CN217205743U - Building engineering rail guard - Google Patents
Building engineering rail guard Download PDFInfo
- Publication number
- CN217205743U CN217205743U CN202220375396.8U CN202220375396U CN217205743U CN 217205743 U CN217205743 U CN 217205743U CN 202220375396 U CN202220375396 U CN 202220375396U CN 217205743 U CN217205743 U CN 217205743U
- Authority
- CN
- China
- Prior art keywords
- stand
- connect
- rod
- base
- rail according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 230000000712 assembly Effects 0.000 claims 1
- 238000000429 assembly Methods 0.000 claims 1
- 238000005192 partition Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 description 4
- 239000007787 solid Substances 0.000 description 4
- 239000003351 stiffener Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to a building engineering rail guard, its characterized in that: including a set of base, all connect a stand on every base, all connect a company's board subassembly through the articulated shaft in the both sides of stand, all connect fixedly through corresponding company's board subassembly between two adjacent stands, all connect the net that separates between two adjacent stands. The utility model has the advantages that: this scheme can be according to the nimble length and the height of adjusting of size of construction, and simple to operate intensity of labour is little, and the effectual current rail guard of having solved operates inconveniently, influences safeguard function, reduces factor of safety's problem.
Description
Technical Field
The utility model relates to a building technical field specifically is a building engineering rail guard.
Background
With the rapid development of national economy, people have more and more demands on houses, and various house buildings are increased day by day. When housing construction, often need the protection railing to keep apart the job site, prevent that non-constructor from getting into the construction site at will, protection personnel safety, but most rail guards in the existing market can't nimble change length and height. The traditional protective guard for the building engineering is simple in structure, generally adopts an integrated design, and is time-consuming and labor-consuming in the installation process of the protective guard, so that a large amount of labor is wasted.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a building engineering rail guard.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a building engineering rail guard which characterized in that: including a set of base, all connect a stand on every base, all connect a company's board subassembly through the articulated shaft in the both sides of stand, all connect fixedly through corresponding company's board subassembly between two adjacent stands, all connect the net that separates between two adjacent stands.
On the basis of the above scheme, the following technical scheme can be adopted:
the base includes the backup pad, is equipped with a fixed section of thick bamboo in the upside of backup pad, is equipped with the foundation at the downside of backup pad, still is equipped with head rod and supporting component in the backup pad.
The first connecting rod is a screw rod, the supporting assembly comprises a hinged seat, the hinged seat is connected with a supporting rod, and the supporting rod is a folding rod.
The stand is round bar or square pole, is equipped with second connecting rod and connecting hole respectively at the both ends of stand, and the second connecting rod is connected correspondingly the base still is equipped with a set ofly on the stand and is used for connecting separate the couple of net.
And a reinforcing rod is also connected between two adjacent bases.
Every separate the net all set up and correspond two between the even board subassembly.
The connecting plate assembly comprises two hinged plates, and an extension bar is movably connected between the two hinged plates.
The beneficial effects of the utility model are that: this scheme can be according to the nimble length and the height of adjusting of size of construction, and simple to operate intensity of labour is little, and the effectual current rail guard of having solved operates inconveniently, influences safeguard function, reduces factor of safety's problem.
Drawings
FIG. 1 is a schematic view of the basic structure of the present invention;
fig. 2 is a side view of fig. 1.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
As shown in fig. 1 and 2, the utility model relates to a building engineering rail guard, including a set of base 1, the quantity of base 1 is decided according to the size in construction place, and base 1 includes square backup pad 6, is equipped with solid fixed cylinder 7 at the upside of backup pad 6, and solid fixed cylinder 7 is the circular shape screw tube, is equipped with foundation column 8 at the downside of backup pad 6, and foundation column 8 is square post, and when the installation, foundation column 8 buries underground, plays the fixed action. The two symmetrical sides of the supporting plate 6 are respectively provided with a supporting component 10, a first connecting rod 9 is further arranged on the supporting plate 6 between the two supporting components 10, and the first connecting rod 9 is a screw rod and plays a role in connecting the two bases 1. Two supporting component 10 play the effect of stable base 1 after the installation, and supporting component 10 is including articulated seat 11, and 11 joint support poles of articulated seat, bracing piece are the folding rod, and during the installation, the bracing piece passes through the expansion screw to be connected and fixes subaerial. Adjacent two still connect a stiffener 15 through the head rod 9 that corresponds between the base 1, stiffener 15 plays two effects that correspond base 1 of stabilizing, and stiffener 15 is the round bar, all is equipped with a screw at stiffener 15 both ends, and the screw of two screws is revolved to opposite setting.
All connect a stand 2 through a solid fixed cylinder 7 on every base 1, stand 2 is round bar or square pole, this scheme adopts square pole, be equipped with second connecting rod 12 and connecting hole 13 respectively at the both ends of stand 2, second connecting rod 12 is the screw rod, through threaded connection in solid fixed cylinder 7, connecting hole 13 is the screw, plays the effect of extension rail guard height, when heightening, is fixed second connecting rod 12 on another stand 2 and the connecting hole 13 threaded connection who corresponds. 7 hooks 14 are welded on the side wall of the upright post 2, the hooks 14 are of L-shaped structures, and the hooks 14 are used for hooking and fixing the separation net 5.
The front side and the rear side of the upright post 2 are both connected with a connecting plate component 4 through a hinge shaft 3, the connecting plate component 4 comprises two hinge plates, and an extension bar 16 is movably connected between the two hinge plates. When the installation, every even both ends of board subassembly 4 all are connected respectively at the upside and the downside of two adjacent stands 2 through the articulated shaft 3 that corresponds, and two even board subassemblies 4 cross arrangement between two adjacent stands 2, separate the setting of net 5 between two corresponding stands 2.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a building engineering rail guard which characterized in that: including a set of base (1), all connect a stand (2) on every base (1), all connect one even board subassembly (4) through articulated shaft (3) in the both sides of stand (2), all connect fixedly through corresponding even board subassembly (4) between two adjacent stands (2), all connect between two adjacent stands (2) and separate net (5).
2. A construction engineering guard rail according to claim 1, characterized in that: the base (1) comprises a supporting plate (6), a fixing barrel (7) is arranged on the upper side of the supporting plate (6), a bottom column (8) is arranged on the lower side of the supporting plate (6), and a first connecting rod (9) and a supporting component (10) are further arranged on the supporting plate (6).
3. A construction engineering guard rail according to claim 2, characterized in that: the first connecting rod (9) is a screw rod, the supporting component (10) comprises a hinged seat (11), the hinged seat (11) is connected with a supporting rod, and the supporting rod is a folding rod.
4. A construction engineering guard rail according to claim 1, characterized in that: stand (2) are round bar or square pole, are equipped with second connecting rod (12) and connecting hole (13) respectively at the both ends of stand (2), and second connecting rod (12) are connected correspondingly base (1) still is equipped with a set of couple (14) that are used for connecting on stand (2) separate net (5).
5. A construction engineering guard rail according to claim 1, characterized in that: and a reinforcing rod (15) is also connected between two adjacent bases (1).
6. A construction engineering guard rail according to claim 1, characterized in that: each partition net (5) is arranged between two corresponding connecting plate assemblies (4).
7. A construction engineering guard rail according to claim 1, characterized in that: the connecting plate assembly (4) comprises two hinged plates, and an extension bar (16) is movably connected between the two hinged plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220375396.8U CN217205743U (en) | 2022-02-24 | 2022-02-24 | Building engineering rail guard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220375396.8U CN217205743U (en) | 2022-02-24 | 2022-02-24 | Building engineering rail guard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217205743U true CN217205743U (en) | 2022-08-16 |
Family
ID=82797498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220375396.8U Expired - Fee Related CN217205743U (en) | 2022-02-24 | 2022-02-24 | Building engineering rail guard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217205743U (en) |
-
2022
- 2022-02-24 CN CN202220375396.8U patent/CN217205743U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217205743U (en) | Building engineering rail guard | |
CN212002382U (en) | Constructional engineering frame roof beam reinforcing apparatus | |
CN211622189U (en) | Assemble anti-drop's outer wall curtain structure | |
CN210947477U (en) | High strength guardrail modelled after an antique | |
CN216476477U (en) | Earthquake-resistant reinforcing structure is built to building | |
CN216108995U (en) | Frame connecting piece of steel construction joint department | |
CN216109594U (en) | Construction engineering place construction is with scaffold frame of encorbelmenting of dismouting operation of being convenient for | |
CN216130567U (en) | Frame type template | |
CN215802249U (en) | Large-span factory building steel construction beam column | |
CN216380482U (en) | Novel scaffold frame of house processing usefulness | |
CN211114927U (en) | Special guardrail of civil engineering | |
CN211923450U (en) | Cantilever device for building engineering construction | |
CN211923628U (en) | Novel steel structure frame for reinforcing ground beam | |
CN218061705U (en) | Earthquake-resistant structure for integrated house | |
CN205896588U (en) | Display screen mounting bracket | |
CN214614578U (en) | Assembled column foot board | |
CN218970567U (en) | Metal scaffold mechanism convenient to dismouting | |
CN221345859U (en) | Prefabricated folding balcony | |
CN218493102U (en) | Fixing support for building engineering template | |
CN215443196U (en) | Building wall curtain wall installation location construction equipment | |
CN214302793U (en) | A hoist and mount scaffold frame for frame post construction | |
CN221002139U (en) | Aluminum profile for stage construction | |
CN215406601U (en) | Pre-embedded part for precast concrete external wall panel | |
CN204781885U (en) | Novel crown cornice shaped steel operation platform that encorbelments | |
CN217054263U (en) | Draw scaffold frame of encorbelmenting to one side |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220816 |