CN217204297U CN202123206464.2U CN202123206464U CN217204297U CN 217204297 U CN217204297 U CN 217204297U CN 202123206464 U CN202123206464 U CN 202123206464U CN 217204297 U CN217204297 U CN 217204297U
Authority
CN
China
Prior art keywords
geomembrane
outer plate
water stop
planking
fixing block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123206464.2U
Other languages
Chinese (zh)
Inventor
姚兰
董洋
魏玉虎
吴文斌
唐子强
郭景伦
杨志浩
陈涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongke Dingshi Environmental Engineering Co ltd
Original Assignee
Zhongke Dingshi Environmental Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongke Dingshi Environmental Engineering Co ltd filed Critical Zhongke Dingshi Environmental Engineering Co ltd
Priority to CN202123206464.2U priority Critical patent/CN217204297U/en
Application granted granted Critical
Publication of CN217204297U publication Critical patent/CN217204297U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Barrages (AREA)

Abstract

The utility model relates to a leakproofness sealing rod direction fixed mounting device for geomembrane is connected, its characterized in that: the inner panel dislocation stack with the inboard of planking, the bottom of inner panel sets up the inner panel fixed block, the bottom of planking sets up the planking fixed block, the inner panel reaches the planking passes through the screw and can dismantle fixedly, the upper end of inner panel sets up the location direction circle, the position of location direction circle with the top of planking is corresponding, the surface of location direction circle with the surface of planking is parallel, the location direction circle supplies the sealing rod to penetrate to keep direction of delivery, the planking fixed block will the sealing rod propelling movement is fixed in the cavity of geomembrane box, the utility model discloses can conveniently assist to control the sealing rod, reduce operating personnel's working strength, improve the construction speed.

Description

Sealing water stop strip guiding and fixing installation device for geomembrane connection
Technical Field
The utility model relates to a leakproofness waterstop direction fixed mounting device for geomembrane is connected.
Background
Currently, the vertical barrier system is the fastest and safest method to block the flow of harmful underground liquids due to solid waste contaminating the leaking fluid. The use of HDPE films for closure shutoff can provide direct protection and long term shutoff. But the connection between two blocks of HDPE geomembranes is very important, and not only needs to fixedly connect the two blocks of membranes together to form a complete barrier membrane wall, but also ensures the watertightness of the joint of the two membranes, and prevents pollution from diffusing due to leakage of a connecting device.
The water stop strip is formed by mixing a high-molecular inorganic water-absorbing expansion material and rubber, and is a main application material for preventing and treating leakage of various engineering construction joints. The water stop strip generates 2-3 times of expansion deformation after meeting water, is full of all irregular surfaces, cavities and gaps of seams, generates huge contact pressure and thoroughly prevents leakage. The existing water stop strip is inconvenient to seal and install due to the fact that a cavity formed by membrane connection is small, operation space is very narrow and small, filling sundries caused by construction at the cavity part need to be cleaned, the water stop strip is not easy to fix, guide and install easily, time and labor are wasted, and the effect is not good. Therefore, a new guide fixing installation device for the water stop strip is needed to solve the problem.
SUMMERY OF THE UTILITY MODEL
The utility model provides a leakproofness sealing rod direction fixed mounting device for geomembrane is connected can conveniently assist the sealing rod and control, reduces operating personnel's working strength, improves the construction speed.
In order to realize the purpose, the utility model discloses a technical scheme is:
the utility model provides a leakproofness sealing rod direction fixed mounting device for geomembrane is connected which characterized in that: inner plates are stacked in a staggered mode and are arranged on the inner sides of the outer plates, inner plate fixing blocks are arranged at the bottom ends of the inner plates, and outer plate fixing blocks are arranged at the bottom ends of the outer plates;
the inner plate and the outer plate are detachably fixed through screws, a positioning guide ring is arranged at the upper end of the inner plate, the position of the positioning guide ring corresponds to the top end of the outer plate, the surface of the positioning guide ring is parallel to the surface of the outer plate, and a water stop strip is inserted into the positioning guide ring and the conveying direction of the water stop strip is kept;
the screw reaches the inner panel fixed block can dredge and clear up the debris in the cavity of geomembrane box, the planking fixed block will the sealing rod propelling movement is fixed in the cavity of geomembrane box.
A leakproofness sealing rod direction fixed mounting device for geomembrane is connected, wherein: the length of the inner plate and the outer plate is 50cm, the width of the inner plate and the outer plate is 5cm, the bottom end of the outer plate is lower than the bottom end of the inner plate by 8cm, the diameter of the positioning guide ring is 5cm, and the length of the inner plate fixing block and the length of the outer plate fixing block are 4 cm.
A leakproofness sealing rod direction fixed mounting device for geomembrane is connected, wherein: the inner plate fixing block and the outer plate fixing block are protruding solid cylinders.
A leakproofness sealing rod direction fixed mounting device for geomembrane is connected, wherein: the inner plate, the outer plate, the positioning guide ring, the inner plate fixing block and the outer plate fixing block are made of steel.
The utility model has the advantages that the water stop strip can be positioned, clamped and installed through the fixing block, and is firmer; carry out directional transport to the sealing rod through the location guide circle to can conveniently assist to control the sealing rod, reduce operating personnel's working strength, improve construction speed.
Drawings
Fig. 1 is a structural view of a sealing water stop guiding and fixing installation device for geomembrane connection.
Fig. 2 is a side view structural view of the sealing water stop guiding and fixing installation device for geomembrane connection.
Fig. 3 is a bottom view of an embodiment of a sealing water stop guiding and fixing installation device for geomembrane connection.
Fig. 4 is a side view structural diagram of an embodiment of a sealing water stop guiding and fixing installation device for geomembrane connection.
Description of reference numerals: 1-an inner plate; 2-an outer plate; 3, positioning a guide ring; 4-screws; 5-inner plate fixing block; 6-outer plate fixing block; 7-geomembrane female buckle; 8-water stop bar; 9-cavity.
Detailed Description
As shown in fig. 1 to 3, the sealing water stop strip guiding, fixing and mounting device for geomembrane connection is characterized in that: inner panel 1 dislocation stack with the inboard of planking 2, inner panel 1 reaches 2 long for 50cm of planking, the width is 5cm, the bottom of planking 2 is less than 8cm in the bottom of inner panel 1, inner panel 1 reaches 2 can dismantle fixedly through screw 4 in the planking, the bottom of inner panel 1 sets up inner panel fixed block 5, the bottom of planking 2 sets up planking fixed block 6, inner panel fixed block 5 reaches the length of planking fixed block 6 is 4cm, inner panel fixed block 5 reaches planking fixed block 6 is protruding solid cylinder.
The upper end of inner panel 1 sets up location guide ring 3, the diameter of location guide ring 3 is 5cm, the position of location guide ring 3 with the top of planking 2 is corresponding, the surface of location guide ring 3 with the surface of planking 2 is parallel, location guide ring 3 supplies sealing rod 8 to penetrate, and keeps sealing rod 8's direction of delivery.
The screw 4 and the inner plate fixing block 5 can dredge and clean sundries in the cavity 9 of the geomembrane female buckle 7, and the outer plate fixing block 6 pushes and fixes the water stop strip 8 in the cavity 9.
The inner plate 1, the outer plate 2, the positioning guide ring 3, the inner plate fixing block 5 and the outer plate fixing block 6 are made of steel.
In the embodiment, a geomembrane female buckle 7 is arranged on one side edge of a geomembrane, before two membranes are fixedly connected, a water stop strip 8 is placed in a cavity of the geomembrane female buckle 7, the cavity of the geomembrane female buckle 7 is not large, the operation space is very narrow, the water stop strip 8 is inconvenient to seal and install and is not easy to fix and guide, at the moment, the water stop strip 8 can firstly penetrate through the positioning guide ring 3, the surface of the positioning guide ring 3 is parallel to the surface of the outer plate 2, the conveying direction of the water stop strip 8 can be always longitudinally parallel to the geomembrane female buckle 7, sundries in the cavity 9 of the geomembrane female buckle 7 are firstly dredged and cleaned by utilizing the screw 4 and the inner plate fixing block 5, the cleanness in the cavity 9 is kept, and the water stop strip 8 is pushed into the cavity 9 through the fixing block 6, the water stop bar 8 is fixed in the cavity 9 in an installing mode, the water stop bar 8 is pushed into the cavity 9 in sequence along the geomembrane female buckle 7 in an axial moving mode, and the water stop bar 8 is installed and fixed in the cavity 9 until the geomembrane female buckle 7 is installed and fixed on the water stop bar 8.
The utility model has the advantages that:
the water stop strip can be positioned, clamped and installed through the fixing block, and is firmer; carry out directional transport to the sealing rod through the location guide circle to can conveniently assist to control the sealing rod, reduce operating personnel's working strength, improve construction speed.
The foregoing description is intended to be illustrative rather than limiting, and it will be appreciated by those skilled in the art that many modifications, variations or equivalents may be made without departing from the spirit and scope of the invention as defined in the appended claims.

Claims (4)

1. The utility model provides a leakproofness sealing rod direction fixed mounting device for geomembrane is connected which characterized in that: the inner plates (1) are stacked on the inner sides of the outer plates (2) in a staggered mode, inner plate fixing blocks (5) are arranged at the bottom ends of the inner plates (1), and outer plate fixing blocks (6) are arranged at the bottom ends of the outer plates (2);
the inner plate (1) and the outer plate (2) are detachably fixed through screws (4), a positioning guide ring (3) is arranged at the upper end of the inner plate (1), the position of the positioning guide ring (3) corresponds to the top end of the outer plate (2), the surface of the positioning guide ring (3) is parallel to the surface of the outer plate (2), and a water stop strip (8) is inserted into the positioning guide ring (3) and the conveying direction of the water stop strip (8) is kept;
the screw (4) and the inner plate fixing block (5) can dredge and clean sundries in a cavity (9) of the geomembrane female buckle (7), and the outer plate fixing block (6) pushes and fixes the water stop strip (8) into the cavity (9).
2. The sealing water stop strip guiding and fixing installation device for geomembrane connection according to claim 1, wherein: the length of the inner plate (1) and the width of the outer plate (2) are 50cm and 5cm, the bottom end of the outer plate (2) is lower than the bottom end of the inner plate (1) by 8cm, the diameter of the positioning guide ring (3) is 5cm, and the length of the inner plate fixing block (5) and the length of the outer plate fixing block (6) are 4 cm.
3. The sealing water stop strip guiding and fixing installation device for geomembrane connection according to claim 1, wherein: the inner plate fixing block (5) and the outer plate fixing block (6) are protruding solid cylinders.
4. The sealing water stop strip guiding and fixing installation device for geomembrane connection according to claim 1, wherein: the inner plate (1), the outer plate (2), the positioning guide ring (3), the inner plate fixing block (5) and the outer plate fixing block (6) are made of steel.
CN202123206464.2U 2021-12-16 2021-12-16 A leakproofness sealing rod direction fixed mounting device for geomembrane is connected Active CN217204297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123206464.2U CN217204297U (en) 2021-12-16 2021-12-16 A leakproofness sealing rod direction fixed mounting device for geomembrane is connected

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123206464.2U CN217204297U (en) 2021-12-16 2021-12-16 A leakproofness sealing rod direction fixed mounting device for geomembrane is connected

Publications (1)

Publication Number Publication Date
CN217204297U true CN217204297U (en) 2022-08-16

Family

ID=82784184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123206464.2U Active CN217204297U (en) 2021-12-16 2021-12-16 A leakproofness sealing rod direction fixed mounting device for geomembrane is connected

Country Status (1)

Country Link
CN (1) CN217204297U (en)

Similar Documents

Publication Publication Date Title
CN107859064B (en) Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method
CN103321255A (en) Underground concrete structural engineering joint waterproof construction method
CN103437417B (en) Part repair structure for steel lining of drainage pipeline
CN217204297U (en) A leakproofness sealing rod direction fixed mounting device for geomembrane is connected
CN106436771B (en) A kind of tunnel, city piping lane leakage expansion joint method for repairing and mending and expansion gap device
CN103806412A (en) Water leakage repair structure for water pool expansion joint
CN114215378A (en) Installation method for guiding and fixing sealing water stop strip for geomembrane connection
KR100775954B1 (en) Repair method of using packer and packer structure for repairing
EP3963142B1 (en) Watertight joint and method of installing a watertight joint
CN219367022U (en) Waterproof structure of underground construction through-wall pipeline
CN204530782U (en) A kind of waterstop protective device and comprise the immersed tube tunnel structure of this device
CN103924694B (en) A kind of mending-leakage processing method of water proofing property concrete extension joint
CN111827363A (en) Underground building deformation joint waterproof structure and construction method thereof
CN209873861U (en) Sealing device for lap joint of steel corrugated plate pipe gallery plates
CN106836462A (en) Basement extends out the processing method and waterproof construction of structure construction seam
CN217439617U (en) A construction structures for building structure slip casting leaking stoppage
CN212107451U (en) Continuous water seal blocking device for large box culvert
CN209741928U (en) Structure is administered to underground space structures movement joint percolating water
CN103821109A (en) Water pool expansion joint water leakage repairing method
CN220599829U (en) Leakage-proof device
CN219413829U (en) Sealed cement pipe
CN213805525U (en) Underground continuous wall broken wall processing apparatus
CN213391311U (en) Water stopping structure between new and old concrete structure seams
CN210827602U (en) Underground anti-seepage connecting joint and underground anti-seepage connecting device
CN218118966U (en) Anti-seepage device for building water supply and drainage

Legal Events

Date Code Title Description
GR01 Patent grant