CN217352643U - Secant pile construction deviation correcting device - Google Patents

Secant pile construction deviation correcting device Download PDF

Info

Publication number
CN217352643U
CN217352643U CN202122527098.4U CN202122527098U CN217352643U CN 217352643 U CN217352643 U CN 217352643U CN 202122527098 U CN202122527098 U CN 202122527098U CN 217352643 U CN217352643 U CN 217352643U
Authority
CN
China
Prior art keywords
pile body
deviation correcting
pile
pipe
distance measuring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122527098.4U
Other languages
Chinese (zh)
Inventor
王飞
王世界
王欢
马秉顺
王嘉
吕文吏
张井昌
崔明宇
于超
崔吉光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Huixiang Engineering Technology Co ltd
Original Assignee
Liaoning Huixiang Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Huixiang Engineering Technology Co ltd filed Critical Liaoning Huixiang Engineering Technology Co ltd
Priority to CN202122527098.4U priority Critical patent/CN217352643U/en
Application granted granted Critical
Publication of CN217352643U publication Critical patent/CN217352643U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses an occlusive pile construction deviation correcting device, which comprises a pile hole, wherein a deviation correcting mechanism is arranged in the pile hole; the deviation correcting mechanism comprises a first pile body, a second pile body, a fixing plate, a hydraulic cylinder, a fixing pipe and an infrared distance measuring sensor; first pile body and second pile body are all installed to the downthehole portion left and right sides of stake, the equal equidistance laminating in first pile body right side and second pile body left side has the one end of a plurality of fixed plates, the other end fixedly connected with pneumatic cylinder of fixed plate, the fixed pipe of one end fixedly connected with of fixed plate is kept away from to the pneumatic cylinder. The utility model discloses a pneumatic cylinder and fixed plate on the fixed pipe can utilize the pneumatic cylinder to drive the fixed plate and remove, removes simultaneously to two piles and rectifies a deviation, is provided with infrared distance measuring sensor moreover on fixed pipe, can utilize infrared distance measuring sensor to measure two distances between the piles to judge whether two piles are in perpendicularly, promote the accuracy nature of rectifying a deviation.

Description

Secant pile construction deviation correcting device
Technical Field
The utility model relates to an occlusive pile construction technical field specifically is an occlusive pile construction deviation correcting device.
Background
The deviation correction of the oil cylinder of the drilling machine is generally as follows: when the deviation of the pile body is not large or the casing pipe is not deeply buried, the verticality of the casing pipe is adjusted by directly utilizing the oil cylinder of the drilling machine, so that the purpose of correcting the deviation can be achieved; when the pile body sleeve is deeply buried and deviates, the oil cylinder of the drilling machine can be used for directly rectifying deviation, if the requirement cannot be met, the inner side of the sleeve can be filled with soil, the sleeve can be pulled up at the same time until the sleeve is lifted to a position qualified in the last inspection, the perpendicularity of the sleeve is adjusted and inspected, and the sleeve is pressed down again; when the sleeve pipe deflects greatly, the deviation of the pile body cannot be effectively corrected by using the oil cylinder due to the problems of operation level, geological conditions, sleeve pipe rigidity and the like, and the sleeve pipe generates flexural deformation and even instability due to the pressing load of the oil cylinder, so that the pile body is forked. The bifurcate of the pile body not only influences the mechanical property of the pile, but also can cause the water leakage of the building envelope, and influences the implementation of the site construction. Therefore, how to ensure the perpendicularity of the pile body is the key of the secant pile construction.
Patent No. CN201720815447.3 discloses an secant pile construction deviation correcting device, and it includes the rig hydro-cylinder, and rig hydro-cylinder inner chamber is equipped with the pipe, and the pipe outside is equipped with the sleeve pipe, is equipped with the spirit level at the top of pipe. The beneficial effects of the utility model are that it is simple to rectify the principle, convenient operation, and the component configuration is easy.
At present, the existing deviation correcting device for the secant pile construction has some defects, such as defects; current secant pile construction deviation correcting device, the effect of rectifying is not fine, can't rectify simultaneously two pile bodies, and the device does not possess water injection mechanism moreover, when the piping, can't in time carry out the water injection.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an interlock pile construction deviation correcting device has solved the problem that proposes among the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a secant pile construction deviation correcting device comprises a pile hole, wherein a deviation correcting mechanism is arranged in the pile hole;
the deviation correcting mechanism comprises a first pile body, a second pile body, a fixing plate, a hydraulic cylinder, a fixing pipe and an infrared distance measuring sensor; first pile body and second pile body are all installed to the downthehole portion left and right sides of stake, the equal equidistance laminating in first pile body right side and second pile body left side has the one end of a plurality of fixed plates, the other end fixedly connected with pneumatic cylinder of fixed plate, the fixed pipe of one end fixedly connected with of fixed plate is kept away from to the pneumatic cylinder, the equal bolted connection in fixed pipe left and right sides has a plurality of infrared distance measuring sensor, and infrared distance measuring sensor is located between a plurality of pneumatic cylinders.
As an embodiment of the utility model, fixed pipe top intercommunication has the water pump, water pump top intercommunication has the connecting pipe, connecting pipe top intercommunication has the water tank, water tank top bolted connection has the rig hydro-cylinder.
As a preferred embodiment of the utility model, water tank rear side bolted connection industry control computer, industry control computer and infrared distance measuring sensor signal connection.
As a preferred embodiment of the utility model, water tank top left side intercommunication has the inlet tube, the inlet tube top is rotated and is connected with the tube cap.
As a preferred embodiment of the present invention, the fixing tube, the connecting tube, the water inlet tube and the fixing plate are made of stainless metal.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a pneumatic cylinder and fixed plate on the fixed pipe can utilize the pneumatic cylinder to drive the fixed plate and remove, removes simultaneously to two piles and rectifies a deviation, is provided with infrared distance measuring sensor moreover on fixed pipe, can utilize infrared distance measuring sensor to measure two distances between the piles to judge whether two piles are in perpendicularly, promote the accuracy nature of rectifying a deviation, be favorable to more practical use an interlock pile construction deviation correcting device.
2. The utility model discloses a fixed pipe intercommunication water pump can utilize water pump and fixed pipe at the in-process that the piping appears in the interlock stake, injects the inside water of water tank to stop the piping, be favorable to more practical use an interlock stake construction deviation correcting device.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a pile hole internal view of the deviation correcting device for secant pile construction of the utility model;
fig. 2 is the utility model discloses a secant pile construction deviation correcting device's water tank side view.
In the figure: the device comprises a pile hole 1, a pile hole 2, a first pile body 3, a second pile body 4, a drilling machine oil cylinder 5, a water tank 6, a connecting pipe 7, a water pump 8, a hydraulic cylinder 9, a fixing plate 10, an infrared distance measuring sensor 11, a water inlet pipe 12, a pipe cover 13, an industrial personal computer 14 and a fixing pipe.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-2, the present invention provides a technical solution: a secant pile construction deviation correcting device comprises a pile hole 1, wherein a deviation correcting mechanism is arranged in the pile hole 1;
the deviation rectifying mechanism comprises a first pile body 2, a second pile body 3, a fixing plate 9, a hydraulic cylinder 8, a fixing pipe 14 and an infrared distance measuring sensor 10; the left side and the right side of the interior of the pile hole 1 are respectively provided with a first pile body 2 and a second pile body 3, the right side of the first pile body 2 and the left side of the second pile body 3 are respectively and equidistantly laminated with one end of a plurality of fixing plates 9, the other end of each fixing plate 9 is fixedly connected with a hydraulic cylinder 8, one end of each hydraulic cylinder 8 far away from the fixing plate 9 is fixedly connected with a fixing pipe 14, the left side and the right side of each fixing pipe 14 are respectively connected with a plurality of infrared distance measuring sensors 10 through bolts, the infrared distance measuring sensors 10 are positioned among the plurality of hydraulic cylinders 8, the hydraulic cylinders 8 and the fixing plates 9 on the fixing pipes 14 can drive the fixing plates 9 to move by utilizing the hydraulic cylinders 8, and simultaneously move and correct the two pile bodies, and are provided with the infrared distance measuring sensors 10, so that the distance between the two pile bodies can be measured to judge whether the two pile bodies are vertical or not, the accuracy of deviation rectification is improved.
In the embodiment, referring to fig. 1, the top of the fixed pipe 14 is communicated with a water pump 7, the top of the water pump 7 is communicated with a connecting pipe 6, the top of the connecting pipe 6 is communicated with a water tank 5, the top of the water tank 5 is connected with a drilling machine oil cylinder 4 through a bolt, the fixed pipe 14 is communicated with the water pump 7, and water in the water tank 5 can be injected by the water pump 7 and the fixed pipe 14 in the process that piping occurs in the occlusive pile, so that the piping is stopped.
Referring to fig. 1 in this embodiment, the rear side of the water tank 5 is connected to an industrial personal computer 13 through a bolt, and the industrial personal computer 13 is in signal connection with an infrared distance measuring sensor 10.
In this embodiment, referring to fig. 1, a water inlet pipe 11 is communicated with the left side of the top of the water tank 5, and a pipe cover 12 is rotatably connected to the top of the water inlet pipe 11.
In the embodiment, referring to fig. 1, the fixing tube 14, the connecting tube 6, the water inlet tube 11 and the fixing plate 9 are made of stainless metal.
When the secant pile construction deviation correcting device is used, firstly, a hydraulic cylinder 8 is connected with external hydraulic equipment, a water pump 7, an infrared distance measuring sensor 10 and an industrial control computer 13 are electrically connected with an external power supply, then, the hydraulic cylinder 8, the water pump 7, the infrared distance measuring sensor 10 and the industrial control computer 13 are in signal connection with an external control switch, after the connection is finished, when the deviation correction is needed, a fixed pipe 14 is extended into a pile hole 1 by using a drilling machine oil cylinder 4, a first pile body 2 and a second pile body 3 are arranged between the first pile body 2 and the second pile body 3, then, the hydraulic cylinder 8 is opened, the hydraulic cylinder 8 drives a fixed plate 9 to abut against the first pile body 2 and the second pile body 3, the first pile body 2 and the second pile body 3 are moved to correct the deviation, the infrared distance measuring sensor 10 is arranged on the fixed pipe 14, the distance between the two pile bodies can be measured by using the infrared distance measuring sensor 10, and whether the two pile bodies are vertical or not is judged, promote the accuracy of rectifying, when taking place the piping and need carry out the water injection, can open water pump 7, utilize water pump 7 through connecting pipe 6 and fixed pipe 14, inject the inside water of water tank 5.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (5)

1. The utility model provides an interlock pile construction deviation correcting device, includes stake hole (1), its characterized in that: a deviation correcting mechanism is arranged inside the pile hole (1);
the deviation correcting mechanism comprises a first pile body (2), a second pile body (3), a fixing plate (9), a hydraulic cylinder (8), a fixing pipe (14) and an infrared distance measuring sensor (10); first pile body (2) and second pile body (3) are all installed to the inside left and right sides in stake hole (1), the one end that has a plurality of fixed plates (9) is equallyd divide apart from the laminating in first pile body (2) right side and second pile body (3) left side, the other end fixedly connected with pneumatic cylinder (8) of fixed plate (9), the fixed pipe of one end fixedly connected with (14) of fixed plate (9) is kept away from in pneumatic cylinder (8), the equal bolted connection in fixed pipe (14) left and right sides has a plurality of infrared distance measuring sensor (10), and infrared distance measuring sensor (10) are located between a plurality of pneumatic cylinder (8).
2. The secant pile construction deviation correcting device of claim 1, wherein: the top of the fixed pipe (14) is communicated with a water pump (7), the top of the water pump (7) is communicated with a connecting pipe (6), the top of the connecting pipe (6) is communicated with a water tank (5), and the top of the water tank (5) is in bolted connection with a drilling machine oil cylinder (4).
3. The secant pile construction deviation correcting device of claim 2, wherein: the rear side of the water tank (5) is connected with an industrial personal computer (13) through a bolt, and the industrial personal computer (13) is in signal connection with the infrared distance measuring sensor (10).
4. The secant pile construction deviation correcting device of claim 2, wherein: the water tank (5) top left side intercommunication has inlet tube (11), inlet tube (11) top rotation is connected with tube cap (12).
5. The secant pile construction deviation correcting device of claim 4, wherein: the fixed pipe (14), the connecting pipe (6), the water inlet pipe (11) and the fixed plate (9) are all made of stainless metal materials.
CN202122527098.4U 2021-10-20 2021-10-20 Secant pile construction deviation correcting device Active CN217352643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122527098.4U CN217352643U (en) 2021-10-20 2021-10-20 Secant pile construction deviation correcting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122527098.4U CN217352643U (en) 2021-10-20 2021-10-20 Secant pile construction deviation correcting device

Publications (1)

Publication Number Publication Date
CN217352643U true CN217352643U (en) 2022-09-02

Family

ID=83008818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122527098.4U Active CN217352643U (en) 2021-10-20 2021-10-20 Secant pile construction deviation correcting device

Country Status (1)

Country Link
CN (1) CN217352643U (en)

Similar Documents

Publication Publication Date Title
CN103243747B (en) Deviation rectifying method of prestressed concrete pipe pile foundation
CN203848823U (en) Combined type underground deep disaster monitoring device
CN112576812B (en) Large-diameter long-distance linear jacking pipe jacking method
CN103603330B (en) Method for using total station instrument to measure horizontal displacement of deep soil
CN108914999B (en) Deviation rectifying and repairing structure for inclined pile foundation
CN210311844U (en) Oil storage tank structure capable of rapidly detecting leakage points
CN110468887A (en) A kind of miniature steel pipe stake body soil pressure and displacement monitoring method
CN110485482A (en) A kind of miniature steel pipe stake body soil pressure and displacement monitor
CN201421330Y (en) Leveling device
CN217352643U (en) Secant pile construction deviation correcting device
CN201502060U (en) Bored pile double pile casing system
CN201520977U (en) Drilling bored pile underwater pouring concrete pile top elevation controller
CN203429596U (en) Gauging station using pipe jacking technique to build logging well
CN214783882U (en) Bored pile protects a fender pile location auxiliary device
CN216049765U (en) Full-automatic tunnel secondary lining thickness detection instrument
CN214577030U (en) Complicated environment ultra-long distance pipe jacking structure
CN210459252U (en) Cofferdam sheet pile capable of monitoring deep horizontal displacement
CN211312622U (en) Foundation pile bearing capacity detection device
CN211621892U (en) Leakage detection and leakage stoppage integrated device
CN204825934U (en) Side slope drainage system
CN208604644U (en) Static pressure pipe pile end resistance and stake subsoil loading test device
CN103953075B (en) Self Balance Test Method of Foundation Pile load box squeezing unit and mud-jacking technology
CN205748366U (en) A kind of automatic monitoring rod of Foundation Pit
CN214843702U (en) Pipeline gas metering instrument convenient to install for oil well
CN207147906U (en) A kind of signal detecting and protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant