CN217299753U - Connecting structure for vertical rod of climbing frame - Google Patents

Connecting structure for vertical rod of climbing frame Download PDF

Info

Publication number
CN217299753U
CN217299753U CN202123320171.7U CN202123320171U CN217299753U CN 217299753 U CN217299753 U CN 217299753U CN 202123320171 U CN202123320171 U CN 202123320171U CN 217299753 U CN217299753 U CN 217299753U
Authority
CN
China
Prior art keywords
sleeve
joint
bolt
connecting structure
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123320171.7U
Other languages
Chinese (zh)
Inventor
孟凡达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xianneng Power Engineering Co Ltd
Original Assignee
Xianneng Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xianneng Power Engineering Co Ltd filed Critical Xianneng Power Engineering Co Ltd
Priority to CN202123320171.7U priority Critical patent/CN217299753U/en
Application granted granted Critical
Publication of CN217299753U publication Critical patent/CN217299753U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a climbing frame vertical rod connecting structure, which comprises a sleeve and a joint, wherein the joint is in a C-shaped structure, the lower end of the sleeve is welded with a top plate, and a drain hole is arranged on the top plate in the area surrounded by the sleeve; the side plate is correspondingly provided with a first bolt hole for a bolt to pass through so that the joint and the bottom pocket rod are fixed. The utility model has the advantages that: set up the wash port in the region that the sleeve pipe encloses on the roof to make the intraductal rainwater of entering sleeve pipe arrange to the greatest extent through the wash port on the roof, in order to avoid sleeve pipe or sleeve pipe and roof's welding department to appear the corrosion, increase of service life promotes the security.

Description

Connecting structure for vertical rod of climbing frame
Technical Field
The utility model relates to an intelligent (window) curtain installation construction field in the building, concretely relates to climb a pole setting connection structure.
Background
The tradition climbs a pole setting connection structure and contains sleeve pipe and steel sheet, and the sleeve pipe upper end passes through the bolt with the pole setting and fixes mutually, and its lower extreme welds with the steel sheet mutually, and the steel sheet then passes through the bolt with the scaffold board and fixes mutually, and in the outdoor long-term use, the easy long-pending rainwater of sleeve pipe because do not have drainage structures between sleeve pipe and the steel sheet, long-term ponding leads to the easy corrosion of the welded junction of sleeve pipe or sleeve pipe and steel sheet, influences life and security.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a climb a pole setting connection structure is provided to overcome not enough among the above-mentioned prior art.
The utility model provides an above-mentioned technical problem's technical scheme as follows: a climbing frame upright rod connecting structure comprises a sleeve and a joint, wherein the joint is of a C-shaped structure, the lower end of the sleeve is welded with a top plate, and a drain hole is formed in the area, surrounded by the sleeve, on the top plate; the side plate is correspondingly provided with a first bolt hole for a bolt to pass through so that the joint and the bottom pocket rod are fixed.
The beneficial effects of the utility model are that: set up the wash port in the region that the sleeve pipe encloses on the roof to make the rainwater that gets into in the sleeve pipe arrange to the greatest extent through the wash port on the roof, in order to avoid sleeve pipe or sleeve pipe and roof's welding department to appear the corrosion, increase of service life promotes the security.
On the basis of the technical scheme, the utility model discloses can also do following improvement.
Further, the first bolt hole is a kidney-shaped hole.
Adopt above-mentioned further beneficial effect to do: so that the position of the joint on the bottom pocket lever can be adjusted within a proper range according to the size of the scaffold board.
Furthermore, a second bolt hole for a bolt to pass through so as to fix the sleeve and the scaffold board is correspondingly formed in the sleeve.
Furthermore, a third bolt hole for a bolt to penetrate through is correspondingly formed in the sleeve so that the sleeve and the vertical rod can be fixed together.
Further, the sleeve is a square tube.
Adopt above-mentioned further beneficial effect to do: the square tube can play a role in preventing rotation.
Drawings
Fig. 1 is a perspective view of the connecting structure of the climbing frame and the upright rod of the present invention;
fig. 2 is a top view of the connecting structure of the climbing frame and the vertical rod.
In the drawings, the components represented by the respective reference numerals are listed below:
1. sleeve pipe, 110, second bolt hole, 120, third bolt hole, 2, joint, 210, top plate, 211, drain hole, 220, side plate, 221, first bolt hole.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
Example 1
As shown in fig. 1 and 2, a connecting structure of a climbing frame and a vertical rod comprises a sleeve 1 and a joint 2, wherein the joint 2 is of a C-shaped structure, the lower end of the sleeve 1 is welded with a top plate 210, and a drain hole 211 is formed in the area, surrounded by the sleeve 1, on the top plate 210, so that rainwater entering the sleeve 1 can be drained through the drain hole 211 on the top plate 210, and the sleeve 1 or the welded part of the sleeve 1 and the top plate 210 is prevented from being rusted; the side plate 220 is correspondingly provided with a first bolt hole 221 for a bolt to pass through so as to fix the joint 2 and the bottom pocket rod.
Example 2
As shown in fig. 1 and fig. 2, the present embodiment is a further improvement on embodiment 1, and specifically includes the following steps:
the first bolt hole 221 is a kidney-shaped hole so that the position of the joint 2 on the pocket bottom bar can be adjusted within a proper range according to the size of the footrest.
Example 3
As shown in fig. 1 and fig. 2, this embodiment is a further improvement on embodiment 1 or 2, and specifically includes the following steps:
the sleeve 1 is correspondingly provided with a second bolt hole 110 for a bolt to pass through so that the sleeve 1 and the scaffold board can be fixed.
Example 4
As shown in fig. 1, this embodiment is a further improvement on the basis of embodiment 1, 2 or 3, and specifically includes the following steps:
the sleeve 1 is correspondingly provided with a third bolt hole 120 through which a bolt can pass so that the sleeve 1 and the vertical rod are fixed.
Example 5
As shown in fig. 1, this embodiment is a further improvement on any one of embodiments 1 to 4, and specifically includes the following steps:
the sleeve 1 is a square tube, wherein the square tube can play a role in preventing rotation.
Although embodiments of the present invention have been shown and described, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art without departing from the scope of the present invention.

Claims (5)

1. A climbing frame and upright rod connecting structure is characterized by comprising a sleeve (1) and a joint (2), wherein the joint (2) is of a C-shaped structure, the lower end of the sleeve (1) is welded with a top plate (210), and a drain hole (211) is formed in the area surrounded by the sleeve (1) on the top plate (210); the side plate (220) is correspondingly provided with a first bolt hole (221) for a bolt to pass through so that the joint (2) and the bottom pocket rod are fixed.
2. The connecting structure for a climbing frame and a vertical rod according to claim 1, wherein the first bolt hole (221) is a kidney-shaped hole.
3. The connecting structure of the climbing frame and the upright rod according to claim 2, wherein the sleeve (1) is correspondingly provided with a second bolt hole (110) for a bolt to pass through so as to fix the sleeve (1) with the scaffold board.
4. A connecting structure for a climbing frame and an upright rod according to claim 3, characterized in that the sleeve (1) is correspondingly provided with a third bolt hole (120) for a bolt to pass through so as to fix the sleeve (1) and the upright rod.
5. A climbing frame and upright rod connecting structure according to any one of claims 1 to 4, characterized in that the sleeve (1) is a square tube.
CN202123320171.7U 2021-12-24 2021-12-24 Connecting structure for vertical rod of climbing frame Active CN217299753U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123320171.7U CN217299753U (en) 2021-12-24 2021-12-24 Connecting structure for vertical rod of climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123320171.7U CN217299753U (en) 2021-12-24 2021-12-24 Connecting structure for vertical rod of climbing frame

Publications (1)

Publication Number Publication Date
CN217299753U true CN217299753U (en) 2022-08-26

Family

ID=82920427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123320171.7U Active CN217299753U (en) 2021-12-24 2021-12-24 Connecting structure for vertical rod of climbing frame

Country Status (1)

Country Link
CN (1) CN217299753U (en)

Similar Documents

Publication Publication Date Title
CN112065029A (en) Overhanging type attached climbing frame wall-attached adjustable steel beam support
CN217299753U (en) Connecting structure for vertical rod of climbing frame
CN210683021U (en) Rotary tower body structure of tower crane
CN216949411U (en) Be used for inserted lift scaffold to hang and establish protection pocket net device
CN212271436U (en) External building drainage eaves mouth supporting component
CN211257794U (en) Intelligent combined mounting frame for building
CN214834658U (en) Wall-attached support of lifting scaffold
CN215368337U (en) Epitaxial light-duty sunshading board installation node structure
CN215160095U (en) B value adjustable construction elevator attaches wall member
CN212406082U (en) Overhanging type attached climbing frame wall-attached adjustable steel beam support structure
CN219508853U (en) Waterproof board of folding box house
CN216109256U (en) Novel waterproof system for curtain wall daylighting roof
CN220336263U (en) Roof parapet flashing structure
CN221031068U (en) Reinforced steel structure canopy
CN213391162U (en) Pedal support piece for building climbing frame and building climbing frame
CN213269005U (en) Climbing frame concrete pouring baffle
CN210914885U (en) Retaining wall rod fixing device of construction elevator
CN210535805U (en) Antenna fixing device for communication tower
CN216428821U (en) Protection installation node assembly
CN212957573U (en) Transverse connecting frame for scaffold
CN219909687U (en) Support device for integrally lifting roof truss
CN214512894U (en) Cornice model with roof steel mesh frame structure extension as keel
CN220565798U (en) Large-span photovoltaic waterproof shed support
CN212689545U (en) Corner pole setting device for lifting aluminum alloy climbing frame
CN209027125U (en) A kind of sectional shelf-unit for solar engineering system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant