire tightener and the rope clamp 9 are used for limiting the steel wire rope 7, so that protection and alternate propulsion are realized.
In the manufacturing process, the gap width between the upper base 1 and the lower base 3 is determined according to the thickness of the steel beam panel 8, and for convenient installation, the gap width is about 1cm larger than the thickness of the steel beam panel 8; the fastening bolt 4 is preferably 1-2cm larger than the sum of the height of the channel steel of the upper base 1 and the width of the gap; the number of the fastening bolts 4 is not less than 2, and the distance is preferably more than 5 cm; the height of the vertical upright rods 5 is not less than 1.2m, and the reserved space of the penetration holes 6 is preferably 30-40 cm. After the steel wire rope 7 penetrates into the penetration holes 6 of the vertical rods 5, the steel wire rope 7 is fastened by using a tightener, the end part of the steel wire rope 7 is limited by using a rope clamp 9, and the whole installation is finished.
When the edge protection structure needs to be removed, the rope clamp 9 is loosened, the base structure at the tail end and the vertical upright rod 5 at the upper part of the base structure are removed, the base structure and the vertical upright rod 5 of the upright rod are installed at the lower section of the base structure along the length direction of the edge protection structure, the tightening is performed for reinforcement, and the edge protection structure is alternately pushed in a circulating manner.
The edge protection structure is made of on-site waste materials, the purposes of reducing cost and protecting environment are achieved, 1-2 people can process the edge protection structure in a fixed place, the cutting and welding amount is small, the processing period is short, and the reuse rate is high. Has convenient use, can use self-processing and can also be customized and processed. The safety and the usability are high, and the base can be used in various occasions by adjusting the gap or the form of the base. The protective device can be alternately pushed circularly on a straight line or a large-diameter curve, and is particularly suitable for temporary two or three-day protection.
The steel beam panel 8 is fastened through the fastening bolts 4, waste channel steel, angle steel, steel plates and bolts are used for manufacturing the protective structure, and 3-grade or 4-grade galvanized steel wire ropes 7 are installed through the steel wire ropes 7, the rope clamps 9 and the tighteners. The reuse of resources can be realized, the safety condition of the operation environment is improved, and the construction cost is reduced.

Claims (6)

1. What use when suspension bridge steel truss stiffening girder hoist and mount welding construction faces limit protective structure, its characterized in that: the steel beam panel structure comprises base structures with lateral openings, wherein a plurality of base structures are clamped on a steel beam panel (8) and fixed through fastening bolts (4), vertical upright rods (5) are fixedly arranged on the top surfaces of the base structures, a plurality of penetrating holes (6) are formed in the vertical upright rods (5) at intervals along the height direction of the vertical upright rods, and the base structures are connected through a plurality of steel wire ropes (7); the base structure comprises a long-strip-shaped upper base (1) and a lower base (3), wherein one end of the upper base (1) and one end of the lower base (3) are fixedly connected through a connecting steel plate (2), the upper base (1), the connecting steel plate (2) and the lower base (3) form an Contraband-shaped structure with a lateral opening, and a fastening bolt (4) penetrating through the top and the bottom of the upper base (1) is arranged on the upper base (1).
2. The edge protection structure for hoisting and welding the suspension bridge steel truss stiffening beam according to claim 1, which is characterized in that: two ends of the steel wire rope (7) are connected with rope clamps (9), and the rope clamps (9) are clamped at the penetrating holes (6).
3. The edge-facing protective structure used during hoisting and welding construction of the steel truss stiffening beam of the suspension bridge according to claim 1, which is characterized in that: the upper base (1) and the lower base (3) are made of channel steel, and the vertical upright rods (5) are made of angle steel.
4. The edge protection structure for hoisting and welding the suspension bridge steel truss stiffening beam according to claim 1, which is characterized in that: the number of the fastening bolts (4) is more than or equal to 2, and the distance between adjacent bolts (4) is more than 5 cm.
5. The edge protection structure for hoisting and welding the suspension bridge steel truss stiffening beam according to claim 1, which is characterized in that: the distance between the upper base (1) and the lower base (3) is larger than the thickness of the steel beam panel (8) by at least 1 cm.
6. The edge protection structure for hoisting and welding the suspension bridge steel truss stiffening beam according to claim 1, which is characterized in that: the vertical upright rods (5) are higher than or equal to 1.2m, and the distance between every two adjacent penetrating holes (6) is 30-40 cm.
CN202220859531.6U 2022-04-14 2022-04-14 Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam Active CN217399422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220859531.6U CN217399422U (en) 2022-04-14 2022-04-14 Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220859531.6U CN217399422U (en) 2022-04-14 2022-04-14 Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam

Publications (1)

Publication Number Publication Date
CN217399422U true CN217399422U (en) 2022-09-09

Family

ID=83140150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220859531.6U Active CN217399422U (en) 2022-04-14 2022-04-14 Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam

Country Status (1)

Country Link
CN (1) CN217399422U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116084725A (en) * 2023-03-10 2023-05-09 中交一公局集团有限公司 General protection and platform integrated device of quick installation and removal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116084725A (en) * 2023-03-10 2023-05-09 中交一公局集团有限公司 General protection and platform integrated device of quick installation and removal

Similar Documents

Publication Publication Date Title
CN217399422U (en) Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam
CN214995799U (en) Tool type wall hanging cantilever frame
CN213509691U (en) Adjustable regularization horizontal protection device in super high-rise core barrel elevator shaft
CN110714603A (en) Steel pipe and steel rope composite scaffold system and construction method thereof
CN214995990U (en) Steel reinforced concrete independent beam template tool type supporting assembly
CN212249150U (en) Scaffold gangboard
CN212641470U (en) Prestressed fish-bellied beam steel strand construction guiding device
CN210032595U (en) Dual-purpose column mould hoop device
CN103195235A (en) Design and calculation for detachable steel plate type steel fixture
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN216239866U (en) Hanging device of push-pull type safety pocket net
CN214245371U (en) Annular prestressed steel beam fixing device
CN215331290U (en) Simple operation platform for full scaffold
CN214575761U (en) Special wire rope pull ring device for cantilever steel beam
CN219509171U (en) Cantilever edge support-free node of fabricated steel structure floor support plate
CN217420649U (en) Interim bearing structure of span overrun steel bar truss building carrier plate
CN215055559U (en) Roof steel beam installation protection structure of electronic factory building
CN215368613U (en) Shaped steel hangs outrigger external corner construction structures
CN212866318U (en) Column through assembled prestressed concrete frame
CN216238160U (en) Device for assisting multi-buckle cable graded tensioning in arch bridge inclined pull buckle hanging construction
CN214089888U (en) Steel support anti-falling device
CN213976725U (en) Simple and easy wall formula hoist device that rides
CN214658996U (en) High-altitude installation safety protection device for diving tower slideway truss
CN218493068U (en) High altitude construction is with preventing wind stable hanging flower basket
CN219138452U (en) Safety net combination device for peripheral protection of high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant