CN217353086U CN202220937576.0U CN202220937576U CN217353086U CN 217353086 U CN217353086 U CN 217353086U CN 202220937576 U CN202220937576 U CN 202220937576U CN 217353086 U CN217353086 U CN 217353086U
Authority
CN
China
Prior art keywords
fixedly connected
steelframe
building curtain
steel frame
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220937576.0U
Other languages
Chinese (zh)
Inventor
高峰
沈守利
刘季昂
胡雨生
杨燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Lantian Building Decoration Engineering Co ltd
Original Assignee
Shanghai Lantian Building Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Lantian Building Decoration Engineering Co ltd filed Critical Shanghai Lantian Building Decoration Engineering Co ltd
Priority to CN202220937576.0U priority Critical patent/CN217353086U/en
Application granted granted Critical
Publication of CN217353086U publication Critical patent/CN217353086U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application discloses assembled building curtain belongs to building curtain technical field, including the steelframe and with steelframe fixed connection's horizontal stiffener, the equal fixedly connected with steel sheet of inside and outside of steelframe, the upper and lower side that first screw hole and first screw hole were all seted up to the both sides of steelframe has all welded spacing cardboard, the outside of steelframe both sides is provided with the pole setting that the mounting groove was seted up on the surface, the fixed surface of pole setting is connected with the locating part just the locating part sets up the inside at the mounting groove, bolt fixedly connected with upper cross rod is passed through at the top of steelframe, connecting piece fixedly connected with sheer pole is passed through to the bottom of steelframe, and is a set of spacing cardboard's quantity is two and two spacing cardboard inclines to set up relatively. This assembly type building curtain makes the comparatively easy dismantlement of maintenance personal installation curtain through setting up connecting piece and locating part, has practiced thrift maintenance personal's operating time.

Description

Assembled building curtain
Technical Field
The application belongs to the technical field of building curtain, especially, relate to an assembly type building curtain.
Background
The building curtain wall is composed of a supporting structure system and a panel, can have certain displacement capacity relative to the main body structure, and does not share the external protective structure or the decorative structure of the building acted on the main body structure. The curtain wall is an outer wall enclosure of a building, does not bear load, is hung like a curtain, is also called a hanging wall, and is a light wall with decoration effect commonly used by modern large-scale and high-rise buildings.
In the process of implementing the application, the inventor finds that at least the following problems exist in the technology: the assembled building curtain is in the in-process of accomplishing the use in the assembly, because the curtain itself forms through the equipment, not through concrete and building wall fixed connection, this has led to the curtain can appear the condition of rocking after the live time is longer, rocks for a long time and makes the curtain can receive some destruction and need take off the curtain and maintain.
Therefore, the assembled building curtain wall is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The purpose of this application is in order to solve among the prior art, the inconvenient problem of assembled building curtain inside heat insulating material change, and the assembled building curtain that proposes.
In order to achieve the purpose, the following technical scheme is adopted in the application:
the utility model provides an assembly type building curtain, include the steelframe and with steelframe fixed connection's horizontal stiffener, one side fixedly connected with steel sheet of steelframe, first screw hole and steelframe are located the upper and lower side of first screw hole and all weld spacing cardboard, the outside of steelframe both sides is provided with the pole setting that the mounting groove was seted up on the surface, the fixed surface of pole setting is connected with the locating part just the locating part sets up the inside at the mounting groove, bolt fixedly connected with upper cross rod is passed through at the top of steelframe, connecting piece fixedly connected with bottom rail is passed through to the bottom of steelframe.
The steel frame, the vertical rods and the cross rods are connected together through the limiting parts and the connecting parts, and an operator can take down the steel frame by controlling the connecting parts and the limiting parts so as to replace heat insulation materials filled between the steel frames.
Preferably, the number of the limiting clamping plates in one group is two, and the two limiting clamping plates are arranged in a relatively inclined mode.
Through setting up spacing cardboard slope, can with spacing cardboard card among the gap between locating part and the mounting groove, the spacing cardboard that the slope set up simultaneously also can prevent to rock about the steelframe.
Preferably, the limiting part comprises a limiting block fixedly connected with the vertical rod, a top block connected with the limiting block in a sliding manner, and a second threaded hole on one side of the limiting block.
Through setting up the kicking block in stopper inside, operating personnel can push up the kicking block to the outside when inserting the second screw hole with the bolt, and the kicking block that moves to the outside top can support the limiting plate to this guarantees that the steel sheet can not appear rocking because of having the gap between stopper and the stopper.
Preferably, the surfaces of the vertical rod, the upper cross rod and the lower cross rod are fixedly connected with lug plates with mounting holes on the surfaces.
Through setting up the otic placode, the decorator can install pole setting, last horizontal pole and sheer pole on the wall through the otic placode, the steelframe is lifted off with the follow-up installation of being convenient for.
Preferably, the connecting piece is fixedly installed at the top of the lower cross bar and arranged in the groove at the top of the lower cross bar.
Through setting up the connecting piece inside the recess, can help avoiding the connecting piece to hinder the operator as far as possible and take off the steelframe.
Preferably, the connecting piece includes a slide bar fixedly connected with the lower cross bar, a threaded sleeve slidably sleeved on the surface of the slide bar, and a spring arranged inside the threaded sleeve and sleeved on the surface of the slide bar.
Through set up the spring in threaded sleeve inside, make it paste on the slide bar surface with threaded sleeve pulling downwards through the spring, avoid threaded sleeve's upper portion to hinder the dismantlement of steelframe.
Preferably, the bottom of the lower cross rod is provided with a positioning hole matched with the bolt.
Through setting up the locating hole, the operator can only correspond the sheer pole position on upper strata with the last floor through the bolt, and the constructor of being convenient for aligns the relative position of curtain about when installing the curtain.
Preferably, one end of the ejector block close to the second threaded hole is arranged in a spherical mode.
One end of the ejector block is arranged to be a spherical shape, so that friction force between the ejector block and the bolt can be reduced, and the bolt can be conveniently ejected outwards to move the ejector block.
To sum up, the technical effect and the advantage of this application: this assembled building curtain sets up the locating part through the surface in the pole setting for locating part and spacing cardboard cooperation make to be connected more stably between steelframe and the pole setting, guarantee that the steelframe can not appear rocking about, set up the connecting piece simultaneously at the top of sheer pole, when guaranteeing that steelframe and sheer pole installation are stable, also convenient to use person adjusts the connecting piece in order to take off the steelframe when suitable time.
Drawings
FIG. 1 is a schematic diagram of the internal structure of the present application;
FIG. 2 is a schematic view of a steel frame construction of the present application;
FIG. 3 is a schematic external structural view of the present application;
FIG. 4 is a schematic view of the structure of the vertical rod of the present application;
FIG. 5 is a schematic view of a position limiting member according to the present application;
FIG. 6 is a cross-sectional view of the bottom rail of the present application;
fig. 7 is a schematic view of the structure of the connector of the present application.
In the figure: 1. a steel frame; 2. a transverse stiffener; 3. a steel plate; 4. a first threaded hole; 5. a limiting clamping plate; 6. erecting a rod; 61. mounting grooves;
62. a limiting member; 621. a limiting block; 622. a top block; 623. a second threaded hole;
7. an upper cross bar; 8. a bolt; 9. a lower cross bar;
91. a connecting member; 911. a threaded sleeve; 912. a slide bar; 913. a spring; 92. and (7) positioning the holes.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments.
Referring to fig. 1-2, an assembly type building curtain, including steelframe 1 and with 1 fixed connection's of steelframe horizontal stiffener 2, it has insulation material to fill between the steelframe 1, horizontal strength that horizontal stiffener 2 can guarantee 1 of steelframe helps avoiding 1 of steelframe to warp as far as possible, 1's of steelframe inside and outside all is through mounting nut fixedly connected with steel sheet 3, the operator can dismantle 1 both sides of steelframe steel sheet 3 through rotating mounting nut, first screw hole 4 has all been seted up to 1's of steelframe both sides, 1's of steelframe fixed surface welding has spacing cardboard 5, and spacing cardboard 5 is located the last downside of first screw hole 4, bolt 8 fixedly connected with upper horizontal pole 7 is passed through at 1's top of steelframe, 1's upper end runs through steelframe 1 and upper horizontal pole 7, there is lower horizontal pole 9 bottom through connecting piece 91 fixedly connected with of steelframe 1.
Referring to fig. 2, the quantity of a set of spacing cardboard 5 is two and two relative slopes of spacing cardboard 5 set up, and the spacing cardboard 5 that the slope set up can restrict steelframe 1 and rock about.
Referring to fig. 3-4, the outside of the two sides of the steel frame 1 is provided with a vertical rod 6 with a surface provided with a mounting groove 61, the surface of the vertical rod 6 is fixedly connected with a limiting part 62 and the limiting part 62 is arranged inside the mounting groove 61, a gap between the inner wall of the mounting groove 61 and the limiting part 62 can block the limiting clamping plate 5, the vertical rod 6, the surface of the upper cross rod 7 and the surface of the lower cross rod 9 are fixedly connected with lug plates with surface provided with mounting holes, a projection matched with the lug plates is arranged on the wall, and a user can fixedly connect the vertical rod 6, the upper cross rod 7 and the lower cross rod 9 on the wall through the cooperation of the mounting bolt and the lug plates.
Referring to fig. 4-5, the limiting member 62 includes a limiting block 621 fixedly connected to the vertical rod 6, and a top block 622 slidably connected to the limiting block 621, wherein a second threaded hole 623 is formed in one side of the limiting block 621, one end of the top block 622 close to the second threaded hole 623 is disposed in a spherical shape, and the top block 622 having a spherical end portion can effectively reduce the friction between the top block 622 and the mounting bolt.
Referring to fig. 6, the connector 91 is fixedly installed on the top of the bottom rail 9 and is disposed inside the groove on the top of the bottom rail 9. The bottom of the lower cross rod 9 is provided with a positioning hole 92 matched with the bolt 8, and the top end of the bolt 8 can be inserted into the positioning hole 92 so as to position the upper curtain wall and the lower curtain wall.
Referring to fig. 6-7, the connection member 91 includes a sliding rod 912 fixedly connected to the bottom rail 9, a threaded sleeve 911 slidably sleeved on a surface of the sliding rod 912, and a spring 913 disposed inside the threaded sleeve 911 and sleeved on a surface of the sliding rod 912, wherein the threaded sleeve 911 may extend upward through a hole at the bottom of the steel frame 1 and then cooperate with a nut to clamp the steel frame 1, so as to ensure that the steel frame 1 does not separate from the bottom rail 9.
The working principle is as follows: the vertical rod 6 is firstly installed on the side surface of the wall by a fitter, the upper cross rod 7 and the lower cross rod 9 are installed on the surfaces of an upper floor and a lower floor at the same time, then the steel frame 1 is slid between the upper cross rod 7 and the lower cross rod 9, then the steel frame 1 is clamped into the installation groove 61 with the limiting clamping plate 5, then the operator can insert the installation bolt into the first threaded hole 4 on two sides of the steel frame 1, the installation bolt can enter the second threaded hole 623 after being inserted into the first threaded hole 4, then the installation bolt can push the top block 622 out towards the outer side of the second threaded hole 623, then the top block 622 extending outwards can prop against the limiting clamping plate 5, so that the friction force between the limiting clamping plate 5 and the top block 622 is increased, meanwhile, the shaking of the steel frame 1 can be limited by the limiting clamping plate 5, then the threaded sleeve 911 is upwards stretched to enable the threaded sleeve to penetrate through the installation hole on the lower side of the steel frame 1, and then the nut is screwed on the surface of the threaded sleeve 911, the screw sleeve 911 has guaranteed that the steelframe 1 and the sheer pole 9 slide, and then the operator can run through the mounting hole of steelframe 1 upside with bolt 8, then runs through last horizontal pole 7 again and makes bolt 8 insert in the locating hole 92 of last curtain bottom sheer pole 9 bottom to curtain mounted position's accuracy about this assurance. When repairing the curtain wall, an operator firstly takes down the mounting nut to take down the steel plate 3 on the inner side, then rotates the bolt 8 and the threaded sleeve 911, and then rotates the bolt inside the second threaded hole 623 to take out the steel frame 1, so that a maintenance person can take down the curtain wall.
The above description is only for the preferred embodiments of the present application, but the scope of the present application is not limited thereto, and any person skilled in the art should be considered to be within the scope of the present application, and all equivalent substitutions and changes according to the technical solutions and the inventive concepts of the present application should be covered by the scope of the present application.

Claims (8)

1. An assembly type building curtain wall comprises a steel frame (1) and a transverse reinforcing rod (2) fixedly connected with the steel frame (1), it is characterized in that the inner side and the outer side of the steel frame (1) are fixedly connected with steel plates (3), first threaded holes (4) are formed in the two sides of the steel frame (1), limiting clamping plates (5) are welded on the upper side and the lower side of the steel frame (1) at the first threaded holes (4), upright posts (6) with mounting grooves (61) on the surfaces are arranged outside the two sides of the steel frame (1), the surface of the upright rod (6) is fixedly connected with a limiting piece (62), the limiting piece (62) is arranged in the mounting groove (61), the top of the steel frame (1) is fixedly connected with an upper cross rod (7) through a bolt (8), the bottom of the steel frame (1) is fixedly connected with a lower cross rod (9) through a connecting piece (91).
2. The fabricated building curtain wall as claimed in claim 1, wherein the number of the limiting clamping plates (5) is two, and the two limiting clamping plates (5) are arranged obliquely relative to each other.
3. The assembled building curtain wall as claimed in claim 1, wherein the limiting member (62) comprises a limiting block (621) fixedly connected with the vertical rod (6), a top block (622) slidably connected with the limiting block (621), and a second threaded hole (623) at one side of the limiting block (621).
4. The assembly type building curtain wall as claimed in claim 1, wherein the surfaces of the vertical rods (6), the upper cross rod (7) and the lower cross rod (9) are fixedly connected with lug plates with mounting holes on the surfaces.
5. An assembled building curtain wall as claimed in claim 1, wherein the connector (91) is fixedly mounted on top of the bottom rail (9) and is disposed within a recess in the top of the bottom rail (9).
6. The fabricated building curtain wall as claimed in claim 5, wherein the connecting piece (91) comprises a sliding rod (912) fixedly connected with the bottom cross rod (9), a threaded sleeve (911) slidably sleeved on the surface of the sliding rod (912), and a spring (913) arranged inside the threaded sleeve (911) and sleeved on the surface of the sliding rod (912).
7. The assembled building curtain wall as claimed in claim 1, wherein the bottom of the bottom cross bar (9) is provided with positioning holes (92) for matching with the bolts (8).
8. The prefabricated building curtain wall of claim 3, wherein one end of the top block (622) close to the second threaded hole (623) is arranged in a ball shape.
CN202220937576.0U 2022-04-22 2022-04-22 Assembled building curtain Active CN217353086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220937576.0U CN217353086U (en) 2022-04-22 2022-04-22 Assembled building curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220937576.0U CN217353086U (en) 2022-04-22 2022-04-22 Assembled building curtain

Publications (1)

Publication Number Publication Date
CN217353086U true CN217353086U (en) 2022-09-02

Family

ID=83056282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220937576.0U Active CN217353086U (en) 2022-04-22 2022-04-22 Assembled building curtain

Country Status (1)

Country Link
CN (1) CN217353086U (en)

Similar Documents

Publication Publication Date Title
CN217353086U (en) Assembled building curtain
CN212153855U (en) Building curtain wall structure
CN210374024U (en) Intelligent air conditioner easy to assemble
CN112196156A (en) Unit curtain wall plate anti-drop hanging joint and construction method thereof
CN216713553U (en) Fireproof environment-friendly curtain box
CN215563305U (en) Prefabricated assembled concrete frame dry node structure
CN210768370U (en) Steel construction window that wafts convenient to installation
CN203846655U (en) Short-cantilever dry-hanging device of stone curtain wall
CN210507901U (en) Assembled wall module
CN205840067U (en) The connector that type unitized curtain wall is connected with agent structure
CN219753963U (en) Horizontal supporting structure for concrete laminated slab construction
CN206289824U (en) A kind of long cantilever stone material back of the body bolt hanger system
CN219528087U (en) Building curtain wall mounting fastener
CN217151174U (en) Construction is with convenient to detach's supplementary installation device of scaffold frame
CN218814587U (en) Curtain wall structure for energy-saving green building
CN205990755U (en) A kind of masonry panel no scaffold eye constructing device
CN217734448U (en) Energy-saving prefabricated shear wall for building construction
CN218643789U (en) External wall insulation decorates intergral template construction erection equipment
CN219327085U (en) Grouting head for pile foundation
CN211774943U (en) Novel assembled building wall curtain
CN214696062U (en) Platform frame modular structure of green steel construction
CN217998388U (en) Fixing structure for large-distance overhanging connection outer hanging piece of exposed frame glass
CN218205152U (en) Toilet's roof furred ceiling structure
CN214994887U (en) Rapid-construction assembly type shear wall
CN220565560U (en) Detachable assembled embedded grid blocking device for inclined roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant