CN217383513U - Cooling device for steel structure production - Google Patents

Cooling device for steel structure production Download PDF

Info

Publication number
CN217383513U
CN217383513U CN202220522641.3U CN202220522641U CN217383513U CN 217383513 U CN217383513 U CN 217383513U CN 202220522641 U CN202220522641 U CN 202220522641U CN 217383513 U CN217383513 U CN 217383513U
Authority
CN
China
Prior art keywords
cooling box
cooling
cooling device
box
water receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220522641.3U
Other languages
Chinese (zh)
Inventor
黄翠红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Feiya Steel Structure Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220522641.3U priority Critical patent/CN217383513U/en
Application granted granted Critical
Publication of CN217383513U publication Critical patent/CN217383513U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Abstract

The utility model relates to the technical field of steel structure production, in particular to a cooling device for steel structure production, which comprises a cooling box and a water receiving box, wherein a feed inlet is arranged at the central position on the left side of the cooling box, a discharge outlet is arranged at the central position on the right side of the cooling box, supporting legs are fixedly connected at four corners of the bottom of the cooling box, and a plurality of guide wheels are rotatably connected between the front side and the back side of an inner cavity of the cooling box along the horizontal direction at equal intervals; the utility model is used for cooling device is used in steel construction production, through first standpipe cooperation second standpipe and first shower nozzle and the second shower nozzle that sets up, can be quick simultaneously cool off the steel construction tow sides for refrigerated efficiency utilizes two extraction fans of setting simultaneously, can effectually derive the steam that produces and arrange upwards, prevents that steam from scattering the scald staff and influencing the staff field of vision.

Description

Cooling device for steel structure production
Technical Field
The utility model relates to a steel construction production technical field specifically is a be used for steel construction production to use cooling device.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets. Because of its light dead weight and simple construction, it is widely used in large factory buildings, venues, super high-rise and other fields. The steel structure is easy to rust, and generally the steel structure needs to be derusted, galvanized or painted, and needs to be maintained regularly.
At present the steel construction when carrying out production, generally all need carry out cooling treatment, but current cooling device is when using, the cooling effect is relatively poor, can't carry out quick cooling to the tow sides of steel construction simultaneously, and when the cooling, can produce a large amount of steam, current cooling device lacks the direction to steam, cause steam to scatter, cause the scald to the staff easily, and cause certain influence to the work field of vision, consequently, need design one kind can cool off steel construction tow sides fast, and can effectually lead to the cooling device who takes out to steam.
SUMMERY OF THE UTILITY MODEL
The utility model provides a be not enough to prior art, the utility model provides a be used for steel construction production to use cooling device possesses can cool off the steel construction tow sides fast, and can effectually lead to advantages such as twitch to steam, has solved traditional cooling device cooling effect relatively poor, can't carry out quick cooling to the tow sides of steel construction simultaneously, and lacks and leads to steam, causes the scald to the staff easily, and leads to the fact the problem of certain influence to the work field of vision.
A cooling device for steel structure production comprises a cooling box and a water receiving box, wherein a feed inlet is formed in the central position of the left side of the cooling box, a discharge outlet is formed in the central position of the right side of the cooling box, supporting legs are fixedly connected to four corners of the bottom of the cooling box, a plurality of guide wheels are rotatably connected between the front side and the back side of an inner cavity of the cooling box along the horizontal direction at equal intervals, three second vertical pipes are fixedly connected to the top of the inner cavity of the cooling box along the horizontal direction at equal intervals, the top ends of the three second vertical pipes penetrate through the cooling box and are connected with an external water source, second spray heads are mounted at the bottom ends of the three second vertical pipes, the water receiving box is positioned between the four supporting legs, a water pump is fixedly mounted at the central position of the bottom of the inner cavity of the water receiving box, transverse pipes are fixedly connected between the left side and the right side of the inner cavity of the water receiving box, and the output ends of the water pump are fixedly communicated with the bottom ends of the transverse pipes, violently manage the top and transversely fixedly communicate along the level and have four first standpipe, four first standpipe is all sealed to run through the cooler bin bottom and the top all installs first shower nozzle, the fixed intercommunication in central position of cooler bin bottom has the drain pipe, the trompil has all been seted up with the crisscross position of three second standpipes in cooler bin inner chamber top, and equal fixed mounting has the suction fan in two trompils.
The utility model is used for steel construction production is with cooling device, wherein the equal fixedly connected with water conservancy diversion piece in four corners department of cooler bin inner chamber bottom, the drain pipe is close to the position of bottom and installs the ooff valve, through the drain pipe and the ooff valve that set up, makes the better drainage of water in the cooler bin to the water receiving incasement.
The utility model is used for cooling device is used in steel construction production, wherein two equal fixed funnels, two of having cup jointed in extraction fan top the equal fixedly connected with metal mesh in position that the funnel inner chamber is close to the top through funnel and the metal mesh that sets up, can make partial steam condensation, plays the purpose of water economy resource.
The utility model is used for cooling device is used in steel construction production, wherein water receiving tank top is open structure, the both ends of violently managing are seal structure.
The utility model is used for steel construction production is with cooling device, wherein four first shower nozzles stagger respectively between a plurality of guide pulleys, the high parallel and level of the height on guide pulley top and feed inlet and discharge gate bottom through this structure setting, make that first shower nozzle can be more even spray water to the steel construction bottom.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model is used for steel construction is cooling device for production, first standpipe cooperation second standpipe and first shower nozzle and second shower nozzle through setting up, can be quick simultaneously cool off the steel construction tow sides, refrigerated efficiency has been accelerated, utilize two extraction fans of setting simultaneously, can effectually derive the steam that produces and arrange upwards, prevent that steam from scattering the scald staff and influencing the staff field of vision, it is relatively poor to have solved traditional cooling device cooling effect, can't carry out quick cooling to the tow sides of steel construction simultaneously, and lack and lead to steam, cause the scald to the staff easily, and cause the problem of certain influence to the work field of vision.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
FIG. 1 is a schematic view of the overall front sectional structure of the present invention;
fig. 2 is a schematic view of the overall front view structure of the present invention.
In the figure: 01. a cooling tank; 02. a feed inlet; 03. a discharge port; 04. a guide wheel; 05. a drain pipe; 06. a water receiving tank; 07. a water pump; 08. a transverse tube; 09. a first vertical tube; 10. a first nozzle; 11. a second standpipe; 12. a second nozzle; 13. an exhaust fan; 14. a funnel; 15. a metal mesh; 16. support the feet.
Detailed Description
In the following description, numerous implementation details are set forth in order to provide a more thorough understanding of the present invention. It should be understood, however, that these implementation details should not be used to limit the invention. That is, in some embodiments of the invention, details of these implementations are not necessary. In addition, some conventional structures and components are shown in simplified schematic form in the drawings.
In addition, the descriptions related to "first", "second", etc. in the present invention are only for description purposes, not specifically referring to the order or sequence, and are not intended to limit the present invention, but only to distinguish the components or operations described in the same technical terms, and are not to be construed as indicating or implying any relative importance or implicit indication of the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the feature. In addition, the technical solutions in the embodiments may be combined with each other, but it must be based on the realization of those skilled in the art, and when the technical solutions are contradictory or cannot be realized, the combination of the technical solutions should not be considered to exist, and is not within the protection scope of the present invention.
Referring to fig. 1-2, the cooling device for steel structure production of the present invention comprises a cooling box 01 and a water receiving box 06, a feed inlet 02 is disposed at the left central position of the cooling box 01, a discharge outlet 03 is disposed at the right central position of the cooling box 01, supporting legs 16 are fixedly connected at four corners of the bottom of the cooling box 01, a plurality of guide wheels 04 are rotatably connected between the front and the back of the inner cavity of the cooling box 01 along the horizontal direction at equal intervals, three second vertical pipes 11 are fixedly connected at the top of the inner cavity of the cooling box 01 along the horizontal direction at equal intervals, the top ends of the three second vertical pipes 11 penetrate through the cooling box 01 and are connected with an external water source, second spray heads 12 are mounted at the bottom ends of the three second vertical pipes 11, the water receiving box 06 is disposed between the four supporting legs 16, a water pump 07 is fixedly mounted at the central position of the bottom of the inner cavity of the water receiving box 06, a horizontal pipe 08 is fixedly connected between the left side and the right side of the inner cavity of the water receiving box 06, the output of water pump 07 is with violently managing 08 bottom mounting intercommunication, violently manages 08 top and transversely fix the intercommunication along the level and have four first standpipe 09, and four first standpipe 09 are all sealed to run through cooler bin 01 bottom and top and all install first shower nozzle 10, and the fixed intercommunication in central position of cooler bin 01 bottom has drain pipe 05, and the trompil has all been seted up with three crisscross positions of second standpipe 11 in cooler bin 01 inner chamber top, and equal fixed mounting has extractor fan 13 in two trompils.
The equal fixedly connected with water conservancy diversion piece in four corners department of cooler bin 01 inner chamber bottom, the switch valve is installed to the position that drain pipe 05 is close to the bottom, through the drain pipe 05 and the switch valve that set up, makes the better drainage of water in the cooler bin 01 go into in the water receiving tank 06.
The funnel 14 has all been fixed to having cup jointed on two 13 tops of extraction fan, and the equal fixedly connected with metal mesh 15 in position that two 14 inner chambers of funnel are close to the top can make partial steam condensation through the funnel 14 and the metal mesh 15 that set up, plays the purpose of water economy resource.
The top of the water receiving tank 06 is of an open structure, and two ends of the transverse pipe 08 are of sealing structures.
Four first shower nozzles 10 stagger respectively and distribute between a plurality of guide pulleys 04, and the height on guide pulley 04 top and the high parallel and level of feed inlet 02 and discharge gate 03 bottom set up through this structure, make first shower nozzle 10 can be more even spray water to the steel construction bottom.
When using the utility model discloses the time: insert and promote from feed inlet 02 the refrigerated steel construction earlier, utilize guide pulley 04 to make its better removal, open water pump 07 switch and external water source switch simultaneously this moment, make the cooling water evenly spray to the top of steel construction from second shower nozzle 12 respectively, and through water pump 07 with the water in the water receiving tank 06 evenly spray to the bottom of steel construction from first shower nozzle 10 through violently pipe 08 and first standpipe 09, the efficiency of cooling has further been accelerated, open two suction fans 13 simultaneously, take the steam that produces and arrange upwards, part steam meets metal mesh 15 condensation and becomes liquid, drip into in the cooler bin 01 again through funnel 14, when the water yield reduces in the water receiving tank 06, open the ooff valve on the drain pipe 05, make the water in the cooler bin 01 discharge to the water receiving tank 06 in, form the circulation.
The above description is only an embodiment of the present invention, and is not intended to limit the present invention. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims (5)

1. The utility model provides a be used for steel construction production to use cooling device, includes cooler bin (01) and water receiving tank (06), its characterized in that: a feed inlet (02) is formed in the center of the left side of the cooling box (01), a discharge outlet (03) is formed in the center of the right side of the cooling box (01), supporting legs (16) are fixedly connected to four corners of the bottom of the cooling box (01), a plurality of guide wheels (04) are rotatably connected between the front side and the back side of an inner cavity of the cooling box (01) along the horizontal direction at equal intervals, three second vertical pipes (11) are fixedly connected to the top of the inner cavity of the cooling box (01) along the horizontal direction at equal intervals, the top ends of the three second vertical pipes (11) penetrate through the cooling box (01) and are connected with an external water source, second spray heads (12) are mounted at the bottom ends of the three second vertical pipes (11), the water receiving box (06) is located among the four supporting legs (16), and a water pump (07) is fixedly mounted at the center of the bottom of the inner cavity of the water receiving box (06), fixedly connected with violently manages (08) between water receiving tank (06) inner chamber left and right sides, water pump (07) output and violently manage (08) bottom mounting intercommunication, violently manage (08) top and have four first standpipe (09), four along the horizontal fixed intercommunication of level first standpipe (09) all seal and run through cooling box (01) bottom and top and all install first shower nozzle (10), the fixed intercommunication in central position of cooling box (01) bottom has drain pipe (05), trompil has all been seted up with three crisscross positions of second standpipe (11) in cooling box (01) inner chamber top, and equal fixed mounting has suction fan (13) in two trompils.
2. The cooling device for steel structure production according to claim 1, wherein: the equal fixedly connected with water conservancy diversion piece in four corners department of cooler bin (01) inner chamber bottom, the ooff valve is installed to the position that drain pipe (05) are close to the bottom.
3. The cooling device for steel structure production according to claim 1, wherein: two all fixed funnel (14) of having cup jointed in extraction fan (13) top, two the equal fixedly connected with metal mesh (15) in position that funnel (14) inner chamber is close to the top.
4. The cooling device for the steel structure production as claimed in claim 1, wherein: the top of the water receiving tank (06) is of an open structure, and two ends of the transverse pipe (08) are of sealing structures.
5. The cooling device for steel structure production according to claim 1, wherein: the four first spray heads (10) are respectively distributed among the guide wheels (04) in a staggered mode, and the heights of the top ends of the guide wheels (04) are flush with the heights of the bottoms of the feed inlet (02) and the discharge outlet (03).
CN202220522641.3U 2022-03-10 2022-03-10 Cooling device for steel structure production Active CN217383513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220522641.3U CN217383513U (en) 2022-03-10 2022-03-10 Cooling device for steel structure production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220522641.3U CN217383513U (en) 2022-03-10 2022-03-10 Cooling device for steel structure production

Publications (1)

Publication Number Publication Date
CN217383513U true CN217383513U (en) 2022-09-06

Family

ID=83102478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220522641.3U Active CN217383513U (en) 2022-03-10 2022-03-10 Cooling device for steel structure production

Country Status (1)

Country Link
CN (1) CN217383513U (en)

Similar Documents

Publication Publication Date Title
CN217383513U (en) Cooling device for steel structure production
CN106048931A (en) Dyeing equipment and method allowing dye liquor to flow inwards and outwards at the same time
CN210010244U (en) Construction site dust collecting equipment with circulating water system
CN208995185U (en) Coagulating formula inclined tube horizontal sedimentation tank
CN108826020B (en) Four-bin double-system integrated drainer
CN218221788U (en) Cooling and washing integrated washing tower
CN214009671U (en) Liquid drainage structure, equipment support base and refrigeration equipment
CN211210832U (en) New forms of energy water-saving irrigation equipment
CN209188385U (en) A kind of spray column cyclic water tank
CN210936329U (en) Glass heparin tube belt cleaning device
CN112484380A (en) Liquid drainage structure, equipment support base and refrigeration equipment
CN211936110U (en) Novel spray tower
KR102013755B1 (en) A scrubber
CN214920223U (en) Water cooling equipment for aluminum alloy cleaning production
CN112503967A (en) Counter-flow wet cooling tower
CN214880509U (en) Flow-guiding aeration biological filter
CN207362990U (en) A kind of floor drain being easily installed
CN211482096U (en) Ecological vertical greening wall based on water circulation
CN220030637U (en) Workshop high temperature steam curing pool
CN217490213U (en) Adjustable ultralow wet dust collector
CN217564250U (en) Municipal administration is municipal administration guardrail for three-dimensional greening
CN218491827U (en) Cooling device for hot galvanizing
CN209384341U (en) A kind of gardens ecological drainage system
CN106045877A (en) Reaction film backflushing tank for butanone oxime production
CN211430999U (en) Cleaning structure for pleurotus eryngii production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230920

Address after: No. 10 Jingsi Road, High tech Industrial Development Zone, Changji City, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region, 831100

Patentee after: Xinjiang Feiya Steel Structure Engineering Co.,Ltd.

Address before: Building 30, Huicheng, Zhongnanhai, Guidan Road, Nanhai District, Foshan City, Guangdong Province, 528000

Patentee before: Huang Cuihong