CN217268637U - Quick wall plastering unit for building engineering construction - Google Patents

Quick wall plastering unit for building engineering construction Download PDF

Info

Publication number
CN217268637U
CN217268637U CN202220845371.XU CN202220845371U CN217268637U CN 217268637 U CN217268637 U CN 217268637U CN 202220845371 U CN202220845371 U CN 202220845371U CN 217268637 U CN217268637 U CN 217268637U
Authority
CN
China
Prior art keywords
wall
fixedly connected
support frame
engineering construction
communicating pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220845371.XU
Other languages
Chinese (zh)
Inventor
孟智红
李晓萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220845371.XU priority Critical patent/CN217268637U/en
Application granted granted Critical
Publication of CN217268637U publication Critical patent/CN217268637U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a quick plastering unit of wall for building engineering construction, including supporting the base, support adjacent one side fixedly connected with receipts silo in base bottom, support the first support frame of adjacent one side fixedly connected with in base top and second support frame, be equipped with complementary unit on the inner wall of first support frame, the top of second support frame is equipped with elevating system, and the recess that is used for placing the storage section of thick bamboo is offered at the top of supporting the base. The utility model discloses: first mud scraper slides in first spout on driving the installation piece through being equipped with electric telescopic handle, cooperate first connecting pipe and first row of material pipe, paint mud in the wall bottom, utilize the push rod to promote the support base, thereby improve the efficiency of plastering to wall bottom region, it rotates to drive the spool through the motor, the spool twines the rope, the second mud scraper that the rope drove on the connecting block slides in the second spout, cooperation second connecting pipe and second row of material pipe, paint mud at the wall, thereby improve the efficiency of plastering.

Description

Quick wall plastering unit for building engineering construction
Technical Field
The utility model belongs to the technical field of the construction equipment, concretely relates to quick plastering unit of wall for building engineering construction.
Background
The wall body stacking is an important process in building construction, the plastering is a basic decoration project in the building construction for ensuring the uniformity of bricks in the wall body stacking process, and the plastering is used for coating mortar on walls, ground, ceilings and surfaces of the building construction and has the functions of protecting a base layer and improving the attractiveness.
The manual plastering is carried out through the workman mostly in the current building construction, but the efficiency of manual plastering is lower, and along with workman's operating time increases to and the consumption of workman's energy and physical power, the unable thickness of guaranteeing to plaster of workman is unanimous, and the efficiency of plastering is lower moreover, and to the region of wall bottom, current plastering unit can't carry out quick plastering simultaneously, thereby the time of extension plastering.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick plastering unit of wall for building engineering construction aims at solving among the prior art most and leans on the manual efficiency of plastering that leads to plastering lower and to the regional long problem of plastering time in wall bottom of plastering of manual work.
In order to achieve the above object, the utility model provides a following technical scheme: a wall surface rapid plastering device for constructional engineering construction comprises a supporting base, wherein a material receiving groove is fixedly connected to one adjacent side of the bottom of the supporting base, a first supporting frame and a second supporting frame are fixedly connected to one adjacent side of the top of the supporting base, an auxiliary mechanism is arranged on the inner wall of the first supporting frame, a lifting mechanism is arranged at the top of the second supporting frame, and a groove for placing a material storage barrel is formed in the top of the supporting base;
the auxiliary mechanism comprises an electric telescopic rod arranged on the first support frame, the telescopic end of the electric telescopic rod is fixedly connected with an installation block, and one side of the installation block is fixedly connected with a first mud scraper.
In order to make be convenient for install first connecting pipe, as the utility model relates to an it is preferred, first spout has been seted up on the inner wall of first support frame, the inner wall and the installation piece sliding connection of first spout, one side of installation piece is equipped with first buckle.
In order to make and adjust the second mud scraper, as the utility model relates to a preferred, elevating system is including installing the motor at second support frame top, the output shaft fixedly connected with spool of motor, the surface winding of spool has the rope, the one end fixedly connected with connecting block of rope, one side of connecting block is equipped with the second mud scraper.
In order to make to be convenient for install second communicating pipe, as the utility model relates to a preferred, the second spout has been seted up to one side of second support frame, the inner wall of second spout and the protruding sliding connection of connecting block one side, the top of connecting block is equipped with the second buckle.
In order to make the raw materials that will plaster carry scraper department, as the utility model relates to a preferred, the discharge gate of storage section of thick bamboo passes through the feed inlet fixed connection of pipeline with the force pump, the discharge gate fixedly connected with connecting piece of force pump, the both sides of connecting piece are equipped with first communicating pipe and second communicating pipe respectively.
In order to make the stability of guaranteeing transportation process, as the utility model relates to a preferred, the one end surface and the first buckle block of first communicating pipe are connected, first row of material pipe is installed to the one end of first communicating pipe, the one end surface and the second buckle block of second communicating pipe are connected, row of material pipe of second is installed to the one end of second communicating pipe.
In order to make and control the inside electrical apparatus of device, conduct the utility model relates to an it is preferred, top one side of supporting the base is equipped with the push rod, the top of supporting the base is equipped with control panel, electric telescopic handle, force pump and motor are all through control panel and external power supply electric connection.
Compared with the prior art, the beneficial effects of the utility model are that:
1) the first mud scraping plate on the mounting block is driven to slide in the first sliding groove through the arranged electric telescopic rod, the conveyed mud is smeared at the bottom of the wall surface by matching with the first communicating pipe and the first discharging pipe, and the supporting base is pushed by the push rod, so that the plastering efficiency of the bottom area of the wall surface is improved;
2) drive the spool through being equipped with the motor and rotate, the spool twines the rope, and the second mud scraper on the rope drives the connecting block slides in the second spout, and row's pipe is arranged to cooperation second communicating pipe and second, paints the mud that comes at the wall to improve the efficiency of plastering, reduce the manpower and pay out.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the present invention;
FIG. 3 is a schematic structural view of the auxiliary mechanism of the present invention;
fig. 4 is a schematic structural view of the lifting mechanism of the present invention;
FIG. 5 is a schematic view of the storage barrel of the present invention;
fig. 6 is a schematic view of the structure of the support base of the present invention.
In the figure: 1. a support base; 11. a material receiving groove; 12. a first support frame; 121. a first chute; 13. a second support frame; 131. a second chute; 14. a groove; 15. a push rod; 16. a control panel; 2. an auxiliary mechanism; 21. an electric telescopic rod; 22. mounting a block; 221. a first buckle; 23. a first scraper; 3. a lifting mechanism; 31. a motor; 32. a spool; 33. a rope; 34. connecting blocks; 341. a second buckle; 35. a second mud scraper; 4. a material storage cylinder; 41. a pressure pump; 42. a connecting member; 43. a first communication pipe; 431. a first discharging pipe; 44. a second communicating pipe; 441. a second discharge conduit.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides the following technical solutions: the utility model provides a quick plastering unit of wall for building engineering construction, includes and supports base 1, supports the adjacent one side fixedly connected with in base 1 bottom and receives silo 11, supports the first support frame 12 of the adjacent one side fixedly connected with in base 1 top and second support frame 13, is equipped with complementary unit 2 on the inner wall of first support frame 12, and the top of second support frame 13 is equipped with elevating system 3, and the recess 14 that is used for placing storage cylinder 4 is offered at the top of supporting base 1.
In the present embodiment, the auxiliary mechanism 2 includes an electric telescopic rod 21 mounted on the first support frame 12, a mounting block 22 is fixedly connected to a telescopic end of the electric telescopic rod 21, and a first mud scraper 23 is fixedly connected to one side of the mounting block 22.
During the specific use, electric telescopic handle 21 drives installation piece 22 and removes, and installation piece 22 drives first cleaning shoe 23 and removes to plaster the operation.
In this embodiment, the inner wall of the first support frame 12 is provided with a first sliding groove 121, the inner wall of the first sliding groove 121 is slidably connected with the mounting block 22, and one side of the mounting block 22 is provided with a first buckle 221.
During specific use, the mounting block 22 slides in the first sliding groove 121, so that the plastering stability is ensured.
In this embodiment, the lifting mechanism 3 includes a motor 31 installed at the top of the second support frame 13, an output shaft of the motor 31 is fixedly connected with a winding shaft 32, a rope 33 is wound on the surface of the winding shaft 32, one end of the rope 33 is fixedly connected with a connecting block 34, and a second mud scraper 35 is arranged on one side of the connecting block 34.
During the specific use, motor 31 drives spool 32 and rotates, and spool 32 twines rope 33 to drive the second cleaning shoe 35 on the connecting block 34 and remove, thereby plaster the operation.
In this embodiment, the second sliding groove 131 is formed in one side of the second supporting frame 13, the inner wall of the second sliding groove 131 is slidably connected to the protrusion on one side of the connecting block 34, and the second buckle 341 is disposed at the top of the connecting block 34.
During specific use, the connecting block 34 slides in the second sliding groove 131, so that the plastering stability is ensured.
In this embodiment, the discharge port of the storage barrel 4 passes through the pipeline and is fixedly connected with the feed inlet of the pressure pump 41, the discharge port of the pressure pump 41 is fixedly connected with the connecting piece 42, and the two sides of the connecting piece 42 are respectively provided with the first communicating pipe 43 and the second communicating pipe 44.
When the slurry storage device is used specifically, the pressure pump 41 pumps out slurry inside the storage barrel 4 and the slurry is conveyed by matching the first communicating pipe 43 and the second communicating pipe 44 on the connecting piece 42.
In this embodiment, one end surface of the first communication pipe 43 is connected to the first buckle 221 in a clamping manner, the first discharging pipe 431 is installed at one end of the first communication pipe 43, one end surface of the second communication pipe 44 is connected to the second buckle 341 in a clamping manner, and the second discharging pipe 441 is installed at one end of the second communication pipe 44.
When the slurry discharging device is used specifically, one end surface of the first communicating pipe 43 is engaged with the first buckle 221, the first communicating pipe 43 conveys slurry to the first discharging pipe 431, one end surface of the second communicating pipe 44 is engaged with the second buckle 341, and the second communicating pipe 44 conveys slurry to the second discharging pipe 441.
In this embodiment, a push rod 15 is arranged on one side of the top of the supporting base 1, a control panel 16 is arranged on the top of the supporting base 1, and the electric telescopic rod 21, the pressure pump 41 and the motor 31 are electrically connected with an external power supply through the control panel 16.
When the electric telescopic rod is used specifically, the control panel 16 is used for controlling the electric telescopic rod 21 and the motor 31.
The working principle is as follows: when the device is used, the device is connected with an external power supply, firstly, a constructor pushes the device to a proper position, mixed slurry is poured into the storage cylinder 4, the slurry inside the storage cylinder 4 is pumped out through the pressure pump 41, then the slurry is conveyed to the first discharging pipe 431 through the first communicating pipe 43 on the connecting piece 42, the electric telescopic rod 21 is started to drive the first mud scraping plate 23 on the mounting block 22 to slide in the first chute 121, the slurry is smeared at the bottom of the wall surface, the plastering efficiency of a worker on the bottom of the wall surface is improved, the motor 31 is started, the winding shaft 32 is driven to start winding the rope 33, the connecting block 34 is driven to slide in the second chute 131, the second communicating pipe 44 and the second discharging pipe 441 are matched, the conveyed slurry is smeared on the wall surface, the smearing efficiency of the worker on the wall surface is improved, and the physical exertion of the worker is also convenient to reduce.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a quick plastering unit of wall for building engineering construction, includes support base (1), its characterized in that: a material receiving groove (11) is fixedly connected to one side adjacent to the bottom of the supporting base (1), a first supporting frame (12) and a second supporting frame (13) are fixedly connected to one side adjacent to the top of the supporting base (1), an auxiliary mechanism (2) is arranged on the inner wall of the first supporting frame (12), a lifting mechanism (3) is arranged on the top of the second supporting frame (13), and a groove (14) for placing a material storage barrel (4) is formed in the top of the supporting base (1);
the auxiliary mechanism (2) comprises an electric telescopic rod (21) installed on the first support frame (12), the telescopic end of the electric telescopic rod (21) is fixedly connected with an installation block (22), and one side of the installation block (22) is fixedly connected with a first mud scraper (23).
2. The quick wall plastering device for the construction engineering construction according to claim 1, wherein: a first sliding groove (121) is formed in the inner wall of the first support frame (12), the inner wall of the first sliding groove (121) is connected with the mounting block (22) in a sliding mode, and a first buckle (221) is arranged on one side of the mounting block (22).
3. The quick wall plastering device for the construction engineering construction according to claim 1, wherein: elevating system (3) is including installing motor (31) at second support frame (13) top, the output shaft fixedly connected with spool (32) of motor (31), the surface winding of spool (32) has rope (33), the one end fixedly connected with connecting block (34) of rope (33), one side of connecting block (34) is equipped with second mud scraper (35).
4. The quick wall plastering device for the construction engineering construction as claimed in claim 3, wherein: second spout (131) have been seted up to one side of second support frame (13), the inner wall of second spout (131) and the protruding sliding connection of connecting block (34) one side, the top of connecting block (34) is equipped with second buckle (341).
5. The quick wall plastering device for the construction engineering construction as claimed in claim 3, wherein: the discharge gate of storage section of thick bamboo (4) passes through the feed inlet fixed connection of pipeline with force pump (41), the discharge gate fixed connection of force pump (41) has connecting piece (42), the both sides of connecting piece (42) are equipped with first communicating pipe (43) and second communicating pipe (44) respectively.
6. The quick wall plastering device for constructional engineering construction as claimed in claim 5, wherein: the one end surface and first buckle (221) block of first communicating pipe (43) are connected, first row material pipe (431) is installed to the one end of first communicating pipe (43), the one end surface and second buckle (341) block of second communicating pipe (44) are connected, second row material pipe (441) is installed to the one end of second communicating pipe (44).
7. The quick wall plastering device for the construction engineering construction as claimed in claim 5, wherein: the electric telescopic rod is characterized in that a push rod (15) is arranged on one side of the top of the supporting base (1), a control panel (16) is arranged on the top of the supporting base (1), and the electric telescopic rod (21), the pressure pump (41) and the motor (31) are electrically connected with an external power supply through the control panel (16).
CN202220845371.XU 2022-04-13 2022-04-13 Quick wall plastering unit for building engineering construction Active CN217268637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220845371.XU CN217268637U (en) 2022-04-13 2022-04-13 Quick wall plastering unit for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220845371.XU CN217268637U (en) 2022-04-13 2022-04-13 Quick wall plastering unit for building engineering construction

Publications (1)

Publication Number Publication Date
CN217268637U true CN217268637U (en) 2022-08-23

Family

ID=82873645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220845371.XU Active CN217268637U (en) 2022-04-13 2022-04-13 Quick wall plastering unit for building engineering construction

Country Status (1)

Country Link
CN (1) CN217268637U (en)

Similar Documents

Publication Publication Date Title
CN111075165A (en) Wall cement patching machine
CN112140340A (en) Can realize concrete mixing device of synchronous business turn over material
CN217268637U (en) Quick wall plastering unit for building engineering construction
CN216239576U (en) Plastering machine for construction engineering construction
CN217027924U (en) Curtain construction is with whitewashing device
CN213268760U (en) Suspended ceiling spraying device for architectural decoration
CN212802384U (en) Plastering device for construction decoration engineering construction
CN212613859U (en) Automatic mortar smearing device
CN108396940A (en) A kind of construction and decoration mechanical float
CN112814337A (en) Wall plastering device for decoration project
CN214498282U (en) A water pulp grinder for spreading tiling stone material
CN220080899U (en) Waterproof engineering concrete crack repairing device
CN2732904Y (en) Mortar-conveying pasting machine
CN216949343U (en) Plastering device for civil construction of builders
CN111042500A (en) Ceramic tile plastering device for home decoration
CN218541615U (en) Ceramic tile plastering machine convenient to operate for building construction
CN111335598A (en) Wall cement patching machine
CN220487007U (en) Plastering gypsum mortar spraying device
CN200946371Y (en) Highly effective automatic wall-whitewashing machine
CN111456386B (en) Supplementary plastering unit for building
CN220014356U (en) Plastering device based on construction is used
CN218493002U (en) Cement trowelling device
CN215790777U (en) Strength reinforcing structure based on concrete combined layer
CN217420393U (en) Wall chase plastering unit
CN220521881U (en) Plastering machine for building wall

Legal Events

Date Code Title Description
GR01 Patent grant