CN217299753U - Connecting structure for vertical rod of climbing frame - Google Patents
Connecting structure for vertical rod of climbing frame Download PDFInfo
- Publication number
- CN217299753U CN217299753U CN202123320171.7U CN202123320171U CN217299753U CN 217299753 U CN217299753 U CN 217299753U CN 202123320171 U CN202123320171 U CN 202123320171U CN 217299753 U CN217299753 U CN 217299753U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- joint
- bolt
- connecting structure
- climbing frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model relates to a climbing frame vertical rod connecting structure, which comprises a sleeve and a joint, wherein the joint is in a C-shaped structure, the lower end of the sleeve is welded with a top plate, and a drain hole is arranged on the top plate in the area surrounded by the sleeve; the side plate is correspondingly provided with a first bolt hole for a bolt to pass through so that the joint and the bottom pocket rod are fixed. The utility model has the advantages that: set up the wash port in the region that the sleeve pipe encloses on the roof to make the intraductal rainwater of entering sleeve pipe arrange to the greatest extent through the wash port on the roof, in order to avoid sleeve pipe or sleeve pipe and roof's welding department to appear the corrosion, increase of service life promotes the security.
Description
Technical Field
The utility model relates to an intelligent (window) curtain installation construction field in the building, concretely relates to climb a pole setting connection structure.
Background
The tradition climbs a pole setting connection structure and contains sleeve pipe and steel sheet, and the sleeve pipe upper end passes through the bolt with the pole setting and fixes mutually, and its lower extreme welds with the steel sheet mutually, and the steel sheet then passes through the bolt with the scaffold board and fixes mutually, and in the outdoor long-term use, the easy long-pending rainwater of sleeve pipe because do not have drainage structures between sleeve pipe and the steel sheet, long-term ponding leads to the easy corrosion of the welded junction of sleeve pipe or sleeve pipe and steel sheet, influences life and security.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a climb a pole setting connection structure is provided to overcome not enough among the above-mentioned prior art.
The utility model provides an above-mentioned technical problem's technical scheme as follows: a climbing frame upright rod connecting structure comprises a sleeve and a joint, wherein the joint is of a C-shaped structure, the lower end of the sleeve is welded with a top plate, and a drain hole is formed in the area, surrounded by the sleeve, on the top plate; the side plate is correspondingly provided with a first bolt hole for a bolt to pass through so that the joint and the bottom pocket rod are fixed.
The beneficial effects of the utility model are that: set up the wash port in the region that the sleeve pipe encloses on the roof to make the rainwater that gets into in the sleeve pipe arrange to the greatest extent through the wash port on the roof, in order to avoid sleeve pipe or sleeve pipe and roof's welding department to appear the corrosion, increase of service life promotes the security.
On the basis of the technical scheme, the utility model discloses can also do following improvement.
Further, the first bolt hole is a kidney-shaped hole.
Adopt above-mentioned further beneficial effect to do: so that the position of the joint on the bottom pocket lever can be adjusted within a proper range according to the size of the scaffold board.
Furthermore, a second bolt hole for a bolt to pass through so as to fix the sleeve and the scaffold board is correspondingly formed in the sleeve.
Furthermore, a third bolt hole for a bolt to penetrate through is correspondingly formed in the sleeve so that the sleeve and the vertical rod can be fixed together.
Further, the sleeve is a square tube.
Adopt above-mentioned further beneficial effect to do: the square tube can play a role in preventing rotation.
Drawings
Fig. 1 is a perspective view of the connecting structure of the climbing frame and the upright rod of the present invention;
fig. 2 is a top view of the connecting structure of the climbing frame and the vertical rod.
In the drawings, the components represented by the respective reference numerals are listed below:
1. sleeve pipe, 110, second bolt hole, 120, third bolt hole, 2, joint, 210, top plate, 211, drain hole, 220, side plate, 221, first bolt hole.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
Example 1
As shown in fig. 1 and 2, a connecting structure of a climbing frame and a vertical rod comprises a sleeve 1 and a joint 2, wherein the joint 2 is of a C-shaped structure, the lower end of the sleeve 1 is welded with a top plate 210, and a drain hole 211 is formed in the area, surrounded by the sleeve 1, on the top plate 210, so that rainwater entering the sleeve 1 can be drained through the drain hole 211 on the top plate 210, and the sleeve 1 or the welded part of the sleeve 1 and the top plate 210 is prevented from being rusted; the side plate 220 is correspondingly provided with a first bolt hole 221 for a bolt to pass through so as to fix the joint 2 and the bottom pocket rod.
Example 2
As shown in fig. 1 and fig. 2, the present embodiment is a further improvement on embodiment 1, and specifically includes the following steps:
the first bolt hole 221 is a kidney-shaped hole so that the position of the joint 2 on the pocket bottom bar can be adjusted within a proper range according to the size of the footrest.
Example 3
As shown in fig. 1 and fig. 2, this embodiment is a further improvement on embodiment 1 or 2, and specifically includes the following steps:
the sleeve 1 is correspondingly provided with a second bolt hole 110 for a bolt to pass through so that the sleeve 1 and the scaffold board can be fixed.
Example 4
As shown in fig. 1, this embodiment is a further improvement on the basis of embodiment 1, 2 or 3, and specifically includes the following steps:
the sleeve 1 is correspondingly provided with a third bolt hole 120 through which a bolt can pass so that the sleeve 1 and the vertical rod are fixed.
Example 5
As shown in fig. 1, this embodiment is a further improvement on any one of embodiments 1 to 4, and specifically includes the following steps:
the sleeve 1 is a square tube, wherein the square tube can play a role in preventing rotation.
Although embodiments of the present invention have been shown and described, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art without departing from the scope of the present invention.
Claims (5)
1. A climbing frame and upright rod connecting structure is characterized by comprising a sleeve (1) and a joint (2), wherein the joint (2) is of a C-shaped structure, the lower end of the sleeve (1) is welded with a top plate (210), and a drain hole (211) is formed in the area surrounded by the sleeve (1) on the top plate (210); the side plate (220) is correspondingly provided with a first bolt hole (221) for a bolt to pass through so that the joint (2) and the bottom pocket rod are fixed.
2. The connecting structure for a climbing frame and a vertical rod according to claim 1, wherein the first bolt hole (221) is a kidney-shaped hole.
3. The connecting structure of the climbing frame and the upright rod according to claim 2, wherein the sleeve (1) is correspondingly provided with a second bolt hole (110) for a bolt to pass through so as to fix the sleeve (1) with the scaffold board.
4. A connecting structure for a climbing frame and an upright rod according to claim 3, characterized in that the sleeve (1) is correspondingly provided with a third bolt hole (120) for a bolt to pass through so as to fix the sleeve (1) and the upright rod.
5. A climbing frame and upright rod connecting structure according to any one of claims 1 to 4, characterized in that the sleeve (1) is a square tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123320171.7U CN217299753U (en) | 2021-12-24 | 2021-12-24 | Connecting structure for vertical rod of climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123320171.7U CN217299753U (en) | 2021-12-24 | 2021-12-24 | Connecting structure for vertical rod of climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217299753U true CN217299753U (en) | 2022-08-26 |
Family
ID=82920427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123320171.7U Active CN217299753U (en) | 2021-12-24 | 2021-12-24 | Connecting structure for vertical rod of climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217299753U (en) |
-
2021
- 2021-12-24 CN CN202123320171.7U patent/CN217299753U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112065029A (en) | Overhanging type attached climbing frame wall-attached adjustable steel beam support | |
CN217299753U (en) | Connecting structure for vertical rod of climbing frame | |
CN210683021U (en) | Rotary tower body structure of tower crane | |
CN216949411U (en) | Be used for inserted lift scaffold to hang and establish protection pocket net device | |
CN212271436U (en) | External building drainage eaves mouth supporting component | |
CN211257794U (en) | Intelligent combined mounting frame for building | |
CN214834658U (en) | Wall-attached support of lifting scaffold | |
CN215368337U (en) | Epitaxial light-duty sunshading board installation node structure | |
CN215160095U (en) | B value adjustable construction elevator attaches wall member | |
CN212406082U (en) | Overhanging type attached climbing frame wall-attached adjustable steel beam support structure | |
CN219508853U (en) | Waterproof board of folding box house | |
CN216109256U (en) | Novel waterproof system for curtain wall daylighting roof | |
CN220336263U (en) | Roof parapet flashing structure | |
CN221031068U (en) | Reinforced steel structure canopy | |
CN213391162U (en) | Pedal support piece for building climbing frame and building climbing frame | |
CN213269005U (en) | Climbing frame concrete pouring baffle | |
CN210914885U (en) | Retaining wall rod fixing device of construction elevator | |
CN210535805U (en) | Antenna fixing device for communication tower | |
CN216428821U (en) | Protection installation node assembly | |
CN212957573U (en) | Transverse connecting frame for scaffold | |
CN219909687U (en) | Support device for integrally lifting roof truss | |
CN214512894U (en) | Cornice model with roof steel mesh frame structure extension as keel | |
CN220565798U (en) | Large-span photovoltaic waterproof shed support | |
CN212689545U (en) | Corner pole setting device for lifting aluminum alloy climbing frame | |
CN209027125U (en) | A kind of sectional shelf-unit for solar engineering system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |