CN217255862U - A frock for preceding subassembly partial shipment - Google Patents
A frock for preceding subassembly partial shipment Download PDFInfo
- Publication number
- CN217255862U CN217255862U CN202220276049.XU CN202220276049U CN217255862U CN 217255862 U CN217255862 U CN 217255862U CN 202220276049 U CN202220276049 U CN 202220276049U CN 217255862 U CN217255862 U CN 217255862U
- Authority
- CN
- China
- Prior art keywords
- subassembly
- sbr
- fixed plate
- frock
- preceding subassembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/50—Manufacturing or production processes characterised by the final manufactured product
Landscapes
- Automatic Assembly (AREA)
Abstract
The utility model discloses a frock for preceding subassembly partial shipment, including preceding subassembly body fixed plate, dustproof slider, SBR cylinder linear slide rail, frock frame and pulley, the utility model discloses can imitate the location to the position of each assembly part of preceding subassembly, guarantee mounting dimension's accuracy, efficiency when increasing the operation. Utilize the frame that square pipe welding becomes, not only durable, conveniently receive and release moreover, when subassembly partial shipment in the front, in the middle of the curved surface (the pencil walks the line hole site of arranging) on subassembly body fixed plate was put to preceding each part of subassembly and pencil, the position size and the assembly size of location curved surface match, and the preceding subassembly after the location is carried out the bolt again and is tightened fixedly, has guaranteed the accuracy and the uniformity of assembly.
Description
The technical field is as follows:
the utility model relates to a frock for preceding subassembly partial shipment.
Background art:
before there is not preceding subassembly partial shipment frock, preceding subassembly partial shipment operation all is that the operating personnel carries out the partial shipment on ground, the assembly of being difficult for taking fast, in addition low pressure on the preceding subassembly, high-voltage wire bundle shape is irregular, because the structural constraint of assembly article itself, there is not pretension or spacing frock auxiliary assembly during the assembly, preceding subassembly (DC converter, on-vehicle machine that charges, machine controller, the switch board) is as the core spare part in the final assembly assembling process, because pencil trend problem, when each spare part attaches together, the staff need carry out the operation with difficult posture or upset, staff's intensity of labour will be increased like this, waste time and energy, and easily make mistakes on spare part and auxiliary material are chosen, low efficiency.
The utility model has the following contents:
the utility model relates to a solve the problem that above-mentioned prior art exists and provide a frock that is used for preceding subassembly partial shipment. The utility model discloses simple structure, the simple operation does not damage spare part, is favorable to practicing thrift assembly man-hour, improves assembly efficiency.
The utility model discloses the technical scheme who adopts has:
a tool for front assembly split charging comprises front assembly body fixing plates, dustproof sliding blocks, SBR (sequencing batch reactor) cylindrical linear sliding rails, a tool frame and pulleys, wherein every two of the four SBR cylindrical linear sliding rails are a group which is parallel to each other and fixed on the top end face of the tool frame, each SBR cylindrical linear sliding rail is connected with the dustproof sliding block in a sliding mode, and the two front assembly body fixing plates are connected to the two groups of SBR cylindrical linear sliding rails in a sliding mode; the front assembly body fixing plate is of a rectangular plate structure, three adjacent sides of the front assembly body fixing plate are bent upwards by 90 degrees to form supporting sides, and wiring harness routing and arrangement hole sites are arranged on two supporting sides which are parallel to each other in one of the front assembly body fixing plates.
Furthermore, the tool frame is provided with a rectangular auxiliary material box.
Further, the tool frame is a rectangular frame and is formed by welding a plurality of square pipes.
Further, the pulleys include a directional pulley and a universal pulley.
The utility model discloses following beneficial effect has:
the utility model discloses can imitate the location to the position of each assembled component of preceding subassembly, guarantee mounting dimension's accuracy, efficiency when increasing the operation. Utilize the frame that square tube welding becomes, not only durable, conveniently receive and release moreover, when subassembly partial shipment in the front, in the middle of the curved surface (the pencil walks the line hole site of arranging) on subassembly body fixed plate before each part of preceding subassembly and pencil are put, the position size and the assembly size of location curved surface match, and preceding subassembly after the location carries out the bolt again and steps up fixedly, has guaranteed the accuracy and the uniformity of assembly.
Description of the drawings:
fig. 1 is a structural diagram of the present invention.
The specific implementation mode is as follows:
the present invention will be further described with reference to the accompanying drawings.
As shown in fig. 1, the utility model relates to a frock for preceding subassembly partial shipment, including preceding subassembly body fixed plate 1, dustproof slider 2, SBR cylinder linear slide rail 3, frock frame 4 and pulley, on four SBR cylinder linear slide rails 3 two liang are a set of top face that is fixed in frock frame 4 that is parallel to each other, sliding connection dustproof slider 2 on every SBR cylinder linear slide rail 3, 1 sliding connection of subassembly body fixed plate is on two sets of SBR cylinder linear slide rails 3 before two. The front assembly body fixing plate 1 is of a rectangular plate structure, three adjacent side edges of the front assembly body fixing plate 1 are bent upwards by 90 degrees and form supporting edges 11, and wiring harness routing arrangement hole positions 12 are arranged on the two supporting edges 11 which are parallel to each other in one of the front assembly body fixing plates 1. The tool frame 4 is provided with a rectangular auxiliary material box 41 for holding tools.
Utilize the frock frame 4 that square pipe welding becomes, durable, and conveniently put, put SBR cylinder linear slide rail on the frame, dustproof slider is installed on SBR cylinder linear slide rail and can be along SBR cylinder linear slide rail seesaw, preceding subassembly body fixed plate is fixed on dustproof slider, preceding subassembly is laid subassembly body fixed plate in the front and is slided the assembly, and reserve the pencil on the preceding subassembly body fixed plate and walk the line hole site of arranging, preceding subassembly after the location carries out bolt tightening fixed operation again and the pencil is arranged, the accuracy and the uniformity of assembly have been guaranteed.
The utility model has simple structure, satisfies the positioning and mounting functions in operation and use, and is beneficial to saving assembly time, saving labor resources, improving assembly efficiency and assembly precision; the tool is convenient to transfer to different working sites in the whole working process; is convenient for equipment maintenance.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications can be made without departing from the principle of the present invention, and these modifications should also be regarded as the protection scope of the present invention.
Claims (4)
1. The utility model provides a frock for preceding subassembly partial shipment which characterized in that: the tool comprises front assembly body fixing plates (1), dustproof sliding blocks (2), SBR (styrene butadiene rubber) cylindrical linear sliding rails (3), a tool framework (4) and pulleys, wherein every two of the four SBR cylindrical linear sliding rails (3) form a group which is parallel to each other and is fixed on the top end face of the tool framework (4), each SBR cylindrical linear sliding rail (3) is connected with the dustproof sliding block (2) in a sliding mode, and the two front assembly body fixing plates (1) are connected to the two groups of SBR cylindrical linear sliding rails (3) in a sliding mode; preceding subassembly body fixed plate (1) is the rectangular plate structure, and the adjacent three side of preceding subassembly body fixed plate (1) all upwards bends 90 degrees and forms support limit (11), is equipped with pencil line wiring hole site (12) of arranging on two support limits (11) that are parallel to each other in one of them preceding subassembly body fixed plate (1).
2. The tooling for racking a front assembly of claim 1, wherein: the tool frame (4) is provided with a rectangular auxiliary material box (41).
3. The tooling for racking front assemblies according to claim 1, wherein: the tool frame (4) is a rectangular frame and is formed by welding a plurality of square tubes.
4. The tooling for racking a front assembly of claim 1, wherein: the pulleys include a directional pulley (51) and a universal pulley (52).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220276049.XU CN217255862U (en) | 2022-02-11 | 2022-02-11 | A frock for preceding subassembly partial shipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220276049.XU CN217255862U (en) | 2022-02-11 | 2022-02-11 | A frock for preceding subassembly partial shipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217255862U true CN217255862U (en) | 2022-08-23 |
Family
ID=82905332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220276049.XU Active CN217255862U (en) | 2022-02-11 | 2022-02-11 | A frock for preceding subassembly partial shipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217255862U (en) |
-
2022
- 2022-02-11 CN CN202220276049.XU patent/CN217255862U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208904578U (en) | A kind of buckle-type slot type straight-through cable gantry | |
CN217255862U (en) | A frock for preceding subassembly partial shipment | |
CN203862870U (en) | Multi-working-position combination tool | |
CN203125014U (en) | Transverse moving device for truss robot | |
CN202887870U (en) | Busbar manufacturing combined tool | |
CN213827690U (en) | Welding tool and welding device for silencer | |
CN103001152A (en) | Overhead ground wire lifter of power transmission line | |
CN202984990U (en) | Steel pipe welding device | |
CN204187129U (en) | Exempt to weld collapsible cable bearer | |
CN202270924U (en) | Coaster chassis frame flexible tool | |
CN112757324A (en) | Multi-component extension module for photovoltaic cleaning robot | |
CN207743925U (en) | A kind of photovoltaic panel clean robot walking transition connecting apparatus | |
CN207858067U (en) | A kind of specific purpose tool of large scale equipment stamp | |
CN112091855A (en) | Clamping device for steel pipe machining | |
CN206820323U (en) | A kind of power distribution cabinet bus-bar assembly tooling | |
CN209667324U (en) | Floating on water power station assembly support pre-installs tooling | |
CN211320866U (en) | Cable guide mechanism of bus fixing hardware fitting | |
CN206279753U (en) | Scarfing cinder straightener | |
CN205870517U (en) | Forge and press unilateral cubic unit manipulator | |
CN203266050U (en) | Practical reducer dismantling device | |
CN217538144U (en) | Auxiliary integration frame for large equipment installation operation | |
CN216841389U (en) | Pedal type movable simple step ladder | |
CN216016307U (en) | Adjustable omnidirectional binding wire hanger | |
CN203529658U (en) | Installation structure of guide rail for steel pylon lifting device and steel pylon | |
CN203681652U (en) | Engineering vehicle detachable rear beam and ancillary facility convenient for replacing operation modules |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |