CN206512612U - A kind of nacelle device of bridge construction - Google Patents
A kind of nacelle device of bridge construction Download PDFInfo
- Publication number
- CN206512612U CN206512612U CN201720187072.0U CN201720187072U CN206512612U CN 206512612 U CN206512612 U CN 206512612U CN 201720187072 U CN201720187072 U CN 201720187072U CN 206512612 U CN206512612 U CN 206512612U
- Authority
- CN
- China
- Prior art keywords
- pontic
- fixedly connected
- servomotor
- loading plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of nacelle device of bridge construction, including pontic, the side of the pontic is provided with hanging basket body, first pulley group and second pulley group are provided with the top of the pontic, the top of the hanging basket body is fixedly connected with one end of drawstring, the winding end that the other end of the drawstring winds the coiling machine of first pulley group and second pulley group with being fixedly mounted at the top of pontic successively is fixedly connected, the input of the coiling machine is electrically connected with by the output end for the drive motor being fixedly mounted at the top of wire and pontic, the hanging basket body includes loading plate, servomotor is installed with the inner chamber of the loading plate, the inside of the loading plate is installed with the riser positioned at servomotor both sides.The nacelle device of the bridge construction, has reached the effect clamped to material on hanging basket body, can be practical according to the material de-regulation size on hanging basket body, facilitates the use of staff.
Description
Technical field
The utility model is related to technical field of bridge construction, specially a kind of nacelle device of bridge construction.
Background technology
Bridge construction builds the process of bridge according to design content, refers mainly to bridge Construction Technology and construction organization, construction
The content such as management and construction quality.Nacelle device is used in the construction of bridge, in Chinese Authorization Notice No. CN
Hanging basket body in a kind of nacelle device for the bridge construction write in 205205690 U can not be according to how much de-regulations of material
The size of hanging basket body, hanging basket body does not possess the effect of clamping to material, and practicality is not strong, it has not been convenient to the use of worker.
There are drive motor, drawstring, coiling machine, first pulley with the apokoinou construction in the Chinese U of Authorization Notice No. CN 205205690 herein
Group, second pulley group and steel cable.
Utility model content
(One)The technical problem of solution
In view of the shortcomings of the prior art, the utility model provides a kind of nacelle device of bridge construction, solves bridge
Hanging basket body on the nacelle device of construction can not be according to the sizes of how much de-regulation hanging basket bodies of material, hanging basket body to thing
Not the problem of material does not possess effect and the not strong practicality of clamping.
(Two)Technical scheme
To achieve the above object, the utility model provides following technical scheme:A kind of nacelle device of bridge construction, including
Pontic, the side of the pontic, which is provided with the top of hanging basket body, the pontic, is provided with first pulley group and second pulley group,
The top of the hanging basket body is fixedly connected with one end of drawstring, and the other end of the drawstring winds first pulley group and successively
The winding end of coiling machine of two assembly pulleys with being fixedly mounted at the top of pontic is fixedly connected, and the input of the coiling machine passes through wire
The output end of drive motor with being fixedly mounted at the top of pontic is electrically connected with, and the hanging basket body includes loading plate, the carrying
Servomotor is installed with the inner chamber of plate, the inside of the loading plate is installed with positioned at the perpendicular of servomotor both sides
Plate, side of the riser away from servomotor is fixedly connected with one end of extrusion spring, the other end of the extrusion spring with
One end of expansion plate is fixedly connected, and the other end of the expansion plate passes through loading plate and extends to the outside of loading plate, described to stretch
Contracting plate is installed with hook away from being installed with the top of servomotor one end at the top of clamping plate, the clamping plate, described to hang
Hook is fixedly connected with one end of drawstring, and the output shaft of the servomotor is fixedly connected with the back side of rotating wheel, the table of rotating wheel
Face is fixedly connected with one end of steel cable, and the other end of the steel cable sequentially passes through riser and extrusion spring and one end of expansion plate is consolidated
Fixed connection.
It is preferred that, the exit of the loading plate groove is connected with pulley, the surface of the expansion plate offer with
The slide rail that pulley is used cooperatively.
It is preferred that, the top and bottom of described expansion plate one end are connected with roller, the top of the loading plate inner chamber
Portion and bottom offer the moving rail that roller is used cooperatively.
It is preferred that, the two ends of the extrusion spring are installed with vertical bar.
It is preferred that, the clamping plate is provided with slipmat close to the side of servomotor.
(Three)Beneficial effect
The utility model provides a kind of nacelle device of bridge construction.Possesses following beneficial effect:
1st, the nacelle device of the bridge construction, by hanging basket body, loading plate, servomotor, riser, extrusion spring, stretches
Contracting plate, clamping plate, hook, pulley are used cooperatively, and have reached the effect clamped to material on hanging basket body, can according to hanging basket body
On material de-regulation size, it is practical, facilitate the use of staff.
2nd, the nacelle device of the bridge construction, is rotated by servomotor and drives rotating wheel to rotate, and steel cable shrinks, expansion plate
Motion, extrusion spring forced compression with the motion of expansion plate, clamping plate is with the motion of expansion plate to the thing on loading plate
Material is clamped, compact conformation, reasonable in design.
Brief description of the drawings
Fig. 1 is the profile of the utility model structure hanging basket body;
Fig. 2 is the utility model structural representation.
In figure:Bridge 1 body, 2 hanging basket bodies, 21 loading plates, 22 servomotors, 23 risers, 24 extrusion springs, 25 expansion plates,
26 clamping plates, 27 hooks, 28 pulleys, 3 drive motors, 4 drawstrings, 5 coiling machines, 6 first pulley groups, 7 second pulley groups, 8 steel cables, 9
Roller.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
As shown in Figure 1-2, the utility model provides a kind of technical scheme:A kind of nacelle device of bridge construction, including bridge
Body 1, the side of pontic 1 is provided with hanging basket body 2, and the top of pontic 1 is provided with first pulley group 6 and second pulley group 7, hanging basket
The top of body 2 is fixedly connected with one end of drawstring 4, and the other end of drawstring 4 winds first pulley group 6 and second pulley group successively
The winding end of 7 coiling machines 5 being fixedly mounted with the top of pontic 1 is fixedly connected, and the input of coiling machine 5 passes through wire and pontic 1
The output end for the drive motor 3 that top is fixedly mounted is electrically connected with, and the power supply mode of drive motor 3 is supplied by external power supply
Electricity, hanging basket body 2 includes being installed with servomotor 22, the confession of servomotor 22 in loading plate 21, the inner chamber of loading plate 21
It is electrically to be powered by external power supply, the inside of loading plate 21 is installed with the riser positioned at the both sides of servomotor 22
23, side of the riser 23 away from servomotor 22 is fixedly connected with one end of extrusion spring 24, and the two ends of extrusion spring 24 are solid
Dingan County is equipped with vertical bar, and the other end of extrusion spring 24 is fixedly connected with one end of expansion plate 25, the exit of the groove of loading plate 21
Pulley 28 is connected with, the surface of expansion plate 25 offers the slide rail used cooperatively with pulley 28, the other end of expansion plate 25
Through loading plate 21 and the outside of loading plate 21 is extended to, the top and bottom of the one end of expansion plate 25 are connected with roller 9,
The top and bottom of the inner chamber of loading plate 21 offer the moving rail that roller 9 is used cooperatively, and expansion plate 25 is away from servomotor 22
Clamping plate 26 is installed with the top of one end, clamping plate 26 is provided with slipmat, the top of clamping plate 26 close to the side of servomotor 22
Portion is installed with hook 27, and hook 27 is fixedly connected with one end of drawstring 4, the output shaft of servomotor 22 and the back of the body of rotating wheel
Face is fixedly connected, and the surface of rotating wheel is fixedly connected with one end of steel cable 8, and the other end of steel cable 8 sequentially passes through riser 23 and squeezed
Pressing spring 24 is fixedly connected with one end of expansion plate 25, by hanging basket body 2, loading plate 21, servomotor 22, riser 23, squeeze
Pressing spring 24, expansion plate 25, clamping plate 26, hook 27, pulley 28 are used cooperatively, and reached material on hanging basket body 2 is clamped
Effect, can be practical according to the material de-regulation size on hanging basket body 2, facilitate the use of staff.
It can to sum up obtain, the nacelle device of the bridge construction, pass through hanging basket body 2, loading plate 21, servomotor 22, riser
23rd, extrusion spring 24, expansion plate 25, clamping plate 26, hook 27, pulley 28 are used cooperatively, and have been reached to material on hanging basket body 2
The effect of clamping, can be practical according to the material de-regulation size on hanging basket body 2, facilitates the use of staff.
In addition, the nacelle device of the bridge construction, is rotated by servomotor 22 and drive rotating wheel to rotate, steel cable 8 shrinks,
Expansion plate 25 is moved, the forced compression with the motion of expansion plate 25 of extrusion spring 24, and clamping plate 26 is with the motion of expansion plate 25
And the material on loading plate 21 is clamped, compact conformation, it is reasonable in design.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those
Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment
Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that
Also there is other identical element in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof, it is necessary to illustrate, this article
The electric elements of middle appearance are electrically connected with extraneous main controller and 220V civil powers, and main controller can play control for computer etc.
The conventionally known equipment of system.
Claims (5)
1. a kind of nacelle device of bridge construction, including pontic(1), it is characterised in that:The pontic(1)Side be provided with and hang
Basket body(2), the pontic(1)Top be provided with first pulley group(6)With second pulley group(7), the hanging basket body(2)
Top and drawstring(4)One end be fixedly connected, the drawstring(4)The other end wind first pulley group successively(6)With second
Assembly pulley(7)With pontic(1)The coiling machine that top is fixedly mounted(5)Winding end be fixedly connected, the coiling machine(5)Input
End passes through wire and pontic(1)The drive motor that top is fixedly mounted(3)Output end be electrically connected with, the hanging basket body(2)
Including loading plate(21), the loading plate(21)Inner chamber in be installed with servomotor(22), the loading plate(21)'s
Inside is installed with positioned at servomotor(22)The riser of both sides(23), the riser(23)Away from servomotor(22)One
Side and extrusion spring(24)One end be fixedly connected, the extrusion spring(24)The other end and expansion plate(25)One end fix
Connection, the expansion plate(25)The other end pass through loading plate(21)And extend to loading plate(21)Outside, the expansion plate
(25)Away from servomotor(22)Clamping plate is installed with the top of one end(26), the clamping plate(26)Top be installed with
Hook(27), the hook(27)With drawstring(4)One end be fixedly connected, the servomotor(22)Output shaft and rotating wheel
The back side be fixedly connected, the surface of rotating wheel and steel cable(8)One end be fixedly connected, the steel cable(8)The other end wear successively
Cross riser(23)And extrusion spring(24)With expansion plate(25)One end be fixedly connected.
2. a kind of nacelle device of bridge construction according to claim 1, it is characterised in that:The loading plate(21)Groove
Exit be connected with pulley(28), the expansion plate(25)Surface offer and pulley(28)The cunning used cooperatively
Rail.
3. a kind of nacelle device of bridge construction according to claim 1, it is characterised in that:The expansion plate(25)One end
Top and bottom be connected with roller(9), the loading plate(21)The top and bottom of inner chamber offer roller(9)
The moving rail used cooperatively.
4. a kind of nacelle device of bridge construction according to claim 1, it is characterised in that:The extrusion spring(24)'s
Two ends are installed with vertical bar.
5. a kind of nacelle device of bridge construction according to claim 1, it is characterised in that:The clamping plate(26)It is close to watch
Take motor(22)Side be provided with slipmat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720187072.0U CN206512612U (en) | 2017-02-28 | 2017-02-28 | A kind of nacelle device of bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720187072.0U CN206512612U (en) | 2017-02-28 | 2017-02-28 | A kind of nacelle device of bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206512612U true CN206512612U (en) | 2017-09-22 |
Family
ID=59867853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720187072.0U Expired - Fee Related CN206512612U (en) | 2017-02-28 | 2017-02-28 | A kind of nacelle device of bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206512612U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558380A (en) * | 2017-09-28 | 2018-01-09 | 曾小真 | A kind of hanging basket for bridge construction |
CN110863439A (en) * | 2019-12-04 | 2020-03-06 | 胡妹芳 | Bridge construction that can control flexible is with hanging basket |
CN112196310A (en) * | 2020-09-25 | 2021-01-08 | 温州融宸科技有限公司 | Prefabricated assembled building support frame |
CN113021655A (en) * | 2021-03-22 | 2021-06-25 | 铜陵有色金属集团股份有限公司工程技术分公司 | Electrical ore cutting equipment |
-
2017
- 2017-02-28 CN CN201720187072.0U patent/CN206512612U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558380A (en) * | 2017-09-28 | 2018-01-09 | 曾小真 | A kind of hanging basket for bridge construction |
CN107558380B (en) * | 2017-09-28 | 2019-02-05 | 山东瑞鸿重工机械有限公司 | A kind of hanging basket for bridge construction |
CN110863439A (en) * | 2019-12-04 | 2020-03-06 | 胡妹芳 | Bridge construction that can control flexible is with hanging basket |
CN112196310A (en) * | 2020-09-25 | 2021-01-08 | 温州融宸科技有限公司 | Prefabricated assembled building support frame |
CN113021655A (en) * | 2021-03-22 | 2021-06-25 | 铜陵有色金属集团股份有限公司工程技术分公司 | Electrical ore cutting equipment |
CN113021655B (en) * | 2021-03-22 | 2024-08-27 | 铜陵有色金属集团股份有限公司工程技术分公司 | Ore electrical cutting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206512612U (en) | A kind of nacelle device of bridge construction | |
CN206622869U (en) | A kind of component of machine process equipment | |
CN111572264A (en) | Wall paper device of laminating fast | |
CN209536678U (en) | Straightening device is used in a kind of processing of cable | |
CN207202168U (en) | A kind of clothing cloth clamping device | |
CN206912887U (en) | A kind of sander easy to remove | |
CN206536937U (en) | A kind of adjustable pressing roll mechanism of spacing | |
CN205260745U (en) | Linear guide's belt tightener | |
CN208468516U (en) | A kind of plastic material Special Fixture for Machining | |
CN206581962U (en) | A kind of constructing tunnel top shield structure | |
CN206590676U (en) | A kind of copper cash wrap-up suitable for different model | |
CN206254419U (en) | Mould automatic turning device | |
CN206369445U (en) | A kind of sterilized drying box for being used to produce veterinary drug | |
CN206712431U (en) | Electric power cable bearer is used in a kind of tunnel | |
CN206327986U (en) | A kind of telpher | |
CN210795550U (en) | Hoisting device for boiler equipment installation | |
CN214244844U (en) | Tabouret for embroidery machine | |
CN207128304U (en) | A kind of sanitaryware production line punching block pressue device | |
CN213315931U (en) | Wood board gluing device for wood furniture production | |
CN207524066U (en) | A kind of heat-sealing structure of vacuum packing machine | |
CN207098458U (en) | A kind of pay off rack for being applicable different size cable | |
CN206717653U (en) | A kind of edging device based on timber machining type | |
CN206448179U (en) | A kind of nacelle device of bridge construction | |
CN207295041U (en) | A kind of tension regulator of filter cloth production special warping machine | |
CN206364065U (en) | A kind of trimmer of automation battery box hat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170922 Termination date: 20180228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |