CN211936110U - Novel spray tower - Google Patents

Novel spray tower Download PDF

Info

Publication number
CN211936110U
CN211936110U CN201922393919.2U CN201922393919U CN211936110U CN 211936110 U CN211936110 U CN 211936110U CN 201922393919 U CN201922393919 U CN 201922393919U CN 211936110 U CN211936110 U CN 211936110U
Authority
CN
China
Prior art keywords
tower body
basin
pipe
tower
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922393919.2U
Other languages
Chinese (zh)
Inventor
孙应
任秀梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Hongqi Environmental Protection Technology Co ltd
Original Assignee
Chongqing Hongqi Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Hongqi Environmental Protection Technology Co ltd filed Critical Chongqing Hongqi Environmental Protection Technology Co ltd
Priority to CN201922393919.2U priority Critical patent/CN211936110U/en
Application granted granted Critical
Publication of CN211936110U publication Critical patent/CN211936110U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Gas Separation By Absorption (AREA)

Abstract

The utility model discloses a novel spray tower, comprising a tower body, the tower body lower extreme is provided with the air inlet, the tower body upper end is provided with the gas outlet, install in the tower body that first spraying mechanism and second spray the mechanism, first spray the mechanism through the slope set up the baffle with tower body inside wall fixed connection, first spraying mechanism below is provided with first basin, first basin below is provided with the second basin, first basin and second basin outside are connected with the outlet pipe, install the valve on the outlet pipe, the air inlet sets up the baffle below, the second sprays the mechanism setting and is in first spraying mechanism top. The spray tower can better promote gas flow, increase the contact time with liquid, and improve the treatment efficiency and the treatment quality.

Description

Novel spray tower
Technical Field
The utility model relates to a waste gas treatment technical field especially relates to a novel spray column.
Background
The spray tower is a device for treating waste gas. There are two types of spray towers commonly used at present. One is a filling type and is unsmooth in ventilation, and the other is a rotational flow plate type, so that the gas passing space is small, the efficiency is low, and the gas-liquid mixing is not uniform. Therefore, a novel spray tower is urgently needed to be developed to solve the problems of the two existing spray towers.
SUMMERY OF THE UTILITY MODEL
To the deficiency of the prior art, the technical problem to be solved by the present patent application is: how to provide a can be better improvement spray effect, simple structure, convenient to use's novel spray column.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a novel spray column, includes the tower body, the tower body lower extreme is provided with the air inlet, the tower body upper end is provided with the gas outlet, install in the tower body that first spraying mechanism and second spray the mechanism, first spraying mechanism through the slope set up the baffle with tower body inside wall fixed connection, first spraying mechanism below is provided with first basin, first basin below is provided with the second basin, first basin and second basin outside are connected with the outlet pipe, install the valve on the outlet pipe, the air inlet sets up the baffle below, the second sprays the mechanism setting and is in first spraying mechanism top.
Therefore, waste gas enters the tower body through the gas inlet, is sprayed by the first spraying mechanism and then is sprayed by the second spraying mechanism, and then is discharged from the gas outlet. Be provided with the baffle, block waste gas for waste gas can only rise through first spraying mechanism back, sprays the liquid drop gathering that the mechanism fell through first spraying mechanism and second in first basin, and first basin is just to first spraying mechanism setting, and the water from first basin spill falls into the second basin in, discharges through the outlet pipe. First basin is less than the volume of second basin, and first basin is just to first spraying mechanism setting, first basin and tower body inside wall fixed connection, and first basin can not cause the rising of waste gas to block.
Further, first mechanism that sprays includes the mounting panel that two subtends set up, the mounting panel with tower body inside wall fixed connection, two through a plurality of V-arrangement board fixed connection between the mounting panel, the opening direction of V-arrangement board is unanimous and the interval sets up, mounting panel outside fixed mounting has the trunk line, V-arrangement board upper shed has the small transfer line, the trunk line passes through the pipe joint intercommunication with the small transfer line and sets up, the pipe joint is installed in the mounting panel, just right on the V-arrangement board the small transfer line is provided with the opening, the shower nozzle is installed to the opening part, the trunk line passes the tower body is outside to be connected with the water tank, install water pump and valve on the trunk line.
Therefore, after waste gas enters the tower body, the waste gas moves upwards along a channel formed by the adjacent V-shaped plates, the valve is opened, the water pump acts, liquid is introduced into the branch pipeline through the main pipeline, the liquid is sprayed out through the spray head, the passing waste gas is sprayed and treated, and the treated liquid flows downwards along the surfaces of the V-shaped plates. The V-shaped plate is arranged, so that the flowing time and the flowing path of the waste gas in the box body are increased, the treatment time is prolonged, and the treatment effect is improved.
Further, the second sprays the mechanism including installing violently managing in the tower body, violently manage and install the nozzle downwards, violently manage and pass the tower body is connected with the water tank outward, violently install water pump and valve on the pipe. The valve is opened, and the water pump action drives water or liquid in the water tank and gets into in the violently pipe to from the nozzle blowout, handle once more through the waste gas that first spraying mechanism handled, improve the treatment effect.
Further, the number of the transverse pipes is at least 3. The treatment effect is improved.
Furthermore, a drain pipe is installed on the tower body and is right opposite to the junction position of the baffle and the side wall of the tower body. The liquid drops gathered on the baffle can be better discharged.
Furthermore, a demister is arranged in the spray tower and is arranged below the gas outlet. Can eliminate the fog in the waste gas, conveniently carry out subsequent processing.
In conclusion, the spray tower can better promote the gas flow, increase the contact time with liquid and improve the treatment efficiency and the treatment quality.
Drawings
In order to illustrate the embodiments of the present invention more clearly, the present invention will be further described with reference to the accompanying drawings and embodiments, wherein the drawings in the following description are only some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without inventive work, and wherein:
fig. 1 is the structural schematic diagram of the novel spray tower disclosed by the utility model.
Fig. 2 is a sectional view a-a of fig. 1.
Fig. 3 is a schematic structural view of the first sprayer and the first water tank and the baffle in fig. 2.
Fig. 4 is a schematic structural view of the first spraying mechanism in fig. 3, wherein a side mounting plate is not shown.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, a clear and complete description will be given below with reference to the technical solutions of the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, a novel spray tower comprises a tower body 1, wherein an air inlet 11 is arranged at the lower end of the tower body 1, an air outlet 12 is arranged at the upper end of the tower body 1, a first spray mechanism and a second spray mechanism are arranged in the tower body 1, the first spray mechanism is fixedly connected with the inner side wall of the tower body 1 through a baffle 2 arranged in an inclined manner, a first water tank 3 is arranged below the first spray mechanism, a second water tank 4 is arranged below the first water tank 3, the first water tank 3 and the second water tank 4 are outwards connected with an outlet pipe 31, a valve (not shown) is arranged on the outlet pipe 31, the air inlet 11 is arranged below the baffle 2, and the second spray mechanism is arranged above the first spray mechanism.
Therefore, waste gas enters the tower body through the gas inlet, is sprayed by the first spraying mechanism and then is sprayed by the second spraying mechanism, and then is discharged from the gas outlet. Be provided with the baffle, block waste gas for waste gas can only rise through first spraying mechanism back, sprays the liquid drop gathering that the mechanism fell through first spraying mechanism and second in first basin, and first basin is just to first spraying mechanism setting, and the water from first basin spill falls into the second basin in, discharges through the outlet pipe. First basin is less than the volume of second basin, and first basin is just to first spraying mechanism setting, first basin and tower body inside wall fixed connection, and first basin can not cause the rising of waste gas to block.
In this embodiment, first mechanism that sprays includes mounting panel 4 that two subtends set up, mounting panel 4 with 1 inside wall fixed connection of tower body, two through 5 fixed connection of a plurality of V-arrangement boards between the mounting panel 4, the unanimous and interval setting of opening direction of V- arrangement board 5, 4 outside fixed mounting of mounting panel has trunk line 41, 5 upper shed of V-arrangement board has pipeline 51, trunk line 41 passes through the pipe joint intercommunication with pipeline 51 and sets up, the pipe joint is installed in mounting panel 4, V-arrangement board 5 is last just right pipeline 51 is provided with the opening, shower nozzle 52 is installed to the opening part, trunk line 41 passes 1 externally connected with water tank 6 of tower body, install water pump 42 and valve on the trunk line 41.
Therefore, after waste gas enters the tower body, the waste gas moves upwards along a channel formed by the adjacent V-shaped plates, the valve is opened, the water pump acts, liquid is introduced into the branch pipeline through the main pipeline, the liquid is sprayed out through the spray head, the passing waste gas is sprayed and treated, and the treated liquid flows downwards along the surfaces of the V-shaped plates. The V-shaped plate is arranged, so that the flowing time and the flowing path of the waste gas in the box body are increased, the treatment time is prolonged, and the treatment effect is improved.
In this embodiment, the second spraying mechanism includes a horizontal pipe 7 installed in the tower body 1, a nozzle 71 is installed downwards on the horizontal pipe 7, the horizontal pipe 7 penetrates through the tower body 1 and is connected with a water tank 6, and a water pump and a valve are installed on the horizontal pipe 7. The valve is opened, and the water pump action drives water or liquid in the water tank and gets into in the violently pipe to from the nozzle blowout, handle once more through the waste gas that first spraying mechanism handled, improve the treatment effect.
In this embodiment, at least 3 transverse tubes 7 are provided. The treatment effect is improved.
In this embodiment, install drain pipe 8 on tower body 1, drain pipe 8 just is to setting up the boundary position setting of baffle 2 and tower body 1 lateral wall. The liquid drops gathered on the baffle can be better discharged.
In this embodiment, a demister 9 is installed in the spray tower 1, and the demister 9 is disposed below the air outlet 12. Can eliminate the fog in the waste gas, conveniently carry out subsequent processing.
The working principle is as follows:
waste gas passes through in the air inlet gets into the tower body, along the passageway upward movement that adjacent V-arrangement board constitutes, the valve is opened, the water pump action, let in liquid to the small transfer line through the trunk line, liquid passes through the shower nozzle blowout, carry out the injection treatment to the waste gas of process, liquid after the processing is along V-arrangement board subsurface flow down, waste gas continues to rise, water or liquid in the water tank get into the cross-tube, and from the nozzle blowout, handle once more to the waste gas through first spraying mechanism processing, afterwards, the liquid drop collects in first basin and second basin, and on the baffle, discharge through drain pipe and outlet pipe, waste gas carries out the defogging through the defroster, later can carry out subsequent processing.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a novel spray column, a serial communication port, including the tower body, the tower body lower extreme is provided with the air inlet, the tower body upper end is provided with the gas outlet, install in the tower body that first spraying mechanism and second spray the mechanism, first spraying mechanism through the slope set up the baffle with tower body inside wall fixed connection, first spraying mechanism below is provided with first basin, first basin below is provided with the second basin, first basin and second basin outside are connected with the outlet pipe, install the valve on the outlet pipe, the air inlet sets up the baffle below, the second sprays the mechanism setting and is in first spraying mechanism top.
2. The novel spray tower as claimed in claim 1, wherein the first spray mechanism comprises two oppositely arranged mounting plates, the mounting plates are fixedly connected with the inner side wall of the tower body, the two mounting plates are fixedly connected with each other through a plurality of V-shaped plates, the opening directions of the V-shaped plates are consistent and arranged at intervals, a main pipe is fixedly mounted on the outer side of the mounting plates, a branch pipe is arranged at an opening of each V-shaped plate, the main pipe and the branch pipe are communicated through a pipe joint, the pipe joint is mounted in the mounting plates, an opening is formed in each V-shaped plate, a nozzle is mounted at the opening, the main pipe penetrates through the tower body and is connected with a water tank, and a water pump and a valve are mounted on the main pipe.
3. The novel spray tower as claimed in claim 2, wherein the second spray mechanism comprises a horizontal pipe installed in the tower body, the horizontal pipe is provided with a nozzle downwards, the horizontal pipe penetrates through the tower body and is connected with a water tank outwards, and a water pump and a valve are installed on the horizontal pipe.
4. The novel spray tower of claim 3, wherein at least 3 transverse pipes are provided.
5. The novel spray tower as claimed in claim 1, wherein a drain pipe is installed on the tower body, and the drain pipe is arranged right opposite to a junction position of the baffle plate and the side wall of the tower body.
6. The novel spray tower of claim 1, wherein a demister is installed in the spray tower and is arranged below the air outlet.
CN201922393919.2U 2019-12-27 2019-12-27 Novel spray tower Expired - Fee Related CN211936110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922393919.2U CN211936110U (en) 2019-12-27 2019-12-27 Novel spray tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922393919.2U CN211936110U (en) 2019-12-27 2019-12-27 Novel spray tower

Publications (1)

Publication Number Publication Date
CN211936110U true CN211936110U (en) 2020-11-17

Family

ID=73187806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922393919.2U Expired - Fee Related CN211936110U (en) 2019-12-27 2019-12-27 Novel spray tower

Country Status (1)

Country Link
CN (1) CN211936110U (en)

Similar Documents

Publication Publication Date Title
KR101354444B1 (en) Cleaning-type deodorizing apparatus for preventing cleaning solutions from mixing each other
CN208032249U (en) A kind of exhaust gas packed tower
CN210584455U (en) Novel waste gas purification tower
CN107998789B (en) Burning tail gas dust treatment equipment
CN109433501A (en) A kind of multi-level water whirling paint-spraying cabinet
CN215538647U (en) Coagulating sedimentation tank for wastewater treatment
CN211936110U (en) Novel spray tower
CN216798821U (en) Water distribution device for lateral flow sedimentation and sedimentation module
CN105477969B (en) A kind of device for being used to intercept salt fog and aerosol
CN209564830U (en) A kind of new type water rotation paint mist treatment device
CN206238081U (en) A kind of flush-type chicken manure cleaning equipment
CN211274193U (en) Waste gas purification device
CN211612049U (en) Hazardous waste burns gas cleaning equipment
CN209564831U (en) A kind of paint mist treatment cabinet
CN209935076U (en) Multistage water revolves cabinet that sprays paint
CN208080111U (en) A kind of landscape irrigation system
CN215539584U (en) Separator with defogging function
CN218306990U (en) Dust removal spray column
CN211025794U (en) Circulating spraying waste gas treatment device
CN215506244U (en) Water washing device for waste gas purification equipment
CN209491109U (en) A kind of cleaning device
CN204478905U (en) A kind of self-cleaning cooling tower air filter
CN204305878U (en) Lower water flushing-back filtering device
CN214158992U (en) Talcum powder production dust collector
CN214766420U (en) Paint spraying chamber pipeline system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117

Termination date: 20211227