CN217205413U - Wallboard installation device for building engineering - Google Patents

Wallboard installation device for building engineering Download PDF

Info

Publication number
CN217205413U
CN217205413U CN202220000051.4U CN202220000051U CN217205413U CN 217205413 U CN217205413 U CN 217205413U CN 202220000051 U CN202220000051 U CN 202220000051U CN 217205413 U CN217205413 U CN 217205413U
Authority
CN
China
Prior art keywords
wallboard
bottom plate
screw
gear
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220000051.4U
Other languages
Chinese (zh)
Inventor
郭玉强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of CN217205413U publication Critical patent/CN217205413U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of building engineering, and discloses a wallboard mounting device for building engineering, comprising a bottom plate, a first motor is fixedly mounted on the left side of the top of the bottom plate, a first gear is bolted to an output shaft of the first motor, a second gear is meshed with the bottom of the first gear, a first screw rod is bolted to the inside of the second gear, both ends of the first screw rod are rotatably connected with the inner wall of the bottom plate, a swivel nut is connected with the surface thread of the first screw rod, a first supporting rod is hinged to the top of the swivel nut, risers are welded at the front and rear parts of the right side of the top of the bottom plate, and a chute is formed in one opposite side of the two risers; the utility model discloses can adjust the height and the angle of wallboard, make things convenient for constructor to install to improve the efficiency of installation, solved present wallboard installation device and be not convenient for adjust it, and reduced the problem of efficiency of construction.

Description

Wallboard installation device for building engineering
Technical Field
The utility model relates to a building engineering technical field specifically is a wallboard installation device for building engineering.
Background
The wall board is a house structure of a bearing system consisting of walls and floor slabs. The wall is used as a bearing component and a partition of a room, and is the most common and economical structural form in residential buildings. The disadvantage is the poor flexibility of the planar arrangement in the room, and to overcome this disadvantage, development is currently underway toward large bays. The wall plate structure is mainly used for houses, apartments, office buildings, schools and other public buildings. The load-bearing wall of the wallboard structure may be made of bricks, blocks, prefabricated or cast-in-place concrete. The floor slab is made of prefabricated reinforced concrete or prestressed concrete hollow slab, channel slab and solid slab; prefabricating and casting a superposed floor slab in situ; a full cast-in-place floor slab.
At construction's in-process, often need use installation device to install the wallboard, but present wallboard is in the installation, and its installation direction is fixed, can't adjust, can't go up and down to the wallboard according to the height of installation simultaneously, influences the installation of constructor to the wallboard to the efficiency of installation has been reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a wallboard installation device for building engineering possesses the direction and the height that can be to the wallboard and adjusts to improve the advantage of installation effectiveness, solved present wallboard installation device and be not convenient for carry out the problem adjusted to the wallboard.
In order to achieve the above object, the utility model provides a following technical scheme: a wallboard mounting device for building engineering comprises a bottom plate, wherein a first motor is fixedly mounted on the left side of the top of the bottom plate, an output shaft of the first motor is in bolted connection with a first gear, the bottom of the first gear is meshed with a second gear, a first screw rod is in bolted connection with the inside of the second gear, two ends of the first screw rod are in rotary connection with the inner wall of the bottom plate, a threaded sleeve is in threaded connection with the surface of the first screw rod, a first supporting rod is hinged to the top of the threaded sleeve, vertical plates are welded at the front and back of the right side of the top of the bottom plate, sliding grooves are formed in opposite sides of the two vertical plates, sliding blocks are connected inside the sliding grooves in a sliding manner, a connecting box is fixedly connected between the two sliding blocks, the left side of the connecting box is hinged to the other end of the first supporting rod, a second motor is fixedly mounted inside the connecting box, and an output shaft of the second motor is in bolted connection with a connecting plate, and the top of the inner side of the connecting plate is bolted with a spring, the other end of the spring is bolted with a first clamping plate, and the bottom of the inner side of the connecting plate is provided with a limiting structure.
Preferably, the limiting structure comprises a second screw rod, the second screw rod is in threaded connection with the bottom of the inner side of the connecting plate, a twisting disc is bolted to one end of the second screw rod, and a second clamping plate is rotatably connected to the other end of the second screw rod.
Preferably, the two sides of the bottom of the inner side of the connecting plate are both provided with first telescopic rods, and the output ends of the first telescopic rods are bolted to the bottom of the second clamping plate.
Preferably, the inside of bottom plate is provided with the movable rod, the surperficial swing joint of movable rod has the movable block, and the welding has the connecting rod between movable block and the swivel nut, the top of movable block articulates there is the second bracing piece, and the other end of second bracing piece is articulated with the left side of connecting box.
Preferably, a second telescopic rod is fixedly installed on the right side of the top of the bottom plate, and the output end of the second telescopic rod is bolted to the bottom of the connecting box.
Preferably, a push rod is fixedly mounted on the left side of the top of the bottom plate, and a soft pad is arranged on the surface of the push rod.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a rotation of first gear is driven to first motor, make first gear drive second gear and first screw rod rotate, and through the removal of swivel nut and first bracing piece, make connecting box and connecting plate carry out removal from top to bottom, be convenient for highly adjust the upper and lower of wallboard, make things convenient for constructor to install the wallboard, avoid artifical manual lifting, lead to workman's physical power to descend, and the efficiency of installation has been reduced, simultaneously, drive the rotation of connecting plate through the second motor, can adjust the installation angle of wallboard, and the suitability is improved, the problem of adjusting the wallboard is not convenient for to present wallboard installation device has been solved.
Drawings
FIG. 1 is a schematic sectional view of the present invention;
FIG. 2 is a schematic view of the top view of the present invention;
FIG. 3 is a schematic view of a partial three-dimensional structure of the present invention;
fig. 4 is a partially enlarged schematic view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a base plate; 2. a first motor; 3. a first gear; 4. a second gear; 5. a first screw; 6. a threaded sleeve; 7. a first support bar; 8. a vertical plate; 9. a chute; 10. a slider; 11. a connection box; 12. a second motor; 13. a connecting plate; 14. a spring; 15. a first clamping plate; 16. a limiting structure; 161. a second screw; 162. twisting the disc; 163. a second clamping plate; 17. a first telescopic rod; 18. a movable rod; 19. a movable block; 20. a connecting rod; 21. a second support bar; 22. a second telescopic rod; 23. a push rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a wallboard mounting device for construction engineering comprises a bottom plate 1, a first motor 2 is fixedly mounted on the left side of the top of the bottom plate 1, a first gear 3 is bolted on an output shaft of the first motor 2, a second gear 4 is meshed with the bottom of the first gear 3, a first screw 5 is bolted inside the second gear 4, two ends of the first screw 5 are rotatably connected with the inner wall of the bottom plate 1, a threaded sleeve 6 is connected with the surface of the first screw 5 in a threaded manner, a first support rod 7 is hinged on the top of the threaded sleeve 6, a limit groove is formed in the top of the bottom plate 1, the surface of the first support rod 7 is slidably connected with the inner wall of the limit groove, in order to assist in limiting the threaded sleeve 6 and the first support rod 7 and facilitate left and right movement of the threaded sleeve, risers 8 are welded on the front and rear sides of the right side of the top of the bottom plate 1, and chutes 9 are formed in opposite sides of the two risers 8, the inner part of the sliding groove 9 is connected with sliding blocks 10 in a sliding manner, a connecting box 11 is fixedly connected between the two sliding blocks 10, the left side of the connecting box 11 is hinged with the other end of the first supporting rod 7, a second motor 12 is fixedly arranged in the connecting box 11, an output shaft of the second motor 12 is connected with a connecting plate 13 in a bolted manner, the connecting plate 13 is arranged in a concave manner, the wallboard is conveniently fixed by the design, the wallboard is prevented from falling, a spring 14 is connected to the top of the inner side of the connecting plate 13 in a bolted manner, a first clamping plate 15 is connected to the other end of the spring 14 in a bolted manner, a limiting structure 16 is arranged at the bottom of the inner side of the connecting plate 13, the first gear 3 is driven to rotate by the first motor 2, the second gear 4 and the first screw 5 are driven to rotate by the first gear 3, the connecting box 11 and the connecting plate 13 move up and down by the movement of the threaded sleeve 6 and the first supporting rod 7, and the up-and down height adjustment of the wallboard is facilitated, make things convenient for constructor to install the wallboard, avoid artifical manual lifting, lead to workman's physical power to descend to reduced the efficiency of installation, driven the rotation of connecting plate 13 through second motor 12 simultaneously, can adjust the installation angle of wallboard, and improved the suitability, solved present wallboard installation device and be not convenient for carry out the problem adjusted to the wallboard.
Referring to fig. 1 and 4, the limiting structure 16 includes a second screw 161, the second screw 161 is in threaded connection with the bottom of the inner side of the connecting plate 13, a twisting disc 162 is bolted to one end of the second screw 161, the other end of the second screw 161 is rotatably connected with a second locking plate 163, and the twisting disc 162 drives the second screw 161 to rotate and drives the second locking plate 163 to move upwards through the arrangement of the second screw 161, the twisting disc 162 and the second locking plate 163, so that the wall panels with different heights can be fixed and the stability of the wall panels is enhanced.
Referring to fig. 1 and 4, the two sides of the inner bottom of the connecting plate 13 are provided with the first telescopic rods 17, the output ends of the first telescopic rods 17 are bolted to the bottom of the second clamping plate 163, and the second clamping plate 163 can be assisted to be limited by the arrangement of the first telescopic rods 17, so that the second clamping plate can be conveniently moved up and down, and can be prevented from rotating.
Referring to fig. 2 and 3, a movable rod 18 is arranged inside the bottom plate 1, a movable block 19 is movably connected to the surface of the movable rod 18, a connecting rod 20 is welded between the movable block 19 and the threaded sleeve 6, a second supporting rod 21 is hinged to the top of the movable block 19, the other end of the second supporting rod 21 is hinged to the left side of the connecting box 11, and the threaded sleeve 6 is moved by the arrangement of the movable rod 18, the movable block 19, the connecting rod 20 and the second supporting rod 21, and the movable block 19 is driven to move on the surface of the movable rod 18, so that the second supporting rod 21 is driven to apply force to the connecting box 11.
Referring to fig. 3, a second telescopic rod 22 is fixedly installed on the right side of the top of the bottom plate 1, an output end of the second telescopic rod 22 is bolted to the bottom of the connection box 11, and the connection box 11 can be supported in an auxiliary manner by the arrangement of the second telescopic rod 22, so that the stability of the connection box during up-and-down movement is enhanced.
Referring to fig. 1, a push rod 23 is fixedly installed on the left side of the top of the bottom plate 1, a soft cushion is arranged on the surface of the push rod 23, the push rod 23 is arranged to facilitate force application and movement of a constructor on the device, and meanwhile, the soft cushion can protect hands of the constructor and improve comfort when the constructor grips the device.
The working principle is as follows: during the use, can place the wallboard in the inboard of first cardboard 15 and second cardboard 163, then rotate the wrench disk 162, the wrench disk 162 drives second cardboard 163 through second screw 161 and carries out spacing fixed to the wallboard, then remove the device to mounted position department, then can be as required according to the installation, and start first motor 2, the output shaft of first motor 2 drives first gear 3 rotatory, and first gear 3 drives second gear 4 and first screw 5 and rotates together, thereby drive swivel nut 6 and first bracing piece 7 and move right, and then drive connecting box 11 and connecting plate 13 rebound, at this moment can adjust the height and position of wallboard, when needing to carry out angle modulation to it, can start second motor 12, the output shaft of second motor 12 drives connecting plate 13 and rotates, finally can to the wallboard installation.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a wallboard installation device for building engineering, includes bottom plate (1), its characterized in that: the left side of the top of the bottom plate (1) is fixedly provided with a first motor (2), an output shaft of the first motor (2) is in bolted connection with a first gear (3), the bottom of the first gear (3) is meshed with a second gear (4), the inside of the second gear (4) is in bolted connection with a first screw (5), two ends of the first screw (5) are rotatably connected with the inner wall of the bottom plate (1), the surface thread of the first screw (5) is connected with a threaded sleeve (6), the top of the threaded sleeve (6) is hinged with a first supporting rod (7), risers (8) are welded at the front and rear sides of the right side of the top of the bottom plate (1), and the opposite sides of the two risers (8) are respectively provided with a sliding groove (9), the inside of the sliding groove (9) is connected with a sliding block (10), and a connecting box (11) is fixedly connected between the two sliding blocks (10), the left side of connecting box (11) is articulated with the other end of first bracing piece (7), the inside fixed mounting of connecting box (11) has second motor (12), the output shaft bolt of second motor (12) has connecting plate (13), and the inboard top bolt of connecting plate (13) has spring (14), and the other end bolt of spring (14) has first cardboard (15), the inboard bottom of connecting plate (13) is provided with limit structure (16).
2. A wallboard installation assembly for use in construction engineering as claimed in claim 1, wherein: the limiting structure (16) comprises a second screw (161), the second screw (161) is in threaded connection with the inner side of the connecting plate (13) at the bottom, a twisting disc (162) is bolted at one end of the second screw (161), and a second clamping plate (163) is rotatably connected at the other end of the second screw (161).
3. A wallboard installation structure for building engineering according to claim 2, wherein: the two sides of the bottom of the inner side of the connecting plate (13) are respectively provided with a first telescopic rod (17), and the output end of each first telescopic rod (17) is bolted to the bottom of the corresponding second clamping plate (163).
4. A wallboard mounting apparatus for construction engineering according to any one of claims 1-3, wherein: the inside of bottom plate (1) is provided with movable rod (18), the surperficial swing joint of movable rod (18) has movable block (19), and the welding has connecting rod (20) between movable block (19) and swivel nut (6), the top of movable block (19) articulates there is second bracing piece (21), and the other end of second bracing piece (21) is articulated with the left side of connecting box (11).
5. A wallboard mounting apparatus for construction engineering according to any one of claims 1-3, wherein: the right side at the top of the bottom plate (1) is fixedly provided with a second telescopic rod (22), and the output end of the second telescopic rod (22) is bolted with the bottom of the connecting box (11).
6. A wallboard mounting apparatus for construction engineering according to any one of claims 1-3, wherein: the left side fixed mounting at bottom plate (1) top has push rod (23), the surface of push rod (23) is provided with the cushion.
CN202220000051.4U 2021-11-18 2022-01-01 Wallboard installation device for building engineering Active CN217205413U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202122834384 2021-11-18
CN2021228343845 2021-11-18

Publications (1)

Publication Number Publication Date
CN217205413U true CN217205413U (en) 2022-08-16

Family

ID=82788025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220000051.4U Active CN217205413U (en) 2021-11-18 2022-01-01 Wallboard installation device for building engineering

Country Status (1)

Country Link
CN (1) CN217205413U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117927040A (en) * 2024-03-25 2024-04-26 山西绿建住品科技有限公司 Auxiliary installation equipment for assembled wallboard

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117927040A (en) * 2024-03-25 2024-04-26 山西绿建住品科技有限公司 Auxiliary installation equipment for assembled wallboard
CN117927040B (en) * 2024-03-25 2024-06-04 山西绿建住品科技有限公司 Auxiliary installation equipment for assembled wallboard

Similar Documents

Publication Publication Date Title
CN217205413U (en) Wallboard installation device for building engineering
CN218623313U (en) Building is built with pouring template bearing structure
CN111980398B (en) Connecting structure for joint of wall aluminum formwork and wood formwork and construction method
CN215368836U (en) Wall body bearing structure is built to low-rise room
CN211974353U (en) Adjustable support for constructional engineering
CN113565347B (en) Supporting device for construction of steel bar truss floor bearing plate
CN214532092U (en) A consolidate bearing structure for building engineering
CN208168281U (en) A kind of plastering machine that can consolidate placement
CN221168861U (en) Assembled building strutting arrangement based on BIM
CN220036239U (en) Cast-in-situ box girder steel pipe support
CN216860119U (en) Cutting and positioning device for building prefabricated slab
CN221703226U (en) Horizontal mortar joint mortar spreading device for building engineering blocks
CN220167604U (en) Full prefabricated movable house
CN214062291U (en) Building outer wall is with be convenient for aggregate erection scaffold
CN221442066U (en) Movable scaffold
CN221442064U (en) Steel construction canopy construction platform
CN221524223U (en) Plugging structure of assembled superimposed sheet piece template
CN216007931U (en) Building steel structure support frame
CN212802079U (en) Light steel structure wall
CN221031637U (en) Cast-in-place concrete structure crack surface treatment device
CN211615521U (en) Auxiliary installation device for glass curtain wall
CN221031678U (en) Prefabricated component strutting arrangement of assembled concrete
CN216196717U (en) Cement troweling device for constructional engineering
CN217999069U (en) Pre-arranged beam supporting assembly for building engineering
CN214658643U (en) Mobile platform for multi-use architecture construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant