CN217321738U - Premixed concrete powder silo mount - Google Patents

Premixed concrete powder silo mount Download PDF

Info

Publication number
CN217321738U
CN217321738U CN202221233173.4U CN202221233173U CN217321738U CN 217321738 U CN217321738 U CN 217321738U CN 202221233173 U CN202221233173 U CN 202221233173U CN 217321738 U CN217321738 U CN 217321738U
Authority
CN
China
Prior art keywords
silo
channel
bottom plate
concrete powder
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221233173.4U
Other languages
Chinese (zh)
Inventor
陈光伟
孙福永
代勇
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meishan Chengtou Building Materials Co ltd
Original Assignee
Meishan Chengtou Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meishan Chengtou Building Materials Co ltd filed Critical Meishan Chengtou Building Materials Co ltd
Priority to CN202221233173.4U priority Critical patent/CN217321738U/en
Application granted granted Critical
Publication of CN217321738U publication Critical patent/CN217321738U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/51Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for storing agricultural or horticultural products

Landscapes

  • Storage Of Harvested Produce (AREA)

Abstract

The utility model relates to a premixed concrete powder silo mount, including integral anchor bottom plate, a plurality of material silos that set up side by side, integral upper portion connecting channel, be equipped with feed cylinder storehouse stand on the feed cylinder storehouse and feed cylinder storehouse stand is fixed in on the integral anchor bottom plate, integral upper portion connecting channel connects the upper portion at each material silo simultaneously, is provided with feed cylinder storehouse crossbeam between the feed cylinder storehouse stand, is provided with lower part connecting channel and exhibition formula on the feed cylinder storehouse crossbeam and overhauls the platform; the top surface of each silo is provided with a silo top connecting rod, and a connecting rod telescopic section is connected between the silo top connecting rods on two adjacent silos; cross cable ball supports are arranged among the upright columns of the charging barrel bins. The utility model discloses the wholeness is stronger, can bear the horizontal load in the certain limit, has better comprehensive benefit.

Description

Premixed concrete powder silo mount
Technical Field
The utility model relates to a premixed concrete powder silo mount mainly is applicable to the reinforcing fixed mounting construction of material silo in the great area of wind load.
Background
Silos are commonly found in petrochemical and construction enterprises and are commonly used to store loose particulate materials. According to the process arrangement characteristics and the requirements of conveying pipelines and the like, the storage bin is usually supported on a frame with the height of 15-25 m, and has the characteristics of high supporting position and gravity center, large load and the like. Due to the structural characteristics of the material silo and the construction environment of the material silo, the material silo is required to bear larger vertical load, larger wind load and larger earthquake load, and therefore, the overall stability of the material silo during working is required to be ensured by adopting a reasonable structural form.
In order to provide enough lateral rigidity, a plurality of supporting systems are required to be arranged on a steel-structured stock bin frame to ensure the lateral rigidity, and meanwhile, the stock bin is very sensitive to uneven settlement, so that a base plate with higher rigidity is required to support, and a proper material bin structure is required to be adopted on the premise of fully considering various load working conditions so as to reduce the construction difficulty and improve the construction efficiency.
In view of this, aiming at a series of problems existing in the manufacturing and construction of the prior charging bin bracket, the invention of a simple and effective premixed concrete powder silo fixing frame is urgently needed to improve the integrity of a silo group.
Disclosure of Invention
The utility model aims to improve the wholeness of the material silo group and have better technical and economic benefits.
In order to realize the technical purpose, the invention adopts the following technical scheme:
the utility model relates to a premixed concrete powder silo mount, including integral anchor bottom plate, a plurality of material silos that set up side by side, integral upper portion connecting channel, be equipped with feed cylinder storehouse stand on the feed cylinder storehouse and feed cylinder storehouse stand is fixed in on the integral anchor bottom plate, integral upper portion connecting channel connects the upper portion at each material silo simultaneously, is provided with feed cylinder storehouse crossbeam between the feed cylinder storehouse stand, is provided with lower part connecting channel and exhibition formula on the feed cylinder storehouse crossbeam and overhauls the platform; the top surface of each silo is provided with a silo top connecting rod, and a connecting rod telescopic section is connected between the silo top connecting rods on two adjacent silos; cross cable ball supports are arranged among the upright columns of the charging barrel bins.
Preferably, the integral anchoring bottom plate comprises reinforced longitudinal section steel and reinforced transverse section steel, the reinforced longitudinal section steel and the reinforced transverse section steel are arranged in a transversely-longitudinally staggered mode to form a plurality of lattices, and each lattice is internally provided with one anchoring bottom plate unit.
Preferably, the bottom of the upright column of the silo is provided with a column base bottom plate, the integral anchoring bottom plate is provided with a column base anchor bolt, and the column base bottom plate is fixedly connected with the column base anchor bolt.
Preferably, the column base bottom plate is provided with a limiting arc plate, the charging bin stand column is provided with an inclined rod limiting groove corresponding to the limiting arc plate, and a reinforcing inclined rod is arranged between the inclined rod limiting groove and the limiting arc plate.
Preferably, the bottom of the integral upper connecting channel is provided with a channel bottom plate, the lower end of the channel bottom plate is provided with a reinforced annular I-shaped steel corresponding to the charging barrel bin, the reinforced annular I-shaped steel is fixedly connected to the upper part of the charging barrel bin, and an upper connecting channel inclined strut is arranged between the reinforced annular I-shaped steel and the channel bottom plate.
Preferably, the lower connecting channels and the unfolding type overhauling platform are arranged between the cross beams of the charging bin, and the unfolding type overhauling platform is arranged between every two adjacent lower connecting channels.
Preferably, the bottom of the lower connecting channel is provided with a channel reinforcing I-shaped steel, and a channel connecting bolt is arranged between the channel reinforcing I-shaped steel and the lower connecting channel.
Preferably, the unfolding type maintenance platform is arranged between the two material bin cross beams, one end of the unfolding type maintenance platform is hinged with one material bin cross beam, and the unfolding type maintenance platform can turn over around the material bin cross beam up and down; the other end of the unfolding maintenance platform is provided with a platform unfolding stay rope which bypasses the beam of the other charging barrel bin; the inhaul cable is unfolded through the platform to fold and unfold the maintenance platform.
Preferably, a connecting rod fixing ring is arranged between the bin top connecting rod and the charging bin.
The invention has the following characteristics and beneficial effects:
1. the integral anchoring bottom plate with the reinforced longitudinal section steel and the reinforced transverse section steel to form the grid is arranged at the bottom of the material silo group, so that the material silo group can be fixed on a solid foundation, and the integrity of the material silo group is ensured.
2. The upper parts of the material silos are connected through the integral upper part connecting channel, the tops of the material silos are connected through the silo top connecting rod, and the cross cable ball supports are arranged among the vertical columns of the material silo, so that the connecting stability among the material silos is improved, the integrity of the material silo groups is improved, and the working stability and the load resistance of the material silo groups are improved.
3. The reinforced diagonal rod is additionally arranged on the charging bin stand column, so that the lateral bearing capacity of the charging bin stand column can be further guaranteed, and the overall stability of a charging bin group is further guaranteed.
4. Set up integral interface channel in feed cylinder storehouse top, the lower part sets up sub-unit connection passageway, and the construction of being convenient for sets up the formula of putting in feed cylinder storehouse crossbeam one side simultaneously and overhauls the platform, and the formula of putting in exhibition is overhauld the platform and is not the time spent accessible cable folding, guarantees to have sufficient operating space.
Drawings
FIG. 1 is an overall structure of the present invention;
FIG. 2 is a view of the unitary anchor base;
FIG. 3 is an enlarged view of the column shoe;
FIG. 4 is a schematic view of an upper connecting channel;
FIG. 5 is a side view of the overall structure;
FIG. 6 is a plan view of the overall structure;
FIG. 7 is a plan view of the bin top connecting rod;
wherein: 1. the integral type anchoring bottom plate 2, the reinforced longitudinal section steel 3, the column base bottom plate 4, the column base anchor bolt 5, the reinforced transverse section steel 6, the limiting arc plate 7, the reinforced diagonal rod 8, the upper limiting groove 9 of the diagonal rod, the charging bin upright post 10, the charging bin 11, the integral upper connecting channel 12, the bin top connecting rod 13, the connecting rod fixing ring 14, the connecting rod telescopic section 15, the channel bottom plate 16, the upper connecting channel diagonal brace 17, the reinforced annular I-steel 18, the lower connecting channel 19, the channel reinforced I-steel 20, the channel connecting bolt 21, the charging bin cross beam 22, the expanding type maintenance platform 23, the maintenance platform expanding stay 24 and the cross stay ball support.
Detailed Description
As shown in fig. 1-3, the premixed concrete powder silo fixing frame comprises an integral anchoring bottom plate 1, a column base bottom plate 3, a plurality of material silos 10 arranged side by side, a silo top connecting rod 12, an integral upper connecting channel 11, a lower connecting channel 18 and an unfolding type maintenance platform 22.
The material silo is provided with material silo stand columns 9 and material silo stand columns 9, the material silo stand columns 9 are arranged on the integral anchoring bottom plate 1, the lower ends of the material silo stand columns 9 are provided with column foot bottom plates 3, material silo cross beams 21 are connected between the material silo stand columns 9, an unfolding type maintenance platform 22 is arranged on the material silo cross beams 21, lower connecting channels 18 are arranged between the material silo cross beams 21, integral upper connecting channels 11 are arranged at the upper ends of the material silos 10, silo top connecting rods 12 are arranged on the top surfaces of the material silos 10, and cross cable ball supports 24 are arranged among the material silo stand columns 9. The cross cable ball support 24 comprises a central ball body located in the middle, four connecting rods are connected to the central ball body, the four connecting rods are of an X-shaped structure, two of the connecting rods are connected with the charging bin stand column 9 on one side, and the other two connecting rods are connected with the charging bin stand column 9 on the other side.
Integral anchor bottom plate 1 is including consolidating vertical shaped steel 2 and consolidating horizontal shaped steel 5, consolidates vertical shaped steel 2 and consolidates horizontal shaped steel 5 and violently indulges staggered arrangement and form a plurality of sash, all sets up an anchor bottom plate unit in every sash. Preferably, the reinforced longitudinal section steel 2 and the reinforced transverse section steel 5 are both I-shaped steel, and the reinforced longitudinal section steel 2 and the reinforced transverse section steel 5 are fixed by welding.
The bottom of the charging bin upright post 9 is provided with a column base bottom plate 3, and the column base bottom plate 3 is fixedly connected with the integral anchoring bottom plate 1 through a column base anchor bolt 4. Wherein, the column base anchor bolt 4 is pre-embedded on the integral anchoring base plate 1. The column base bottom plate 3 is provided with a column limiting arc plate 6, the side surface of the charging bin column 9 is provided with an inclined rod limiting groove 8 corresponding to the limiting arc plate 6, and a reinforcing inclined rod 7 is arranged between the inclined rod limiting groove 8 and the corresponding limiting arc plate 6. In this scheme, all be equipped with four on every feed cylinder storehouse stand 9 and consolidate down tube 7, four are consolidated down tube 7 and are distributed around feed cylinder storehouse stand 9 side.
As shown in fig. 4, the channel floor 15 is provided at the bottom of the integrated upper connecting channel 11, and the channel floor 15 is simultaneously connected to the upper portions of a plurality of cartridges 10 placed side by side. Wherein, the lower end of the channel bottom plate 15 is provided with a reinforced annular I-shaped steel 17 corresponding to the charging barrel bin 10, and the reinforced annular I-shaped steel 17 is fixedly connected with the side surface of the upper part of the charging barrel bin 10. An upper connecting channel inclined strut 16 is arranged between the reinforcing annular I-shaped steel 17 and the channel bottom plate 15, and the connection between the reinforcing annular I-shaped steel 17 and the channel bottom plate 15 is reinforced through the connecting channel inclined strut 16.
As shown in fig. 5-7, the silo cross beams 21 are arranged between the silo upright posts 9, and all the silo cross beams 21 are arranged at the same height. The lower connecting channel 18 and the unfolding type overhauling platform 22 are arranged on the charging bin cross beam 21, the lower connecting channel 18 and the unfolding type overhauling platform 22 are both arranged between the charging bin cross beams 21, and the unfolding type overhauling platform 22 is arranged between every two adjacent lower connecting channels 18. The bottom of the lower connecting channel 18 is provided with two channel reinforcing I-beams 19, the two channel reinforcing I-beams 19 are parallel to each other, the two channel reinforcing I-beams 19 are all transversely arranged on the two charging bin cross beams 21, and the lower connecting channel 18 is fixed on the two channel reinforcing I-beams 19. Specifically, a channel connecting bolt 20 is arranged between the channel reinforcing i-steel 19 and the lower connecting channel 18, and the channel reinforcing i-steel 19 and the lower connecting channel 18 are fixedly connected through the channel connecting bolt 20.
The exhibition formula is overhauld the platform 22 and is set up between two feed cylinder storehouse crossbeams 21, and the one end that the platform 22 was overhauld to the exhibition formula is put and is articulated rather than one of them feed cylinder storehouse crossbeam 21, and the exhibition formula is overhauld the platform 22 and can overturn from top to bottom round this feed cylinder storehouse crossbeam 21, and the other end that the platform 22 was overhauld to the exhibition formula is equipped with the platform and opens up and put cable 23, and the cable 23 is put in the platform exhibition is walked around from another feed cylinder storehouse crossbeam 21. The folding and unfolding operation of the platform is carried out through the platform unfolding inhaul cable 23. When the unfolding maintenance platform 22 is in a folded state, the platform unfolding stay 23 is in a vertical state, and one end of the platform unfolding stay 23, which is far away from the unfolding maintenance platform 22, bypasses the charging bin cross beam 21 and then naturally sags; when needs put formula maintenance platform 22 to the exhibition and carry out the exhibition and put, only need put cable 23 with the platform exhibition and pull down, make exhibition put formula maintenance platform 22 go up with the one end that cable 23 links to each other is put to the platform exhibition turn-up, finally make exhibition put formula maintenance platform 22 upset to the horizontality, then put cable 23 with the platform exhibition and keep away from the one end that exhibition put formula maintenance platform 22 and fix and make exhibition put formula maintenance platform 22 keep at the horizontality, exhibition after the upset is put formula maintenance platform 22 and 18 high parallel and level of sub-unit connection passageway, thereby put two adjacent sub-unit connection passageways 18 switch-ons.
A connecting rod telescopic section 14 is arranged between the bin top connecting rods 12, and a connecting rod fixing ring 13 is arranged between the bin top connecting rods 12 and the charging bin 10. Specifically, a silo top connecting rod 12 is arranged on the top surface of each silo 10, and the silo top connecting rod 12 is fixed with the silo 10 through a connecting rod fixing ring 13; the connecting rod telescopic section 14 is arranged between the bin top connecting rods 12 on two adjacent material silos 10; the connecting rod telescopic section 14 is cylindrical, two sections of internal threads are arranged on two sides of the inner wall of the connecting rod telescopic section 14, the rotating directions of the two sections of internal threads are opposite, external threads are respectively arranged on one ends of the two bin top connecting rods 12 connected with the connecting rod telescopic section 14, and the external threads on the end parts of the two bin top connecting rods 12 are respectively matched with the two sections of internal threads on the connecting rod telescopic section 14; the telescopic section 14 of the connecting rod is rotated to realize the telescopic effect between the two silo top connecting rods 12, so that the distance between the tops of two adjacent silo 10 is adjusted.

Claims (9)

1. A premixed concrete powder silo fixing frame is characterized by comprising an integral anchoring bottom plate (1), a plurality of material silos (10) arranged side by side and an integral upper connecting channel (11), wherein the material silo (10) is provided with material silo stand columns (9), the material silo stand columns (9) are fixed on the integral anchoring bottom plate (1), the integral upper connecting channel (11) is simultaneously connected to the upper parts of the material silos (10), material silo cross beams (21) are arranged among the material silo stand columns (9), and the material silo cross beams (21) are provided with lower connecting channels (18) and an unfolding type maintenance platform (22); the top surface of each material silo (10) is provided with a silo top connecting rod (12), and a connecting rod telescopic section (14) is connected between the silo top connecting rods (12) on two adjacent material silos (10); cross cable ball supports (24) are arranged between the charging barrel bin upright posts (9).
2. The ready mixed concrete powder silo mount according to claim 1, characterized in that the integral anchoring base plate (1) comprises reinforced longitudinal section steel (2) and reinforced transverse section steel (5), the reinforced longitudinal section steel (2) and the reinforced transverse section steel (5) are arranged in a staggered manner in the transverse direction and the longitudinal direction to form a plurality of lattices, and an anchoring base plate unit is arranged in each lattice.
3. The premixed concrete powder silo mount according to claim 1, wherein the bottom of the silo upright post (9) is provided with a column base bottom plate (3), the integral anchoring bottom plate (1) is provided with a column base anchor bolt (4), and the column base bottom plate (3) is fixedly connected with the column base anchor bolt (4).
4. The premixed concrete powder silo fixing frame according to claim 3, wherein the column base bottom plate (3) is provided with a limiting arc plate (6), the charging bin upright post (9) is provided with an inclined rod limiting groove (8) corresponding to the limiting arc plate (6), and a reinforcing inclined rod (7) is arranged between the inclined rod limiting groove (8) and the limiting arc plate (6).
5. The premixed concrete powder silo fixing frame according to claim 1, wherein a channel bottom plate (15) is arranged at the bottom of the integral upper connecting channel (11), a reinforced annular I-shaped steel (17) corresponding to the silo (10) is arranged at the lower end of the channel bottom plate (15), the reinforced annular I-shaped steel (17) is fixedly connected to the upper part of the silo (10), and an upper connecting channel inclined strut (16) is arranged between the reinforced annular I-shaped steel (17) and the channel bottom plate (15).
6. The ready mixed concrete powder silo mount according to any one of claims 1 to 5, characterized in that the lower connecting channels (18) and the open maintenance platform (22) are arranged between the silo beams (21), and one open maintenance platform (22) is arranged between two adjacent lower connecting channels (18).
7. The ready-mixed concrete powder silo mount according to claim 6, characterized in that the bottom of the lower connecting channel (18) is provided with a channel reinforcing I-steel (19), and a channel connecting bolt (20) is arranged between the channel reinforcing I-steel (19) and the lower connecting channel (18).
8. The ready-mixed concrete powder silo mount according to claim 6, characterized in that the spread maintenance platform (22) is arranged between two silo beams (21), one end of the spread maintenance platform (22) is hinged with one of the silo beams (21), and the spread maintenance platform (22) can be turned over up and down around the silo beam (21); the other end of the unfolding type maintenance platform (22) is provided with a platform unfolding guy cable (23), and the platform unfolding guy cable (23) bypasses the other material silo cross beam (21); the folding and unfolding operation of the unfolding type maintenance platform (22) is carried out through the platform unfolding inhaul cable (23).
9. The ready mixed concrete powder silo mount according to any one of claims 1 to 5, characterized in that a connecting rod securing ring (13) is provided between the silo roof connecting rod (12) and the silo (10).
CN202221233173.4U 2022-05-20 2022-05-20 Premixed concrete powder silo mount Active CN217321738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221233173.4U CN217321738U (en) 2022-05-20 2022-05-20 Premixed concrete powder silo mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221233173.4U CN217321738U (en) 2022-05-20 2022-05-20 Premixed concrete powder silo mount

Publications (1)

Publication Number Publication Date
CN217321738U true CN217321738U (en) 2022-08-30

Family

ID=82987775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221233173.4U Active CN217321738U (en) 2022-05-20 2022-05-20 Premixed concrete powder silo mount

Country Status (1)

Country Link
CN (1) CN217321738U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114800875A (en) * 2022-05-20 2022-07-29 眉山市城投建筑材料有限公司 Operation method of premixed concrete powder silo

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114800875A (en) * 2022-05-20 2022-07-29 眉山市城投建筑材料有限公司 Operation method of premixed concrete powder silo
CN114800875B (en) * 2022-05-20 2024-03-22 眉山市城投建筑材料有限公司 Operation method of premixed concrete powder silo

Similar Documents

Publication Publication Date Title
CN108265977B (en) Large-span space latticed shell assembly jig frame construction method under complex working condition
CN217321738U (en) Premixed concrete powder silo mount
CN214462704U (en) Adjustable jig frame for assembling steel truss
CN201581623U (en) Novel bowl-type steel tube scaffold
CN202202587U (en) Communication base station
CN111218987A (en) Bearing type net rack construction method
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
US10196248B2 (en) Jack with two masts
CN117302746A (en) Bearing frame for stacking reinforcing steel bars convenient to assemble
CN211566448U (en) Feeding device for mixing station and steel structure bent frame set
CN212612004U (en) Modular cast-in-place box girder braced system
CN209949014U (en) Dead weight formula photovoltaic support
CN210503881U (en) Assembled shear force wall piling bin
CN211283628U (en) Umbrella rib fixed type flexible adjustable net rack jacking unit
CN203006258U (en) Step-type rain-proof heavy-duty cantilever storage rack
CN203247699U (en) Modular building structure
CN110936500A (en) Feeding device for mixing station and steel structure bent frame set
CN111593732A (en) Roller compacted concrete warehousing method for crossing normal concrete dam section by adopting Bailey bridge
CN215168311U (en) Temporary supporting structure for reinforcing and reforming cultural relics
CN215631905U (en) Silo storehouse top template strutting arrangement
CN220167602U (en) Supporting system for vertical assembly of roof herringbone box girder
CN212897484U (en) High-altitude operation platform for constructional engineering
CN214883826U (en) Novel assembled tower crane steel foundation
CN216685796U (en) Novel overhead stirring station supporting structure
CN215666655U (en) Supporting structure for erecting gantry crane walking rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant