CN217323144U - A tower crane attached to a wall pier - Google Patents

A tower crane attached to a wall pier Download PDF

Info

Publication number
CN217323144U
CN217323144U CN202220350288.5U CN202220350288U CN217323144U CN 217323144 U CN217323144 U CN 217323144U CN 202220350288 U CN202220350288 U CN 202220350288U CN 217323144 U CN217323144 U CN 217323144U
Authority
CN
China
Prior art keywords
tower crane
pier
wall
embedded
structural frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220350288.5U
Other languages
Chinese (zh)
Inventor
向前
董晓刚
严宗宇
俞佳航
胡浩桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN202220350288.5U priority Critical patent/CN217323144U/en
Application granted granted Critical
Publication of CN217323144U publication Critical patent/CN217323144U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本实用新型提供了一种塔吊附墙墩,包括:预埋连接件,一端预埋在楼板内;结构框架,沿第一方向穿设在预埋连接件上,结构框架能够在预埋连接件上滑动;固定件,用于固定结构框架在预埋连接件上的滑动位置。基于本实用新型的技术方案,结构框架与预埋连接件可拆卸地连接,这样使得塔吊附墙墩能够在不同层的楼板上周转使用,从而提高了塔吊附墙墩的使用效率,避免了相关技术中在楼板上浇筑钢筋混凝土附墙墩,进而节约了塔吊作业的成本,同时提高了塔吊作业的效率。另外,结构框架能够在预埋连接件上滑动,这样使得塔吊附墙墩的高度可调,从而增加了塔吊附墙墩与外部的拉杆的连接范围,进而扩大了塔吊附墙墩的适用范围。

Figure 202220350288

The utility model provides a tower crane attached wall pier, comprising: a pre-embedded connector, one end of which is pre-embedded in a floor; a structural frame, which is penetrated on the pre-embedded connector along a first direction, and the structural frame can be inserted into the pre-embedded connector. Sliding up; fixing piece, used to fix the sliding position of the structural frame on the embedded connection piece. Based on the technical solution of the present utility model, the structural frame and the embedded connector are detachably connected, so that the tower crane attached wall pier can be used on floors of different floors, thereby improving the use efficiency of the tower crane attached wall pier and avoiding the related In the technology, reinforced concrete attached wall piers are poured on the floor slab, thereby saving the cost of tower crane operation and improving the efficiency of tower crane operation. In addition, the structural frame can slide on the embedded connectors, so that the height of the tower crane attached wall pier can be adjusted, thereby increasing the connection range of the tower crane attached wall pier and the external tie rod, thereby expanding the application scope of the tower crane attached wall pier.

Figure 202220350288

Description

一种塔吊附墙墩A tower crane attached to a wall pier

技术领域technical field

本实用新型涉及建筑施工技术领域,特别地涉及一种塔吊附墙墩。The utility model relates to the technical field of building construction, in particular to a tower crane attached to a wall pier.

背景技术Background technique

目前,塔吊水平臂超过自由高度时每隔一段高度都会设置拉杆把塔吊与结构物相连接,拉杆通常连接在构造柱或梁上。附墙杆有角度及长度的限制,导致塔吊有时无法附着在柱或梁上。At present, when the horizontal arm of the tower crane exceeds the free height, tie rods are set at intervals to connect the tower crane with the structure, and the tie rods are usually connected to the structural columns or beams. The angle and length of the wall-attached poles are limited, so that the tower crane sometimes cannot be attached to the column or beam.

然而,相关技术中通常在楼板上浇筑钢筋混凝土附墙墩供塔吊附着,钢筋混凝土附墙墩无法周转使用,这样容易导致施工进度慢,施工成本高。However, in the related art, reinforced concrete wall piers are usually poured on the floor for the tower crane to attach, and the reinforced concrete wall piers cannot be used for turnover, which easily leads to slow construction progress and high construction costs.

以上也就是说,相关技术中塔吊附墙墩无法周转使用的问题。That is to say, in the related art, the tower crane attached to the wall pier cannot be used in turnaround.

实用新型内容Utility model content

针对上述现有技术中的问题,本申请提出了一种塔吊附墙墩,解决了塔吊附墙墩无法周转使用的问题。In view of the above problems in the prior art, the present application proposes a tower crane attached wall pier, which solves the problem that the tower crane attached wall pier cannot be used in turnaround.

本实用新型的塔吊附墙墩,包括:预埋连接件,一端预埋在楼板内;The tower crane attached wall pier of the utility model comprises: a pre-embedded connecting piece, one end of which is pre-embedded in the floor;

结构框架,沿第一方向穿设在预埋连接件上,结构框架能够在预埋连接件上滑动;固定件,用于固定结构框架在预埋连接件上的滑动位置。The structural frame is penetrated on the embedded connecting piece along the first direction, and the structural frame can slide on the embedded connecting piece; the fixing piece is used for fixing the sliding position of the structural frame on the embedded connecting piece.

在一个实施方式中,预埋连接件采用地脚螺栓。In one embodiment, the pre-embedded connector adopts anchor bolts.

在一个实施方式中,固定件采用螺纹紧固件,螺纹紧固件与预埋连接件螺纹连接,螺纹紧固件能够固定结构框架在预埋连接件上的滑动位置。通过本实施方式,塔吊附墙墩的高度调节好之后,固定件与地脚螺栓通过螺纹配合,从而实现了固定件的固定作用,进而确保塔吊附墙墩能够调节至合适的高度进行支撑。In one embodiment, the fixing member adopts a threaded fastener, the threaded fastener is threadedly connected with the embedded connector, and the threaded fastener can fix the sliding position of the structural frame on the embedded connector. Through this embodiment, after the height of the tower crane attached wall pier is adjusted, the fixing member and the anchor bolt are threadedly matched, so as to realize the fixing effect of the fixing member, thereby ensuring that the tower crane attached wall pier can be adjusted to a suitable height for support.

在一个实施方式中,结构框架包括:多个结构单元,多个结构单元沿第二方向间隔设置;连接板,设置在多个结构单元上,连接板开设有第一连接孔。In one embodiment, the structural frame includes: a plurality of structural units, and the plurality of structural units are arranged at intervals along the second direction; a connecting plate is disposed on the plurality of structural units, and the connecting plate is provided with a first connecting hole.

在一个实施方式中,结构框架还包括连接梁,连接梁设置在多个结构单元中相邻的两个结构单元之间。In one embodiment, the structural frame further includes a connecting beam, and the connecting beam is arranged between two adjacent structural units in the plurality of structural units.

在一个实施方式中,结构单元呈三角架结构,结构单元包括:立柱;水平连接梁,一端与立柱的底端连接;斜拉连接梁,一端与立柱的顶端连接,其另一端与水平连接梁的另一端连接。通过本实施方式,将结构单元设置成三角架结构,这样加强了结构单元的连接强度,从而提高了塔吊附墙墩的支撑强度,进而满足支撑塔吊所需的强度要求。In one embodiment, the structural unit is a tripod structure, and the structural unit includes: a column; a horizontal connecting beam, one end of which is connected to the bottom end of the column; an inclined-stayed connecting beam, one end of which is connected to the top of the column, and the other end of which is connected to the horizontal connecting beam the other end of the connection. In this embodiment, the structural units are arranged in a tripod structure, which strengthens the connection strength of the structural units, thereby improving the support strength of the tower crane attached wall pier, thereby meeting the strength requirements for supporting the tower crane.

在一个实施方式中,立柱采用工字钢。In one embodiment, the columns are I-beams.

在一个实施方式中,还包括吊耳板,吊耳板设置在结构框架上,吊耳板用于连接外部的拉杆。通过本实施方式,吊耳板设置有吊耳孔,用于与外部的拉杆固定连接,从而确保塔吊附墙墩能够支撑塔吊,进而确保塔吊作业能够正常地开展。In one embodiment, a lifting lug plate is further included, the lifting lug plate is arranged on the structural frame, and the lifting lug plate is used to connect the external pull rod. In this embodiment, the lifting lug plate is provided with a lifting lug hole for fixed connection with an external tie rod, so as to ensure that the tower crane attached wall pier can support the tower crane, thereby ensuring that the tower crane operation can be carried out normally.

在一个实施方式中,还包括附墙墩底座,附墙墩底座穿设并固定在预埋连接件上,且位于结构框架的下方。通过本实施方式,设置附墙墩底座提高了塔吊附墙墩整体的稳定性,从而提高了塔吊附墙墩支撑的稳定性和可靠性。In one embodiment, it also includes a wall-attached pier base, which is penetrated and fixed on the embedded connector, and is located below the structural frame. Through the present embodiment, setting the base of the pier attached to the wall improves the overall stability of the pier attached to the tower crane, thereby improving the stability and reliability of the support of the pier attached to the tower crane.

在一个实施方式中,附墙墩底座为矩形形状的焊件,附墙墩底座的角部位置开设有第二连接孔,用于与预埋连接件固定连接。通过本实施方式,第二连接孔设置成螺纹孔,且与地脚螺栓螺纹连接,这样确保附墙墩底座能够稳定地固定在楼板上,从而确保附墙墩底座能够稳定地支撑塔吊。In one embodiment, the base of the pier attached to the wall is a rectangular-shaped weldment, and a second connection hole is opened at the corner of the base of the pier attached to the wall for fixed connection with the embedded connection piece. In this embodiment, the second connection hole is set as a threaded hole and is threadedly connected with the anchor bolt, which ensures that the base of the pier can be stably fixed on the floor, thereby ensuring that the base of the pier can stably support the tower crane.

上述技术特征可以各种适合的方式组合或由等效的技术特征来替代,只要能够达到本实用新型的目的。The above technical features can be combined in various suitable ways or replaced by equivalent technical features, as long as the purpose of the present invention can be achieved.

本实用新型提供的一种塔吊附墙墩,与现有技术相比,至少具备有以下有益效果:Compared with the prior art, the tower crane attached wall pier provided by the utility model has at least the following beneficial effects:

结构框架与预埋连接件可拆卸地连接,这样使得塔吊附墙墩能够在不同层的楼板上周转使用,从而提高了塔吊附墙墩的使用效率,避免了相关技术中在楼板上浇筑钢筋混凝土附墙墩,进而节约了塔吊作业的成本,同时提高了塔吊作业的效率。另外,结构框架能够在预埋连接件上滑动,这样使得塔吊附墙墩的高度可调,从而增加了塔吊附墙墩与外部的拉杆的连接范围,进而扩大了塔吊附墙墩的适用范围。The structural frame and the embedded connectors are detachably connected, so that the tower crane attached wall piers can be used on floors of different floors, thereby improving the use efficiency of the tower crane attached wall piers and avoiding the need to pour reinforced concrete on the floor in the related art. The wall pier is attached, thereby saving the cost of the tower crane operation and improving the efficiency of the tower crane operation. In addition, the structural frame can slide on the embedded connectors, so that the height of the tower crane attached wall pier can be adjusted, thereby increasing the connection range of the tower crane attached wall pier and the external tie rod, thereby expanding the application scope of the tower crane attached wall pier.

附图说明Description of drawings

在下文中将基于实施例并参考附图来对本实用新型进行更详细的描述。其中:Hereinafter, the present invention will be described in more detail based on embodiments and with reference to the accompanying drawings. in:

图1显示了本实用新型的塔吊附墙墩结构示意图(侧视视角);Fig. 1 shows the structural schematic diagram (side view) of the tower crane attached to the wall pier of the present invention;

图2显示了图1中的塔吊附墙墩的另一个角度的结构示意图(主视视角);Fig. 2 shows the structural schematic diagram (front view) of another angle of the tower crane attached to the wall pier in Fig. 1;

图3显示了图1中的塔吊附墙墩的另一个角度的结构示意图(俯视视角);Fig. 3 shows the structural schematic diagram of another angle of the tower crane attached to the wall pier in Fig. 1 (top view);

图4显示了图1中的预埋连接件与结构框架的装配关系示意图;FIG. 4 shows a schematic diagram of the assembly relationship between the embedded connector and the structural frame in FIG. 1;

图5显示了图1中的附墙墩底座的结构示意图;Fig. 5 shows the structural schematic diagram of the base of the pier attached to the wall in Fig. 1;

图6显示了图1中的连接板的结构示意图。FIG. 6 shows a schematic diagram of the structure of the connection board in FIG. 1 .

在附图中,相同的部件使用相同的附图标记。附图并未按照实际的比例。In the drawings, the same components are given the same reference numerals. The drawings are not to actual scale.

附图标记:Reference number:

10、预埋连接件;20、结构框架;21、结构单元;211、立柱;212、水平连接梁;213、斜拉连接梁;22、连接板;221、第一连接孔;23、连接梁;30、固定件;40、吊耳板;50、附墙墩底座;51、第二连接孔。10. Embedded connecting piece; 20. Structural frame; 21. Structural unit; 211. Upright column; 212. Horizontal connecting beam; 213. Cable-stayed connecting beam; 22. Connecting plate; ; 30, the fixing part; 40, the lug plate; 50, the base of the pier attached to the wall; 51, the second connecting hole.

具体实施方式Detailed ways

下面将结合附图对本实用新型作进一步说明。The present utility model will be further described below with reference to the accompanying drawings.

需要说明的是,本申请中的塔吊附墙墩作为支撑基础,用于侧向支撑塔吊,本申请中塔吊附墙墩固定在楼板上,其一侧与外部的拉杆连接,拉杆作为支撑杆,用于支撑塔吊。即拉杆设置在塔吊附墙墩与塔吊之间。It should be noted that the tower crane attached wall pier in this application is used as a support foundation to support the tower crane laterally. In this application, the tower crane attached wall pier is fixed on the floor, and one side thereof is connected with an external tie rod, and the tie rod is used as a support rod, Used to support tower cranes. That is, the tie rod is set between the tower crane attached wall pier and the tower crane.

需要说明的是,本申请中的第一方向是指图1中塔吊附墙墩的高度方向,第二方向是指图2中塔吊附墙墩的宽度方向。It should be noted that the first direction in this application refers to the height direction of the tower crane attached wall pier in FIG. 1 , and the second direction refers to the width direction of the tower crane attached wall pier in FIG. 2 .

如图1至图4所示,本实用新型提供了一种塔吊附墙墩,其包括预埋连接件10、结构框架20和固定件30。As shown in FIGS. 1 to 4 , the present invention provides a tower crane attached wall pier, which includes a pre-embedded connecting piece 10 , a structural frame 20 and a fixing piece 30 .

其中,预埋连接件10的一端预埋在楼板内,结构框架20沿第一方向穿设在预埋连接件10上,结构框架20能够在预埋连接件10上滑动,固定件30用于固定结构框架20在预埋连接件10上的滑动位置。One end of the embedded connector 10 is pre-embedded in the floor slab, the structural frame 20 is penetrated on the embedded connector 10 along the first direction, the structural frame 20 can slide on the embedded connector 10, and the fixing member 30 is used for The sliding position of the fixed structural frame 20 on the embedded connector 10 .

上述设置中,结构框架20与预埋连接件10可拆卸地连接,这样使得塔吊附墙墩能够在不同层的楼板上周转使用,从而提高了塔吊附墙墩的使用效率,避免了相关技术中在楼板上浇筑钢筋混凝土附墙墩,进而节约了塔吊作业的成本,同时提高了塔吊作业的效率。In the above setting, the structural frame 20 is detachably connected with the embedded connector 10, so that the tower crane attached wall pier can be used on floors of different floors, thereby improving the use efficiency of the tower crane attached wall pier and avoiding the related art. The reinforced concrete attached wall pier is poured on the floor, thereby saving the cost of tower crane operation and improving the efficiency of tower crane operation.

另外,结构框架20能够在预埋连接件10上滑动,这样使得塔吊附墙墩的高度可调,从而增加了塔吊附墙墩与外部的拉杆的连接范围,进而扩大了塔吊附墙墩的适用范围。In addition, the structural frame 20 can slide on the embedded connector 10, so that the height of the tower crane attached wall pier can be adjusted, thereby increasing the connection range between the tower crane attached wall pier and the external tie rod, thereby expanding the application of the tower crane attached wall pier scope.

具体地,如图1至图4所示,在一个实施例中,预埋连接件10采用地脚螺栓。Specifically, as shown in FIGS. 1 to 4 , in one embodiment, the embedded connector 10 adopts anchor bolts.

进一步地,预埋连接件10采用M48的地脚螺栓。Further, the embedded connector 10 adopts M48 anchor bolts.

具体地,如图1至图4所示,在一个实施例中,固定件30采用螺纹紧固件,螺纹紧固件与预埋连接件10螺纹连接,螺纹紧固件能够固定结构框架20在预埋连接件10上的滑动位置。Specifically, as shown in FIGS. 1 to 4 , in one embodiment, the fixing member 30 adopts a threaded fastener, the threaded fastener is threadedly connected with the embedded connector 10 , and the threaded fastener can fix the structural frame 20 in the Sliding position on the embedded connector 10 .

上述设置中,塔吊附墙墩的高度调节好之后,固定件30与地脚螺栓通过螺纹配合,从而实现了固定件30的固定作用,进而确保塔吊附墙墩能够调节至合适的高度进行支撑。In the above setting, after the height of the tower crane attachment wall pier is adjusted, the fixing member 30 and the anchor bolts are threadedly matched, so as to realize the fixing effect of the fixing member 30, thereby ensuring that the tower crane attachment wall pier can be adjusted to a suitable height for support.

具体地,如图1至图4所示,在一个实施例中,固定件30采用两个锁紧螺母。Specifically, as shown in FIGS. 1 to 4 , in one embodiment, the fixing member 30 adopts two locking nuts.

具体地,如图2、图3和图6所示,在一个实施例中,结构框架20包括多个结构单元21和连接板22。其中,多个结构单元21沿第二方向间隔设置,连接板22设置在多个结构单元21上,连接板22开设有第一连接孔221。Specifically, as shown in FIGS. 2 , 3 and 6 , in one embodiment, the structural frame 20 includes a plurality of structural units 21 and connecting plates 22 . The plurality of structural units 21 are arranged at intervals along the second direction, the connecting plates 22 are disposed on the plurality of structural units 21 , and the connecting plates 22 are provided with first connecting holes 221 .

具体地,如图2和图3所示,在一个实施例中,结构框架20包括三个结构单元21。第一连接孔221为螺纹孔,用于固定吊耳板40。Specifically, as shown in FIGS. 2 and 3 , in one embodiment, the structural frame 20 includes three structural units 21 . The first connection hole 221 is a threaded hole for fixing the lifting lug plate 40 .

当然在本申请附图中未显示的替代实施例中,结构框架20可设置成包括四个及四个以上的结构单元21。Of course, in alternative embodiments not shown in the drawings of the present application, the structural frame 20 may be configured to include four or more structural units 21 .

具体地,在一个实施例中,连接板22采用钢板,结构单元21为焊件。Specifically, in one embodiment, the connecting plate 22 is a steel plate, and the structural unit 21 is a weldment.

具体地,如图1和图4所示,在一个实施例中,结构单元21呈三角架结构,结构单元21包括立柱211、水平连接梁212和斜拉连接梁213。其中,水平连接梁212的一端与立柱211的底端连接,斜拉连接梁213的一端与立柱211的顶端连接,其另一端与水平连接梁212的另一端连接。Specifically, as shown in FIGS. 1 and 4 , in one embodiment, the structural unit 21 is a tripod structure, and the structural unit 21 includes a column 211 , a horizontal connecting beam 212 and a cable-stayed connecting beam 213 . One end of the horizontal connecting beam 212 is connected to the bottom end of the upright column 211 , one end of the cable-stayed connecting beam 213 is connected to the top end of the upright column 211 , and the other end is connected to the other end of the horizontal connecting beam 212 .

上述设置中,将结构单元21设置成三角架结构,这样加强了结构单元21的连接强度,从而提高了塔吊附墙墩的支撑强度,进而满足支撑塔吊所需的强度要求。In the above setting, the structural unit 21 is set as a tripod structure, which strengthens the connection strength of the structural unit 21, thereby improving the supporting strength of the tower crane attached wall pier, thereby meeting the strength requirements for supporting the tower crane.

具体地,如图1所示,在一个实施例中,水平连接梁212设置在上述两个锁紧螺母之间。Specifically, as shown in FIG. 1 , in one embodiment, the horizontal connecting beam 212 is disposed between the above two locking nuts.

具体地,如图1至图4所示,在一个实施例中,立柱211采用工字钢。Specifically, as shown in FIGS. 1 to 4 , in one embodiment, the upright column 211 is made of I-beam.

具体地,如图1所示,在一个实施例中,塔吊附墙墩还包括吊耳板40,吊耳板40设置在结构框架20上,吊耳板40用于连接外部的拉杆。Specifically, as shown in FIG. 1 , in one embodiment, the tower crane attachment wall pier further includes a lifting lug plate 40 , the lifting lug plate 40 is arranged on the structural frame 20 , and the lifting lug plate 40 is used for connecting external tie rods.

上述设置中,吊耳板40设置有吊耳孔,用于与外部的拉杆固定连接,从而确保塔吊附墙墩能够支撑塔吊,进而确保塔吊作业能够正常地开展。In the above arrangement, the lifting lug plate 40 is provided with a lifting lug hole for fixed connection with an external tie rod, so as to ensure that the tower crane attached wall pier can support the tower crane, thereby ensuring that the tower crane operation can be carried out normally.

具体地,如图1至图3所示,在一个实施例中,塔吊附墙墩还包括附墙墩底座50,附墙墩底座50穿设并固定在预埋连接件10上,且位于结构框架20的下方。Specifically, as shown in FIG. 1 to FIG. 3 , in one embodiment, the tower crane attached wall pier further includes an attached wall pier base 50 , and the attached wall pier base 50 is penetrated and fixed on the embedded connector 10 and is located in the structure below the frame 20.

上述设置中,设置附墙墩底座50提高了塔吊附墙墩整体的稳定性,从而提高了塔吊附墙墩支撑的稳定性和可靠性。In the above arrangement, setting the wall-attached pier base 50 improves the overall stability of the tower-mounted wall-mounted pier, thereby improving the stability and reliability of the tower-mounted wall-mounted pier support.

具体地,如图5所示,在一个实施例中,附墙墩底座50为矩形形状的焊件,附墙墩底座50的角部位置开设有第二连接孔51,用于与预埋连接件10固定连接。Specifically, as shown in FIG. 5 , in one embodiment, the base 50 of the pier attached to the wall is a welding piece in a rectangular shape, and the corner of the base 50 of the pier attached to the wall is provided with a second connection hole 51 for connecting with the pre-embedded pier 10 is fixedly connected.

上述设置中,第二连接孔51设置成螺纹孔,且与地脚螺栓螺纹连接,这样确保附墙墩底座50能够稳定地固定在楼板上,从而确保附墙墩底座50能够稳定地支撑塔吊。In the above arrangement, the second connection hole 51 is set as a threaded hole and is threadedly connected with the anchor bolt, thus ensuring that the pier base 50 can be stably fixed on the floor, thereby ensuring that the pier base 50 can stably support the tower crane.

具体地,如图1所示,在一个实施例中,所述结构框架20还包括连接梁23,所述连接梁23设置在所述多个结构单元21中相邻的两个所述结构单元21之间。Specifically, as shown in FIG. 1 , in one embodiment, the structural frame 20 further includes a connecting beam 23 , and the connecting beam 23 is disposed on two adjacent structural units among the plurality of structural units 21 . between 21.

上述设置中,设置连接梁23能够加强结构框架20的连接强度,从而确保塔吊附墙墩结构强度,进而满足对塔吊的支撑要求。In the above arrangement, the arrangement of the connecting beams 23 can strengthen the connection strength of the structural frame 20, thereby ensuring the structural strength of the tower crane attached wall pier, thereby meeting the support requirements for the tower crane.

需要说明的是,本申请中的工字钢的翼缘与钢板熔透焊,腹板与连接梁23焊接,能够提高工字钢抗弯强度。It should be noted that in the present application, the flange of the I-beam and the steel plate are penetration welded, and the web is welded to the connecting beam 23, which can improve the bending strength of the I-beam.

本申请中的塔吊附墙墩具有以下特点:The tower crane attached wall pier in this application has the following characteristics:

1、主要构件通过螺栓连接固定在楼板上,可实现快拆、快装操作,节约工期,提高施工质量的同时降低了施工成本。1. The main components are fixed on the floor by bolt connection, which can realize quick disassembly and quick installation, save construction period, improve construction quality and reduce construction cost.

2、各构件均为钢材加工制作,因而能够重复使用,减少了建筑废料的产出与成本支出,节能环保。2. Each component is made of steel, so it can be reused, reducing the output and cost of construction waste, saving energy and protecting the environment.

3、安装位置相对自由,增加塔吊可布置位置,降低施工难度。3. The installation position is relatively free, increasing the position where the tower crane can be arranged to reduce the difficulty of construction.

在本实用新型的描述中,需要理解的是,术语“上”、“下”、“底”、“顶”、“前”、“后”、“内”、“外”、“左”、“右”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "bottom", "top", "front", "rear", "inner", "outer", "left", The orientation or positional relationship indicated by "right" and the like is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation , are constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.

虽然在本文中参照了特定的实施方式来描述本实用新型,但是应该理解的是,这些实施例仅仅是本实用新型的原理和应用的示例。因此应该理解的是,可以对示例性的实施例进行许多修改,并且可以设计出其他的布置,只要不偏离所附权利要求所限定的本实用新型的精神和范围。应该理解的是,可以通过不同于原始权利要求所描述的方式来结合不同的从属权利要求和本文中所述的特征。还可以理解的是,结合单独实施例所描述的特征可以使用在其他所述实施例中。Although the invention has been described herein with reference to specific embodiments, it should be understood that these embodiments are merely exemplary of the principles and applications of the invention. It should therefore be understood that many modifications may be made to the exemplary embodiments and other arrangements can be devised without departing from the spirit and scope of the invention as defined by the appended claims. It should be understood that the features described in the various dependent claims and herein may be combined in different ways than are described in the original claims. It will also be appreciated that features described in connection with a single embodiment may be used in other described embodiments.

Claims (10)

1. The utility model provides a tower crane attaches wall mound which characterized in that includes:
one end of the pre-embedded connecting piece is pre-embedded in the floor slab;
the structural frame penetrates through the embedded connecting piece along a first direction and can slide on the embedded connecting piece;
and the fixing piece is used for fixing the sliding position of the structural frame on the embedded connecting piece.
2. The tower crane wall-attached pier according to claim 1, wherein the embedded connecting piece is an anchor bolt.
3. The tower crane wall-attached pier according to claim 2, wherein the fixing member is a threaded fastener, the threaded fastener is in threaded connection with the embedded connecting member, and the threaded fastener can fix the sliding position of the structural frame on the embedded connecting member.
4. The tower crane wall attachment pier according to claim 1, wherein the structural frame comprises:
a plurality of structural units arranged at intervals along a second direction;
the connecting plate is arranged on the plurality of structural units and is provided with a first connecting hole.
5. The tower crane wall pier of claim 4, wherein the structural frame further comprises a connecting beam disposed between two adjacent structural units of the plurality of structural units.
6. The tower crane attaches wall pier of claim 4, characterized in that, the constitutional unit is tripod structure, the constitutional unit includes:
a column;
one end of the horizontal connecting beam is connected with the bottom end of the upright post;
and one end of the diagonal connecting beam is connected with the top end of the upright post, and the other end of the diagonal connecting beam is connected with the other end of the horizontal connecting beam.
7. The tower crane wall pier of claim 6, wherein the upright column is made of I-steel.
8. The tower crane wall-attached pier according to claim 1, further comprising a lifting lug plate, wherein the lifting lug plate is arranged on the structural frame and is used for connecting an external pull rod.
9. The tower crane wall-attached pier of claim 1, further comprising a wall-attached pier base, wherein the wall-attached pier base is arranged on the embedded connecting piece in a penetrating manner and fixed, and is located below the structural frame.
10. The tower crane wall-attached pier of claim 9, wherein the wall-attached pier base is a rectangular weldment, and second connecting holes are formed in the corner positions of the wall-attached pier base and used for being fixedly connected with the embedded connecting pieces.
CN202220350288.5U 2022-02-21 2022-02-21 A tower crane attached to a wall pier Active CN217323144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220350288.5U CN217323144U (en) 2022-02-21 2022-02-21 A tower crane attached to a wall pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220350288.5U CN217323144U (en) 2022-02-21 2022-02-21 A tower crane attached to a wall pier

Publications (1)

Publication Number Publication Date
CN217323144U true CN217323144U (en) 2022-08-30

Family

ID=82996454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220350288.5U Active CN217323144U (en) 2022-02-21 2022-02-21 A tower crane attached to a wall pier

Country Status (1)

Country Link
CN (1) CN217323144U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116040506A (en) * 2022-12-29 2023-05-02 中国建筑第二工程局有限公司 A tower crane attachment wall reinforcement device, a tower crane attachment wall system and a construction method thereof
WO2024239489A1 (en) * 2023-05-25 2024-11-28 中建科工集团有限公司 Wall attachment structure and hoist device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116040506A (en) * 2022-12-29 2023-05-02 中国建筑第二工程局有限公司 A tower crane attachment wall reinforcement device, a tower crane attachment wall system and a construction method thereof
WO2024239489A1 (en) * 2023-05-25 2024-11-28 中建科工集团有限公司 Wall attachment structure and hoist device

Similar Documents

Publication Publication Date Title
CN110747746A (en) Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof
CN217323144U (en) A tower crane attached to a wall pier
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN219450459U (en) A Construction Frame Body of a Cylindrical Bridge Pier Covering the Girder with Hoops
CN217399706U (en) Height-adjustable steel structure modular building foundation connection node
CN216109354U (en) A transfer layer steel column installation structure
CN213390842U (en) Local bearing and supporting structure of steel truss
CN111809654B (en) An assembled weight-bearing tower crane foundation structure
CN214117221U (en) Wallboard in beam slab integration for assembly type structure
CN221256137U (en) Temporary supporting device for floor support plate
CN113863506A (en) A hybrid connection node of prefabricated concrete column and H-shaped steel beam
CN112049415A (en) Construction method of cornice formwork
CN209353366U (en) Tower Crane Foundation Conversion Parts
CN217267515U (en) Hanging beam connecting node structure
CN110700443A (en) Integral concrete structure of steel frame shear wall structure and construction method thereof
CN212404844U (en) Bracket system for cast-in-situ flange plate of I-shaped steel-concrete composite beam
CN115749258A (en) High-altitude overhanging roof formwork supporting system
CN210288449U (en) Integrated assembly type foundation
CN210369025U (en) Floor-free tower crane foundation construction structure with steel structure
CN208964354U (en) For horizontal or low-angle moving sidewalk truss medial support structures
CN217537027U (en) A deep foundation pit dewatering well operation platform
CN222121043U (en) A wall reinforcement device
CN216360884U (en) Building floor corner outer frame support system that encorbelments
CN111676972A (en) A safe operation platform for construction on foundation pit
CN216075601U (en) Assembled concrete column girder steel hybrid connection node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant