CN217296951U - Auxiliary lifting appliance for installation of building water supply engineering - Google Patents
Auxiliary lifting appliance for installation of building water supply engineering Download PDFInfo
- Publication number
- CN217296951U CN217296951U CN202220061220.5U CN202220061220U CN217296951U CN 217296951 U CN217296951 U CN 217296951U CN 202220061220 U CN202220061220 U CN 202220061220U CN 217296951 U CN217296951 U CN 217296951U
- Authority
- CN
- China
- Prior art keywords
- block
- wall
- fixedly connected
- water supply
- seted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 23
- 230000000694 effects Effects 0.000 claims abstract description 6
- 238000010276 construction Methods 0.000 claims description 8
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a supplementary hoist of building water supply engineering installation relates to the building engineering field. This supplementary hoist of building water supply engineering installation, first supporting block bottom fixedly connected with left couple, the recess is seted up on first supporting block right side, the recess inner wall activity of seting up on first supporting block right side is pegged graft and is had the second supporting block, second supporting block right-hand member fixedly connected with connecting plate. This supplementary hoist of building water supply engineering installation for drive the rotary rod through rotating rotatory handle and rotate, make and drive the second supporting shoe and remove right, make the distance between right side couple and the left couple obtain the adjustment, be convenient for adjust the position of the joint support point of pipeline according to the length of pipeline, further strengthened the equilibrium when the pipeline lifts by crane, make things convenient for the constructor to install the pipeline and arrange.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a supplementary hoist of building water supply engineering installation.
Background
The installation and construction of the building water supply project mainly comprises the project installation of a water supply system, a drainage system, a fire fighting system and a rainwater system, the core of the installation and construction is not separated from the arrangement of pipelines, generally, pipeline ditches need to be excavated underground according to design requirements and pipeline layout, then the pipelines fall into preset positions through lifting and the like, and therefore, a lifting pipe is one of important construction links of the installation and construction of the water supply project and runs through the whole course of the water supply construction.
Traditional hoist and mount mainly adopt wire rope to bind and hoist the article, but current building is pipeline length for water supply engineering is longer, and also is different according to the required pipeline length of relief condition, when using traditional handling instrument to lift by crane the pipeline, can only bind pipeline outer wall intermediate position, be difficult to the equilibrium that keeps the pipeline, cause the pipeline both sides focus to differ easily, take place crooked in the allocation and transportation, the installation of giving the pipeline arranges and has increased the degree of difficulty, therefore, provide a building is installed to water supply engineering and is assisted hoist in order to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model discloses a supplementary hoist of building water supply engineering installation to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: an auxiliary lifting appliance for installation of construction water supply engineering, comprising:
the bottom of the first supporting block is fixedly connected with a left hook, the right side of the first supporting block is provided with a groove, the inner wall of the groove formed in the right side of the first supporting block is movably inserted with a second supporting block, the right end of the second supporting block is fixedly connected with a connecting plate, and the bottom of the connecting plate is fixedly connected with a right hook;
and the moving mechanism is arranged in the inner cavity of the first supporting block.
Preferably, moving mechanism includes rotatory handle, rotary rod and second supporting shoe, the round hole has been seted up to first supporting shoe left side wall, the round hole that rotatory handle right-hand member passed first supporting shoe left side wall and seted up extends right, rotatory handle right-hand member fixedly connected with rotary rod, the threaded hole is seted up to second supporting shoe left end, rotary rod right-hand member threaded connection is in the threaded hole that second supporting shoe left end was seted up.
Preferably, the outer wall of the rotating handle is fixedly connected with a limiting plate, a limiting hole is formed in the left wall of the limiting plate, a fixing rod is movably inserted into the inner wall of the limiting hole, a fixing groove is formed in the left wall of the first supporting block, and the right end of the fixing rod is connected to the inner wall of the fixing groove in a threaded mode.
Preferably, the outer wall of the rotating handle is fixedly connected with a first connecting block, the outer wall of the first connecting block is fixedly connected with a second connecting block, and the left wall of the first supporting block is movably clamped between the first connecting block and the second connecting block.
Preferably, a sliding groove is formed in the rear wall of the inner cavity of the first supporting block, a sliding block is fixedly connected to the outer wall of the second supporting block, and the rear end of the sliding block is movably clamped in the inner wall of the sliding groove.
Preferably, a connecting chain is arranged at the top of the first supporting block, a fixed block is fixedly connected to the top of the connecting chain, and a connecting ring is fixedly connected to the top of the fixed block.
The utility model discloses a supplementary hoist of building water supply engineering installation, its beneficial effect who possesses as follows:
1. this supplementary hoist of building feedwater engineering installation, through setting up rotatory handle, the rotary rod, the relation of connection of first supporting shoe and second supporting shoe, make and drive the rotary rod rotation through rotating rotatory handle, make and drive the second supporting shoe and remove right, make the distance between right side couple and the left couple obtain the adjustment, be convenient for adjust the position of the joint support point of pipeline according to the length of pipeline, the equilibrium when further having strengthened the pipeline and hanging up, make things convenient for constructor to install the pipeline and arrange.
2. This supplementary hoist of building water supply engineering installation, through setting up rotatory handle outer wall fixedly connected with limiting plate, spacing hole has been seted up to limiting plate left wall, spacing downthehole wall activity is pegged graft and is had the dead lever, the fixed slot has been seted up to first supporting shoe left wall, dead lever right-hand member threaded connection is in the fixed slot inner wall, make the position of limiting plate fixed, the motion state of the rotation handle of being convenient for restricts, make can fix the position of second supporting shoe, be convenient for fix the position of right side couple.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of the structure of the rotating rod of the present invention;
FIG. 3 is a schematic view of the inner cavity structure of the first support block of the present invention;
fig. 4 is a schematic diagram of the structure of the limiting plate of the present invention.
In the figure: 1. a first support block; 101. a fixed block; 102. a connecting ring; 103. a sliding groove; 104. fixing grooves; 105. a left hook; 106. a connecting chain; 2. rotating the handle; 201. rotating the rod; 202. a first connection block; 203. a second connecting block; 204. a limiting plate; 205. a limiting hole; 206. fixing the rod; 3. a second support block; 301. a slider; 302. a connecting plate; 303. and a right hook.
Detailed Description
The embodiment of the utility model discloses supplementary hoist of building water supply engineering installation, as shown in fig. 1-4, include:
according to the attached drawings 1 and 2, a left hook 105 is fixedly connected to the bottom of a first supporting block 1, a groove is formed in the right side of the first supporting block 1, a second supporting block 3 is movably inserted into the inner wall of the groove formed in the right side of the first supporting block 1, a connecting plate 302 is fixedly connected to the right end of the second supporting block 3, and a right hook 303 is fixedly connected to the bottom of the connecting plate 302, so that the position of the second supporting block 3 can be moved, the distance between the right hook 303 and the left hook 105 can be adjusted, and a pipeline can be conveniently supported;
according to the illustration in fig. 2, the moving mechanism is mounted in the cavity of the first support block 1, facilitating the adjustment of the position of the second support block 3.
According to fig. 2 and 3, the moving mechanism includes rotatory handle 2, rotary rod 201 and second supporting shoe 3, the round hole has been seted up to first supporting shoe 1 left wall, the round hole that rotatory handle 2 right-hand member passed first supporting shoe 1 left wall and seted up extends to the right, 2 right-hand member fixedly connected with rotary rod 201 of rotatory handle, threaded hole is seted up to second supporting shoe 3 left end, rotary rod 201 right-hand member threaded connection is in the threaded hole that second supporting shoe 3 left end was seted up, make and to move right through rotating rotatory handle 2 drive second supporting shoe 3, make the position of right side couple 303 obtain the adjustment.
According to fig. 4, outer wall fixedly connected with limiting plate 204 of rotatory handle 2, limiting hole 205 has been seted up to limiting plate 204 left wall, spacing hole 205 inner wall activity is pegged graft and is had dead lever 206, fixed slot 104 has been seted up to 1 left wall of first supporting shoe, dead lever 206 right-hand member threaded connection is in fixed slot 104 inner wall, make the position of limiting plate 204 fixed, be convenient for restrict the motion state of rotatory handle 2, make can fix the position of second supporting shoe 3, be convenient for fix the position of right side couple 303.
According to the illustration of fig. 2, the outer wall of the rotating handle 2 is fixedly connected with a first connecting block 202, the outer wall of the first connecting block 202 is fixedly connected with a second connecting block 203, the left wall of the first supporting block 1 is movably clamped between the first connecting block 202 and the second connecting block 203, and the position of the rotating handle 2 is further limited, so that the rotating rod 201 keeps a parallel state.
According to the attached drawing 3, the sliding groove 103 is formed in the rear wall of the inner cavity of the first supporting block 1, the sliding block 301 is fixedly connected to the outer wall of the second supporting block 3, and the rear end of the sliding block 301 is movably clamped in the inner wall of the sliding groove 103, so that the moving range of the second supporting block 3 is limited, and the second supporting block 3 is prevented from being separated from the first supporting block 1.
According to the illustration of fig. 1, the top of the first supporting block 1 is provided with a connecting chain 106, the top of the connecting chain 106 is fixedly connected with a fixing block 101, and the top of the fixing block 101 is fixedly connected with a connecting ring 102, so as to support the first supporting block 1 and the second supporting block 3.
The working principle is as follows: in order to keep the balance of the pipeline when the pipeline is hoisted, a user can hang the connecting ring 102 on the hoisting device, the fixing rod 206 is rotated anticlockwise and backwards, so that the fixing rod 206 moves leftwards along the thread direction, the fixing rod 206 moves out of the fixing groove 104, the limiting plate 204 can rotate, the rotating handle 2 can rotate conveniently, the rotating handle 2 is rotated clockwise and forwards, so that the rotating handle 2 rotating forwards drives the rotating rod 201 to rotate forwards, the rotating rod 201 rotating forwards drives the second supporting block 3 to move rightwards along the thread direction, the connecting plate 302 driven rightwards by the second supporting block 3 moving rightwards moves rightwards, the connecting plate 302 driven rightwards drives the right hook 303 to move rightwards, the right supporting point 303 of the hoisted pipeline can move rightwards, and the distance between the right hook and the left hook 105 is increased, the left side and the right side of the pipeline are conveniently supported, the balance during hoisting of the pipeline is further enhanced, and the pipeline is conveniently installed and arranged.
After the position of right couple 303 is accomplished according to the length adjustment of pipeline, through inserting dead lever 206 in the spacing hole 205 that corresponds the position, through rotatory dead lever 206, make dead lever 206 rear end screw thread tighten to fixed slot 104 in, make the position of limiting plate 204 fixed, be convenient for restrict the motion state of rotation handle 2, make can fix the position of second supporting shoe 3, be convenient for fix the position of right couple 303, the person of facilitating the use uses.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a supplementary hoist of building water supply engineering installation which characterized in that includes:
the support device comprises a first support block (1), wherein the bottom of the first support block (1) is fixedly connected with a left hook (105), the right side of the first support block (1) is provided with a groove, the inner wall of the groove formed in the right side of the first support block (1) is movably inserted with a second support block (3), the right end of the second support block (3) is fixedly connected with a connecting plate (302), and the bottom of the connecting plate (302) is fixedly connected with a right hook (303);
the moving mechanism is arranged in the inner cavity of the first supporting block (1).
2. The auxiliary lifting appliance for the installation of the building water supply project according to claim 1, wherein: moving mechanism is including rotatory handle (2), rotary rod (201) and second supporting shoe (3), the round hole has been seted up to first supporting shoe (1) left side wall, the round hole that rotatory handle (2) right-hand member passed first supporting shoe (1) left side wall and seted up extends right, rotatory handle (2) right-hand member fixedly connected with rotary rod (201), second supporting shoe (3) left end set up threaded hole, rotary rod (201) right-hand member threaded connection is in the threaded hole that second supporting shoe (3) left end was seted up.
3. The auxiliary lifting appliance for the construction water supply engineering installation according to claim 2, wherein: rotatory handle (2) outer wall fixedly connected with limiting plate (204), limiting hole (205) have been seted up to limiting plate (204) left wall, spacing hole (205) inner wall activity is pegged graft and is had dead lever (206), fixed slot (104) have been seted up to first supporting block (1) left wall, dead lever (206) right-hand member threaded connection is in fixed slot (104) inner wall.
4. The auxiliary lifting appliance for the construction water supply engineering installation according to claim 2, wherein: rotatory handle (2) outer wall fixedly connected with first connecting block (202), first connecting block (202) outer wall fixedly connected with second connecting block (203), first supporting block (1) left wall activity joint is between first connecting block (202) and second connecting block (203).
5. The auxiliary lifting appliance for the installation of the building water supply project according to claim 1, wherein: sliding tray (103) have been seted up to first supporting shoe (1) inner chamber rear wall, second supporting shoe (3) outer wall fixedly connected with sliding block (301), sliding block (301) rear end activity joint is in sliding tray (103) inner wall.
6. The auxiliary lifting appliance for the installation of the building water supply project according to claim 1, wherein: the top of the first supporting block (1) is provided with a connecting chain (106), the top of the connecting chain (106) is fixedly connected with a fixing block (101), and the top of the fixing block (101) is fixedly connected with a connecting ring (102).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220061220.5U CN217296951U (en) | 2022-01-11 | 2022-01-11 | Auxiliary lifting appliance for installation of building water supply engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220061220.5U CN217296951U (en) | 2022-01-11 | 2022-01-11 | Auxiliary lifting appliance for installation of building water supply engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217296951U true CN217296951U (en) | 2022-08-26 |
Family
ID=82923980
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220061220.5U Expired - Fee Related CN217296951U (en) | 2022-01-11 | 2022-01-11 | Auxiliary lifting appliance for installation of building water supply engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217296951U (en) |
-
2022
- 2022-01-11 CN CN202220061220.5U patent/CN217296951U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113845010A (en) | Special hoisting equipment for nodular cast iron pipe | |
CN217296951U (en) | Auxiliary lifting appliance for installation of building water supply engineering | |
CN212356248U (en) | Horizontal coil lifting appliance with protection structure | |
CN208666883U (en) | A kind of convenient and safe Cast tube hook | |
CN215831308U (en) | Electromechanical engineering screw jib synthesizes support | |
CN211198336U (en) | Novel internal reflux pump hoisting device | |
CN214946938U (en) | Suspension protection device for current underground pipeline | |
CN210716187U (en) | Hydraulic control valve convenient to maintain | |
CN212374704U (en) | Culvert pipe lifting device for municipal construction | |
CN111017707B (en) | Clamping mechanism for lifting vertical placing pipeline | |
CN110630193B (en) | Control device of hydraulic power tongs and hydraulic power tongs | |
CN110642136A (en) | Novel internal reflux pump hoisting device and method | |
CN211110779U (en) | Lifting device for construction and installation | |
CN219388848U (en) | Electromechanical installation antidetonation hoist and mount frame | |
CN218371495U (en) | Steel pipe hoist and mount hoist for construction | |
CN213356752U (en) | Building materials hoisting accessory for building | |
CN219971654U (en) | Hanging steel truss splicing and hoisting construction equipment | |
CN221853916U (en) | Hoisting tool for pipeline | |
CN216038301U (en) | A hoisting accessory for hydraulic engineering pipeline | |
CN219881719U (en) | Municipal administration tube well construction auxiliary device | |
CN216583786U (en) | Novel tubular pile hoist | |
CN221416563U (en) | Large-pipe-diameter pipeline installation device | |
CN221397073U (en) | Pipeline laying structure for water supply of building engineering | |
CN221396962U (en) | Safe type overhead hoist is used in house construction | |
CN218024953U (en) | Water hose elbow lifting fixer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220826 |