CN217398202U - Tool type hanging basket for hoisting polyphenyl particle cement sandwich composite batten - Google Patents
Tool type hanging basket for hoisting polyphenyl particle cement sandwich composite batten Download PDFInfo
- Publication number
- CN217398202U CN217398202U CN202220160763.2U CN202220160763U CN217398202U CN 217398202 U CN217398202 U CN 217398202U CN 202220160763 U CN202220160763 U CN 202220160763U CN 217398202 U CN217398202 U CN 217398202U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- main
- sandwich composite
- polyphenyl granule
- cement sandwich
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The application relates to the technical field of hoisting operation tools, in particular to a tool type hanging basket for hoisting polyphenyl granule cement sandwich composite battenboard. A tool type hanging basket for hoisting polyphenyl granule cement sandwich composite battens comprises a main upright post and a main cross beam which are vertically distributed in a rectangular shape, wherein the main cross beam surrounds one side, close to the end part, of the main upright post, and then a mounting plate is mounted after the main cross beam supports the main upright post; a hoisting ring is arranged at one end of the main upright post, which is far away from the main cross beam; main upright interlude demountable installation has the breast beam subassembly. This application can be through placing polylith polyphenyl granule cement clamp core composite slat on the mounting panel, and the fender beam subassembly carries on spacingly to polyphenyl granule cement clamp core composite slat, then hoist and mount machine through with hoist and mount ring be connected the back with the hanging flower basket vertical hoisting that will place polyphenyl granule cement clamp core composite slat, practiced thrift the transit time of material for the construction progress.
Description
Technical Field
The application relates to the technical field of hoisting operation tools, in particular to a tool type hanging basket for hoisting polyphenyl granule cement sandwich composite battens.
Background
The majority of secondary structures in the building field are polyphenyl particle cement sandwich composite battens, and under the working condition that no ramp is available and only vertical hoisting is available, materials can only be vertically transported through a discharging hole. The single hoisting belt is used as a vertical hoisting tool to transport the polyphenyl particle cement sandwich composite batten to an operation position.
Because the polyphenyl granule cement sandwich composite lath can only be horizontally hung, in the process of horizontal hanging, the surface of the partition board is too smooth, the friction force is smaller, and in order to ensure the safe hanging, only a single block can be used for hanging.
Aiming at the vertical hoisting tool, the inventor finds that the single hoisting of the hoisting belt greatly increases the material transportation time and directly and seriously affects the construction progress, and the improvement design of the existing vertical hoisting tool is urgently needed for solving the problems.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems that the transportation time of materials is greatly prolonged by hoisting a single hoisting belt, and the construction progress is directly and seriously influenced, the application provides a tool type hanging basket for hoisting a polyphenyl granule cement sandwich composite batten.
The application provides a instrument formula hanging flower basket for hoisting compound slat of polyphenyl granule cement core, adopts following technical scheme: a tool type hanging basket for hanging polyphenyl granule cement sandwich composite battens comprises a main upright post and a main cross beam which are vertically and rectangularly distributed, wherein the main cross beam encloses one side of the main upright post close to the end part; main upright interlude demountable installation has the fender beam subassembly.
Through adopting above-mentioned technical scheme, the cylinder that the cooperation formed the hanging flower basket is connected to head mast and main beam, places polylith polyphenyl granule cement core composite slat in proper order on the platform that the main beam was built, and interlude detachable fender beam assembly carries out spacing centre gripping to polyphenyl granule cement core composite slat, improves polyphenyl granule cement core composite slat's stability of placing. The lifting hook on the hoisting machine is hooked on the hoisting ring, and the hoisting machine is used for vertically hoisting the hanging basket and the polyphenyl particle cement sandwich composite batten, so that the material transportation time is saved, and the construction progress is accelerated.
Optionally, a plurality of secondary beams are arranged between the main cross beams at intervals, and the length direction of the secondary beams is perpendicular to the installation direction of the polyphenyl particle cement sandwich composite batten.
By adopting the technical scheme, the hanging basket can support the polyphenyl particle cement sandwich composite strip more stably due to the arrangement of the secondary beam.
Optionally, the mounting plate is laid on one side of the secondary beam facing the hoisting ring.
By adopting the technical scheme, the contact area between the polyphenyl particle cement sandwich composite batten and the hanging basket is increased due to the arrangement of the mounting plate, and the hanging stability of the hanging basket on the polyphenyl particle cement sandwich composite batten is further improved.
Optionally, a plurality of guide ribs are arranged on the mounting plate at intervals, and the direction of the guide ribs is consistent with the mounting direction of the polyphenyl particle cement sandwich composite batten.
Through adopting above-mentioned technical scheme, the setting up of guide bar muscle has been guided for the installation of polyphenyl granule cement core composite slat on the mounting panel, and polyphenyl granule cement core composite slat who places on the mounting panel simultaneously can support and lean on guide bar muscle position, avoids polyphenyl granule cement core composite slat to slide.
Optionally, a first fixed stop beam is connected to the middle section of the main upright column and is parallel to the main upright column in the length direction, two ends of the first fixed stop beam extend to be matched with the length of the polyphenyl granule cement sandwich composite slat, one end of the first fixed stop beam is fixedly connected with a second fixed stop beam, and the other end of the first fixed stop beam is detachably connected with a detachable stop beam.
Through adopting above-mentioned technical scheme, the setting of first fixed fender beam, the fixed fender beam of second and can dismantle fender beam on the leading post can carry out spacing and centre gripping to the compound slat of polyphenyl granule cement core of placing on the hanging flower basket, improves the hoist and mount stability of the compound slat of polyphenyl granule cement core. The detachable stop beam is detached before the process of placing the polyphenyl granule cement sandwich composite batten on the hanging basket, so that the installation by an operator is facilitated; after the polystyrene particle cement sandwich composite batten is placed, the detachable stop beam is installed well and used for improving the stability of hoisting.
Optionally, the detachable blocking beam is provided with a fixing pin, and a positioning hole matched with the fixing pin is formed at the position of the first fixed blocking beam corresponding to the fixing pin.
Through adopting above-mentioned technical scheme, the collocation of fixed pin and locating hole makes can dismantle the fender roof beam and can carry out demountable installation at the tip of first fixed fender roof beam.
Optionally, a supporting plate is installed at one end, close to the main cross beam, of the main upright, and the area of the supporting plate is larger than the cross-sectional area of the main upright.
Through adopting above-mentioned technical scheme, the setting up of backup pad has increased the area of contact of leading post and ground, and then has increased the stability of placing of hanging flower basket.
Optionally, a support beam is connected to a position adjacent to the main upright column and close to the hoisting ring.
By adopting the technical scheme, the supporting beam and the main beam are fixedly connected with the main upright column from the two opposite ends of the main upright column, so that the stability of the hanging basket is effectively improved.
To sum up, this application includes following beneficial technological effect:
the blocking beam can be disassembled to be taken down, the polyphenyl particle cement sandwich composite lath is placed on the mounting plate, then the blocking beam can be disassembled to be mounted, and then the lifting hook of the lifting machine is connected to the position of the lifting ring, so that the polyphenyl particle cement sandwich composite lath is vertically lifted, the lifting efficiency is improved, and the operation is convenient.
Drawings
Fig. 1 is a schematic overall structure diagram of a tool-type hanging basket for hanging polyphenyl granule cement sandwich composite battens according to an embodiment of the application.
Description of the reference numerals:
1. polystyrene particle cement sandwich composite lath; 2. a main upright post; 21. hoisting a ring; 22. a fixing pin; 23. a support plate; 24. a support beam; 3. a main cross beam; 31. a secondary beam; 32. mounting a plate; 33. guiding the bar ribs; 4. a first fixed stop beam; 41. a second fixed stop beam; 42. the fender beam can be disassembled.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses a tool type hanging basket for hoisting polyphenyl particle cement sandwich composite battenboard.
As shown in figure 1, the tool type hanging basket for hoisting the polyphenyl granule cement sandwich composite batten comprises main upright posts 2 which are distributed in a rectangular shape and main cross beams 3 which are arranged around the main upright posts 2 in a surrounding mode, wherein the main cross beams 3 are arranged at one ends close to the main upright posts 2 and provide a platform for placing the polyphenyl granule cement sandwich composite batten 1.
A plurality of secondary beams 31 are sequentially installed in a rectangular frame enclosed by the main cross beam 3 along the length direction at intervals, the polyphenyl particle cement sandwich composite batten 1 is placed on the vertical upper surfaces of the main cross beam 3 and the secondary beams 31 along the length direction of the main cross beam 3, and then the hanging basket is lifted to carry out vertical hoisting. The arrangement of the secondary beam 31 effectively supports the polyphenyl granule cement sandwich composite slat 1 and increases the hoisting stability of the polyphenyl granule cement sandwich composite slat 1.
The mounting plate 32 is arranged on one side, facing upwards, of the secondary beam 31 and the main beam 3, the placing area of the polyphenyl particle cement sandwich composite slat 1 can be effectively increased, the lifting safety is improved, the mounting plate 32 is provided with a plurality of guide bar ribs 33 at intervals along the mounting direction of the polyphenyl particle cement sandwich composite slat 1, and the guide effect can be achieved in the process of loading the polyphenyl particle cement sandwich composite slat 1 into a hanging basket. The polyphenyl granule cement sandwich composite slat 1 can also lean against the position of the guide bar rib 33 when being placed on the mounting plate 32, thereby avoiding the polyphenyl granule cement sandwich composite slat 1 from sliding and improving the safety.
Install hoisting ring 21 in the one end of main column 2 keeping away from main beam 3, make things convenient for the lifting hook on the hoisting machine to hook into in hoisting ring 21, and then the application of force is mentioned the hanging flower basket, and then carries out the hoist and mount operation to polyphenyl granule cement clamp core composite slat 1.
A supporting beam 24 is arranged at the position, close to the hoisting ring 21, of the main upright post 2, and two ends of the supporting beam 24 are connected to the corresponding main upright posts 2 respectively, so that the overall stability of the hanging basket is improved.
Along the length direction of the rectangle enclosed by the main upright posts 2, the middle positions of the adjacent main upright posts 2 at two sides are provided with first fixed stop beams 4. The two ends of the first fixed stop beams 4 symmetrically extend towards the direction far away from the main upright post 2, so that the length of the first fixed stop beams 4 is equal to or greater than that of the polyphenyl granule cement sandwich composite slat 1, the second fixed stop beams 41 are fixedly arranged at one ends of the two first fixed stop beams 4, and the detachable stop beams 42 are detachably arranged at the other ends of the two first fixed stop beams 4. The detachable blocking beams 42 are taken down and then a plurality of polyphenyl particle cement sandwich composite laths 1 can be placed in the hanging basket, and then the detachable blocking beams 42 are installed and then can limit the polyphenyl particle cement sandwich composite laths 1 in the hanging basket, so that the stability of the hoisting process is improved.
The detachable blocking beam 42 is provided with a fixing pin 22, the first fixed blocking beam 4 is provided with a positioning hole matched with the fixing pin 22, and the fixing pin 22 is clamped at the positioning hole to realize detachable connection of the detachable blocking beam 42 on the first fixed blocking beam 4.
The horizontal support plate 23 is connected to the end, far away from the hoisting ring 21, of the main upright post 2, and the area of the support plate 23 is larger than the cross-sectional area of the main upright post 2, so that the contact stability of the hanging basket and the ground is improved.
In the using process, the detachable blocking beam 42 is taken down from the end part of the first fixed blocking beam 4, then the polyphenyl granule cement sandwich composite slat 1 to be hoisted is vertically pushed into the hanging basket, after the detachable blocking beam 42 is installed, a lifting hook on a hoisting machine is hooked on the hoisting ring 21, and the polyphenyl granule cement sandwich composite slat 1 is vertically hoisted by the hoisting machine. The simultaneous hoisting of the plurality of polyphenyl granule cement sandwich composite laths 1 is realized, the processing and manufacturing cost of the hanging basket is low, and the hanging basket can be repeatedly utilized.
The specific embodiments are only for explaining the present application and are not limiting to the present application, and those skilled in the art can make modifications to the embodiments without inventive contribution as required after reading the present specification, but all the embodiments are protected by patent law within the scope of the claims of the present application.
Claims (8)
1. The utility model provides a instrument formula hanging flower basket for hoisting compound slat of polyphenyl granule cement clamp core which characterized in that: the sandwich composite batten is characterized by comprising main columns (2) and main beams (3) which are vertically distributed in a rectangular shape, wherein the main beams (3) enclose one sides of the main columns (2) close to the end parts, hoisting rings (21) are installed at one ends, far away from the main beams (3), of the main columns (2), and hoisting polyphenyl granule cement sandwich composite battens (1) are placed on one sides, facing the hoisting rings (21), of the main beams (3); the middle section of the main upright post (2) is detachably provided with a stop beam assembly.
2. The tool type hanging basket for hanging the polyphenyl granule cement sandwich composite batten according to the claim 1, is characterized in that: a plurality of secondary beams (31) are arranged between the main beams (3) at intervals, and the length direction of the secondary beams (31) is vertical to the installation direction of the polyphenyl granule cement sandwich composite batten (1).
3. The tool type hanging basket for hoisting the polyphenyl granule cement sandwich composite lath according to the claim 2 is characterized in that: and a mounting plate (32) is paved on one side of the secondary beam (31) facing the hoisting ring (21).
4. The tool type hanging basket for hanging the polyphenyl granule cement sandwich composite batten according to the claim 3, is characterized in that: the installation plate (32) is provided with a plurality of guide bar ribs (33) at intervals, and the direction of the guide bar ribs (33) is consistent with the installation direction of the polyphenyl granule cement sandwich composite lath (1).
5. The tool type hanging basket for hanging the polyphenyl granule cement sandwich composite batten according to the claim 1, is characterized in that: the main upright post structure is characterized in that a first fixed stop beam (4) is connected to the middle section of the main upright post (2) and is parallel to the main upright post (2) in the length direction, the two ends of the first fixed stop beam (4) are extended to be matched with the length of the polyphenyl particle cement sandwich composite slat (1), a second fixed stop beam (41) is fixedly connected to one end of the first fixed stop beam (4), and a detachable stop beam (42) is detachably connected to the other end of the first fixed stop beam (4).
6. The tool type hanging basket for hanging the polyphenyl granule cement sandwich composite batten according to the claim 5, is characterized in that: the detachable blocking beam (42) is provided with a fixing pin (22), and the first fixed blocking beam (4) corresponds to the position of the fixing pin (22) and is provided with a positioning hole matched with the fixing pin (22).
7. The tool type hanging basket for hanging the polyphenyl granule cement sandwich composite batten according to the claim 1, is characterized in that: a supporting plate (23) is installed at one end, close to the main cross beam (3), of the main upright post (2), and the area of the supporting plate (23) is larger than the cross sectional area of the main upright post (2).
8. The tool type hanging basket for hanging the polyphenyl granule cement sandwich composite batten according to the claim 1, is characterized in that: and a supporting beam (24) is connected to the position, close to the hoisting ring (21), of the adjacent main upright (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220160763.2U CN217398202U (en) | 2022-01-20 | 2022-01-20 | Tool type hanging basket for hoisting polyphenyl particle cement sandwich composite batten |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220160763.2U CN217398202U (en) | 2022-01-20 | 2022-01-20 | Tool type hanging basket for hoisting polyphenyl particle cement sandwich composite batten |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217398202U true CN217398202U (en) | 2022-09-09 |
Family
ID=83136106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220160763.2U Active CN217398202U (en) | 2022-01-20 | 2022-01-20 | Tool type hanging basket for hoisting polyphenyl particle cement sandwich composite batten |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217398202U (en) |
-
2022
- 2022-01-20 CN CN202220160763.2U patent/CN217398202U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11028651B2 (en) | Drilling rig | |
RU2736256C2 (en) | Assembled protective screen for perimeter fencing | |
CN217398202U (en) | Tool type hanging basket for hoisting polyphenyl particle cement sandwich composite batten | |
CN112252741A (en) | Full-rail crane for super high-rise unit curtain wall and installation and use method thereof | |
CN208686051U (en) | A kind of construction material lift equipment | |
CN212957184U (en) | Low-rise building assembled roof | |
CN214062384U (en) | Full-rail crane for super high-rise unit curtain wall | |
CN116181377A (en) | Supporting net frame conveying device | |
CN212359072U (en) | Construction equipment of roofing of encorbelmenting | |
CN113526395B (en) | Floor elevator for aluminum alloy templates | |
CN210710588U (en) | Hoisting system for prefabricating pipe trench in highly-limited narrow space | |
CN210086783U (en) | Tool type operating platform for large-gradient inclined roof | |
CN210289068U (en) | Elevator shaft lifting platform | |
CN215859175U (en) | Lifting protection device for assembled building wallboard | |
CN219852778U (en) | Device for welding haunched steel structure under auxiliary beam of reverse construction method | |
CN214879858U (en) | Material lifting device for building | |
CN221856133U (en) | Safety protection device for building construction | |
CN209760042U (en) | Movable type liftable reeving machine operation platform | |
CN214527694U (en) | Plate hoisting device for building construction | |
CN110725523A (en) | Scaffold for building construction | |
CN215666814U (en) | Light reactor hoisting device | |
CN214243483U (en) | Be used for supplementary hoist device of cast-in-place roof beam stretch-draw | |
CN216471954U (en) | Liftable support for construction engineering construction | |
CN219116950U (en) | Assembled grid curtain hoisting structure | |
CN218507446U (en) | Simple lifting device for construction of assembled plate wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |