CN217326499U - Building house construction is with pouring device - Google Patents

Building house construction is with pouring device Download PDF

Info

Publication number
CN217326499U
CN217326499U CN202220212538.9U CN202220212538U CN217326499U CN 217326499 U CN217326499 U CN 217326499U CN 202220212538 U CN202220212538 U CN 202220212538U CN 217326499 U CN217326499 U CN 217326499U
Authority
CN
China
Prior art keywords
pouring
pipe
pump
shock absorber
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220212538.9U
Other languages
Chinese (zh)
Inventor
王友超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220212538.9U priority Critical patent/CN217326499U/en
Application granted granted Critical
Publication of CN217326499U publication Critical patent/CN217326499U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a building engineering technical field, concretely relates to building house construction is with pouring device, including pouring pump, expansion disc and bumper shock absorber, the bottom of pouring the pump all is provided with the expansion disc, and the lower extreme of expansion disc is connected with the bumper shock absorber, and the expansion disc sets up respectively in the four corners of pouring the pump bottom. The utility model overcomes prior art's is not enough, through being provided with the bumper shock absorber, when this device removes the adjustment, because construction site road surface unevenness all is provided with the bumper shock absorber through pouring pump bottom four corners, can change the impact force that the external world brought through the shock attenuation effect of bumper shock absorber and solve to make the device remove the adjustment more stable, improved work efficiency, be favorable to in-service use.

Description

Building house construction is with pouring device
Technical Field
The utility model relates to a building engineering technology field specifically is a building house construction is with pouring device.
Background
The building is an artificially constructed asset, belongs to the category of fixed assets, and comprises two categories of houses and constructions, wherein the houses are engineering buildings for people to live, work, study, produce, manage, entertain, store articles and perform other social activities; the construction refers to engineering buildings except houses, such as walls, roads, dams, wells, tunnels, water towers, bridges, chimneys and the like; concrete is needed to be used in the building construction process, and a pouring device is used for pouring the concrete.
However, the concrete is stained with easily to the inner wall of discharging pipe after the concrete transmission with current partial building house construction with pouring device, block up the discharging pipe easily after the concrete dries, thereby influence the ejection of compact, it is very inconvenient when clearing up, be unfavorable for in-service use, moreover, current partial building house construction is with pouring device makes the device very inconvenient when removing because the construction site road surface unevenness easily when the construction site removes, work efficiency has been reduced, its shock attenuation effect is poor, be unfavorable for in-service use.
SUMMERY OF THE UTILITY MODEL
The utility model is not enough to prior art, the utility model provides a building house construction is with pouring device, the not enough of prior art has been overcome, structural design is simple, the effectual current partial building house construction of having solved is stained with the concrete easily with the inner wall of pouring device at the discharging pipe after the concrete transmission, block up the discharging pipe easily after the concrete drying, thereby influence the ejection of compact, it is very inconvenient when the clearance, be unfavorable for the in-service use, and, current partial building house construction is with pouring device because the uneven device of construction place road surface makes the device very inconvenient when removing when the construction place removes, and the work efficiency is reduced, its shock attenuation effect is poor, be unfavorable for the problem of in-service use.
In order to solve the technical problem, the utility model provides a following technical scheme:
a pouring device for building construction comprises a pouring pump, movable disks and shock absorbers, wherein the movable disks are arranged at the bottoms of the pouring pump, and the shock absorbers are connected to the lower ends of the movable disks;
the movable plates are respectively arranged at four corners of the bottom of the pouring pump.
Preferably, the fixed block is installed to the bottom of bumper shock absorber, the lower extreme movable mounting of fixed block has the gyro wheel, pour the surperficial right-hand member of pump and install the controller, the surperficial left end of controller is equipped with the display screen, the right-hand member of display screen is equipped with control button.
Preferably, the left side through connection who pours the pump has a transmission pipe, the connector is installed in the left side of transmission pipe, the surface of connector all through connection has fixing bolt, and fixing bolt all is and encircles the setting, the inboard of connector is provided with the sealing washer.
Preferably, the rear end embedding of pouring the pump is provided with the fan, and the fan is electric connection with the controller, the top of pouring the pump is connected with the inlet pipe, the upper end of inlet pipe is connected with feed hopper, feed hopper's inboard is provided with the filter screen.
Preferably, the upper end of the conveying pipe is connected with a communicating pipe, and the communicating pipe is used for respectively connecting the feeding pipe with the conveying pipe.
Preferably, a motor is installed on the right side of the pouring pump, a push rod is arranged at the upper end of the motor, one end of the motor is connected with a spiral rod, and the spiral rod is arranged inside the transmission pipe.
The embodiment of the utility model provides a construction of building house is with pouring device possesses following beneficial effect: this kind of modified building house construction is with pouring device can be stained with the concrete that attaches of the inner wall of discharging pipe after having transported the concrete and clear away, can not influence the ejection of compact, and is very convenient when the clearance, is favorable to the in-service use, and moreover, this kind of modified building house construction is with pouring the device and removing when adjusting at the construction site very stably, and the shock attenuation effect is strong, has improved work efficiency, is favorable to the in-service use.
1. By arranging the transmission pipe, the spiral rod and the motor, when the device is used, the pouring pipe is connected with the connector, then the screw rod is fixed by a fixing bolt, the motor is operated under the control of a control button on the controller, the screw rod is rotated after the motor is operated, then pouring the concrete to be transmitted into the transmission pipe through the feeding hopper, transmitting the concrete through the screw thread by the rotation of the screw rod, when the inner wall of the transmission pipe is stained with concrete after the concrete is transmitted, when the stained concrete is removed, wherein the screw rod is attached to the inner wall of the transmission pipe, the screw rod is rotated by the operation of the motor, the concrete attached to the inner wall of the transmission pipe can be scraped off when the spiral rod and the inner wall of the transmission pipe are attached to rotate, so that the concrete conveying device is very convenient to clean and is beneficial to practical use.
2. Through being provided with the bumper shock absorber, when this device removes the adjustment, because the construction site road surface is unsmooth, all is provided with the bumper shock absorber through pouring pump bottom four corners, and the shock attenuation effect through the bumper shock absorber can be dissolved the impact force that the external world brought to make the device remove the adjustment more stable, improved work efficiency, be favorable to in-service use.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall back structure of the present invention;
fig. 3 is a schematic view of the cross-sectional structure of the conveying pipe of the present invention.
In the figure: 1. pouring a pump; 2. a controller; 3. a display screen; 4. a control button; 5. a conveying pipe; 6. a connector; 7. fixing the bolt; 8. a seal ring; 9. a feed pipe; 10. a feed hopper; 11. a filter screen; 12. a fan; 13. a motor; 14. a push rod; 15. a movable tray; 16. a shock absorber; 17. a fixed block; 18. a roller; 19. a communicating pipe; 20. a screw rod.
Detailed Description
The preferred embodiments of the present invention will be described hereinafter with reference to the accompanying drawings, and it should be understood that the preferred embodiments described herein are merely for purposes of illustration and explanation, and are not intended to limit the present invention.
Example (b): as shown in fig. 1-2, a building construction is with pouring device, including pouring pump 1, expansion disc 15 and bumper shock absorber 16, the bottom of pouring pump 1 all is provided with expansion disc 15, expansion disc 15 can carry out 360 rotations, the lower extreme of expansion disc 15 is connected with bumper shock absorber 16, expansion disc 15 sets up respectively in the four corners of pouring pump 1 bottom, the shock attenuation effect through bumper shock absorber 16 can be dissolved the impact force that the external world brought, thereby make the device more stable at the removal adjustment, work efficiency has been improved.
Specifically, please refer to fig. 1-2, a fixed block 17 is installed at the bottom of the shock absorber 16, a roller 18 is movably installed at the lower end of the fixed block 17, when the device is moved and adjusted, the roller 18 is moved, the controller 2 is installed at the right end of the surface of the pouring pump 1, the left end of the surface of the controller 2 is provided with a display screen 3, the right end of the display screen 3 is provided with a control button 4, when the device is used, the whole device is controlled and adjusted through the control button 4 on the controller 2, and the display screen 3 is used for displaying all data of the whole device.
Specifically, please refer to fig. 1-3, the left side of the pouring pump 1 is connected with a transmission pipe 5 in a penetrating manner, the left side of the transmission pipe 5 is provided with a connector 6, the surface of the connector 6 is connected with a fixing bolt 7 in a penetrating manner, the fixing bolts 7 are arranged in a surrounding manner, the inner side of the connector 6 is provided with a sealing ring 8, before the device is used, the connector 6 is connected with the pouring pipe firstly, then the fixing bolt 7 is used for fixing, and the outer leakage of the concrete in the transmission process can be avoided by arranging the sealing ring 8.
Specifically, please refer to fig. 1-3, the rear end of the casting pump 1 is embedded with a fan 12, the fan 12 is electrically connected to the controller 2, the fan 12 is used for dissipating heat of the casting pump 1, the top of the casting pump 1 is connected with a feed pipe 9, the upper end of the feed pipe 9 is connected with a feed hopper 10, the inner side of the feed hopper 10 is provided with a filter screen 11, when concrete is transferred, the concrete is poured into the feed hopper 10 and then transferred into the transfer pipe 5 through the feed pipe 9 via a communicating pipe 19, and the filter screen 11 can filter large stones.
Specifically, referring to fig. 1-3, a communicating pipe 19 is connected to an upper end of the transfer pipe 5, the communicating pipe 19 connects the feeding pipe 9 and the transfer pipe 5, and concrete enters the communicating pipe 19 through the feeding pipe 9 and finally enters the transfer pipe 5 for transmission.
Specifically, referring to fig. 1-3, a motor 13 is installed on the right side of the casting pump 1, a push rod 14 is disposed at the upper end of the motor 13, the device is pushed by the push rod 14 when being moved and adjusted, one end of the motor 13 is connected with a spiral rod 20, the spiral rod 20 is disposed inside the transmission pipe 5, the spiral rod 20 is attached to the inner wall of the transmission pipe 5, the spiral rod 20 is rotated by the operation of the motor 13, the concrete entering the transmission pipe 5 can be transmitted, and the concrete attached to the inner wall of the transmission pipe 5 can be scraped off, which is beneficial to practical use.
The working principle is as follows: the utility model relates to a building house construction is with pouring device, when using this device, will pour the pipe and link to each other with connector 6, then fix through fixing bolt 7, make motor 13 operate through the control of control button 4 on the controller 2, make hob 20 rotate after motor 13 operates, then pour the concrete that needs the transmission into transmission pipe 5 through feed hopper 10, make the concrete transmit through the screw thread through the rotation of hob 20, transmission pipe 5 inner wall can be stained with attaches the concrete after the concrete transmission is finished, when clearing away the concrete that attaches, wherein hob 20 wants to paste with transmission pipe 5 inner wall, make hob 20 rotate through the operation of motor 13, want to paste and can scrape the concrete that attaches at transmission pipe 5 inner wall under when hob 20 rotates through hob 20 with transmission pipe 5 inner wall, the clearance is got up very conveniently, when this device removes the adjustment, because the construction site road surface is unsmooth, all is provided with bumper shock absorber 16 through pouring 1 bottom four corners of pump, can change the impact force that the external world brought through bumper shock absorber 16's shock attenuation effect and solve to make the device remove the adjustment more stable, improved work efficiency, be favorable to in-service use.

Claims (6)

1. A pouring device for building and house construction comprises a pouring pump (1), movable discs (15) and shock absorbers (16), and is characterized in that the movable discs (15) are arranged at the bottoms of the pouring pump (1), and the shock absorbers (16) are connected to the lower ends of the movable discs (15);
the movable discs (15) are respectively arranged at four corners of the bottom of the pouring pump (1).
2. The pouring device for building house construction according to claim 1, wherein a fixed block (17) is installed at the bottom of the shock absorber (16), rollers (18) are movably installed at the lower end of the fixed block (17), the controller (2) is installed at the right end of the surface of the pouring pump (1), a display screen (3) is arranged at the left end of the surface of the controller (2), and a control button (4) is arranged at the right end of the display screen (3).
3. The pouring device for building construction according to claim 1, wherein a transmission pipe (5) is connected to the left side of the pouring pump (1) in a penetrating mode, a connector (6) is installed on the left side of the transmission pipe (5), fixing bolts (7) are connected to the surface of the connector (6) in a penetrating mode, the fixing bolts (7) are arranged in a surrounding mode, and a sealing ring (8) is arranged on the inner side of the connector (6).
4. The pouring device for building construction according to claim 1, wherein a fan (12) is embedded in the rear end of the pouring pump (1), the fan (12) is electrically connected with the controller (2), the top of the pouring pump (1) is connected with a feeding pipe (9), the upper end of the feeding pipe (9) is connected with a feeding funnel (10), and a filter screen (11) is arranged on the inner side of the feeding funnel (10).
5. Pouring device for construction of building houses according to claim 3, characterized in that the upper end of the transfer pipe (5) is connected with a communicating pipe (19), and the communicating pipes (19) connect the feeding pipe (9) with the transfer pipe (5), respectively.
6. The pouring device for building construction according to claim 1, wherein a motor (13) is installed on the right side of the pouring pump (1), a push rod (14) is arranged at the upper end of the motor (13), a screw rod (20) is connected to one end of the motor (13), and the screw rod (20) is arranged inside the transmission pipe (5).
CN202220212538.9U 2022-01-26 2022-01-26 Building house construction is with pouring device Active CN217326499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220212538.9U CN217326499U (en) 2022-01-26 2022-01-26 Building house construction is with pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220212538.9U CN217326499U (en) 2022-01-26 2022-01-26 Building house construction is with pouring device

Publications (1)

Publication Number Publication Date
CN217326499U true CN217326499U (en) 2022-08-30

Family

ID=82995884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220212538.9U Active CN217326499U (en) 2022-01-26 2022-01-26 Building house construction is with pouring device

Country Status (1)

Country Link
CN (1) CN217326499U (en)

Similar Documents

Publication Publication Date Title
CN204325984U (en) A kind of road gallet scavenging machine
CN207137455U (en) A kind of garbage filtering device suitable for hydraulic engineering
CN110778848B (en) Self-cleaning sewage discharge pipeline joint for underground engineering construction
CN217326499U (en) Building house construction is with pouring device
CN203374227U (en) Direct circulation hole-cleaning device
CN211333730U (en) Concrete slab pours and uses slip casting device
CN208743211U (en) A kind of mining ore cleaning device
CN212201996U (en) Cleanable sand remover for mine
CN207363005U (en) One kind is used for the unapproachable sewer tube wall sewage disposal apparatus of people
CN212026569U (en) Dredging device for municipal underground pipeline
CN219604387U (en) Special-shaped steel pipe pile and slurry discharging auxiliary device
CN208466756U (en) Cable channel cleaning device and cable channel cleaning device
CN208056000U (en) A kind of adjustable antiseepage chute of notch for hydraulic engineering
CN208152486U (en) Multi-rise building refuse collection pipe-line system
CN111733958A (en) Environment-friendly road and bridge structure and construction method thereof
CN221029439U (en) Grouting pavement surface collecting machine
CN216896223U (en) Building water supply and drainage pipeline connecting device convenient to connect and install
CN219364847U (en) Rain and sewage diversion pipeline for road
CN221031160U (en) Dry-type floor building construction structure
CN216586926U (en) Drainage drop well convenient to mediation
CN216238063U (en) Highway road surface basic unit construction transversal joint processing apparatus
CN113694618B (en) Municipal works environmental protection drainage system
CN220284541U (en) Road roller for construction
CN213725064U (en) Single continuous ball grid plate filtering system and grid unit
CN211080813U (en) Water collecting device for green building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant