CN217182790U - Threading device is laid to pipeline for construction - Google Patents

Threading device is laid to pipeline for construction Download PDF

Info

Publication number
CN217182790U
CN217182790U CN202220034351.4U CN202220034351U CN217182790U CN 217182790 U CN217182790 U CN 217182790U CN 202220034351 U CN202220034351 U CN 202220034351U CN 217182790 U CN217182790 U CN 217182790U
Authority
CN
China
Prior art keywords
box
electric telescopic
threading
pipeline
threading device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220034351.4U
Other languages
Chinese (zh)
Inventor
王成玖
隆荣
赖正清
彭小平
曹刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huachuan Foundation Construction Group Longwei Container Manufacturing Co ltd
Original Assignee
Sichuan Huachuan Foundation Construction Group Longwei Container Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huachuan Foundation Construction Group Longwei Container Manufacturing Co ltd filed Critical Sichuan Huachuan Foundation Construction Group Longwei Container Manufacturing Co ltd
Priority to CN202220034351.4U priority Critical patent/CN217182790U/en
Application granted granted Critical
Publication of CN217182790U publication Critical patent/CN217182790U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a threading device is laid with pipeline to construction, the on-line screen storage device comprises a base, through-hole bilateral symmetry is provided with six electric telescopic handle, electric telescopic handle one side is provided with the baffle-box, the electric telescopic handle upper end is provided with the transmission case, connecting plate one end is provided with hydraulic rod, transmission case one end fixedly connected with threading case, storage line case right-hand member symmetry is provided with two transfer pulleys. The utility model discloses in, device one end is provided with second spring structure, make the pipeline can obtain the cushioning effect after the threading is accomplished through second spring structure, can not drop earlier and go to damage the device, the device lower extreme is provided with electric telescopic handle structure, realize the lift to centre gripping fixed knot structure through electric telescopic handle structure, so that adjust the height of pipeline, the inside one end of threading incasement portion of device is provided with two transfer pulleys, realize dragging the electric wire when coming out through two transfer pulleys, make threading efficiency higher.

Description

Threading device is laid to pipeline for construction
Technical Field
The utility model relates to a threading field is laid to the pipeline, especially relates to a threading device is laid to pipeline for construction.
Background
The pipeline laying is to directly bury the pipeline. In the process of laying the construction pipeline, the pipeline is mainly used for passing through some electric wires, water pipes and other tubular articles, and the pipelines enable the articles not to be easily damaged and have longer service life.
When the applicant applies the invention, through search, the applicant finds that a Chinese patent discloses a pipeline laying and threading device for electric power construction, the application number of which is '202021082985.4', the patent mainly improves the working efficiency, has strong practicability, avoids the phenomenon that the device is stressed and toppled in the working process to influence the working process, reduces a large amount of workload for users, does not need simultaneous operation of multiple persons, and improves the speed of electric power construction. However, this device is not provided with a buffer structure, is not high in threading and is not strong in practicability.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a threading device for laying a pipeline for construction.
In order to realize the purpose, the utility model adopts the following technical scheme: the utility model provides a threading device is laid with pipeline to construction, includes the base, the base lower extreme evenly is provided with four pulleys, the base upper end is provided with the through-hole, through-hole bilateral symmetry is provided with six electric telescopic handle, electric telescopic handle one side is provided with the baffle-box, the electric telescopic handle upper end is provided with the transmission case, the inside lead screw that is provided with of transmission case, threaded connection has the connecting plate on the lead screw, connecting plate one end is provided with hydraulic rod, transmission case one end fixedly connected with threading case, threading incasement portion symmetry is provided with two first springs, first spring right side is provided with stores up the line case, it is provided with two transfer pulleys to store up line case right-hand member symmetry, the transfer pulley right-hand member is provided with the export, the export runs through in the threading case.
As a further description of the above technical solution:
the electric telescopic handle lower extreme is provided with first flexible piece, first flexible piece lower extreme is provided with first motor.
As a further description of the above technical solution:
the buffer box is characterized in that a buffer cushion is arranged at the upper end inside the buffer box, two second springs are symmetrically arranged at the lower end of the buffer cushion, and a third pressing plate and a fourth pressing plate are arranged at the upper end and the lower end of each second spring.
As a further description of the above technical solution:
one end of the screw rod is provided with a fixed block, and the other end of the screw rod is provided with a third motor.
As a further description of the above technical solution:
one end of the hydraulic push rod is provided with a second telescopic block, the other end of the hydraulic push rod is provided with a clamping plate, and one end of the clamping plate is provided with a clamping pad.
As a further description of the above technical solution:
and a first pressing plate and a second pressing plate are arranged at the left end and the right end of the first spring.
As a further description of the above technical solution:
the wire storage box is internally provided with a partition plate, and the right side of the partition plate is provided with a wire outlet wheel.
As a further description of the above technical solution:
the conveying wheel is characterized in that a plurality of conveying blocks are uniformly arranged on the outer side of the conveying wheel, two rotating shafts are symmetrically arranged at two ends of the conveying wheel, a supporting rod is arranged at one end of each rotating shaft, and a second motor is arranged at one end of each supporting rod.
The utility model discloses following beneficial effect has:
1. the utility model discloses in, device one end is provided with second spring structure, makes the pipeline can obtain the cushioning effect after the threading is accomplished through second spring structure, can not drop earlier and go to damage the device.
2. The utility model discloses in, the device lower extreme is provided with the electric telescopic handle structure, realizes the lift to centre gripping fixed knot structure through the electric telescopic handle structure to the height of pipeline is adjusted in the regulation.
3. The utility model discloses in, the inside one end of threading case of device is provided with two transfer gear, realizes dragging when coming out to the electric wire through two transfer gear for threading efficiency is higher.
Drawings
Fig. 1 is a perspective view of a construction pipeline laying threading device provided by the present invention;
fig. 2 is a cross-sectional view of a threading box of the construction pipeline laying threading device provided by the utility model;
fig. 3 is a cross-sectional view of a transmission case of the pipeline laying and threading device for construction according to the present invention;
fig. 4 is a side view of a transmission case of the construction pipeline laying threading device provided by the present invention;
fig. 5 is the utility model provides a cross-sectional view of construction is with pipeline laying threading device's baffle-box.
Illustration of the drawings:
1. a base; 101. a pulley; 102. a threading box; 103. a transmission case; 104. a buffer tank; 105. a through hole; 2. a wire storage box; 201. a partition plate; 202. a wire outlet wheel; 3. a first spring; 301. a first platen; 302. a second platen; 4. a transfer wheel; 401. a transfer block; 402. a rotating shaft; 403. a support bar; 404. a second motor; 405. an outlet; 5. a hydraulic push rod; 501. a second telescopic block; 502. a clamping plate; 503. a clamping pad; 6. a cushion pad; 601. a second spring; 602. a third press plate; 603. a fourth platen; 7. an electric telescopic rod; 701. a first telescopic block; 702. a first motor; 8. a screw rod; 801. a fixed block; 802. a third motor; 803. a connecting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides an embodiment: a threading device for laying a construction pipeline comprises a base 1, four pulleys 101 are uniformly arranged at the lower end of the base 1, the pulleys 101 are used for a moving device, a through hole 105 is formed in the upper end of the base 1, six electric telescopic rods 7 are symmetrically arranged on two sides of the through hole 105, the electric telescopic rods 7 are used for adjusting the height of the device, a buffer box 104 is arranged on one side of each electric telescopic rod 7, the buffer box 104 has a buffering effect on the pipeline, a transmission box 103 is arranged at the upper end of each electric telescopic rod 7, a lead screw 8 is arranged in the transmission box 103, the lead screw 8 is used for transmitting the pipeline, a connecting plate 803 is in threaded connection with the lead screw 8, a hydraulic push rod 5 is arranged at one end of the connecting plate 803, the hydraulic push rod 5 is used for clamping and fixing the pipeline, a threading box 102 is fixedly connected to one end of the transmission box 103, two first springs 3 are symmetrically arranged in the threading box 102, a wire storage box 2 is arranged on the right side of the first springs 3, two delivery wheels 4 are symmetrically arranged at the right end of the thread storage box 2, an outlet 405 is arranged at the right end of each delivery wheel 4, and the outlet 405 penetrates through the threading box 102.
The lower end of the electric telescopic rod 7 is provided with a first telescopic block 701, the lower end of the first telescopic block 701 is provided with a first motor 702, the first motor 702 is used for driving the electric telescopic rod 7 to stretch and retract, the upper end inside the buffer box 104 is provided with a buffer cushion 6, the lower end of the buffer cushion 6 is symmetrically provided with two second springs 601, the upper and lower ends of the second springs 601 are provided with a third pressing plate 602 and a fourth pressing plate 603, the stress area of the second springs 601 is increased by the third pressing plate 602 and the fourth pressing plate 603, one end of the screw rod 8 is provided with a fixed block 801, the other end of the screw rod 8 is provided with a third motor 802, the third motor 802 drives the screw rod 8 to rotate, one end of the hydraulic push rod 5 is provided with a second telescopic block 501, the other end of the hydraulic push rod 5 is provided with a clamping plate 502, one end of the clamping plate 502 is provided with a clamping pad 503, the left and right ends of the first spring 3 are provided with a first pressing plate 301 and a second pressing plate 302, the first pressing plate 301 and the second pressing plate 302 increase the stress area of the first spring 3, the inside baffle 201 that is provided with of storage line case 2, baffle 201 right side are provided with wire outgoing wheel 202, and the 4 outsides of transfer gear evenly are provided with a plurality of conveying blocks 401, and 4 both ends symmetries of transfer gear are provided with two pivots 402, and pivot 402 one end is provided with bracing piece 403, and bracing piece 403 one end is provided with second motor 404, and second motor 404 drives transfer gear 4 and rotates.
The working principle is as follows: install the device, start the controller, when using, fix the pipeline through hydraulic rod 5 centre gripping, carry out the threading through threading case 102 to it, through lead screw 8 transmission to buffer tank 104 after the threading is accomplished on, the rethread external force is laid, realizes the lift to centre gripping fixed knot structure through electric telescopic handle 7 structure to the height of adjustment pipeline.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (8)

1. The utility model provides a threading device is laid with pipeline to construction, includes base (1), its characterized in that: the wire drawing machine is characterized in that four pulleys (101) are uniformly arranged at the lower end of the base (1), a through hole (105) is formed in the upper end of the base (1), six electric telescopic rods (7) are symmetrically arranged on two sides of the through hole (105), a buffer box (104) is arranged on one side of each electric telescopic rod (7), a transmission box (103) is arranged at the upper end of each electric telescopic rod (7), a lead screw (8) is arranged inside the transmission box (103), a connecting plate (803) is connected to each lead screw (8) in a threaded manner, a hydraulic push rod (5) is arranged at one end of each connecting plate (803), a wire drawing box (102) is fixedly connected to one end of each transmission box (103), two first springs (3) are symmetrically arranged inside the wire drawing box (102), a wire storage box (2) is arranged on the right side of each first spring (3), two conveying wheels (4) are symmetrically arranged at the right end of each wire storage box (2), an outlet (405) is formed in the right end of the conveying wheel (4), and the outlet (405) penetrates through the threading box (102).
2. The construction pipe laying threading device according to claim 1, characterized in that: the lower end of the electric telescopic rod (7) is provided with a first telescopic block (701), and the lower end of the first telescopic block (701) is provided with a first motor (702).
3. The construction pipe laying threading device according to claim 1, characterized in that: the buffer box is characterized in that a buffer pad (6) is arranged at the upper end inside the buffer box (104), two second springs (601) are symmetrically arranged at the lower end of the buffer pad (6), and a third pressing plate (602) and a fourth pressing plate (603) are arranged at the upper end and the lower end of each second spring (601).
4. The construction pipe laying threading device according to claim 1, characterized in that: one end of the screw rod (8) is provided with a fixed block (801), and the other end of the screw rod (8) is provided with a third motor (802).
5. The construction pipe laying threading device according to claim 1, characterized in that: one end of the hydraulic push rod (5) is provided with a second telescopic block (501), the other end of the hydraulic push rod (5) is provided with a clamping plate (502), and one end of the clamping plate (502) is provided with a clamping pad (503).
6. The construction pipe laying threading device according to claim 1, characterized in that: and a first pressing plate (301) and a second pressing plate (302) are arranged at the left end and the right end of the first spring (3).
7. The construction pipeline laying threading device according to claim 1, characterized in that: a partition plate (201) is arranged inside the wire storage box (2), and a wire outgoing wheel (202) is arranged on the right side of the partition plate (201).
8. The construction pipe laying threading device according to claim 1, characterized in that: the conveying device is characterized in that a plurality of conveying blocks (401) are uniformly arranged on the outer side of the conveying wheel (4), two rotating shafts (402) are symmetrically arranged at two ends of the conveying wheel (4), a supporting rod (403) is arranged at one end of each rotating shaft (402), and a second motor (404) is arranged at one end of each supporting rod (403).
CN202220034351.4U 2022-01-07 2022-01-07 Threading device is laid to pipeline for construction Active CN217182790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220034351.4U CN217182790U (en) 2022-01-07 2022-01-07 Threading device is laid to pipeline for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220034351.4U CN217182790U (en) 2022-01-07 2022-01-07 Threading device is laid to pipeline for construction

Publications (1)

Publication Number Publication Date
CN217182790U true CN217182790U (en) 2022-08-12

Family

ID=82732705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220034351.4U Active CN217182790U (en) 2022-01-07 2022-01-07 Threading device is laid to pipeline for construction

Country Status (1)

Country Link
CN (1) CN217182790U (en)

Similar Documents

Publication Publication Date Title
CN217182790U (en) Threading device is laid to pipeline for construction
CN210819281U (en) Steel pipe clamping device for building
CN207914357U (en) One kind can angle adjustable steel tube straightening machine
CN216574903U (en) Drawing equipment for processing galvanized iron wires
CN215207738U (en) Pay-off device for pre-embedding of water and electricity pipelines
CN207090866U (en) A kind of power engineering is twisted machine
CN213802587U (en) Adjustable hanging bracket for small-sized hoisting equipment
CN214186227U (en) Perforating device is used in seamless steel pipe processing
CN213906178U (en) Pipe jacking installation structure for cable construction
CN215797583U (en) Cable coiling mechanism is used in installation of building water and electricity
CN210795550U (en) Hoisting device for boiler equipment installation
CN211198230U (en) Cable drum is brake equipment for unwrapping wire
CN207724382U (en) A kind of cable production cutting device
CN219194252U (en) Crane hoisting cable fixing assembly
CN208432774U (en) A kind of communication engineering optical cable installation end traction device
CN112061894A (en) Cable winding and unwinding devices for electric power field
CN215835072U (en) Intelligent system wiring device
CN219592095U (en) Wiring frame convenient to stable concatenation
CN220844869U (en) Aluminum alloy cable shaft type winding displacement device
CN214088752U (en) Plastic wire drawing machine capable of drawing wires uniformly
CN218145381U (en) Pipeline hoist is used in water conservancy water and electricity construction
CN216649078U (en) Underground cable lays and uses wiring frame convenient to corner
CN216376911U (en) Cable traction device for cable laying
CN220182435U (en) Categorised two dish admission machines
CN220548694U (en) Nonmetal composite pipeline enhancement layer winding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant