CN217326748U - Building guardrail for civil engineering - Google Patents

Building guardrail for civil engineering Download PDF

Info

Publication number
CN217326748U
CN217326748U CN202220020905.5U CN202220020905U CN217326748U CN 217326748 U CN217326748 U CN 217326748U CN 202220020905 U CN202220020905 U CN 202220020905U CN 217326748 U CN217326748 U CN 217326748U
Authority
CN
China
Prior art keywords
guardrail
mounting
main part
plate
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220020905.5U
Other languages
Chinese (zh)
Inventor
杨学楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220020905.5U priority Critical patent/CN217326748U/en
Application granted granted Critical
Publication of CN217326748U publication Critical patent/CN217326748U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a building guardrail for civil engineering, including the guardrail main part, the one end of guardrail main part is provided with first bracing piece, the one end that first bracing piece was kept away from to the guardrail main part is provided with the second bracing piece, the utility model discloses in respectively being provided with two first mounting panels and second mounting panel at the both ends of first bracing piece and second bracing piece, be provided with the limiting plate in one side that the inside of guardrail main part is close to first mounting panel, like this when installing the guardrail main part, can align the inside limiting plate of guardrail main part and first mounting panel each other, first mounting panel plays the effect of spacing protection to the guardrail main part like this to the mesh that reaches the installation that can be better.

Description

Building guardrail for civil engineering
Technical Field
The utility model relates to a building material technical field, in particular to building guardrail for civil engineering.
Background
The guardrail is referred to as an industrial guardrail. The guardrail is mainly used for protecting and protecting personal safety and equipment facilities in occasions such as houses, highways, commercial districts, public places and the like. Guardrails are visible everywhere in our lives. The price per meter length of the guardrail can also be different according to the height.
However, the existing guardrail is generally installed by bolts when being installed, but the problem of inconvenient installation and positioning caused by the large gravity of the guardrail can occur during installation.
Therefore, it is necessary to provide a construction guardrail for civil engineering to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building guardrail for civil engineering to solve the problem among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a building guardrail for civil engineering, includes the guardrail main part, the one end of guardrail main part is provided with first bracing piece, the one end that first bracing piece was kept away from to the guardrail main part is provided with the second bracing piece, wherein:
the first supporting rod comprises two first mounting plates, two rod bodies and two second mounting plates, wherein the two first mounting plates are arranged at two ends above the rod bodies, the two second mounting plates are arranged at two ends below the rod bodies respectively;
the first mounting plate comprises a connecting hole, a clamping groove and a plate body, wherein the connecting hole is formed in the center of the plate body, and the clamping groove is formed in the center of the upper portion of the plate body;
the guardrail main part includes limiting plate, frame, branch and mounting hole, branch is provided with a plurality of, a plurality of altogether branch is installed in the middle position department of the inside a week of frame, the mounting hole is seted up in the inside four corners department of frame, the limiting plate is installed at frame top both ends, and the mounted position is in the top of mounting hole.
As a further aspect of the present invention, the first support rod and the second support rod are long strip-shaped structures, and the height of the first support rod and the height of the second support rod are greater than the height of the guardrail main body.
As a further aspect of the present invention, the width of the guardrail main body is the same as the inner space of the first mounting plate and the second mounting plate.
As a further aspect of the present invention, the first mounting plate and the second mounting plate are respectively provided with two, two the first mounting plate and the second mounting plate are plate-shaped structures.
As a further aspect of the present invention, the width of the slot is the same as the width of the plate body.
As a further proposal of the utility model, the limiting plate is provided with a boss near the center position of one side of the mounting hole.
Compared with the prior art, the utility model discloses possess following beneficial effect:
the utility model discloses in respectively be provided with two first mounting panels and second mounting panel at the both ends of first bracing piece and second bracing piece, be provided with the limiting plate in one side that the inside of guardrail main part is close to first mounting panel, like this when installing the guardrail main part, can align the inside limiting plate of guardrail main part and first mounting panel each other, first mounting panel plays the effect of spacing protection to the guardrail main part like this to the mesh of reaching the installation that can be better.
The utility model discloses in seted up the draw-in groove at the table end of first mounting panel, be provided with the boss in one side that the limiting plate is close to the inside draw-in groove of first mounting panel, limiting plate and the inside draw-in groove interconnect of first mounting panel like this to can be better reach and connect inseparable effect.
Drawings
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood and to be implemented in accordance with the content of the description, the preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
FIG. 1 is a schematic view of the whole structure of the building guardrail for civil engineering of the invention;
fig. 2 is a schematic view of the overall structure of the first support rod of the present invention;
fig. 3 is a schematic view of the overall structure of the first mounting plate of the present invention;
fig. 4 is a schematic view of the whole structure of the guardrail main body of the utility model.
In the figure: 1. a first support bar; 11. a first mounting plate; 111. connecting holes; 112. a card slot; 113. a plate body; 12. a rod body; 13. a second mounting plate; 2. a guardrail body; 21. a limiting plate; 22. a frame; 23. a strut; 24. mounting holes; 3. a second support bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention. In addition, for the convenience of description, the terms "upper", "lower", "left" and "right" are used to refer to the same direction as the upper, lower, left, right, etc. of the drawings, and the terms "first", "second", etc. are used for descriptive distinction and have no special meaning.
To the problem that exists among the prior art, the utility model provides a building guardrail for civil engineering, including the guardrail main part, the one end of guardrail main part is provided with first bracing piece, the one end that first bracing piece was kept away from to the guardrail main part is provided with the second bracing piece, and the concrete description is as follows:
1-first supporting rod
First bracing piece is including first mounting panel, the body of rod and second mounting panel, first mounting panel is provided with two altogether, two first mounting panel is installed at body of rod top both ends, the second mounting panel is provided with two altogether, two the second mounting panel is installed respectively at body of rod below both ends one.
The first supporting rod and the second supporting rod are both of a long strip-shaped structure, and the height of the first supporting rod and the height of the second supporting rod are larger than that of the guardrail main body.
The width of guardrail main part is the same with the inside interval of first mounting panel and second mounting panel.
The first mounting panel respectively is provided with two with the second mounting panel, two first mounting panel and second mounting panel are platelike structure.
2-first mounting plate
The first mounting plate comprises a connecting hole, a clamping groove and a plate body, the connecting hole is formed in the middle of the plate body, and the clamping groove is formed in the middle of the upper portion of the plate body.
The width of the clamping groove is the same as that of the plate body.
3-guardrail body
The guardrail main part includes limiting plate, frame, branch and mounting hole, branch is provided with a plurality of, a plurality of altogether branch is installed in the middle position department of the inside a week of frame, the mounting hole is seted up in the inside four corners department of frame, the limiting plate is installed at frame top both ends, and the mounted position is in the top of mounting hole.
And a boss is arranged at the center of the limiting plate close to one side of the mounting hole.
The first embodiment is as follows:
based on the above conception, as shown in fig. 1-4, the utility model provides a building guardrail for civil engineering, including guardrail main part 2, the one end of guardrail main part 2 is provided with first bracing piece 1, the one end that first bracing piece 1 was kept away from to guardrail main part 2 is provided with second bracing piece 3, wherein:
further, as shown in fig. 2, the first support rod 1 includes two first mounting plates 11, two rod bodies 12 and two second mounting plates 13, the two first mounting plates 11 are mounted at two ends above the rod body 12, the two second mounting plates 13 are mounted at two ends below the rod body 12, and the two second mounting plates 13 are respectively mounted at two ends below the rod body 12;
further, as shown in fig. 3, the first mounting plate 11 includes a connection hole 111, a slot 112 and a plate body 113, the connection hole 111 is opened at the center of the plate body 113, and the slot 112 is opened at the center of the upper side of the plate body 113;
further, as shown in fig. 4, the guardrail main body 2 includes a limiting plate 21, a frame 22, a supporting rod 23 and a mounting hole 24, the supporting rod 23 is provided with a plurality of, a plurality of altogether the supporting rod 23 is installed at the middle position of the inside a week of frame 22, the mounting hole 24 is opened at the inside four corners of frame 22, the limiting plate 21 is installed at both ends above the frame 22, and the mounting position is above the mounting hole 24.
Further, as shown in fig. 1, the first support rod 1 and the second support rod 3 are both of a long strip structure, and the height of the first support rod 1 and the height of the second support rod 3 are greater than the height of the guardrail main body 2.
Further, as shown in fig. 1, the guardrail body 2 has a width equal to the inner interval of the first and second mounting plates 11 and 13.
Further, as shown in fig. 2, two first mounting plates 11 and two second mounting plates 13 are respectively provided, and the two first mounting plates 11 and the two second mounting plates 13 are both plate-shaped structures.
Further, as shown in fig. 3, the width of the slot 112 is the same as the width of the plate 113.
Further, as shown in fig. 4, a boss is provided at a position of the stopper plate 21 in the middle of the side close to the mounting hole 24.
The working principle is as follows: during the use, at this moment take out first bracing piece 1 and second bracing piece 3 at first, later install first bracing piece 1 in suitable position department, later take out guardrail main part 2, interconnect limiting plate 21 inside guardrail main part 2 and the inside first mounting panel 11 of first bracing piece 1, then take out the bolt, align first mounting panel 11 and the inside mounting hole 24 interconnect of guardrail main part 2.
And then, the second support rod 3 and the guardrail body 2 are installed closely according to the steps, then the other section of the guardrail body 2 is taken out, and the other section of the guardrail body and one ends of the first support rod 1 and the second support rod 3, which are far away from the first section of the guardrail body 2, are installed in sequence, so that the installation and the use of the guardrail are completed.
Those skilled in the art will appreciate that the drawings are merely schematic representations of one preferred implementation scenario and that the blocks or flow diagrams in the drawings are not necessarily required to implement the present invention.
Those skilled in the art will appreciate that the modules in the devices in the implementation scenario may be distributed in the devices in the implementation scenario according to the description of the implementation scenario, or may be located in one or more devices different from the present implementation scenario with corresponding changes. The modules of the implementation scenario may be combined into one module, or may be further split into a plurality of sub-modules.
The above disclosure is only a concrete implementation scenario of the present invention, however, the present invention is not limited to this, and any changes that can be made by those skilled in the art should fall within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building guardrail for civil engineering, includes guardrail main part (2), its characterized in that: the one end of guardrail main part (2) is provided with first bracing piece (1), the one end that first bracing piece (1) was kept away from in guardrail main part (2) is provided with second bracing piece (3), wherein:
the first supporting rod (1) comprises two first mounting plates (11), a rod body (12) and two second mounting plates (13), the two first mounting plates (11) are arranged at two ends above the rod body (12), the two second mounting plates (13) are arranged at two ends below the rod body (12), and the two second mounting plates (13) are respectively arranged at two ends below the rod body (12);
the first mounting plate (11) comprises a connecting hole (111), a clamping groove (112) and a plate body (113), the connecting hole (111) is formed in the center of the plate body (113), and the clamping groove (112) is formed in the center of the upper portion of the plate body (113);
guardrail main part (2) are including limiting plate (21), frame (22), branch (23) and mounting hole (24), branch (23) are provided with a plurality of, a plurality of altogether branch (23) are installed in the middle position department of frame (22) inside a week, frame (22) inside four corners department is seted up in mounting hole (24), limiting plate (21) are installed at frame (22) top both ends, and the mounted position is in the top of mounting hole (24).
2. The building guardrail for civil engineering as claimed in claim 1, wherein: the guardrail comprises a guardrail body (2) and is characterized in that the first supporting rod (1) and the second supporting rod (3) are of long strip structures, and the heights of the first supporting rod (1) and the second supporting rod (3) are larger than that of the guardrail body (2).
3. The building guardrail for civil engineering as claimed in claim 1, wherein: the width of the guardrail main body (2) is the same as the internal space of the first mounting plate (11) and the second mounting plate (13).
4. The building guardrail for civil engineering as claimed in claim 1, wherein: first mounting panel (11) and second mounting panel (13) respectively are provided with two, two first mounting panel (11) and second mounting panel (13) are platelike structure.
5. The construction guardrail for civil engineering as claimed in claim 1, wherein: the width of the clamping groove (112) is the same as that of the plate body (113).
6. The building guardrail for civil engineering as claimed in claim 1, wherein: and a boss is arranged at the center of one side of the limiting plate (21) close to the mounting hole (24).
CN202220020905.5U 2022-01-06 2022-01-06 Building guardrail for civil engineering Expired - Fee Related CN217326748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220020905.5U CN217326748U (en) 2022-01-06 2022-01-06 Building guardrail for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220020905.5U CN217326748U (en) 2022-01-06 2022-01-06 Building guardrail for civil engineering

Publications (1)

Publication Number Publication Date
CN217326748U true CN217326748U (en) 2022-08-30

Family

ID=82992134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220020905.5U Expired - Fee Related CN217326748U (en) 2022-01-06 2022-01-06 Building guardrail for civil engineering

Country Status (1)

Country Link
CN (1) CN217326748U (en)

Similar Documents

Publication Publication Date Title
CN217326748U (en) Building guardrail for civil engineering
CN207934590U (en) A kind of municipal works gate-type fence
CN215107644U (en) Reinforced concrete corridor construction supporting structure for building construction technology
CN215482421U (en) Flexible protection shed tunnel device for karst tunnel
CN213952650U (en) High strength assembled curtain wall construction
CN211736682U (en) Glass fiber reinforced plastic structure fence
CN211812918U (en) Protection device for steel wire rope inlet of elevator machine room
CN210151938U (en) Column top supporting device for low-position jacking formwork system
CN211079892U (en) Safety protection blocking net for bridge
CN210342227U (en) Novel assembly type building frame
CN202810049U (en) Protective guard device
CN213959993U (en) Roof solar cell panel installing support
CN215330790U (en) Office building outer wall steel structure design structure
CN217420776U (en) Town road construction that can splice is with protection rail
CN214943146U (en) Assembled fender
CN213359621U (en) Rail guard for building site
CN210067631U (en) Net fence convenient to replace
CN217581588U (en) Traffic engineering is with enclosing fender safely that can have enough to meet need
CN211776487U (en) Safety device is used in multi-use architecture construction
CN219710679U (en) Back-bolt type dry-hanging stone corner connection structure
CN218783506U (en) Bridge connecting device for bridge
CN213654240U (en) Formwork support rod and support frame for building
CN211596520U (en) Anti-climbing structure of ETC portal frame
CN212177213U (en) Fire door is prevented to contact passageway
CN216616785U (en) Data center air conditioning equipment overhauls platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220830