CN210795550U - Hoisting device for boiler equipment installation - Google Patents
Hoisting device for boiler equipment installation Download PDFInfo
- Publication number
- CN210795550U CN210795550U CN201921903462.9U CN201921903462U CN210795550U CN 210795550 U CN210795550 U CN 210795550U CN 201921903462 U CN201921903462 U CN 201921903462U CN 210795550 U CN210795550 U CN 210795550U
- Authority
- CN
- China
- Prior art keywords
- block
- arc
- connecting plate
- supporting
- fixed mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model belongs to the technical field of hoist device, especially, be a hoist device is used in boiler equipment installation, including the arc backup pad, the one end of arc backup pad is equipped with the connecting block, one side of connecting block is connected with fixed mounting bracket, fixed mounting bracket's bottom is equipped with the direction backup pad, the top of direction backup pad is equipped with the direction spout, the top sliding connection of direction spout has first support frame, the top of first support frame is equipped with the direction slide rail, the top of direction slide rail is equipped with the supporting shoe. Through the connecting block that sets up, on the one hand can be fixed connecting block and indoor wall body mutually through fixed mounting bracket, and on the other hand cooperatees through fixed mounting bracket and the connecting block that sets up, and the effect of the inside wall body of utilization that can be abundant carries out the installation of hoist device support.
Description
Technical Field
The utility model belongs to the technical field of hoist device, concretely relates to hoist device is used in boiler equipment installation.
Background
The hoisting device is a crane or a hoisting mechanism, the crane or the hoisting mechanism is used for installing and in-place hoisting equipment or objects, various hoisting machines are used for hoisting the equipment, workpieces, appliances, materials and the like in the process of maintenance or repair, so that the equipment, the workpieces, the appliances, the materials and the like are subjected to position change, and the hoisting device is mostly used for hoisting by adopting hydraulic transmission or electric transmission.
Boiler equipment is producing or when installing, need use hoist device to hoist boiler equipment and carry out the installation of spare part or dismantle and maintain, the equipment that hoists that uses in the current boiler equipment production installation is because the volume is great, occupy a large amount of boiler equipment production space, and boiler equipment that has now receives the influence of indoor height when hoisting the installation, lead to boiler equipment can only use the small-size equipment when indoor hoisting, then need outdoor going on when boiler equipment weight is great, very inconvenience.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a hoisting device is used in boiler equipment installation has solved current boiler equipment when indoor hoist and mount, the inconvenient problem of boiler equipment hoist and mount.
In order to achieve the above object, the utility model provides a following technical scheme: a hoisting device for boiler equipment installation comprises an arc-shaped supporting plate, wherein one end of the arc-shaped supporting plate is provided with a connecting block, one side of the connecting block is connected with a fixed mounting frame, the bottom of the fixed mounting frame is provided with a guide supporting plate, the top of the guide supporting plate is provided with a guide sliding chute, the top of the guide sliding chute is connected with a first supporting frame in a sliding manner, the top of the first supporting frame is provided with a guide sliding rail, a supporting block is arranged above the guide sliding rail, one side of the supporting block is movably connected with a roller through a transmission shaft, the supporting block is connected with the guide sliding rail through the roller, the top of the supporting block is provided with a first motor, the output end of the first motor is provided with a driving wheel, the driving wheel is connected with the roller through a belt, the bottom, the output end of the second motor is provided with a second driving wheel, the surface of the second driving wheel is provided with a hoisting steel wire, and the first end of the hoisting steel wire is provided with a clamping device.
Preferably, the clamping device includes the fixed block, one side of fixed block is equipped with first clamping machine and constructs, first clamping machine constructs including first connecting plate, axis of rotation and fixed block swing joint are passed through to the one end of first connecting plate, the other end of first connecting plate has the second connecting plate through axis of rotation swing joint, the one end of second connecting plate has first arc to tighten up the piece through axis of rotation swing joint, one side of first connecting plate is equipped with the third connecting plate, the one end swing joint of third connecting plate has the fourth connecting plate, the one end swing joint of fourth connecting plate has the second arc to tighten up the piece, one side that the second arc tightened up the piece is equipped with the connecting axle.
Preferably, the other side of fixed block is equipped with second clamping machine and constructs, second clamping machine constructs the same with first clamping machine structure, second clamping machine constructs and is connected through the connecting axle between the structure with first clamping machine, the top of connecting axle is equipped with electric telescopic handle, the connecting axle is connected with the fixed block through electric telescopic handle.
Preferably, one side of the fixed mounting frame is provided with a threaded mounting hole.
Preferably, the number of the arc-shaped support plates is a plurality, the number of the arc-shaped support plates is determined by the length of the guide support plate, and the distance between every two arc-shaped support plates is 1 m.
Compared with the prior art, the beneficial effects of the utility model are that:
through the connecting block that sets up, on the one hand can be fixed connecting block and indoor wall body mutually through fixed mounting bracket, on the other hand cooperatees through the fixed mounting bracket and the connecting block that set up, the effect of the inside wall body of utilization that can be abundant, carry out the installation of hoist device support, carry out the fixed mode of hoist device main part through using fixed mounting bracket, and has simple to operate, the cost is used lowly, can increase the hoisting capacity of indoor boiler part greatly simultaneously, through the first support frame that sets up, can carry out the removal about, be convenient for hoist boiler equipment and carry out convenient regulation and remove, the installation effectiveness of boiler is greatly improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a first three-dimensional structure diagram of the present invention;
FIG. 2 is a second perspective structural view of the present invention;
fig. 3 is a side view of the present invention;
fig. 4 is a first three-dimensional structure diagram of the first support frame of the present invention;
fig. 5 is a three-dimensional structure diagram of a second first support frame of the present invention;
fig. 6 is a partial enlarged view of a portion a in fig. 5 according to the present invention.
In the figure: 1, an arc-shaped supporting plate; 2, connecting blocks; 3, fixing a mounting rack; 4, guiding the supporting plate; 5, a guide chute; 6 a first support frame; 7, guiding a sliding rail; 8, supporting blocks; 9, rolling wheels; 10 a first motor; 11 a driving wheel; 12 a second support frame; 13 a second motor; 14 a second transmission wheel; 15 hoisting steel wires; 16, fixing blocks; 17 a first connecting plate; 18 a second connecting plate; 19 an arc-shaped tightening block; 20 a third connecting plate; 21 a fourth connecting plate; 22 a second arcuate clamping block; 23 connecting the shafts; 24 electric telescopic rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides the following technical solutions: a hoisting device for installing boiler equipment comprises an arc-shaped supporting plate 1, wherein one end of the arc-shaped supporting plate 1 is provided with a connecting block 2, the connecting block 2 can be fixed with an indoor wall through a fixed mounting frame 3 through the arranged connecting block 2, on the other hand, the effect of the internal wall can be fully utilized through the matching of the fixed mounting frame 3 and the connecting block 2, the bracket of the hoisting device is installed, one side of the connecting block 2 is connected with the fixed mounting frame 3, the fixing mode of the main body of the hoisting device is realized through the fixed mounting frame 3, the hoisting device has the advantages of convenient installation, low cost use and capability of greatly improving the hoisting capability of indoor boiler parts, the first supporting frame 6 can move left and right, the boiler equipment can be conveniently hoisted and conveniently adjusted and moved, and the installation efficiency of a boiler is greatly improved, the bottom of the fixed mounting frame 3 is provided with a guide support plate 4, the top of the guide support plate 4 is provided with a guide chute 5, the guide chute 5 can be matched with the first support frame 6 for sliding, the top of the guide chute 5 is connected with the first support frame 6 in a sliding manner, the top of the first support frame 6 is provided with a guide slide rail 7, a support block 8 is arranged above the guide slide rail 7, one side of the support block 8 is movably connected with a roller 9 through a transmission shaft, the support block 8 is connected with the guide slide rail 7 through the roller 9, the top of the support block 8 is provided with a first motor 10, the output end of the first motor 10 is provided with a transmission wheel 11, the transmission wheel 11 is connected with the roller 9 through a belt, the transmission wheel 11 can control the roller 9 through the belt to adjust the moving direction, the bottom of the support block 8 is provided with a second support frame 12, the bottom, the surface of the second driving wheel 14 is provided with a hoisting steel wire 15, and a first end of the hoisting steel wire 15 is provided with a clamping device.
Specifically, the clamping device comprises a fixed block 16, one side of the fixed block 16 is provided with a first clamping mechanism, the first clamping mechanism comprises a first connecting plate 17, one end of the first connecting plate 17 is movably connected with the fixed block 16 through a rotating shaft, the other end of the first connecting plate 17 is movably connected with a second connecting plate 18 through a rotating shaft, one end of the second connecting plate 18 is movably connected with a first arc-shaped clamping block 19 through a rotating shaft, one side of the first connecting plate 17 is provided with a third connecting plate 20, one end of the third connecting plate 20 is movably connected with a fourth connecting plate 21, one end of the fourth connecting plate 21 is movably connected with a second arc-shaped clamping block 22, one side of the second arc-shaped clamping block 22 is provided with a connecting shaft 23, through first clamping machine structure, can step up the boiler through second arc step up piece 22, step up through second arc step up piece 22 can be quick, alleviate the work degree of fatigue of artifical clamping and the danger that equipment drops.
Specifically, the opposite side of fixed block 16 is equipped with second clamping machine and constructs, second clamping machine constructs the structure the same with first clamping machine, second clamping machine constructs and is connected through connecting axle 23 between the structure with first clamping machine, the top of connecting axle 23 is equipped with electric telescopic handle 24, connecting axle 23 is connected with fixed block 16 through electric telescopic handle 24, electric telescopic handle 24 through the setting, can realize the tensile effect through electric telescopic handle 24, the realization is to the operation that steps up and loosen of second arc step-up piece 22 and first arc step-up piece 19, make simultaneously that the second arc step-up piece 22 and first arc step-up piece 19 between step-up more stable.
Specifically, one side of fixed mounting frame 3 is equipped with the screw thread mounting hole, and through the screw thread mounting hole that sets up, can be more convenient to install fixedly or convenient dismantlement change between the fixed mounting frame 3.
Specifically, the quantity of arc backup pad 1 is a plurality of, and the quantity of arc backup pad 1 is decided by the length of direction backup pad 4 mutually, and the interval between per two arc backup pads 1 is 1m, is 1m through the interval that uses between per two arc backup pads 1, can accomplish when using hoisting device to adorn to hang, and each department can both bear the weight of hoisting, can both steady going on.
The utility model discloses a theory of operation and use flow: the utility model discloses install the back, earlier carry out horizontal level with first support frame 6 along the direction of direction spout 5 and remove, simultaneously through starting first motor 10, the first motor 10 of accessible drives the belt and passes through the belt and drive gyro wheel 9 and rotate, thereby utilize gyro wheel 9 to rotate and drive supporting shoe 8 and carry out fore-and-aft horizontal migration, when removing supporting shoe 8 to the assigned position, restart second motor 13 utilizes second drive wheel 14 to rotate and puts down hoist and mount steel wire 15, when clamping device descends to appointed height, step up piece 19 and second arc step up piece 22 with arc step up through tensile electric telescopic handle 24, then rethread second drive wheel 14 upset will hoist and mount steel wire 15 rolling, thereby realize the operation of lifting by crane of boiler, all consumer all power supplies power through external power supply in this device.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. The utility model provides a hoisting accessory is used in boiler equipment installation, includes arc backup pad (1), its characterized in that: one end of the arc-shaped supporting plate (1) is provided with a connecting block (2), one side of the connecting block (2) is connected with a fixed mounting frame (3), the bottom of the fixed mounting frame (3) is provided with a guide supporting plate (4), the top of the guide supporting plate (4) is provided with a guide sliding chute (5), the top of the guide sliding chute (5) is connected with a first supporting frame (6) in a sliding manner, the top of the first supporting frame (6) is provided with a guide sliding rail (7), a supporting block (8) is arranged above the guide sliding rail (7), one side of the supporting block (8) is movably connected with a roller (9) through a transmission shaft, the supporting block (8) is connected with the guide sliding rail (7) through the roller (9), the top of the supporting block (8) is provided with a first motor (10), and the output end of the, the transmission wheel (11) is connected with the roller (9) through a belt, a second support frame (12) is arranged at the bottom of the support block (8), a second motor (13) is arranged at the bottom of the second support frame (12), a second transmission wheel (14) is arranged at the output end of the second motor (13), a hoisting steel wire (15) is arranged on the surface of the second transmission wheel (14), and a clamping device is arranged at the first end of the hoisting steel wire (15).
2. The lifting device for boiler plant installation according to claim 1, characterized in that: the clamping device comprises a fixing block (16), one side of the fixing block (16) is provided with a first clamping mechanism, the first clamping mechanism comprises a first connecting plate (17), one end of the first connecting plate (17) is connected with the fixing block (16) in a movable mode through a rotating shaft, the other end of the first connecting plate (17) is connected with a second connecting plate (18) through a rotating shaft in a movable mode, one end of the second connecting plate (18) is connected with a first arc-shaped tightening block (19) through a rotating shaft in a movable mode, one side of the first connecting plate (17) is provided with a third connecting plate (20), one end of the third connecting plate (20) is connected with a fourth connecting plate (21) in a movable mode, one end of the fourth connecting plate (21) is connected with a second arc-shaped tightening block (22), and one side of the second arc-shaped tightening block (22) is provided with.
3. The lifting device for boiler plant installation according to claim 2, characterized in that: the opposite side of fixed block (16) is equipped with second clamping machine and constructs, second clamping machine constructs the structure the same with first clamping machine, second clamping machine constructs and is connected through connecting axle (23) between the structure with first clamping machine, the top of connecting axle (23) is equipped with electric telescopic handle (24), connecting axle (23) are connected with fixed block (16) through electric telescopic handle (24).
4. The lifting device for boiler plant installation according to claim 1, characterized in that: and one side of the fixed mounting frame (3) is provided with a threaded mounting hole.
5. The lifting device for boiler plant installation according to claim 1, characterized in that: the number of the arc-shaped supporting plates (1) is a plurality, the number of the arc-shaped supporting plates (1) is determined by the length of the guide supporting plate (4), and the distance between every two arc-shaped supporting plates (1) is 1 m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921903462.9U CN210795550U (en) | 2019-11-06 | 2019-11-06 | Hoisting device for boiler equipment installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921903462.9U CN210795550U (en) | 2019-11-06 | 2019-11-06 | Hoisting device for boiler equipment installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210795550U true CN210795550U (en) | 2020-06-19 |
Family
ID=71240974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921903462.9U Expired - Fee Related CN210795550U (en) | 2019-11-06 | 2019-11-06 | Hoisting device for boiler equipment installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210795550U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114229434A (en) * | 2021-12-29 | 2022-03-25 | 国能(泉州)热电有限公司 | Device is put in to thermal power boiler inspection robot |
-
2019
- 2019-11-06 CN CN201921903462.9U patent/CN210795550U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114229434A (en) * | 2021-12-29 | 2022-03-25 | 国能(泉州)热电有限公司 | Device is put in to thermal power boiler inspection robot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208916627U (en) | A kind of accurate internal combustion engine flange hanging device of machining | |
CN201098705Y (en) | H-shaped steel flange plate leveling machine | |
CN210795550U (en) | Hoisting device for boiler equipment installation | |
CN206512612U (en) | A kind of nacelle device of bridge construction | |
CN201696001U (en) | Pumping unit employing anti-drop emergency brake and unload hanging linkage protection | |
CN206553101U (en) | A kind of hoisting bracket for automatically adjusting hanging clamp grease head highness | |
CN211310410U (en) | Winding clamping device | |
CN210536171U (en) | Walk board focus adjusting device based on ball | |
CN210655901U (en) | Hoisting device for metal machining | |
CN213894673U (en) | A pay-off for in wire and cable work progress | |
CN208485534U (en) | A kind of construction lifting appliance | |
CN113639464B (en) | Air energy heat pump outdoor unit | |
CN213171157U (en) | European style electric hoist convenient to installation and maintenance | |
CN216574903U (en) | Drawing equipment for processing galvanized iron wires | |
CN211275076U (en) | Electrostatic spraying hanger | |
CN209210244U (en) | A kind of Logistic Park hanging device | |
CN210313238U (en) | Lifting equipment for assembling construction machinery | |
CN219881723U (en) | Support frame for hydroelectric installation | |
CN206417835U (en) | A kind of vehicle part snatch device | |
CN106903600B (en) | Lateral counterweight sliding device for iron pan polishing robot | |
CN221587573U (en) | Novel cable unwrapping wire support | |
CN212167908U (en) | A even rotational speed paint spraying apparatus for wind-powered electricity generation accessory | |
CN211644200U (en) | Quick winding and unwinding devices of electric power wire | |
CN215148621U (en) | Auxiliary device for mounting electromechanical equipment | |
CN220811651U (en) | Bridge type stacking crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200619 Termination date: 20211106 |