CN217204299U - Water stop structure for post-cast strip of roof of underground chamber - Google Patents

Water stop structure for post-cast strip of roof of underground chamber Download PDF

Info

Publication number
CN217204299U
CN217204299U CN202121293826.3U CN202121293826U CN217204299U CN 217204299 U CN217204299 U CN 217204299U CN 202121293826 U CN202121293826 U CN 202121293826U CN 217204299 U CN217204299 U CN 217204299U
Authority
CN
China
Prior art keywords
post
cast strip
roof
vacancy
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121293826.3U
Other languages
Chinese (zh)
Inventor
王辉
李小玥
彭建良
王炎伟
闫新宇
陈稳德
曹建红
尹伟贤
厉楠
张男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Huanan Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Huanan Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Huanan Construction Investment Group Co ltd, Zhongtian Construction Group Co Ltd filed Critical Zhongtian Huanan Construction Investment Group Co ltd
Priority to CN202121293826.3U priority Critical patent/CN217204299U/en
Application granted granted Critical
Publication of CN217204299U publication Critical patent/CN217204299U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an basement roof post-cast strip stagnant water structure, including roof and post-cast strip, be equipped with the vacancy that is used for pouring the post-cast strip on the roof, stagnant water steel sheet has all been buried underground on the relative both sides wall in the vacancy, and each stagnant water steel sheet all stretches out partly and exposes in the vacancy, the post-cast strip is pour in the vacancy and the stagnant water steel sheet that the parcel exposes the part, the roof top of vacancy both sides all is equipped with the anti-bank of muddy earth, the post-cast strip top is pour the arch and is mixed earth, and the arch is mixed earth and still covers two the anti-bank of muddy earth. The utility model discloses a mix the anti-bank of earth and cooperate the effectual rivers that have prevented the post-cast strip and seal preceding roof to go into the underground chamber, mix the anti-bank of earth simultaneously and can mix earth cooperation with the arch and seal, make the post-cast strip seal the back and prolong infiltration route, improved the waterproof ability of post-cast strip, avoid the seepage problem after the post-cast strip seals.

Description

Water stop structure for post-cast strip of roof of underground chamber
Technical Field
The utility model relates to a construction technical field specifically is a basement roof post-cast strip stagnant water structure.
Background
With social development, high-rise buildings and large-area underground garages become standard configurations of urban construction at present, and post-cast strips are generally arranged for solving the problem of uneven settlement caused by different building heights and structural forms or solving the problem of structural cracks caused by temperature deformation; when setting up the post-cast strip according to traditional mode, a large amount of rainwater or construction water can flow into the basement through the post-cast strip on the basement roof, for preventing that the basement from steeping water, need adopt the automatic pump to take out water from the basement to ground, need additionally to consume a large amount of electric energy and manual work. Meanwhile, when the post-cast strip is closed, the construction quality is often difficult to control, the post-cast strip is caused to become a weak part for basement roof leakage, after the basement decoration construction is completed, the roof leakage is greatly affected, the repair is difficult, the maintenance cost is high, and the post-cast strip leakage is also one of the construction management pain points of the existing project.
The water stop structure of the prior post-cast strip always faces the following problems:
1. water on the top plate easily flows into the basement before the post-cast strip is sealed, and water is drained from the basement in the following steps, so that the construction cost and the construction period are increased.
2. After the post-cast strip is closed, water flow easily permeates into the underground chamber from the weak part of the post-cast strip.
SUMMERY OF THE UTILITY MODEL
The utility model provides a problem of proposing in order to solve above-mentioned background art in basement roof post-cast strip stagnant water structure.
In order to solve the above problem, the utility model adopts the following technical scheme:
the utility model provides a basement roof post-cast strip stagnant water structure, includes roof and post-cast strip, be equipped with the vacancy that is used for pouring the post-cast strip on the roof, all bury stagnant water steel sheet underground on the relative both sides wall in the vacancy, and each stagnant water steel sheet all stretches out partly and exposes in the vacancy, the post-cast strip is pour in the vacancy and the parcel lives to expose partial stagnant water steel sheet, the roof top of vacancy both sides all is equipped with the anti-bank of muddy earth, the post-cast strip top is pour and is had the arch to mix earth, and the arch is mixed earth and still covers two the anti-bank of muddy earth.
Preferably, both side ends of each water stop steel plate are bent upwards.
Preferably, the width of each post-pouring strip is 500mm-1200 mm.
Compared with the prior art, the utility model discloses there is following beneficial effect to be:
1. through setting up the anti-bank of muddy earth and stagnant water steel sheet cooperation carry out the stagnant water, can effectually prevent before the post-cast strip seals that rivers on the roof from flowing into in the basement, and then reduce the cost of follow-up interior drainage of basement, reduce engineering time.
2. Set up arch muddy earth and anti-bank cooperation on the roof and seal, prolonged the infiltration road footpath, improved the waterproof ability in post-cast strip, effectively avoid the seepage problem after the post-cast strip seals.
Drawings
FIG. 1 is a schematic cross-sectional view of the overall structure of the present invention;
1-top plate, 2-post-cast strip, 3-water stop steel plate, 4-concrete reverse ridge, 5-arch concrete and 6-vacancy.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the post-cast strip water stop structure for the roof of the underground chamber comprises a roof 1 and a post-cast strip 2, wherein a vacant position 6 for pouring the post-cast strip 2 is formed in the roof 1, water stop steel plates 3 are embedded in two opposite side walls in the vacant position 6, a part of each water stop steel plate 3 extending out is exposed in the vacant position 6, the post-cast strip 2 is poured in the vacant position 6 and wraps the exposed water stop steel plates 3, concrete reversed sills 4 are arranged at the tops of the roof 1 on two sides of the vacant position 6, arch-shaped concrete 5 is poured at the top of the post-cast strip 2, and the arch-shaped concrete 5 covers the two concrete reversed sills 4.
And the two side ends of each water stop steel plate 3 are bent upwards.
The width of each post-cast strip 2 is 500mm-1200 mm.
The utility model discloses during the use, at first deepen according to construction drawing and construction demand to the size and the plane position of 2 stagnant water structures in post-cast strip. And the post-cast strip 2 and the concrete reverse ridge template are erected. And pouring the water stop steel plates 3 on the two sides of the post-cast strip 2 and the concrete reversed ridge concrete, and vibrating tightly to realize advanced water stop before the post-cast strip 2 is sealed. After the templates on the two sides of the concrete reverse ridge are removed, the templates are placed on the reverse ridge, and the positions of the post-pouring belt 2 are completely covered, so that rainwater, water on the top plate 1 of the basement and the like are prevented from flowing into the basement. When the post-cast strip 2 reaches a closed condition, concrete is adopted to fill the position of the post-cast strip 2, arch concrete 5 is poured at the upper part, and the post-cast strip 2 and the concrete reversed ridge at the lower part are covered, so that the water stop structure of the post-cast strip of the top plate of the underground chamber is formed.
The utility model discloses a mix the anti-bank 4 of earth and cooperate 3 effectual rivers that have prevented 2 seals front roof 1 of post-cast strip to go into the underground chamber, mix the anti-bank 4 of earth simultaneously and can mix 5 cooperations of earth with the arch and seal, make 2 seals the back extension infiltration routes of post-cast strip, improved the waterproof ability of post-cast strip 2, avoid the seepage problem after 2 seals of post-cast strip.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (2)

1. The utility model provides an underground chamber roof post-cast strip stagnant water structure, includes roof (1) and post-cast strip (2), its characterized in that: the concrete pouring structure is characterized in that a vacancy (6) used for pouring a post-pouring belt (2) is formed in the top plate (1), water-stop steel plates (3) are buried in two opposite side walls in the vacancy (6) respectively, a part of each water-stop steel plate (3) stretches out to be exposed in the vacancy (6), the post-pouring belt (2) is poured in the vacancy (6) and wraps the water-stop steel plates (3) of the exposed parts, concrete reversed sills (4) are arranged at the tops of the top plates (1) on two sides of the vacancy (6), arch-shaped concrete (5) is poured at the top of the post-pouring belt (2), the arch-shaped concrete (5) covers the two concrete reversed sills (4), the concrete reversed sills (4) are matched with the water-stop steel plates (3) to effectively prevent the post-pouring belt (2) from sealing a water flow into an underground chamber, and the concrete reversed sills (4) can be matched with the arch-shaped concrete (5) to seal the underground chamber, the water seepage path is prolonged after the post-cast strip (2) is closed;
the width of the post-cast strip (2) is 500mm-1200 mm.
2. The structure of stopping water in a post-cast strip of a roof of an underground chamber according to claim 1, wherein: and the two side ends of each water stop steel plate (3) are bent upwards.
CN202121293826.3U 2021-06-09 2021-06-09 Water stop structure for post-cast strip of roof of underground chamber Expired - Fee Related CN217204299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121293826.3U CN217204299U (en) 2021-06-09 2021-06-09 Water stop structure for post-cast strip of roof of underground chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121293826.3U CN217204299U (en) 2021-06-09 2021-06-09 Water stop structure for post-cast strip of roof of underground chamber

Publications (1)

Publication Number Publication Date
CN217204299U true CN217204299U (en) 2022-08-16

Family

ID=82751568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121293826.3U Expired - Fee Related CN217204299U (en) 2021-06-09 2021-06-09 Water stop structure for post-cast strip of roof of underground chamber

Country Status (1)

Country Link
CN (1) CN217204299U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115787744A (en) * 2022-11-25 2023-03-14 中国五冶集团有限公司 Box-type foundation basement advanced water stop structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115787744A (en) * 2022-11-25 2023-03-14 中国五冶集团有限公司 Box-type foundation basement advanced water stop structure

Similar Documents

Publication Publication Date Title
CN203546762U (en) Triple waterproof advance water stop structure for post-cast strip
CN109440951A (en) New-old concrete works intersection stitches waterproof construction and construction technology
CN202493277U (en) Preventive collecting system for leaking water and seeping water in tunnel
CN217204299U (en) Water stop structure for post-cast strip of roof of underground chamber
CN109797874A (en) A kind of high level Multi-tower post-cast strip advance water stop construction method
CN104179277B (en) Water diversion and drainage system for mixing frame curtain wall
CN113513048A (en) Station house underground passage leakage-proof structure and construction process
CN210737258U (en) Prevent subsiding highway subgrade
CN206429253U (en) Seep water treatment structures in tunnel-liner circular construction joint crack
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN211395768U (en) Outer wall post-cast strip is enclosed construction in advance
CN111636483A (en) Waterproof device for reverse construction concrete structure gap and construction method
CN210049292U (en) Advanced water stop pouring belt structure for building
CN106968317A (en) A kind of construction site rainwater recycle reutilization system
CN111287793A (en) Deformation joint water-proof and drainage system based on automatic drainage function and construction process thereof
CN216075134U (en) Rich water district faces lake sandy soil deep basal pit hillside top construction road structure
CN206189430U (en) A escape canal for deep overburden ground
CN209568552U (en) A kind of concrete joint water stop structure
CN210562300U (en) Waterproof structure at joint of station main body and auxiliary channel
CN206273898U (en) A kind of dirty groove of U-shaped section of Fast Installation
CN220451131U (en) Waterproof structure for leakage treatment of pool body construction joint of water pool
CN112281907A (en) Vertical post-cast strip structure of retaining wall and construction method thereof
CN216947714U (en) Sidewalk structure for improving water permeability
CN216552021U (en) Tower crane foundation advanced anti-ridge water stop structure
CN114991222B (en) Shock absorption disposal method for subway station structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220816